Jam

No. Tgl Keluar Unit Gardu Nama Bay


Keluar
3 2-Oct-23 10:16 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5AB4 DIAMETER#4 150kV

4 2-Oct-23 10:16 UPT PULOGADUNG GIS 150KV PRIOK BARAT ST#1.0

5 2-Oct-23 10:16 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5A4 DIAMETER#4 150kV

6 4-Oct-23 1:39 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5AB4 DIAMETER#4 150kV

7 4-Oct-23 1:39 UPT PULOGADUNG GIS 150KV PRIOK BARAT ST#1.0

8 4-Oct-23 1:39 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5A4 DIAMETER#4 150kV

9 4-Oct-23 6:30 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5A4 DIAMETER#4 150kV

10 4-Oct-23 6:30 UPT PULOGADUNG GIS 150KV PRIOK BARAT 5AB4 DIAMETER#4 150kV

11 4-Oct-23 6:30 UPT PULOGADUNG GIS 150KV PRIOK BARAT ST#1.0

12 7-Oct-23 15:22 UPT CILEGON GITET 500KV SURALAYA (HYBRID) 7A5 DIAMETER#5 500kV

13 7-Oct-23 15:22 UPT CILEGON GITET 500KV SURALAYA (HYBRID) GT#5

14 7-Oct-23 15:22 UPT CILEGON GITET 500KV SURALAYA (HYBRID) 7AB5 DIAMETER#5 500kV

16 10-Oct-23 10:34 UPT DURI KOSAMBI GI 150KV MUARAKARANG LAMA 5AB5 DIAMETER#5 150kV

17 10-Oct-23 10:34 UPT DURI KOSAMBI GI 150KV MUARAKARANG LAMA 5A1 DIAMETER#1 150kV

19 10-Oct-23 10:34 UPT DURI KOSAMBI GI 150KV MUARAKARANG LAMA 5A5 DIAMETER#5 150kV

20 10-Oct-23 10:34 UPT DURI KOSAMBI GI 150KV MUARAKARANG LAMA 5AB1 DIAMETER#1 150kV

22 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV MUARAKARANG BARU PHT 150kV PANTAI INDAH KAPUK #1

23 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV MUARAKARANG BARU PHT 150kV PANTAI INDAH KAPUK #2

24 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV MUARAKARANG BARU 5AB7 DIAMETER #7 150KV

25 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV MUARAKARANG BARU 5AB8 DIAMETER #8 150KV

26 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV DAAN MOGOT PHT 150kV PANTAI INDAH KAPUK#2

27 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV PANTAI INDAH KAPUK PHT 150kV DAAN MOGOT#2

28 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV PANTAI INDAH KAPUK PHT 150kV MUARAKARANG BARU#1

29 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV PANTAI INDAH KAPUK PHT 150kV DAAN MOGOT#1

30 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV PANTAI INDAH KAPUK PHT 150kV MUARAKARANG BARU#2

31 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV MUARAKARANG BARU 5B7 DIAMETER #7 150KV

32 11-Oct-23 10:12 UPT DURI KOSAMBI GIS 150KV DAAN MOGOT PHT 150kV PANTAI INDAH KAPUK#1
33 11-Oct-23 11:12 UPT DURI KOSAMBI GIS 150KV MUARAKARANG BARU 5B8 DIAMETER #8 150KV

35 14-Oct-23 10:56 UPT PULOGADUNG GIS 150KV PRIOK TIMUR 5AB2 DIAMETER#2 150kV

36 14-Oct-23 10:56 UPT PULOGADUNG GIS 150KV PRIOK TIMUR PHT 150kV PELINDO

37 14-Oct-23 10:56 UPT PULOGADUNG GIS 150KV PRIOK TIMUR 5B2 DIAMETER#2 150kV

38 16-Oct-23 13:05 UPT PULOGADUNG GI 150KV BEKASI PHT 150kV MARUNDA#2

39 16-Oct-23 13:05 UPT PULOGADUNG GIS 150KV MARUNDA PHT 150kV BEKASI#2

45 20-Oct-23 11:08 UPT CAWANG GIS 150KV CAWANG BARU PHT 150kV CAWANG LAMA #2

46 25-Oct-23 12:57 UPT PULOGADUNG GIS 150KV PADEMANGAN PHT 150KV GUNUNG SAHARI #1

47 25-Oct-23 14:43 UPT CILEGON GITET 500KV CILEGON BARU 7A2 DIAMETER#2 500kV

48 25-Oct-23 14:43 UPT CILEGON GITET 500KV CILEGON BARU 7AB2 DIAMETER#2 500kV

49 25-Oct-23 14:43 UPT CILEGON GITET 500KV CILEGON BARU PHT 500kV CIBINONG

50 25-Oct-23 19:49 UPT DURI KOSAMBI GIS 150KV SUVARNA SUTERA PHT 150kV CIKUPA #2

51 25-Oct-23 19:49 UPT DURI KOSAMBI GI 150KV CIKUPA PHT 150kV SUVARNA SUTERA#2
Laporan Ganggu

Per

GGN Line
Tegangan MVA Kd Aset Kategori
KTT
150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

500kV TL7 TIDAK GANGGUAN PEMBANGKIT

500kV TL7 TIDAK GANGGUAN PEMBANGKIT

500kV TL7 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK GANGGUAN PEMBANGKIT

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK ALAT


150kV TL5 TIDAK ALAT

150kV TL5 TIDAK AKIBAT PEKERJAAN PIHAK LAIN (APPL)

150kV TL5 TIDAK AKIBAT PEKERJAAN PIHAK LAIN (APPL)

150kV TL5 TIDAK AKIBAT PEKERJAAN PIHAK LAIN (APPL)

150kV TL5 TIDAK BELUM DIKETAHUI

150kV TL5 TIDAK AKIBAT PEKERJAAN PIHAK LAIN (APPL)

150kV TL5 TIDAK ALAT

150kV TL5 TIDAK AKIBAT PEKERJAAN PIHAK LAIN (APPL)

500kV TL7 TIDAK ALAM

500kV TL7 TIDAK ALAM

500kV TL7 TIDAK ALAM

150kV TL5 TIDAK AKIBAT PEKERJAAN PIHAK LAIN (APPL)

150kV TL5 TIDAK AKIBAT PEKERJAAN PIHAK LAIN (APPL)


Laporan Gangguan UNIT INDUK TRANSMISI JAWA BAGIAN BARAT

Periode 01 Oktober 2023 s/d 31 Oktober 2023

Sebab SF Proteksi Relai

LAIN-LAIN => UNCONTROLABLE (SYSTEM FAULT) Aux 2 Intertripping

LAIN-LAIN => UNCONTROLABLE (SYSTEM FAULT) Aux 2 Intertripping

LAIN-LAIN => UNCONTROLABLE (SYSTEM FAULT) Aux 2 Intertripping

LAIN-LAIN => UNCONTROLABLE (SYSTEM FAULT) Aux 2 Intertripping

LAIN-LAIN => UNCONTROLABLE (SYSTEM FAULT) Aux 2 Intertripping

LAIN-LAIN => UNCONTROLABLE (SYSTEM FAULT) Aux 2 Intertripping

LAIN-LAIN => UNCONTROLABLE (SYSTEM FAULT) Aux 2 Intertripping

LAIN-LAIN => UNCONTROLABLE (SYSTEM FAULT) Aux 2 Intertripping

LAIN-LAIN => UNCONTROLABLE (SYSTEM FAULT) Aux 2 Intertripping

INTERPOSING => UNCONTROLABLE (SYSTEM FAULT) LOG OUT MVAJ K406 , K407 CUT OFF A DAN AB

INTERPOSING => UNCONTROLABLE (SYSTEM FAULT) LOG OUT MVAJ K406 , K407 CUT OFF A DAN AB

INTERPOSING => UNCONTROLABLE (SYSTEM FAULT) LOG OUT MVAJ K406 , K407 CUT OFF A DAN AB

INTERPOSING => UNCONTROLABLE (SYSTEM FAULT) _

INTERPOSING => UNCONTROLABLE (SYSTEM FAULT) -

INTERPOSING => UNCONTROLABLE (SYSTEM FAULT) _

INTERPOSING => UNCONTROLABLE (SYSTEM FAULT) _

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) -Lockout Q53 -Lockout Q52

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) -Lockout Q53 -Lockout Q52

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) -Lockout Q53 -Lockout Q52

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) -Lockout Q53 -Lockout Q52

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) CBF Start

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) Tidak ada rele kerja

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) Tidak ada rele kerja

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) Tidak ada rele kerja

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) Tidak ada rele kerja

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) -Lockout Q53 -Lockout Q52

DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) CBF Start


DESIGN SUB STANDAR => UNCONTROLABLE (SYSTEM FAULT) -Lockout Q53 -Lockout Q52
AKIBAT PEKERJAAN PIHAK LAIN (Asset Konsumen KTT) =>
UNCONTROLABLE (SYSTEM FAULT) - Differential trip - Diff Fasa S - DTT Receive
AKIBAT PEKERJAAN PIHAK LAIN (Asset Konsumen KTT) =>
UNCONTROLABLE (SYSTEM FAULT) - Differential trip - Diff Fasa S - DTT Receive
AKIBAT PEKERJAAN PIHAK LAIN (Asset Konsumen KTT) =>
UNCONTROLABLE (SYSTEM FAULT) - Differential trip - Diff Fasa S - DTT Receive
Bekasi-Marunda#2 -F87L (Fasa R Trip, Zone 2 Trip, Aidid Trip, FL :
BELUM DIKETAHUI => UNCONTROLABLE (SYSTEM FAULT) 23.53 km)
Bekasi-Marunda#2 -F87L (Fasa R Trip, Zone 2 Trip, Aidid Trip, FL :
AKIBAT PEKERJAAN PIHAK LAIN (Proyek Pemerintah) => 23.53 km) Marunda-Bekasi#2 -F87L (Fasa R Trip, Zone 1 Trip, Aidid
UNCONTROLABLE (SYSTEM FAULT) Trip, FL : 2.02 km)
T/L - RELE => CONTROLABLE SISI SEKUNDER (NON SYSTEM
FAULT) OCR Phasa R LO K412
AKIBAT PEKERJAAN PIHAK LAIN (Proyek GI/Penghantar) =>
CONTROLABLE SISI SEKUNDER (NON SYSTEM FAULT) K863 (Intertrip lockout relay)

PETIR => CONTROLABLE SISI TT/TM (SYSTEM FAULT) Distance Z1 ph R-N

PETIR => CONTROLABLE SISI TT/TM (SYSTEM FAULT) Distance Z1 ph R-N

PETIR => CONTROLABLE SISI TT/TM (SYSTEM FAULT) Distance Z1 ph R-N


AKIBAT PEKERJAAN PIHAK LAIN => UNCONTROLABLE
(SYSTEM FAULT) Line Diff Fasa RST
AKIBAT PEKERJAAN PIHAK LAIN => UNCONTROLABLE
(SYSTEM FAULT) Line Diff Fasa RST
WA BAGIAN BARAT

er 2023

Status
Distribusi Kondisi Main Klasifikasi Permanen Fault
Alat
Trip Tidak Rusak Proteksi Benar

Trip Tidak Meluas Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Meluas Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Meluas Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar & Teleproteksi Benar

Trip Tidak Meluas Tidak Rusak Proteksi Benar & Teleproteksi Benar

Trip Tidak Rusak Proteksi Benar & Teleproteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak

Trip Meluas Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar

Trip Tidak Rusak Proteksi Benar


Trip Tidak Rusak Proteksi Benar

Trip Rusak

Trip Tidak Meluas Rusak Proteksi Benar

Trip Rusak Proteksi Benar

Trip Proteksi Benar

Trip Tidak Meluas

Trip Tidak Meluas Rusak Proteksi Benar

Trip Tidak Meluas Tidak Rusak Proteksi Salah

Reclose Sukses Tidak Rusak Proteksi Benar & Teleproteksi Benar

Reclose Sukses Tidak Rusak Proteksi Benar & Teleproteksi Benar

Reclose Sukses Tidak Rusak Proteksi Benar & Teleproteksi Benar

Trip Tidak Rusak Proteksi Benar & Teleproteksi Salah

Trip Tidak Meluas Tidak Rusak Proteksi Salah


Tindak Lanjut Temporer Fault Non System Fault

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)


1. Kirimkan Berita Acara investigasi 2. Kirimkan Berita Acara
perbaikan 3. Kirimkan ppt gangguan 4. Kajian desain sub standar UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)

UNCONTROLABLE (SYSTEM FAULT)


1. Kirimkan berita acara investigasi, dokumentasi, dan tindak
lanjut.gangguan. 2. Kirimkan dokumentasi pengamanan TKP untuk UNCONTROLABLE (SYSTEM FAULT)
penormalan (ttd pihak ke3). 4. Kirimkan surat teguran ke pihak
PELINDO 5. Lampirkan event logger dan recorder internal/external UNCONTROLABLE (SYSTEM FAULT)
(DFR)
1. berupaevent
Lampirkan PDF dan berupa
logger, logichasil
rele,download yanginternal/external
dan recorder dikemas dalam
RAR/ZIP.
(DFR) 6. Kirimkan
berupa PDF danpptberupa
gangguan
hasil download yang dikemas dalam UNCONTROLABLE (SYSTEM FAULT)
1. Lampirkan
RAR/ZIP. event
( bila logger dan 2.
dimungkinkan) recorder
Lakukaninternal/external
analisa anomali (DFR)
parameter
berupa dan
setting PDFlogic
dan relai.
berupa hasil
( bila download yang
dimungkinkan) 3. dikemas
Lakukan dalam
pengujian UNCONTROLABLE (SYSTEM FAULT)
RAR/ZIP. rele.
comtrade 2. Kirimkan Berita Acara investigasi
(bila dimungkinkan) 4. Kirimkan3.hasil
Kirimkan ppt
uji individual
gangguan
relay. ( bila4.dimungkinkan)
Kirimkan surat5.teguran
Kirimkandanberita
invoice
acaraganti rugi dari pihak
investigasi, tindak UNCONTROLABLE (SYSTEM FAULT)
ke-3
1. 5.dan
lanjut, Kirimkan
Lampirkan berita
dokumentasi
event acara
logger dandan
penggantiandokumentasi
recorderrelay (jika tindak lanjut
relay rusak)
internal/external 6. kirim
(DFR)
perbaikan
PPT
berupagangguan
PDF gangguan
dan7.berupa6. Dokumentasi
Lampirkan
hasilhasil pengamanan
rekomisioning
download gangguan
(jika
yang dikemas mala
dalam kerja UNCONTROLABLE (SYSTEM FAULT)
relay). 8. Lakukan
RAR/ZIP. 2. KirimkanentriWP,
peralatan
DP3, IK,rusak
danpada FOIS jika terjadi
JSA pekerjaan. 3. Kirimkan
kerusakan
berita acaraperalatan.
investigasi, dokumentasi, dan tindak lanjut.gangguan. 4. CONTROLABLE SISI SEKUNDER (NON SYSTEM FAULT)
Kirimkan surat teguran ke pihak ke-3. 5. Kirimkan rekaman CCTV
(bila tersedia). 6. Kirimkan PPT gangguan CONTROLABLE SISI SEKUNDER (NON SYSTEM FAULT)

Sukses CONTROLABLE SISI TT/TM (SYSTEM FAULT)

Sukses CONTROLABLE SISI TT/TM (SYSTEM FAULT)

1. Kirimkan berita acara investigasi, dokumentasi, dan tindak lanjut Sukses CONTROLABLE SISI TT/TM (SYSTEM FAULT)
gangguan (perbaikan logic dan setting rele) 2. Kirimkan surat teguran
ke pihak ke-3. 3. Lampirkan event logger dan recorder UNCONTROLABLE (SYSTEM FAULT)
internal/external (DFR) berupa PDF dan berupa hasil download yang
dikemas dalam RAR/ZIP. 4. Kirimkan PPT gangguan UNCONTROLABLE (SYSTEM FAULT)
Entry Date Checkentry SFOZ

3-Oct-23 0,95

3-Oct-23 0,94

3-Oct-23 0,95

5-Oct-23 1,27

5-Oct-23 1,27

5-Oct-23 1,27

5-Oct-23 1,07

5-Oct-23 1,07

5-Oct-23 1,07

8-Oct-23 0,74

8-Oct-23 0,74

8-Oct-23 0,75

12-Oct-23 2,03

12-Oct-23 2,02

12-Oct-23 2,03

12-Oct-23 2,03

12-Oct-23 1,18

12-Oct-23 1,18

12-Oct-23 1,12

12-Oct-23 1,13

12-Oct-23 1,06

12-Oct-23 1,21

12-Oct-23 1,21

12-Oct-23 1,18

12-Oct-23 1,22

12-Oct-23 1,12

12-Oct-23 1,06
12-Oct-23 1,09

15-Oct-23 1,49

15-Oct-23 1,48

15-Oct-23 1,49

17-Oct-23 0,98

17-Oct-23 0,79

20-Oct-23 0,13

26-Oct-23 0,84

27-Oct-23 2,08

27-Oct-23 2,08

27-Oct-23 2,08

26-Oct-23 0,52

26-Oct-23 0,52