Data Sondir (Gedung Ilham)
Data Sondir (Gedung Ilham)
Data Sondir (Gedung Ilham)
Pembangunan Gedung Kantor DPMPTSP Jl. T Imuem Lueng Bata, Cot Mesjid, Lueng Bata, Kota
PROYEK : LOKASI :
Aceh Banda Aceh - Banda Aceh
Hasil Penyelidikan:
Kedalaman qc fs cm fs x 20 cm
Cw (kg/cm²) Tw (kg/cm²) Tf (kg/cm) Rf (%) KONSISTENSI
(m) (kg/cm²) (kg/cm²) (kg/cm)
Page 1 of 13
Luas penampang piston (Api) 10
Luas penampang konus (Ac) 10 Aoko dan De Alencer
Luas selimut geser (As) 150 1.500 0.300 = 0.45
untuk fs 20 1.500 0.300 = 0.45
Qc Rata-rata 148
Meyerhoff
8 0.300 = 2.4
4 0.300 = 1.2
Qc Rata-rata 139
Aoko dan De Alencer
As Rp 134,400.000
Qb Rp 132,824.314
Fs Rp 1.771
Qs Rp 238,021.171
Q ult Rp 370,845.485
Qall Rp 123,615.162
Meyerhoff
Qc 139
ap 900
JHL 2540.869
p 120
Qa 102662.49341176
Page 2 of 13
DATA SONDIR NOMOR TITIK SONDIR 1
Pembangunan Gedung Kantor DPMPTSP Jl. T Imuem Lueng Bata, Cot Mesjid, Lueng Bata, Kota
PROYEK : LOKASI :
Aceh Banda Aceh - Banda Aceh
Tf , (kg/cm) Tf , (kg/cm)
2.00
2.00
4.00 4.00
Kedalaman (m)
6.00 6.00
8.00 8.00
10.00
10.00
12.00
12.00 -6.000 -4.000 -2.000 0.000 2.000 4.000
-3,000 -2,500 -2,000 -1,500 -1,000 -500 0 500
Column
Rf A
(%)
qc, (kg/cm2)
Column A Column A
Page 3 of 13
DATA SONDIR NOMOR TITIK SONDIR 2
Pembangunan Gedung Kantor DPMPTSP Jl. T Imuem Lueng Bata, Cot Mesjid, Lueng Bata, Kota
PROYEK : LOKASI :
Aceh Banda Aceh - Banda Aceh
Hasil Penyelidikan:
Kedalaman qc fs cm fs x 20 cm
Cw (kg/cm²) Tw (kg/cm²) Tf (kg/cm) Rf (%) KONSISTENSI
(m) (kg/cm²) (kg/cm²) (kg/cm)
Page 4 of 13
Luas penampang piston (Api) 10
Luas penampang konus (Ac) 10 Aoko dan De Alencer
Luas selimut geser (As) 150 1.500 0.300 = 0.45
untuk fs 20 1.500 0.300 = 0.45
Qc Rata-rata 148
Meyerhoff
8 0.300 = 2.4
4 0.300 = 1.2
Qc Rata-rata 137
Aoko dan De Alencer
As 132000
Qb 133141.75714286
Fs 1.7752234285714
Qs 234329.49257143
Q ult 367471.24971429
Qall 122490.41657143
Meyerhoff
Qc 137
ap 900
JHL 1593.484
p 120
Qa 79356.482666667
Page 5 of 13
DATA SONDIR NOMOR TITIK SONDIR 2
Pembangunan Gedung Kantor DPMPTSP Jl. T Imuem Lueng Bata, Cot Mesjid, Lueng Bata, Kota
PROYEK : LOKASI :
Aceh Banda Aceh - Banda Aceh
Tf , (kg/cm) Tf , (kg/cm)
0 20 40 60 80 100 120 140 160 180 -4.00 -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 4.00
0.00 0.00
2.00 2.00
4.00
4.00
Kedalaman (m)
6.00
6.00
8.00
8.00
10.00
10.00
12.00
12.00 -4.000 -2.000 0.000 2.000 4.000
-2,500 -2,000 -1,500 -1,000 -500 0 500
Column
Rf A
(%)
qc, (kg/cm2)
Column A Column A
Page 6 of 13
DATA SONDIR NOMOR TITIK SONDIR 3
Pembangunan Gedung Kantor DPMPTSP Jl. T Imuem Lueng Bata, Cot Mesjid, Lueng Bata, Kota
PROYEK : LOKASI :
Aceh Banda Aceh - Banda Aceh
Hasil Penyelidikan:
Kedalaman qc fs cm fs x 20 cm
Cw (kg/cm²) Tw (kg/cm²) Tf (kg/cm) Rf (%) KONSISTENSI
(m) (kg/cm²) (kg/cm²) (kg/cm)
Page 7 of 13
Luas penampang piston (Api) 10
Luas penampang konus (Ac) 10 Aoko dan De Alencer
Luas selimut geser (As) 150 1.500 0.300 = 0.45
untuk fs 20 1.500 0.300 = 0.45
Qc Rata-rata 140
Meyerhoff
8 0.300 = 2.4
4 0.300 = 1.2
Qc Rata-rata 117
Aoko dan De Alencer
As 100800
Qb 126128.57142857
Fs 1.6817142857143
Qs 169516.800
Q ult 295645.37142857
Qall 98548.457142857
Meyerhoff
Qc 117
ap 900
JHL 944.807
p 120
Qa 57908.670526316
Page 8 of 13
DATA SONDIR NOMOR TITIK SONDIR 3
Pembangunan Gedung Kantor DPMPTSP Jl. T Imuem Lueng Bata, Cot Mesjid, Lueng Bata, Kota
PROYEK : LOKASI :
Aceh Banda Aceh - Banda Aceh
Tf , (kg/cm) Tf , (kg/cm)
0 50 100 150 200 250 300 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00
0.00 0.00
2.00 2.00
4.00
4.00
Kedalaman (m)
6.00
6.00
8.00
8.00
10.00
10.00
12.00
12.00 -5.000 0.000 5.000 10.000
-4,500 -4,000 -3,500 -3,000 -2,500 -2,000 -1,500 -1,000 -500 0 500
Column
Rf A
(%)
qc, (kg/cm2)
Column A Column A
Page 9 of 13
12.00
12.00 -5.000 0.000 5.000 10.000
-4,500 -4,000 -3,500 -3,000 -2,500 -2,000 -1,500 -1,000 -500 0 500
Column
Rf A
(%)
qc, (kg/cm2)
Column A Column A
Page 10 of 13
6
DATA SONDIR NOMOR TITIK SONDIR 4 DATA S
Pembangunan Gedung Kantor DPMPTSP Jl. T Imuem Lueng Bata, Cot Mesjid, Lueng Bata, Kota
PROYEK : LOKASI : PROYEK
Aceh Banda Aceh - Banda Aceh
Hasil Penyelidikan:
Kedalaman qc fs cm fs x 20 cm
Cw (kg/cm²) Tw (kg/cm²) Tf (kg/cm) Rf (%) KONSISTENSI
(m) (kg/cm²) (kg/cm²) (kg/cm)
Kedalaman (m)
5.20 56 32 56 -1.600 -32.000 -152.681 -2.857 STIFF
5.40 53.4 35 53 -1.227 -24.533 -177.215 -2.297 STIFF
5.60 55 35 55 -1.333 -26.667 -203.881 -2.424 STIFF 6.00
5.80 57.986 40 58 -1.199 -23.981 -227.863 -2.068 STIFF
6.00 59 45 59 -0.933 -18.667 -246.529 -1.582 STIFF
6.20 61.119 45 61 -1.075 -21.492 -268.021 -1.758 VERY STIFF
6.40 76.874 45 77 -2.125 -42.499 -310.520 -2.764 VERY STIFF
6.60 80 45 80 -2.333 -46.667 -357.187 -2.917 VERY STIFF
6.80 82 50 82 -2.133 -42.667 -399.853 -2.602 VERY STIFF
7.00 85 50 85 -2.333 -46.667 -446.520 -2.745 VERY STIFF
7.20 89 50 89 -2.600 -52.000 -498.520 -2.921 VERY STIFF
7.40 87.771 55 88 -2.185 -43.695 -542.215 -2.489 VERY STIFF 8.00
7.60 90.303 55 90 -2.354 -47.071 -589.285 -2.606 VERY STIFF
7.80 103.333 60 103 -2.889 -57.777 -647.063 -2.796 VERY STIFF
8.00 113 65 113 -3.200 -64.000 -711.063 -2.832 VERY STIFF
8.20 115.501 62 115.501 -3.567 -71.335 -782.397 -3.088 VERY STIFF
8.40 112.404 68 112.404 -2.960 -59.205 -841.603 -2.634 VERY STIFF
8.60 119.905 70 119.905 -3.327 -66.540 -908.143 -2.775 VERY STIFF
8.80 130 75 130 -3.667 -73.333 -981.476 -2.821 HARD
9.00 133 75 133 -3.867 -77.333 -1058.809 -2.907 HARD
9.20 144 77 144 -4.467 -89.333 -1148.143 -3.102 HARD 10.00
9.40 147 78 147 -4.600 -92.000 -1240.143 -3.129 HARD
9.60 169 83 169 -5.733 -114.667 -1354.809 -3.393 HARD
9.80 180 85 180 -6.333 -126.667 -1481.476 -3.519 HARD
10.00 193 89 193 -6.933 -138.667 -1620.143 -3.592 HARD
10.20 203.038 90 203.038 -7.536 -150.717 -1770.860 -3.712 HARD
10.40 205.701 90 205.701 -7.713 -154.268 -1925.128 -3.750 HARD
10.60 208.904 90 208.904 -7.927 -158.539 -2083.667 -3.795 HARD
10.80 219 95 219 -8.267 -165.333 -2249.000 -3.775 HARD
11.00 224 95 224 -8.600 -172.000 -2421.000 -3.839 HARD
11.20 245 90 245 -10.333 -206.667 -2627.667 -4.218 HARD 12.00
11.40 270 96 270 -11.600 -232.000 -2859.667 -4.296 HARD -4,000 -3,500 -3,0
11.60 290 100 290 -12.667 -253.333 -3113.000 -4.368 HARD
11.80 287 100 287 -12.467 -249.333 -3362.333 -4.344 HARD
12.00 285.083 100 285.083 -12.339 -246.777 -3609.111 -4.328 HARD
Page 11 of 13
Luas penampang piston (Api) 10
Luas penampang konus (Ac) 10 Aoko dan De Alencer
Luas selimut geser (As) 150 1.500 0.300 = 0.45
untuk fs 20 1.500 0.300 = 0.45
Qc Rata-rata 157
Meyerhoff
8 0.300 = 2.4
4 0.300 = 1.2
Qc Rata-rata 138
Aoko dan De Alencer
As 112800
Qb 140914.28571429
Fs 1.8788571428571
Qs 211935.08571429
Q ult 352849.37142857
Qall 117616.45714286
Meyerhoff
Qc 138
ap 900
JHL 1240.143
p 120
Qa 71287.529263158
Page 12 of 13
DATA SONDIR NOMOR TITIK SONDIR 4
Pembangunan Gedung Kantor DPMPTSP Jl. T Imuem Lueng Bata, Cot Mesjid, Lueng Bata, Kota
PROYEK : LOKASI :
Aceh Banda Aceh - Banda Aceh
Tf , (kg/cm) Tf , (kg/cm)
2.00
2.00
4.00 4.00
Kedalaman (m)
6.00 6.00
8.00 8.00
10.00
10.00
12.00
12.00 -10.000 -5.000 0.000 5.000 10.000 15.000
-4,000 -3,500 -3,000 -2,500 -2,000 -1,500 -1,000 -500 0 500 1,000
Column
Rf A
(%)
qc, (kg/cm2)
Column A Column A
Page 13 of 13