NOVEMBER - 2023
J02 – KAFD
Title: Fire Risk Assessment
Document Reference No: KAFD-A1-J02-MCC-HSE-FRA-310-0025
KAFD-A1-J02-MCC-HSE-FRM-0013-Rv01 0|Page
CONTENTS
1 Introduction 2
4 Temporary Electrics 5
7 Smoking Areas 7
10 Means of Access/Egress 9
11 Critical List 10
12 Recommendations 10
13 Conclusions 11
1|Page
Objective:
The Risk Assessment was carried out to identify operations, behavioral aspects of the individuals, tasks, and
processes which may lead to a foreseeable cause for a fire incident that may well harm the Employees and/or
others, and damage to property and Environment. Further this balance out the adequacy of the existing control
measures to prevent the same or minimize the consequence/ impact when occurred.
1. INTRODUCTION
Parcel 3.10 is a high-rise building under construction within the premises of King Abdullah Financial District.
2|Page
b. Fire Equipment System
B. Actions Proposed
➢ Ensure that Fire Hose reel water must not be used in any circumstances except for firefighting.
➢ Ensure that Fire Hose reel water must reachable in all floor areas.
➢ Ensure That Fire Hose Reel Water must not be used for MEP Pressure testing or other construction
activities.
➢ Misuse of Fire Hose Reels will result in a penalty and removal from the site.
3|Page
Total Condition (ok / Damage /Missing/)
No. of Location Audibility Switch Alternative Air Horn Regular Remarks
Electric to all (on / off) power (Number inspection
Alarm floor area Location back up &
Location)
On
every
B-04, B-02, G.F,02,04,06,8, Sound floor, No,
30 Reachable
10,12,14,16,18,20,22,24,26,28,29 we Manual
All level
have Alarms N/A
call are NO YES
points provided
at stairs
R2 &
R1.
2 Electric Alarm-
Provided a
centralized
emergency Siren.
4|Page
3. MATERIALS STORAGE:
Mechanical, Electrical & Civil Stores
➢ Monitoring and Conducting Housekeeping on a daily basis.
➢ Informative Signage displayed nearby the store to aware workers/ Staff regarding the emergency
procedure.
➢ The checklist is provided to ensure and monitor the availability of material.
➢ Provided Authorized person details on notice board nearby store
➢ Fire points and fire hose rill has been increased in the store area
➢ Refreshment training conducted for storekeepers.
Location Topic & Comment Good Observation Photo Bad Observation photo
Mechanical Store,
L-8 materials are stored in
Carton boxes, wooden
boxes
5|Page
3. Temporary storage area of hazardous substances (flammable & combustible chemicals)
➢ SDS (Safety Data Sheet) and COSHH (Control of Chemicals Hazardous to Health) are to be displayed near
each storage area.
➢ Maintaining a register of hazardous chemicals.
➢ Hazardous chemicals are stored in chemical stores and labeled, all stored according to t its SDS.
➢ Segregate incompatible hazardous chemicals.
➢ Prevent storing chemical materials out of the chemical store.
➢ Reducing the number of chemical materials in the site with coordination with procurements and site
engineers.
➢ refreshment training conducted for the storekeepers and workers.
➢ Bund walls, spill kits, proper warning signs, correct Fire Extinguishers, and exclusion zones are identified.
➢ Inventory for chemicals has been placed in chemical storage.
➢ Chemical storage is being monitored by HSE on a daily basis.
➢ Fire Extinguishers like Foam, Co2, and Dry powder have been provided.
➢ A smoke detector has been installed.
Location Topic & Comment Good Observation Photo Bad Observation photo
In Chemical Store, the
B1 material is arranged on
wooden pallets
Actions Proposed
➢ Increase monitoring process for the chemical's activities.
6|Page
4. TEMPORARY ELECTRIC
➢ Site temporary electrical cables are properly elevated to avoid getting damaged.
➢ Record regular inspections of electrical power tools and cables with color coding
➢ Contact details are provided on DB.
➢ Distribution Boxes were noticed with the provision of Earth Leakage Circuit Breakers which in case fire
and short circuit automatically trip off.
Location Topic & Comment Good Observation Photo Bad Observation photo
Cable
Management-
Proper cable
L-9 management
found
Electric DB&
extension with
L-28.5 emergency
contact number
Actions Proposed.
➢ The site electrical team must inspect all temporary electrical power tools/equipment and cables on a
regular basis. A record of regular inspections must be maintained.
➢ All electrical cables must not be put down on the ground to prevent trip hazards. Hang up properly with
adequate and stable support.
➢ Proper sleeving to be used when making the connection of two cords.
➢ All Power Distribution Boxes must be locked and the contact number of the concerned electrician to be
displayed.
7|Page
Locati Topic Good Observation Photo Bad Observation photo
on &
Comm
ent
All
flo Housek
ors ee
ping
Actions Proposed
➢ All combustible materials must be removed.
➢ Construction Team to take Ownership of the Housekeeping of the Parcel.
➢ Proper segregation and stacking of usable and non-usable materials to be done.
➢ Conducting housekeeping and monitoring housekeeping on a daily basis.
Actions Proposed
➢ The area where hot work is done must be clear from any combustible materials. If cannot be achieved
proper screening or Fire-retardant material to be used to avoid any sparks from making contact with
the same.
➢ Fire extinguisher, water, and fire blanket (if necessary) must be available all the time during hot work.
8|Page
➢ Stand by- fire watcher must be available, if necessary. Provided wherever necessary.
➢ Operators must use appropriate Personal Protective Equipment (PPE) specified for the job.
➢ Only trained welders to be assigned for welding work. Still no compliance.
➢ Instruct to supplier provide a cap while delivering any kind of cylinder at site.
7. SMOKING AREAS
➢ One designated Smoking area at Level GF was found well maintained.
➢ Level GF Smoking Areas were provided with Fire point with an adequate number of Fire extinguishers
on standby.
➢ A few Cigarette buds were found discarded on the floor external to the smoking areas indicating some
do not follow the smoking regulation.
Location Topic & Comment Good Observation Photo Bad Observation photo
SMOKING AREA-
Only one Smoking Area
provided at Level G.F. and all
Smoking points removed from
upper floor & basement.
L- gf
Smoking provided outside in
open area side with Smoking
Box and Fire Point.
Actions Proposed
➢ Ensure strict implementation of the No Smoking Policy outside the designated Smoking Areas.
➢ Smoking violators will be disciplined. A penalty will be imposed on violators & terminated from the site.
9|Page
Location Topic & Comment Good Observation Photo Bad Observation photo
Actions Proposed.
9. FIRE DRILLS
➢ Full Parcel drill is being carried out periodically according to the action plan. After every 3 months.
Location Topic & Comment Good Observation Photo Bad Observation photo
Assembly Point -
Gf-310 Assembly Point
Properly arranged
out of parcel.
18 Siren/Air Horn
10 | P a g e
All Level Emergency Light
GF Ambulance
Actions Proposed
➢ Regular awareness is to be provided to all workers.
➢ Informative signages of the Fire warden have been placed at different locations of the site.
➢ Monitoring Ambulances on a daily basis.
11 | P a g e
Actions Proposed
12. CONCLUSION
Based on the findings the implementation of the fire safety precautions is acceptable, more efforts
are required to maintain and develop the system.
S. Implementation
Recommendations Action by Status Comments
# Date/
Discharged fire extinguisher must be PM / HSE All the time Closed Regular
1 replaced immediately and kept in Inspection
designated areas.
Ensure that Fire Hose reel water must PM / All All the time Closed Regular
2
not be used in any circumstances except inspection
for firefighting.
Bund walls, spill kits, proper warning PM All the time Closed Regular
signs, correct Fire Extinguishers, Inspection
3 exclusion zones to be identified.
Refresher Training to be conducted for PM / HSE Weekly Closed Regular follow
all concerned operatives and up
storekeepers for safe usage, storage of
4
materials and firefighting.
Site electrical team must inspect all PM / Weekly Closed Regular
temporary electrical power tools/ Mobilization inspection Inspection
5 equipment’s and cable on regular basis. on going
A record of regular inspection must be
maintained & Did Color coding system
Site electrical supervisor must adopt PM / All the time Closed Training for
log/tag out system on all electrical Mobilization supervisor
6 maintenance and repairs.
All electrical cable must not be put down PM / Immediately Closed Regular
on the ground to prevent trip hazard. Mobilization Inspection
7 Hang up properly with adequate and
stable support.
Proper sleeving to be used when made PM / All the time Open Regular
8 connection of two cords. Mobilization inspection
12 | P a g e
9
Correct Industrial sockets to be used. PM / Immediately Closed Regular
Mobilization Inspection
All Power Distribution Boxes must be locked PM / Immediately Closed Regular
10
and contact number of concerned Mobilization Inspection
electricians to be displayed
Permanent Housekeeping Team to be PM On going Closed Arranged
lead and supervised by a Foreman that
can ensure regular housekeeping.
11
Proper segregation and stacking of PM All the time Open Pending
12
usable and non-usable materials to be
done.
Area where hot work is done must be PM Closed Closed Materials to be
clear from any combustible materials. If made available
cannot be achieved proper screening or
13 Fire-retardant material to be used to
avoid any sparks from making contact
with the same.
Stand by- fire watcher must be available, PM All the time Closed Training for
14
if necessary. Provided wherever supervisors
necessary. required
15
Operators must use appropriate PM Immediately Closed Regular TBT
Personal Protective Equipment (PPE) conducted
specified for the job.
Ensure strict implementation of the No PM / All Immediately Closed Strict inspection
Smoking Policy outside the designated to be followed
Smoking Areas. Smoking violators will
16 be disciplined. A penalty will be imposed
on violators.
Number of Emergency siren to be PM / HSE 23/06/2023 Closed Regularly tested
17
increased.
All identified access/egress must be free PM Round the Closed Regular
18
from any obstruction. clock Inspection
19 Emergency exit must not be blocked Regular
PM At all time Closed
inspection
Signature Signature
Signature
Date: Date: Date:
25/11/2023 25/11/2023 25/11/2023
13 | P a g e
KAFD PROJECT CLUSTER J02
Package: Cluster
J02 RISK ASSESSMENT FOR: Fire Risk Assessment
Probability
Probability
Risk Rating
Risk Rating
Severity
Severity
Description of Who or what might be
Step No. Hazard descriptions & effect Control measures and Precautions to be taken Responsibility
Task harmed
Page 1 of 6
All operatives to be trained on the properties of the chemical that
they deal with and what procedures to be adhered in the event of
an exposure, spillage, or involved in a Fire Situation.
Fumes hazard
If required fume exhaust fan should be installed for adequate
ventilation.
Page 2 of 6
Site temporary electrical cables should be properly elevated to
avoid getting damaged.
Page 3 of 6
Area where hot work is done must be clear from any combustible
materials. If cannot be achieved proper screening or Fire-
retardant material to be used to avoid any sparks from making
contact with the same.
Page 4 of 6
providing nurse and ambulance in case of unexpected injuries
GENERAL /
Site Engineer,
EMERGENCY
Item No. 6 Site workers and others 5 3 H Using walkie talkie for communication in the site Supervisor & HSE 2 1 L
RESPONSE /
conducting trainings and TBTs about use of fire extinguishers for supervisor/officer
ILLUMINATION
workers and reporting of any emergency
Emergency generators to provide substitute electrical connection
Disconnection of electrical to operate emergency alarm system
power / fire alarm system
Manual fire alarm to be used in case of power failure
fixing outer smoking areas to be used
installing smoke detectors in all office areas
Fire hazard Ensure lightings at the stairways and emergency exits are working
properly. Emergency lights shall be installed at stairs to evacuate
in case of power supply failure or emergency.
HAZARD Anything or any activity or any situation can cause harm to people, assets or environment
RISK The probability that a hazard can cause harm and in which level of severity
The result of multiplying the severity by the probability
1-6 Low
RISK RATING
8-12 Medium
15-25 High
1 Notsevere
2 Medium severity level
SEVERITY RATING 3 Requires attention
4 Highlysevere
5 Fatal causing
1 Notlikely
2 Some times
PROBABILITY RATING 3 Common
4 Regular
5 Very likely
Hazardous to
Corrosive NO NO
environment
Oxidizing NO Flammable NO
Page 5 of 6
Required PPE
High Visibility
YES Respirator Mask NO
Clothing
Emergency procedure 5
Location of
the nearest Dalla Hospital
hospital: