PEMRAKARSA : PROYEK : DIGAMBAR DIRENCANAKAN DISETUJUI DIKETAHUI Judul Gambar : No. Gambar : REV. TANGGAL KETERANGAN TTD.

GAMBAR TYPICAL TIMBUNAN HW-D2-


G:\_dariRizal\Fix\SMJ.jpg DATA TANAH DB 04
PRA-STUDY KELAYAKAN STA 4+150 sd 11+450 Skala :
HARBOUR TOLL ROAD
KONSULTAN : SEMARANG SEKSI No. TANGGAL
E:\nitip udos\VIEW PLAN PROFILE JU FULL - Standard\KOP\Logo_PD.jpg DRAFTMAN ENGINEER TEAM LEADER PEMRAKARSA

3.00 3.00
16.00 26.00 4.00 24.00 4.00 10.00 25.90 10.00 4.00 24.00 4.00 26.00 16.00

Vacuum System (from top to bot) :


- Nonwoven Geotextile
- Geomembrane
Solid Soding CL Woven Geotextile PET 100 - Nonwoven Geotextile
FG
- PHD
1:2 5.00
Counterweight Geomembrane Lock
Vacuum Pump 0.50m Clean Sand
(Drainage Layer) Soil Backfill until Top Subgrade 1:2 2.00
1:2 Elev. During Vacuum Preloading 1:2 2.00
0.0 MSL 1.00
1:4 1:4 3.00
-3.0 Seabed

PVD Spacing 1m
Depth TBD after CPT

167.80