The daily report from the godown incharge provides information about operations at the PDS godown on 01-12-2023. It details the timing of the entry and exit of trucks, the number of trucks that made single and multiple trips, and any issues encountered with the FCI server, NIC server, or at the FCI and DSCSC levels. The combined lifting was for PDS supplies from the Ghevra and Narela godowns.
The daily report from the godown incharge provides information about operations at the PDS godown on 01-12-2023. It details the timing of the entry and exit of trucks, the number of trucks that made single and multiple trips, and any issues encountered with the FCI server, NIC server, or at the FCI and DSCSC levels. The combined lifting was for PDS supplies from the Ghevra and Narela godowns.
The daily report from the godown incharge provides information about operations at the PDS godown on 01-12-2023. It details the timing of the entry and exit of trucks, the number of trucks that made single and multiple trips, and any issues encountered with the FCI server, NIC server, or at the FCI and DSCSC levels. The combined lifting was for PDS supplies from the Ghevra and Narela godowns.
The daily report from the godown incharge provides information about operations at the PDS godown on 01-12-2023. It details the timing of the entry and exit of trucks, the number of trucks that made single and multiple trips, and any issues encountered with the FCI server, NIC server, or at the FCI and DSCSC levels. The combined lifting was for PDS supplies from the Ghevra and Narela godowns.
AAPURTI BHAWAN, ARAM BAGH, NEW DELHI-5 PERFORMA FOR DAILY REPORTING BY INCHARGE POSTED AT PDS GODOWN Date of Report:-...01-12-2023.... S. NO. PARTICULARS REPORT/REMARKS 1. Name of PDS Godown 2. GHEVRA/NARELA Time of entry of first PDS truck in godown 09:00 A.M. 3 Time of starting of 09:45 A.M. 4 weighbridge Time of exit of first PDS truck from Godown 11:10A.M. 5 Time of entry of last PDS truck in godown 04:00 P.M. 6. Any Problem faced due to FCI Server 1. Any Problem faced due to NIC Server 8. How many PDS trucks taken 07 only single trip How many PDS trucks taken 20 multiple trips 10. Issues at FCI level
11. Issues at DSCSC level
12. Suggestio ns, if any
COMBINED LIFTING FOR PDS GHEVRA (NARELA AND GHEVRA).