Fire Risk Assessment

Parcel 3.10

NOVEMBER - 2023

J02 – KAFD
Title: Fire Risk Assessment
Document Reference No: KAFD-A1-J02-MCC-HSE-FRA-310-0025

KAFD-A1-J02-MCC-HSE-FRM-0013-Rv01 0|Page
CONTENTS

Sl. No. Title Page

1 Introduction 2

2 Fire Fighting Equipment 2

3 Chemical and Flammable Storage 4

4 Temporary Electrics 5

5 Housekeeping and Material Storage 6

6 Hot Work Permit System 7

7 Smoking Areas 7

8 Security Control System 8

9 Fire Drills/ Emergency Evacuation Drills 9

10 Means of Access/Egress 9

11 Critical List 10

12 Recommendations 10

13 Conclusions 11

1|Page
Objective:

The Risk Assessment was carried out to identify operations, behavioral aspects of the individuals, tasks, and
processes which may lead to a foreseeable cause for a fire incident that may well harm the Employees and/or
others, and damage to property and Environment. Further this balance out the adequacy of the existing control
measures to prevent the same or minimize the consequence/ impact when occurred.

1. INTRODUCTION
Parcel 3.10 is a high-rise building under construction within the premises of King Abdullah Financial District.

Therefore, a fire risk assessment was prepared:


➢ To identify operations, tasks, and processes which may foreseeably cause harm to employees
and/or others on the construction site (fire hazards).
➢ To identify the potential of the fire hazard being realized, and the potential consequences this
might then occur (risk).
➢ To enable a risk assessment to be developed which will assist in eliminating or reducing the
exposure of the workers and others to the risk.
➢ To Identify the Responsible parties in driving the actions proposed for rectification.
2. FIRE FIGHTING equipment
a.Fire Extinguishers
➢ Parcel 3.10 is equipped with CO2, foam, and multipurpose Fire Extinguishers (Dry Powder).
➢ Basements that are considered to be enclosed are seen more with CO2, especially near electrical rooms.
➢ Periodical Inspections are being ensured (daily visually, Weekly, and Monthly basis) and the Tagging
system is maintained & Monthly Color-Coding System is Done to all firefighting equipment.
➢ To provide minimum fire points per floor level is being maintained in consideration of the floor area.
➢ Fire Extinguisher not to be removed from Fire Point for hot work activity.

Total No. of Condition (ok / Missing)


Fire CO2 FOAM DCP Type Safety Pin Hose Pressure Inspection Tag
Extinguisher Type TYPE /Nozzle gauge

262 109 6 147 ok ok ok ok

Location Topic& Comment Good Observation Photo Bad Observation photo


All Floor Daily visual, Weekly,
and Monthly basis
inspections and the
Color Coding &
Tagging system are
maintained.

2|Page
b. Fire Equipment System

➢ All 110 Fire Hose Reels are in operational condition.


➢ Fire Hose Reel status is being maintained properly. Color Coding and inspection are done on a monthly
basis.
➢ The Fire pumps and the water reserves were found serviceable.
➢ Emergency Contact number displayed.
➢ In general, provided number of Hose reels and the water reserve can cater to the expected floor area.
➢ Maintenance and inspection are being done periodically.

Total No. of Reach ability to Condition (ok / Damage /Missing/)


Fire Hose Reel all floor area Sufficient
Pressure Hose Nozzle Pressure gauge Knob /Valve

110 All are OK Ok Ok Ok OK


reachable

Location Topic& Comment Good Observation Photo Bad Observation photo

L-23 Fire hose reel-


Hose reel
reachable at all
levels, inspected
weekly.

B. Actions Proposed
➢ Ensure that Fire Hose reel water must not be used in any circumstances except for firefighting.
➢ Ensure that Fire Hose reel water must reachable in all floor areas.
➢ Ensure That Fire Hose Reel Water must not be used for MEP Pressure testing or other construction
activities.
➢ Misuse of Fire Hose Reels will result in a penalty and removal from the site.

C. Fire Alarm Systems


➢ 30 call points in place. (Manual fire alarm)
➢ Periodical inspection and testing are being carried out to ensure its proper working condition.

3|Page
Total Condition (ok / Damage /Missing/)
No. of Location Audibility Switch Alternative Air Horn Regular Remarks
Electric to all (on / off) power (Number inspection
Alarm floor area Location back up &
Location)
On
every
B-04, B-02, G.F,02,04,06,8, Sound floor, No,
30 Reachable
10,12,14,16,18,20,22,24,26,28,29 we Manual
All level
have Alarms N/A
call are NO YES
points provided
at stairs
R2 &
R1.

Location Topic& Comment Good Observation Photo Bad Observation photo

2 Electric Alarm-
Provided a
centralized
emergency Siren.

Offices Smoke Detector

4|Page
3. MATERIALS STORAGE:
Mechanical, Electrical & Civil Stores
➢ Monitoring and Conducting Housekeeping on a daily basis.
➢ Informative Signage displayed nearby the store to aware workers/ Staff regarding the emergency
procedure.
➢ The checklist is provided to ensure and monitor the availability of material.
➢ Provided Authorized person details on notice board nearby store
➢ Fire points and fire hose rill has been increased in the store area
➢ Refreshment training conducted for storekeepers.

Location Topic & Comment Good Observation Photo Bad Observation photo
Mechanical Store,
L-8 materials are stored in
Carton boxes, wooden
boxes

L-7 Electrical Store


materials are stored in
Carton boxes, wooden
boxes

L-2 Civil Store, materials are


stored in Carton boxes,
wooden boxes

5|Page
3. Temporary storage area of hazardous substances (flammable & combustible chemicals)
➢ SDS (Safety Data Sheet) and COSHH (Control of Chemicals Hazardous to Health) are to be displayed near
each storage area.
➢ Maintaining a register of hazardous chemicals.
➢ Hazardous chemicals are stored in chemical stores and labeled, all stored according to t its SDS.
➢ Segregate incompatible hazardous chemicals.
➢ Prevent storing chemical materials out of the chemical store.
➢ Reducing the number of chemical materials in the site with coordination with procurements and site
engineers.
➢ refreshment training conducted for the storekeepers and workers.
➢ Bund walls, spill kits, proper warning signs, correct Fire Extinguishers, and exclusion zones are identified.
➢ Inventory for chemicals has been placed in chemical storage.
➢ Chemical storage is being monitored by HSE on a daily basis.
➢ Fire Extinguishers like Foam, Co2, and Dry powder have been provided.
➢ A smoke detector has been installed.

Location Topic & Comment Good Observation Photo Bad Observation photo
In Chemical Store, the
B1 material is arranged on
wooden pallets

COSH & MSDS – of the


material stored is
GL displayed near the
storage area.

Actions Proposed
➢ Increase monitoring process for the chemical's activities.

6|Page
4. TEMPORARY ELECTRIC
➢ Site temporary electrical cables are properly elevated to avoid getting damaged.
➢ Record regular inspections of electrical power tools and cables with color coding
➢ Contact details are provided on DB.
➢ Distribution Boxes were noticed with the provision of Earth Leakage Circuit Breakers which in case fire
and short circuit automatically trip off.

Location Topic & Comment Good Observation Photo Bad Observation photo
Cable
Management-
Proper cable
L-9 management
found

Electric DB&
extension with
L-28.5 emergency
contact number

Actions Proposed.
➢ The site electrical team must inspect all temporary electrical power tools/equipment and cables on a
regular basis. A record of regular inspections must be maintained.
➢ All electrical cables must not be put down on the ground to prevent trip hazards. Hang up properly with
adequate and stable support.
➢ Proper sleeving to be used when making the connection of two cords.
➢ All Power Distribution Boxes must be locked and the contact number of the concerned electrician to be
displayed.

5. HOUSEKEEPING & MATERIAL STORAGE


➢ Housekeeping was found acceptable but needed further improvement.
➢ Proper segregation and stacking of usable and non-usable materials were observed.
➢ A separate housekeeping team must be available to maintain regular housekeeping.
➢ Monitor Housekeeping on a daily basis

7|Page
Locati Topic Good Observation Photo Bad Observation photo
on &
Comm
ent
All
flo Housek
ors ee
ping

Actions Proposed
➢ All combustible materials must be removed.
➢ Construction Team to take Ownership of the Housekeeping of the Parcel.
➢ Proper segregation and stacking of usable and non-usable materials to be done.
➢ Conducting housekeeping and monitoring housekeeping on a daily basis.

6. HOT WORK PERMIT SYSTEM


➢ The hot work permit system was noted to have been taken on board with due diligence.
➢ Sufficient quantities of Fire Blankets/ Screening material and Flash Back arrestors for Flammable Gas
cylinders were noted for improvement.
➢ Importance was given to positioning a Fire Watch for the task.

Location Topic & Good Observation Photo Bad Observation photo


Comment
HOT WORK
PERMIT
SYSTEM-
A hot work
permit system
GF is implemented
at the site with
all proper
safety
precautions for
Hot Works &
Paperwork.

Actions Proposed
➢ The area where hot work is done must be clear from any combustible materials. If cannot be achieved
proper screening or Fire-retardant material to be used to avoid any sparks from making contact with
the same.
➢ Fire extinguisher, water, and fire blanket (if necessary) must be available all the time during hot work.

8|Page
➢ Stand by- fire watcher must be available, if necessary. Provided wherever necessary.
➢ Operators must use appropriate Personal Protective Equipment (PPE) specified for the job.
➢ Only trained welders to be assigned for welding work. Still no compliance.
➢ Instruct to supplier provide a cap while delivering any kind of cylinder at site.

7. SMOKING AREAS
➢ One designated Smoking area at Level GF was found well maintained.
➢ Level GF Smoking Areas were provided with Fire point with an adequate number of Fire extinguishers
on standby.
➢ A few Cigarette buds were found discarded on the floor external to the smoking areas indicating some
do not follow the smoking regulation.

Location Topic & Comment Good Observation Photo Bad Observation photo
SMOKING AREA-
Only one Smoking Area
provided at Level G.F. and all
Smoking points removed from
upper floor & basement.
L- gf
Smoking provided outside in
open area side with Smoking
Box and Fire Point.

Actions Proposed
➢ Ensure strict implementation of the No Smoking Policy outside the designated Smoking Areas.
➢ Smoking violators will be disciplined. A penalty will be imposed on violators & terminated from the site.

8. Security Access System // control measures


➢ security gates are provided at all site entrances.
➢ Security Camera installed.
➢ An internal Security Guard at the Parcel entrance was observed and is available 24 hours.
➢ TBT was conducted to avoid trespassers in the parcel.
➢ Security patrolling on site to monitor unauthorized entry.
➢ Monitoring parcels gates by CCTV.

9|Page
Location Topic & Comment Good Observation Photo Bad Observation photo

GF Parcel Main Entrance

Parcel Security Cabin


& Guard Security
GF Cabin & Guard --24
hours Security guard.

Actions Proposed.

➢ Fully lockable gate to be ensured.


➢ Provide a security team to monitor the entry and exit of a person.
➢ A security team has been provided at the entrance to monitor and keep a record of the persons.
➢ Conducting refreshment training for the security team.
➢ Monitoring and implementing Mandatory PPE for those who enter in site.
➢ Monitoring Probating parking in an undesignated area
➢ Verifying Gate pass while shifting material from outside of the parcel.

9. FIRE DRILLS
➢ Full Parcel drill is being carried out periodically according to the action plan. After every 3 months.

Location Topic & Comment Good Observation Photo Bad Observation photo
Assembly Point -
Gf-310 Assembly Point
Properly arranged
out of parcel.

18 Siren/Air Horn

10 | P a g e
All Level Emergency Light

GF Ambulance

Actions Proposed
➢ Regular awareness is to be provided to all workers.
➢ Informative signages of the Fire warden have been placed at different locations of the site.
➢ Monitoring Ambulances on a daily basis.

10. MEANS OF ACCESS/EGRESS


➢ Proper Access/ Egress stairs were available to all the Floors.
➢ Alternate access routes are provided.
➢ Access routes were properly demarcated and is clear from any obstruction.
➢ Emergency light was observed sufficiently inside the basement as well as the staircase.

Location Topic & Good Observation Photo Bad Observation photo


Comment
L -1 ACCESS/EGRESS-
All access
provided cleared
from
obstruction.

L-17 All staircase Free s


from
Obstruction.

11 | P a g e
Actions Proposed

➢ All identified access/egress must be free from any obstruction.


➢ Direction signage for Staircase/Elevator must be posted all conspicuous places.
➢ Emergency light must be provided in all basements and all floor staircases for emergency purposes.

11. CRITICAL LIST


1.) Removing combustible materials from site ASAP.

12. CONCLUSION

Based on the findings the implementation of the fire safety precautions is acceptable, more efforts
are required to maintain and develop the system.

13. RECOMMENDATIONS Parcel-310

S. Implementation
Recommendations Action by Status Comments
# Date/

Discharged fire extinguisher must be PM / HSE All the time Closed Regular
1 replaced immediately and kept in Inspection
designated areas.
Ensure that Fire Hose reel water must PM / All All the time Closed Regular
2
not be used in any circumstances except inspection
for firefighting.
Bund walls, spill kits, proper warning PM All the time Closed Regular
signs, correct Fire Extinguishers, Inspection
3 exclusion zones to be identified.
Refresher Training to be conducted for PM / HSE Weekly Closed Regular follow
all concerned operatives and up
storekeepers for safe usage, storage of
4
materials and firefighting.
Site electrical team must inspect all PM / Weekly Closed Regular
temporary electrical power tools/ Mobilization inspection Inspection
5 equipment’s and cable on regular basis. on going
A record of regular inspection must be
maintained & Did Color coding system
Site electrical supervisor must adopt PM / All the time Closed Training for
log/tag out system on all electrical Mobilization supervisor
6 maintenance and repairs.
All electrical cable must not be put down PM / Immediately Closed Regular
on the ground to prevent trip hazard. Mobilization Inspection
7 Hang up properly with adequate and
stable support.
Proper sleeving to be used when made PM / All the time Open Regular
8 connection of two cords. Mobilization inspection

12 | P a g e
9
Correct Industrial sockets to be used. PM / Immediately Closed Regular
Mobilization Inspection
All Power Distribution Boxes must be locked PM / Immediately Closed Regular
10
and contact number of concerned Mobilization Inspection
electricians to be displayed
Permanent Housekeeping Team to be PM On going Closed Arranged
lead and supervised by a Foreman that
can ensure regular housekeeping.
11
Proper segregation and stacking of PM All the time Open Pending
12
usable and non-usable materials to be
done.
Area where hot work is done must be PM Closed Closed Materials to be
clear from any combustible materials. If made available
cannot be achieved proper screening or
13 Fire-retardant material to be used to
avoid any sparks from making contact
with the same.
Stand by- fire watcher must be available, PM All the time Closed Training for
14
if necessary. Provided wherever supervisors
necessary. required
15
Operators must use appropriate PM Immediately Closed Regular TBT
Personal Protective Equipment (PPE) conducted
specified for the job.
Ensure strict implementation of the No PM / All Immediately Closed Strict inspection
Smoking Policy outside the designated to be followed
Smoking Areas. Smoking violators will
16 be disciplined. A penalty will be imposed
on violators.
Number of Emergency siren to be PM / HSE 23/06/2023 Closed Regularly tested
17
increased.
All identified access/egress must be free PM Round the Closed Regular
18
from any obstruction. clock Inspection
19 Emergency exit must not be blocked Regular
PM At all time Closed
inspection

Report prepared by Report reviewed by Report approved by


Name Name Name
Muhammad Ibrahim Salem Muaz Algezoli
Shahid HSE Deputy Manager HSE Manager
HSE In charge

Signature Signature
Signature
Date: Date: Date:
25/11/2023 25/11/2023 25/11/2023

13 | P a g e
KAFD PROJECT CLUSTER J02
Package: Cluster
J02 RISK ASSESSMENT FOR: Fire Risk Assessment

1 Doc Ref No.: KAFD-RY-RIA1-PGEN-MCC-HSE-RAS-005 Revision: 00 Date of Review: 15/07/2023


Task Hazard Initial Risk Control Measures Controlled By Residual Risk

Probability

Probability
Risk Rating

Risk Rating
Severity

Severity
Description of Who or what might be
Step No. Hazard descriptions & effect Control measures and Precautions to be taken Responsibility
Task harmed

Permanent Housekeeping Team to be led and supervised by a


Foreman that can ensure regular housekeeping.

Materials with cartons must not store in basements.


All combustible materials must be removed.
should not perform any type of hot work activity nearby the
material storage area or Ignition sources available nearby store Site engineer,
Material Storage material storage area
Item No. 1 Fire Hazard site workers and other 5 5 H Supervisor and Safety 2 1 L
and Housekeeping
Construction Team to take the Ownership for the Housekeeping Officer.
of the Parcel.
Proper segregation and stacking of usable and non-usable
materials to be done.
Waste Packing materials/ wooden pellets to be removed
immediately.

Fire retardant cover to be provided on stored fit out materials.

Page 1 of 6
All operatives to be trained on the properties of the chemical that
they deal with and what procedures to be adhered in the event of
an exposure, spillage, or involved in a Fire Situation.

All Chemicals and Flammable Liquids are to be carried along with


a Suitable Fire Extinguisher recommended for usage.

Bund walls, spill kits, proper warning signs, correct Fire


Fire hazard Extinguishers, exclusion zones to be identified.

Refresher Training to be conducted for all concerned operatives


and store keepers for safe usage, storage of materials and
firefighting.

No flammable materials / chemicals are allowed to be stored in


basement.
Site Engineer,
Item No. 2 Chemical Storage Site workers and others 5 5 H Only daily consumable materials are allowed to keep at site. Supervisor & HSE 2 1 L
supervisor/officer
Hot Work Permit must obtain prior to carrying out welding
works

Fire watchman should be assigned during hot work.

Fire extinguisher should be available at the hot workplace.

Fumes hazard
If required fume exhaust fan should be installed for adequate
ventilation.

Fire blanket should be placed to prevent splinters spreading and


flying around including below hot workplace.

Any combustible material should be stored at least 50 ft from the


hot workplace.

Page 2 of 6
Site temporary electrical cables should be properly elevated to
avoid getting damaged.

Record of regular inspection of electrical power tools and cables


with color coding
Contact details provided on DB

Distribution Boxes with the provision of an Earth Leakage Circuit


Breakers which incase fire and short circuit automatically trip off.

Site electrical team must inspect all temporary electrical power


Fire
tools/ equipment’s and cable on regular basis. A record of regular
inspection must be maintained.

All electrical cable must not be put down on the ground to


prevent trip hazard. Hang up properly with adequate and stable
support.

Proper sleeving to be used when made connection of two cords.

No hot work activity should be performed nearby storage area or

Correct Industrial sockets to be used. Site Engineer,


Item No. 3 Electrical Site workers and others 5 5 H Supervisor & HSE 2 1 L
All Power Distribution Boxes must be locked and contact number supervisor/officer
of concerned electricians to be displayed.
should not perform any type of hot work activity nearby the
material storage area or Ignition sources available nearby store
material storage area.
All electrical distribution boards and equipment should be
properly grounded

Implementing LOTO system if necessary

Cables and wires to be properly isolated and covered


Electrical shock
Activity must be carried on by competent person

Regular inspection by maintenance and safety team to be


conducted in the site

Fire extinguishers to be available neat all activities

Installing safe electrical distribution panels or source of power


capable of taking work load from electrical equipment

Proper PPE to be worn

Page 3 of 6
Area where hot work is done must be clear from any combustible
materials. If cannot be achieved proper screening or Fire-
retardant material to be used to avoid any sparks from making
contact with the same.

Fire extinguisher, water and fire blanket (if necessary) must be


available all the time during hot work.

Stand by- fire watcher must be available, if necessary. Provided


Fire hazard wherever necessary.

Operators must use appropriate Personal Protective Equipment


(PPE) specified for the job.

Only trained welders to be assigned for welding work. Still no


compliance.
Site Engineer,
Item No. 4 Hot work activities Site workers and others 5 5 H Instruct to supplier provide cap while deliver any kind of cylinder Supervisor & HSE 2 1 L
at site. supervisor/officer
Hot Work Permit must obtain prior to carrying out welding
works

Fire watchman should be assigned during hot work.

Fire extinguisher should be available at the hot workplace.

If required fume exhaust fan should be installed for adequate


Fumes hazard
ventilation.

Fire blanket should be placed to prevent splinters spreading and


flying around including below hot workplace.

Any combustible material should be stored at least 50 ft from the


hot workplace.

Ensure strict implementation of the No Smoking Policy outside the


designated Smoking Areas. Site Engineer,
Smoking
Item No. 5 Fire hazard Site workers and others 5 5 H Supervisor & HSE 2 1 L
Smoking violators will be disciplined. A penalty will be imposed on supervisor/officer
violators & Terminated from site.

all emergency exit routes must be free of obstacles and danger


and luminated with emergency lights
installing of fire alarms in all easy accessed point to be noticed by
everyone.
posting signages and posters for directions and increase
awareness about evacuation procedure.
posting emergency contact list in all easy accessed points.
Emergency response failure
conducting periodical evacuation mock drill to train people for
evacuation.

Page 4 of 6
providing nurse and ambulance in case of unexpected injuries
GENERAL /
Site Engineer,
EMERGENCY
Item No. 6 Site workers and others 5 3 H Using walkie talkie for communication in the site Supervisor & HSE 2 1 L
RESPONSE /
conducting trainings and TBTs about use of fire extinguishers for supervisor/officer
ILLUMINATION
workers and reporting of any emergency
Emergency generators to provide substitute electrical connection
Disconnection of electrical to operate emergency alarm system
power / fire alarm system
Manual fire alarm to be used in case of power failure
fixing outer smoking areas to be used
installing smoke detectors in all office areas
Fire hazard Ensure lightings at the stairways and emergency exits are working
properly. Emergency lights shall be installed at stairs to evacuate
in case of power supply failure or emergency.

HAZARD Anything or any activity or any situation can cause harm to people, assets or environment
RISK The probability that a hazard can cause harm and in which level of severity
The result of multiplying the severity by the probability
1-6 Low
RISK RATING
8-12 Medium
15-25 High
1 Notsevere
2 Medium severity level
SEVERITY RATING 3 Requires attention
4 Highlysevere
5 Fatal causing
1 Notlikely
2 Some times
PROBABILITY RATING 3 Common
4 Regular
5 Very likely

Hazardous substances (Attach MSDS and COSHH if available)

Acute toxic NO Harmful NO

Hazardous to
Corrosive NO NO
environment

Oxidizing NO Flammable NO

Explosive NO Human Health NO

Page 5 of 6
Required PPE

Head Protection YES Dust Mask YES

Eye Protection YES Ear Protection According to the site condition

Foot Protection YES Hand protection YES

High Visibility
YES Respirator Mask NO
Clothing

Additional information & specific client requests:

Emergency procedure 5

YES / NO Emergency Response Team


Name of on- 1. Ibrahim Salem 0547067036
site first
Ibrahim Salem Abdelkader 2. Mohamed Abdelfattah 0595123557
0547067036 3. Ahmed Hassan Shahin 0565252716
aider:
4. Khaldoun Shoumary 0507003814
4. Mohammed Milhem 0568689513
Medical: Medical clinic location is at Ground floor parcel 3.10
6. Awadh Alharbi 0550501832

Location of
the nearest Dalla Hospital
hospital:

Prepared By : Muhammad Shahid Approved By: Ibrahim Salem


Signature: Signature:

Date: 25/11/2022 Date: 25/11/2022

Page 6 of 6