WTG Commissioning Concern - 2023.08.29
WTG Commissioning Concern - 2023.08.29
7 MW)
10
11
Urgent
A. INTERNAL ROAD
>> PCC to move Piling material for Crane 150 Tons Parking
1 PCC- Subcon JETTY 16-Jul-21 - Piling material need to move for Crane 150 Tons ( TAGI) location TBC Mr. Khoi Mr. Xe
-> PCC confirm the date./ ( Tagi to inform PCC to move befor 5days )
- Leveling elevation between jetty and main road suface all need to
2 PCC- Subcon JETTY 16-Jul-21 >> PCC to make slope below 3% TBC Mr. Khoi Mr. Xe
make sam level and logitudinal slope require below 3%
- Main yard is very bad condition with serious and sinking & quite
defined Space. ( Storage layout must be stored at lease 3 full sets of
3 PCC- Subcon Main Storage 16-Jul-21 >> PCC to provide Crane & Lifting Plan for unloading EQ TBC Mr. Khoi Mr. Xe
WTG)
- 02 Crawle Crane 100Tons ) - Lifting Radius
B. SUBMIT DOCUMENT
PCC- SINOTRANS - Crane 150 Tons ( 2 Pcs) document to submit ( Lifting Plan ,
1 JETTY 16-Jul-21 -> Tagi to provide Certificate of Crane TBC Mr. Khoi
TAGI Certificate ,,, ) before Start work
PCC- SINOTRANS - Tagi to Provide Lifting duration time for each EQ / Each Barge - > To make detail schedule ( Date / Barge / Time offloading for each
2 JETTY 16-Jul-21 TBC Mr. Khoi
TAGI ( Detail schedule for Duration lifting ) Barge )
4 PCC-PCShanxi WTG3-Main Storage 16-Jul-21 - PCC will Provide Truck Crane 500 Tons Certificate - Crane Certificate TBC Mr. Khoi
5 PCC ALL 16-Jul-21 - Delivery detail list ( Invoice No : THPH -001 to 005 ) - Parking List ??/ TBC Mr. Khoi
6 PCC ALL 16-Jul-21 - MS Revise -> PCC Have Submited MS Rev : B on 20/Jul TBC Mr. Khoi
7 PCC ALL 16-Jul-21 - TE request to PCC to submit ITP of WTG inspection TBC Mr. Khoi