Professional Documents
Culture Documents
Weekly Progress BM-1 Pckg#2 Cut of Date 7 Apr 2022
Weekly Progress BM-1 Pckg#2 Cut of Date 7 Apr 2022
Rev. 0 Rev. 00
Next
Last Issue : This Issue : 7/Apr/22
Rev. 0 Rev. 00
Co ntacto r Lo go
Weightage Level
12/May
19/May
26/May
31/Mar
10/Nov
17/Nov
24/Nov
11/Aug
18/Aug
25/Aug
15/Dec
22/Dec
29/Dec
15/Sep
22/Sep
29/Sep
14/Apr
21/Apr
28/Apr
16/Feb
23/Feb
13/Oct
20/Oct
27/Oct
16/Jun
23/Jun
30/Jun
12/Jan
19/Jan
26/Jan
5/May
No. Description Start Finish
3/Nov
14/Jul
21/Jul
28/Jul
4/Aug
1/Dec
8/Dec
1/Sep
8/Sep
7/Apr
2/Feb
9/Feb
6/Oct
2/Jun
9/Jun
5/Jan
7/Jul
1
1 BM-1 Pckg#2 30/Dec/99 100% Cum. Plan 0.0% 0.6% 1.5% 2.5% 3.5% 4.5% 5.6% 6.9% 8.9% 10.9% 12.9% 15.1% 17.4% 19.8% 21.9% 24.2% 26.3% 28.3% 30.6% 32.8% 35.3% 38.3% 41.3% 44.4% 46.7% 49.0% 51.4% 53.7% 56.7% 60.2% 64.0% 67.8% 71.8% 74.5% 76.9% 79.2% 81.5% 83.5% 85.4% 87.4% 89.7% 92.1% 93.8% 95.6% 97.3% 98.6% 99.7% 100.0%
30/Dec/99 Cum. Actual 0.0% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7%
100% Plan 0.0% 0.6% 0.9% 1.0% 1.0% 1.0% 1.1% 1.3% 2.0% 2.0% 2.0% 2.3% 2.3% 2.4% 2.1% 2.3% 2.1% 2.1% 2.2% 2.2% 2.5% 3.0% 3.0% 3.0% 2.3% 2.3% 2.3% 2.3% 3.0% 3.5% 3.8% 3.8% 4.0% 2.7% 2.3% 2.3% 2.3% 1.9% 1.9% 1.9% 2.4% 2.4% 1.7% 1.7% 1.7% 1.3% 1.1% 0.3%
Actual 0.0% 0.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Cum. Plan 0.0% 0.6% 1.5% 2.5% 3.5% 4.5% 5.6% 6.9% 8.9% 10.9% 12.9% 15.1% 17.4% 19.8% 21.9% 24.2% 26.3% 28.3% 30.6% 32.8% 35.3% 38.3% 41.3% 44.4% 46.7% 49.0% 51.4% 53.7% 56.7% 60.2% 64.0% 67.8% 71.8% 74.5% 76.9% 79.2% 81.5% 83.5% 85.4% 87.4% 89.7% 92.1% 93.8% 95.6% 97.3% 98.6% 99.7% 100.0%
Cum. Actual 0.0% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7%
Deviation 0.0% 0.1% -0.8% -1.8% -2.8% -3.8% -4.9% -6.1% -8.1% -10.1% -12.2% -14.4% -16.7% -19.1% -21.2% -23.4% -25.5% -27.6% -29.8% -32.1% -34.5% -37.6% -40.6% -43.6% -46.0% -48.3% -50.6% -53.0% -56.0% -59.5% -63.3% -67.1% -71.1% -73.8% -76.1% -78.5% -80.8% -82.7% -84.7% -86.6% -89.0% -91.4% -93.1% -94.8% -96.6% -97.9% -99.0% -99.3%
Contactor Logo
4.3% 95.0%
85.0%
3.8%
75.0%
3.3%
65.0%
2.8%
PERIOD PROGRESS
CUMULATIVE
55.0%
2.3%
45.0%
1.8%
35.0%
1.3%
25.0%
Actual 0.7%
0.3% 5.0%
Last Issue : This Issue : 7/Apr/22
Rev. 0 Rev. 00
Co ntacto r Lo go
All Data in Red to be updated by
PROJECT WEEKLY PROGRESS - (BM-1) Contractor *Weightage to be defined by contractor
Cut of Date 07-Apr-22 Percentage Wise
Quantity of Works 2022
Cumulative
12/May
19/May
26/May
Weightage
Weightage
31/Mar
No. Description Start Finish
11/Aug
18/Aug
25/Aug
15/Sep
22/Sep
29/Sep
14/Apr
21/Apr
28/Apr
13/Oct
16/Jun
23/Jun
30/Jun
5/May
4/Aug
14/Jul
21/Jul
28/Jul
1/Sep
8/Sep
7/Apr
6/Oct
2/Jun
9/Jun
Level 1
Level 2
7/Jul
UoM Total This Week up to this
Week
1 PIPING WORK Plan 1/Apr/22 30/Dec/99 Dia.Inch 140,000.00 812.28 812.28 50% 100% Plan 0.0% 0.5% 1.0% 1.2% 1.2% 1.2% 1.4% 1.7% 3.0% 2.9% 2.9% 2.9% 2.9% 3.1% 2.5% 2.5% 2.0% 2.0% 2.0% 2.0% 2.5% 3.4% 3.4% 3.4% 2.0% 2.0% 2.0% 2.0% 2.0%
Actual 31/Mar/22 30/Dec/99 0.00 0.00 Actual 0.0% 1.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Fabrication CS Plan Dia.Inch 22,205.09 0.00 24% Plan 0.0% 0.0% 2.3% 2.3% 2.3% 1.7% 1.7% 1.7% 3.4% 3.4% 3.4% 3.4% 3.4% 3.4% 3.4% 3.4% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7%
Actual 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Erection CS Plan Dia.Inch 9,516.47 0.00 10% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8%
Actual 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Fabrication SS Plan 1/Apr/22 Dia.Inch 75,794.91 812.28 812.28 46% Plan 0.0% 1.1% 1.1% 1.4% 1.5% 1.7% 1.1% 1.9% 3.4% 3.4% 3.4% 3.4% 3.4% 3.4% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 3.0% 4.9% 4.9% 4.9% 1.9% 1.9% 1.9% 1.9% 1.9%
Actual 31/Mar/22 1,038.00 1,038.00 Actual 0.0% 3.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Erection SS Plan Dia.Inch 32,483.53 0.00 20% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 2.4% 2.9% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4%
Actual 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
2 SECONDARY PIPE SUPPORT Plan 30/Dec/99 30/Dec/99 Ton 214.89 4.18 4.18 20% 100% Plan 0.0% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7%
Actual 30/Dec/99 30/Dec/99 0.00 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Fabrication Secondary Pipe Support Plan Ton 150.42 4.18 4.18 70% Plan 0.0% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8%
Actual 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Erection Secondary Pipe Support Plan Ton 64.47 0.00 0.00 30% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6%
Actual 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
3 STEEL STRUCTURE Plan 30/Dec/99 30/Dec/99 Ton 10.45 0.00 0.00 5% 100% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.0%
Actual 30/Dec/99 30/Dec/99 0.00 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Fabrication Steel Structure (Carbon Plan Ton 7.31 0.00 0.00 70% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.0%
Steel)
Actual 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Erection Steel Structure Plan Ton 3.14 0.00 0.00 30% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Actual 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
4 HOT INSULATION Plan 30/Dec/99 30/Dec/99 M2 5,390.78 0 0 15% 100% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.2% 0.2% 1.9% 1.9% 1.9% 1.9% 1.9% 2.0% 2.0% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9%
Actual 30/Dec/99 30/Dec/99 0 0 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Fabrication Piping Insulation Plan M2 335.34 0 0 7% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7%
Actual 0 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Installation Piping Insulation Plan M2 143.72 0 3% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1%
Actual 0 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Fabrication Equipment and Tank InsulatiPlan M2 3,438.20 0 0 63% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8%
Actual 0 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Installation Equipment and Tank InsulatiPlan M2 1,473.52 0 27% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3%
Actual 0 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
5 COLD INSULATION Plan 30/Dec/99 30/Dec/99 M2 2,118.21 0.00 0.00 10% 100% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.2% 2.2% 2.2% 2.2% 2.2% 2.2% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3%
Actual 30/Dec/99 30/Dec/99 0.00 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Fabrication Piping Insulation Plan M2 2,118.21 0.00 0.00 70% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1%
Actual 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Installation Piping Insulation Plan M2 907.80 0.00 30% Plan 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7%
Actual 0.00 Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
100% Plan 0.0% 0.6% 0.9% 1.0% 1.0% 1.0% 1.1% 1.3% 2.0% 2.0% 2.0% 2.3% 2.3% 2.4% 2.1% 2.3% 2.1% 2.1% 2.2% 2.2% 2.5% 3.0% 3.0% 3.0% 2.3% 2.3% 2.3% 2.3% 3.0%
Actual 0.0% 0.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Cum. Plan 0.0% 0.6% 1.5% 2.5% 3.5% 4.5% 5.6% 6.9% 8.9% 10.9% 12.9% 15.1% 17.4% 19.8% 21.9% 24.2% 26.3% 28.3% 30.6% 32.8% 35.3% 38.3% 41.3% 44.4% 46.7% 49.0% 51.4% 53.7% 56.7%
Cum. Actual 0.0% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7%
Deviation 0.0% 0.1% -0.8% -1.8% -2.8% -3.8% -4.9% -6.1% -8.1% -10.1% -12.2% -14.4% -16.7% -19.1% -21.2% -23.4% -25.5% -27.6% -29.8% -32.1% -34.5% -37.6% -40.6% -43.6% -46.0% -48.3% -50.6% -53.0% -56.0%
Quantity Wise
2 2022 2021
31/Mar
10/Nov
17/Nov
24/Nov
15/Dec
22/Dec
29/Dec
16/Feb
23/Feb
20/Oct
27/Oct
12/Jan
19/Jan
26/Jan
TOTAL
TOTAL
3/Nov
1/Dec
8/Dec
2/Feb
9/Feb
5/Jan
1
2
2.9% 2.9% 2.9% 3.2% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.9% 2.9% 1.6% 1.6% 1.6% 0.8% 0.8% 0.0% 100.0% 3 0.00 140,000.00
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.5% 4 0.00 1,038.00
5.1% 5.1% 5.1% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7% 5.1% 5.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 5 0.00 22,205.09
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6 -
2.8% 2.8% 2.8% 7.4% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 0.0% 100.0% 7 9,516.47
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8 -
1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 0.0% 0.0% 0.0% 99.8% 9 0.00 75,632.88
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.2% 10 1,038.00
2.4% 2.4% 2.4% 5.7% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 0.0% 100.5% 11 32,645.56
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 12 -
13
2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.0% 0.0% 100.0% 14 0.00 214.89
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15 0.00 -
2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 16 150.42
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17 -
2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 2.6% 0.0% 0.0% 100.0% 18 0.00 64.47
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19 -
20
14.0% 21.5% 21.5% 21.5% 7.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 21 0.00 10.45
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22 0.00 -
20.0% 20.0% 20.0% 20.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 23 0.00 7.31
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 24 -
0.0% 25.0% 25.0% 25.0% 25.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 25 0.00 3.14
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 26 -
27
2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.7% 1.0% 100.0% 28 0 1,808.86
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29 0 -
2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 2.7% 0.0% 0.0% 100.0% 30 0 335.34
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31 -
3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 100.0% 32 143.72
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33 -
2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 0.0% 100.0% 34 0 3,438.20
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35 -
3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 100.0% 36 1,473.52
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 37 -
38
3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 1.1% 100.0% 39 0.00 3,026.01
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40 0.00 -
3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 0.0% 100.0% 41 0.00 2,118.21
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 42 -
3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 3.7% 100.0% 43 907.80
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44 -
45
3.5% 3.8% 3.8% 4.0% 2.7% 2.3% 2.3% 2.3% 1.9% 1.9% 1.9% 2.4% 2.4% 1.7% 1.7% 1.7% 1.3% 1.1% 0.3% 100.0% 46
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.7% 47
60.2% 64.0% 67.8% 71.8% 74.5% 76.9% 79.2% 81.5% 83.5% 85.4% 87.4% 89.7% 92.1% 93.8% 95.6% 97.3% 98.6% 99.7% 100.0% 48
0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 0.7% 49
-59.5% -63.3% -67.1% -71.1% -73.8% -76.1% -78.5% -80.8% -82.7% -84.7% -86.6% -89.0% -91.4% -93.1% -94.8% -96.6% -97.9% -99.0% -99.3% 50
RESOURCE LOADING STATUS
12/May
19/May
26/May
31/Mar
14/Apr
21/Apr
28/Apr
16/Jun
23/Jun
30/Jun
5/May
7/Apr
2/Jun
9/Jun
7/Jul
No Description
MAN POWER
A. PLAN 54 54 54 54 54 54 - - - - - - - - -
A.1 Indirect 23 23 23 23 23 23 - - - - - - - - -
1 President Director 1 1 1 1 1 1
2 Project Director 1 1 1 1 1 1
3 Superitendent 1 1 1 1 1 1
4 SPV Welder 1 1 1 1 1 1
5 SPV Piping 1 1 1 1 1 1
6 SPV Structure 1 1 1 1 1 1
7 Asst. SPV 1 1 1 1 1 1
8 Piping Engineer 1 1 1 1 1 1
9 Drafter 1 1 1 1 1 1
10 Spv. Material 1 1 1 1 1 1
11 Spv. Logistic 1 1 1 1 1 1
12 Procurement HO 1 1 1 1 1 1
13 HRD Coordinator 1 1 1 1 1 1
14 Project Control Coordinator 1 1 1 1 1 1
15 QC Coordinator 1 1 1 1 1 1
16 Staff HRD 1 1 1 1 1 1
17 Admin HRD 1 1 1 1 1 1
18 HSE Officer 2 2 2 2 2 2
19 Document Control 1 1 1 1 1 1
20 Checker 1 1 1 1 1 1
21 Driver 2 2 2 2 2 2
A.2 Direct 31 31 31 31 31 31 - - - - - - - - -
1 Foreman Fitter 1 1 1 1 1 1
2 Fitter 10 10 10 10 10 10
3 Welder 10 10 10 10 10 10
4 Helper 5 5 5 5 5 5
5 Rigger 1 1 1 1 1 1
6 Operator Crane 1 1 1 1 1 1
7 Operator Trailer 1 1 1 1 1 1
8 Opertor Foco Truck 1 1 1 1 1 1
9 Material Man 1 1 1 1 1 1
B. ACTUAL 50 48 - - - - - - - - - - - - -
B.1 Indirect 18 18 - - - - - - - - - - - - -
1 Superitendent 1 1
2 SPV Welder 1 1
3 SPV Piping 1 1
4 SPV Structure - -
5 Asst. SPV 1 1
6 Piping Engineer 1 1
7 Drafter 1 1
8 Spv. Material 1 1
9 Spv. Logistic 1 1
10 Procurement HO 1 1
11 HRD Coordinator 1 1
12 Project Control Coordinator 1 1
13 QC Coordinator 1 1
14 Staff HRD 1 1
15 Admin HRD 1 1
16 HSE Officer 2 2
17 Document Control 1 1
18 Checker 1 1
19 Driver 2 2
B.2 Direct 32 30 - - - - - - - - - - - - -
1 Foreman Fitter -
2 Fitter 10 10
3 Welder 9 9
4 Helper 8 6
5 Rigger 1 1
6 Operator Crane 1 1
7 Operator Trailer 1 1
8 Opertor Foco Truck 1 1
9 Material Man 1 1
2 EQUIPMENT
1.1 PLAN 7 8
Foco Truck/TMC 2 2
Triller 1 1
Crane 25T 1 1
Pick Up 1 1
Light Vehicle 1 2
Bus 1 1
1.2 ACTUAL 6 7
Foco Truck/TMC 1 1 - - - - - - - - - - - - -
Triller 1 1 - - - - - - - - - - - - -
Crane 25T 1 1 - - - - - - - - - - - - -
Pick Up 1 1
Light Vehicle 1 2
Bus 1 1
14/Jul
-
-
-
-
-
-
21/Jul
-
-
-
-
-
-
28/Jul
-
-
-
-
-
-
4/Aug
-
-
-
-
-
-
11/Aug
-
-
-
-
-
-
18/Aug
-
-
-
-
-
-
25/Aug
-
-
-
-
-
-
1/Sep
-
-
-
-
-
-
-
-
-
-
-
-
8/Sep
-
-
-
-
-
-
15/Sep
-
-
-
-
-
-
22/Sep
-
-
-
-
-
-
29/Sep
6/Oct
13/Oct
20/Oct
27/Oct
3/Nov
10/Nov
17/Nov
24/Nov
1/Dec
8/Dec
15/Dec
22/Dec
29/Dec
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
5/Jan
12/Jan
19/Jan
26/Jan
2/Feb
9/Feb
16/Feb
-
-
-
-
23/Feb
1
1
1
1
1
1
1
1
8
8
Remark
1
-
-
1
-
-
-
WEEKLY WEATHER REPORT
Plan Work 8.0 8.0 8.0 8.0 8.0 8.0 8.0 56.0 7.0
Actual Work 9.0 9.0 12.0 9.0 9.0 9.0 9.0 66.0 7.0
Noted :
1. Plan work : base on working day on contract
2. Actual work : base on actual working day range on dur contract
DOCUMENTATION
22-Mar-22 27-Mar-22 Pipe SS (PK021), ASTM A312 Gr TP 316L, 310-010, 200mm, NP/Sch 10H, OD 219 mm, Thk 2,6 mm x 6 mtr P1B01_DOS_MIR0047 2203-5770 btg 8
22-Mar-22 27-Mar-22 Pipe SS (PK021), ASTM A312 Gr TP 316L, 310-010, 200mm, NP/Sch 10H, OD 219 mm, Thk 2,6 mm x 6 mtr P1B01_DOS_MIR0047 2203-5770 btg 35
22-Mar-22 27-Mar-22 Pipe SS (PK021), ASTM A312 Gr TP 316L, 310-010, 200mm, NPS 10, Sch 10H, OD-metric 273 mm, Thk 2,6 mm x 6 mtr P1B01_DOS_MIR0047 2203-5770 btg 20
22-Mar-22 27-Mar-22 Collar Pipe (R0064), SS 316 L, 314-013, Class 150, DN 200, NPS 8 P1B01_DOS_MIR0047 2203-5220 ea 13
22-Mar-22 27-Mar-22 Collar Pipe (R0064), SS 316 L, 314-013, Class 150, DN 200, NPS 8 P1B01_DOS_MIR0047 2203-5220 ea 3
22-Mar-22 27-Mar-22 Collar Pipe (R0064), SS 316 L, 314-013, Class 150, DN 250, NPS 10 P1B01_DOS_MIR0047 2203-5220 ea 6
22-Mar-22 27-Mar-22 Elbow 45 deg, LR, ASTM A403, Gr WP 316L, 311-010, ASME B16.9, Sch 10H, 8.626 in, Thk 3.2 mm P1B01_DOS_MIR0047 2203-5770 ea 2
22-Mar-22 27-Mar-22 Elbow 45 deg, LR, ASTM A403, Gr WP 316L, 311-010, R 1.5D, 250 mm, OD 273 mm, Sch 10H, Thk 4 mm P1B01_DOS_MIR0047 2203-5770 ea 11
22-Mar-22 27-Mar-22 Elbow 90 deg, LR, ASTM A403, Gr WP 316L, 311-010, ASME B16.9, OD 219.1, Sch 10H, 8.626 in, Thk 3.2 mm P1B01_DOS_MIR0047 2203-5770 ea 35
22-Mar-22 27-Mar-22 Elbow 90 deg, LR, ASTM A403, Gr WP 316L, 311-010, ASME B16.9, OD 219.1, Sch 10H, 8.626 in, Thk 4 mm P1B01_DOS_MIR0047 2203-5770 ea 14
22-Mar-22 27-Mar-22 Reducer Conc, 200 x 150 mm, ASTM A403, Gr WP 316L, 312-010, ASME B16.9, OD 219.1, Sch 10H, Thk2.6 mm P1B01_DOS_MIR0047 2203-5770 ea 2
22-Mar-22 27-Mar-22 Reducer Conc, 250 x 200 mm, ASTM A403, Gr WP 316L, 312-010, ASME B16.9, OD 219.1, Sch 10H, Thk2.6 mm P1B01_DOS_MIR0047 2203-5770 ea 1
MATERIALS HAULING FROM LOGISTIC RAPP
A LAYDOWN/GODOWN - PROJECT BM 1 - PACKAGE II
LOCATION ID VEHICLES
FROM WHSE RAPP TO VEHICLE CARRIED