7th Floor, Menas Mall Saigon Airport, 60A Truong Son Street

Ward 2, Tan Binh District, Ho Chi Minh City, Vietnam


Tel : +84 28 38 475 475
ISSUED FOR APPROVAL
CUSTOMER : STERLING INDUSTRIAL TECHNOLOGIES CO.LTD
PROJECT : ZAYET KWIN GARDEN INDUSTRIAL PARK PROJECT
LOCATION : ZAYET KWIN, NEAR BAGO CITY, MYANMAR
BLDG. NAME : 200'X300' WAREHOUSE
BLDG. N0. : B01
8. ALL TECHNICAL DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS, DESIGNS, INSTRUCTIONS DRAWING INDEX
PURCHASER RESPONSIBILITIES PROVIDED BY PEB STEEL BUILDINGS CO. LTD. (“PEB”) ARE INTELLECTUAL PROPERTIES OF PEB THAT
NO PARTIES MAY AT THEIR OWN DISCRETION USE IN ANY MANNER. ANY USE, INCLUDING BUT NOT LIMITED DRG. TITLE
TO REPRODUCTION, DISTRIBUTION, FABRICATION, WITHOUT WRITTEN AUTHORIZATION FROM PEB SHALL STRICTLY FACE
LEGAL CONSEQUENCES. A00 INDEX SHEET 0
1. IT IS THE RESPONSIBILITY OF THE PURCHASER TO INSURE THAT ALL
PROJECT PLANS, SPECIFICATIONS, AND APPLIED DESIGN LOADS, FULLY MATERIALS ASTM DESIGNATIONS AB1 ANCHOR BOLT PLAN 0
MEET THE PROPOSED INTENT AS WELL AS COMPLY WITH ALL APPLICABLE AB2 ANCHOR BOLT DETAIL 0
BUILT-UP (PLATES) ASTM A-572 GRADE 50 (OR EQUI.) Fy = 34.5 kN/cm²
REQUIREMENTS OF ANY GOVERNING AUTHORITIES. AND TO OBTAIN THE HOT ROLLED SECTION Fy = 24.5 kN/cm²
JIS G3101-SS400 (OR EQUI.)
APPROPRIATE APPROVALS AND/OR PERMITS AS MAY BE REQUIRED FROM AB3 COLUMN REACTION 0
COLD FORM NSDC570/NSDH540/ K18 (OR EQUI.) Fy = 45.0 kN/cm²
CITY, COUNTY, STATE, OR FEDERAL AGENCIES. COLD FORM AS 1397 (OR EQUI.) Fy = 45.0 kN/cm² A01 CROSS SECTION AT GL.1 0
ROOF PANEL/ WALL PANEL ASTM A792 Gr.50-JIS G3321 AZ150(OR EQUI.) Fy = 34.5 kN/cm²
2. IT IS THE RESPONSIBILITY OF THE PURCHASER TO COMPLETELY A02 ENDWALL FRAMING AT GL.1 0
ROOF PANEL/ WALL PANEL ASTM A755/A792 Gr.50-JIS G3322 AZ150 (OR EQUI.) Fy = 34.5 kN/cm²
UNDERSTAND WHAT IS INCLUDING OR EXCLUDING FROM ARCHITECTURAL CABLE BRACING EN12385 (OR EQUI.) Fu = 157 kN/cm² A03 CROSS SECTION AT GL.2, 3, 6, 7, 11, 12 0
PLANS AND/OR SPECIFICATIONS. ANCHOR BOLTS JIS G3101-SS400 (OR EQUI.) Fu = 40.0 kN/cm²
HIGH STRENGTH BOLTS (for primary structure) ASTM A325 TYPE 1 Ft = 30.3 kN/cm², Fu = 72 to 83 kN/cm² A04 CROSS SECTION AT GL.4, 5, 8, 9, 10 0
3. IT IS THE RESPONSIBILITY OF THE PURCHASER FOR OVERALL PROJECT MACHINE BOLTS (for secondary structure) DIN 6921- Grade 4.6 (OR EQUI.)Ft = 13.8 kN/cm², Fu = 41.0 kN/cm²
A05 CROSS SECTION AT GL.13 0
COORDINATION, INTERFACE, COMPATIBILITY, AND DESIGN CONCERNING ANY
GENERAL NOTES
MATERIALS NOT FURNISHED BY WITH THE SYSTEM TO BE FURNISHED BY A06 ENDWALL FRAMING AT GL.13 0
SYSTEMS. THE SPECIFIC DESIGN CRITERIA CONCERNING THIS INTERFACE BOLT TIGHTENING REQUIREMENTS:
A07 SIDEWALL FRAMING AT GL.A & J 0
BETWEEN MATERIALS MUST BE FURNISHED BY THE PURCHASER PRIOR TO
1/ IT IS THE ERECTOR'S RESPONSIBILITY TO INSPECT THE TYPE OF BOLT ACCORDING TO THE DRAWINGS A08 DETAIL CONNECTION 0
RELEASE FOR FABRICATION, OR THE DESIGN ASSUMPTIONS OF SYSTEMS DESIGNATE BEFORE INSTALLATION
WILL GOVERN. A09 ROOF PLAN 0
2/ HIGH STRENGTH BOLTS A325 (DIN 8.8) INSTALLATION SHALL BE ASSURED BY THE FOLLOWING METHODS:
-TURN - OF - NUT A10 RIDGE VENT 5.0 0
4. IT IS THE RESPONSIBILITY OF THE PURCHASER TO VERIFY ALL DESIGN
-TORQUE WRENCH
CRITERIA INCLUDING DEFLECTIONS AND NOTIFY SYSTEMS OF ANY A11 ROOF SHEETING PLAN 0
DISCREPANCIES OR INCONSISTENCIES PRIOR TO RELEASE FOR 3/ ANCHOR BOLTS AND SHEAR BEARING CONNECTION OF HIGH STRENGTH BOLTS
SHALL BE INSTALLED BY SNUG - TIGHTENED METHOD A12 ENDWALL SHEETING AT GL.1 0
FABRICATION.
A13 ENDWALL SHEETING AT GL.13 0
5. THE PURCHASER IS RESPONSIBLE FOR THE ACCURATE SETTING OF ANCHOR
A14 SIDEWALL SHEETING AT GL.A & J 0
BOLTS AND ERECTION OF STEEL IN ACCORDANCE WITH CONSTRUCTION
DRAWINGS ONLY TEMPORARY SUPPORTS, GUYS, BRACES,FALSE WORK, A15 DETAIL SHEETING 0
CRIBBING OR OTHER ELEMENTS REQUIRED FOR THE ERECTION OPERATION
A16 DOUBLE SLIDING DOOR 5.0M(W)x5.0M(H) 0
WILL BE DETERMINED, FURNISHED AND INSTALLED BY THE PURCHASER.
6. THE PURCHASER IS RESPONSIBLE FOR ALL AFFECTS THAT MAY BE
IMPOSED ON FACILITIES, LANDS, ROADS, BUILDINGS, ETC.. LOCATED WITHIN
THE PROXIMITY OF THE NEW STRUCTURE, BY THE NEW STRUCTURE,
AFFECTS INCLUDE BUT ARE NOT LIMITED TO SNOW SLIDING, OR DRIFTING,
AND WIND LOADING, SHEDDING, OR VORTEX ACTION.
ENGINEERING CALCULATIONS SUBMITTAL FOR APPROVAL
7. UNLESS SPECIFICALLY STATED OTHERWISE WITHIN SYSTEMS BUILDING CODE: DATE:
IBC-2018 17.03.2023
"PURCHASE OFFER", THE FOLLOWING SHALL GOVERN:
MBMA - 2012 DESIGNED BY: Sent on: SUBMITTAL FOR APPROVAL
DESIGN CODES: NPH
a) IN CASE OF DISCREPANCIES BETWEEN SYSTEMS STRUCTURAL STEEL In order to schedule this project in the most efficient manner, return
AISI - 2001 CHECKED BY: these drawings marked in RED with your comments WITHIN TWO WEEKS
DRAWINGS AND PLANS FOR OTHER TRADES, THE STRUCTURAL STEEL AISC - ASD89 from the above mentioned date WITH COLORS OF SHEETING AND TRIM
TMT
DRAWINGS SHALL GOVERN. AWS - 2015
Any changes made AFTER approval of these drawings will delay the fabrication
DESIGN PARAMETERS ENGINEER'S SEAL and delivery process.
b) SYSTEMS QUALITY CRITERIA, STANDARD PRACTICE, METHODS AND AREA#01 Please supply colors for the sheeting and trim:
TOLERANCES. FRAME TYPE: CS ROOF SHEETING: BY OTHERS
ROOF SLOPE: 1.5:10 WALL SHEETING: BY OTHERS
c) WHEN WINDOW AND/OR DOOR OPENINGS HAVE A COMBINED AREA GUTTER AND DOWNSPOUT: BY OTHERS
BAY SPACING: 12@7.62(M)
INSULATION: BY OTHERS
GREATER THAN 15% OF GROSS WALL AREA ON ANY WALL, AND THE BUILDING WIDTH: 60.93M (OUT TO OUT OF STEEL LINE) LINER: N.A.
BUILDING IS DESIGNED AS "ENCLOSED", THEN THE WINDOWS AND OR LENGTH : 91.44M (OUT TO OUT OF STEEL LINE) SOFFIT: N.A.
DOORS REPRESENTING THE EXCESS ABOVE 15% SHALL BE DESIGNED EAVE HEIGHT: 8.0M FACADE: N.A.
AND DETAILED FOR APPLICABLE LOADING, BY THE PURCHASER. TRIM: BY OTHERS
DESIGN LOADS Trims will be supplied according to the color listed above.
If any trims need to be a different color please make note here.
d) THE SUPPLYING OF SEALED ENGINEERING DATA AND DRAWINGS FOR ROOF DEAD LOAD: 0.1 KN/M² APPROVED WITHOUT CHANGES DMV NPH TMT VTT
THE METAL BUILDING SYSTEM DOES NOT IMPLY OR CONSTITUTE AN No changes, proceed with fabrication
LIVE LOAD: 0.57 KN/M² ON ROOF THIS SEAL IS INTENDED FOR 0 17.03.2023 ISSUED FOR APPROVAL 00
AGREEMENT THAT SYSTEMS OR ITS DESIGN ENGINEER IS ACTING AS 0.3 KN/M² ON FRAME CERTIFACATION OF THE STRUCTURAL APPROVED AS NOTED (MAY INCLUDE CHANGE ORDER)
THE ENGINEER OF RECORD OR DESIGN PROFESSIONAL FOR A PURLIN SPACING: MAX1500 mm DESIGN OF THE METAL BUILDING SYSTEM Fabrication may proceed on the basis of comments indicated.
200'X300' WAREHOUSE
CONSTRUCTION PROJECT. THESE DOCUMENTS ARE SEALED ONLY AS TO COLLATERAL LOAD: 0.05 KN/M² AND COMPONENTS AS PROVIDED BY By signing below, I (We) have reviewed all of the information contained in the
DESIGN. ANY OVERVIEW OF ALL OTHER approval drawings and have found it to be correct, accurate and consistent with
THE COMPONENTS FURNISHED BY SYSTEMS. WIND SPEED: 130 KM/H
PORTIONS OF THE PROJECT ARE NOT my (our) intent and purpose. I (We) accept all of the purchaser responsibilities.
(3-SECOND GUST) I (We) further state the I (we) are authorized to provide acceptance on behalf of
WITHIN THE SCOPE OF THIS SEAL
e) ANY FIELD MODIFICATION OR ALTERATION, OR THE ATTACHMENT OF ANY EXPLOSURE: B the listed company. ZAYET KWIN, NEAR BAGO CITY, MYANMAR
EQUIPMENT OR COMPONENT TO SYSTEMS METAL BUILDING SYSTEMS, OCCUPANCY: II Reviewed by:
SPECIAL LOADS INDEX SHEET
ENCLOSURE: ENCLOSED
OR THE OMITTED INSTALLATION OF ANY SPECIFIED PARTS OR PIECES, Signature: Title:
RAINFALL : 300MM/H MQ17881/23
WITHOUT THE EXPRESS WRITTEN APPROVAL OF SYSTEM SHALL VOID
SEISMIC : Seismic load is based on American Map Zone3 (major). Company:
ANY AND ALL WARRANTIES. M-P02453/23
IT IS THE RESPONSIBILITY OF THE PURCHASER TO VERIFY ALL DESIGN CRITERIA AND NOTIFY PEB Date:
OF ANY DISCREPANCIES OR INCONSISTENCIES PRIOR TO RELEASE FOR FABRICATION. B01 A00
IMPORTANT NOTES:
J
1. All dimensions are in mm unless noted otherwise.
C A A A A A A A A A A A C
2. The customer is responsible for accurate locations of
building lines and bench marks at the building site.
3. The slab or edge beam should be square and level to I
within 5mm tolerance. Anchor bolts should be set to the B B
given dimensions and projection, with maximum deviation
of 5mm. Anchor bolt threads should be protected during
concreting operation, or thoroughly cleaned after pouring. H
All templates should be removed. B B
4. PEB Steel assumes no responsibility or liability for the
column foundations, slab design or construction.
Foundations should be designed as a minimum for the G
B B
given reaction loads.
5. The installation of anchor bolts and embedded items must
be done in accordance with the code of Standard Practice
F
for Steel Buildings of AISC section 7. Anchor bolts and B B
foundation bolts shall be set by the owner (or his civil
contractor) in accordance with PEB Steel "Issued for
Construction Anchor Bolt Plan". Maximum allowable
tolerances are as follows : E
B B
a) 3mm center to center of any two within an anchor bolt
group.
b) 6mm center to center of adjacent bolt groups. D
B B
c) Elevation of the top of anchor bolts +/- 12mm.
d) Maximum accumulation of 6mm per 30 meters along
the established column line of multiple anchor bolt C
groups but not to exceed a total of 25mm B B
e) 6mm from the center of any anchor bolt group to the
established column line through that group.
B
f) The tolerances of paragraphs b, c and d apply to to B B
apply to offset dimensions shown on the plans,
measured parallel and perpendicular to the nearest C A A A A A A A A A A A C
established column line for individual columns shown on A
the plans to be offset from established column line.
6. PEB STEEL LTD(PEBSL) assumes structures. When
required for calculations, no responsibility or liability for
the existing concrete PEB will assume concrete strength of
f'c=3500 psi.
1 2 3 4 5 6 7 8 9 10 11 12 13
7. Before commencing the erection of this building the
erector must read the PEB Erection Manual.
ANCHOR BOLT PLAN
8. In case of descrepancies between PEB Steel structural
steel plans or other trades, PEB Steel plans govern.
(AISC - ASD89)
9. It is important to check that the drawing revision number
shown on each sheet matches with revision in the drawing
transmittal for the same sheet. PEB Steel keeps a master
list showing the latest revision number and date for each SAB
W N
engineering document issued. In case you have any doubt
whether you have the latest revision, you should clear it
DMV NPH TMT VTT
out by contacting our CUSTOMER SERVICE MANAGER at
our head office/plant Tel.Nos.028-38 475 475 or the PEB STRAIGHT ANCHOR BOLT DIMENSIONS PLASTIC CAP
0 17.03.2023 ISSUED FOR APPROVAL 00
Steel's Area office nearest to you. DxP
QTY. SYM. SIZE COMPONENT THREAD PICH T1 T2 L PRO Pipe D L1 200'X300' WAREHOUSE
ID (mm) (mm) (mm) (mm) (mm) (mm) (mm)
10. Building must be erected in strict accordance with PEB
Steel drawings Any deviation must have prior approval M20
from PEB Steel. M24
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
M30
11. PEB Steel will not accept responsibility for any variations ANCHOR BOLT PLAN
M36
or omissions which do not have their written consent.
M42 MQ17881/23
12. PEB steel has right to suggest the connetion which is M48
different than the one show in approval drawing for easy M-P02453/23
to transportation, fabrication, erection STRAIGHT ANCHOR BOLT GRADE 4.6 DETAIL
B01 AB1
J I 13 12
13 12
A B 1 2
1 2
A J
B I
2 B
TO TO
12 I
ANCHOR BOLT DETAIL A ANCHOR BOLT DETAIL B ANCHOR BOLT DETAIL C
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
ANCHOR BOLT DETAIL
MQ17881/23
M-P02453/23
B01 AB2
SIGN CONVENTION SW WIND BRACING SW SEISMIC BRACING
20KN 48KN
+ve
Wind=5KN
Dead=9KN
Live=12KN
Col=2KN
20KN 48KN Wind=-20KN
+ve
+ve WIND COL. REACTION
19KN 19KN 45KN 45KN
GL.1,13
J A
H1 1 H2 2
V1 V2
FRAME @GL.2-12
H1 V1 H2 V2
LOAD CASE
KN KN KN KN
DEAD LOAD 66 62 -66 62
ROOF LIVE LOAD 98 77 -98 77
COLLATERAL 16 13 -16 13
WIND LEFT -116 -96 94 -77
WIND RIGHT -94 -77 116 -96
WIND END -135 -113 135 -113
SEISMIC X LEFT -11 -3 -11 3
SEISMIC X RIGHT 11 3 11 -3
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
COLUMN REACTION
MQ17881/23
M-P02453/23
B01 AB3
C
L of ridge
S5
S7 S7
S7 S7
S7 S7
S7 S7
S6 S6
J I H G F E D C B A
CROSS SECTION AT GL.1
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
CROSS SECTION AT GL.1
MQ17881/23
M-P02453/23
B01 A01
C
L of ridge
* *
* * * * * * * *
* * * * * * * * * *
* * * * * * * * * *
J I H G F E D C B A
ENDWALL FRAMING AT GL.1
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
ENDWALL FRAMING AT GL.1
MQ17881/23
M-P02453/23
B01 A02
C
L of ridge
* * * *
* *
* S4 *
* *
* *
* *
** * S3 S3 * **
** **
S2 S2
S1 S1
** **
* *
A J
CROSS SECTION AT GL.2, 3, 6, 7, 11, 12
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
CROSS SECTION AT GL.2, 3, 6, 7, 11, 12
MQ17881/23
M-P02453/23
B01 A03
C
L of ridge
* * * *
* *
* S4 *
* *
* *
* *
** * S3 S3 * **
** **
S2 S2
S1 S1
** **
* *
A J
CROSS SECTION AT GL.4, 5, 8, 9, 10
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
CROSS SECTION AT GL.4, 5, 8, 9, 10
MQ17881/23
M-P02453/23
B01 A04
C
L of ridge
S5
S7 S7
S7 S7
S7 S7
S7 S7
S6 S6
A B C D E F G H I J
CROSS SECTION AT GL.13
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
CROSS SECTION AT GL.13
MQ17881/23
M-P02453/23
B01 A05
C
L of ridge
* *
* * * * * * * *
* * * * * * * * * *
* * * * * * * * * *
A B C D E F G H I J
ENDWALL FRAMING AT GL.13
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
ENDWALL FRAMING AT GL.13
MQ17881/23
M-P02453/23
B01 A06
1 2 3 4 5 6 7 8 9 10 11 12 13
SIDEWALL FRAMING AT GL.A
13 12 11 10 9 8 7 6 5 4 3 2 1
SIDEWALL FRAMING AT GL.J
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
SIDEWALL FRAMING AT GL.A & J
MQ17881/23
M-P02453/23
B01 A07
DETAIL S1 DETAIL S2 DETAIL S3 DETAIL S4 DETAIL S5
A A B B
VIEW A-A VIEW B-B
DETAIL S6 DETAIL S7 DETAIL SAG ANGLE
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
F.F.L 2 1
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
CANOPY AT GL.1/(B-I) DETAIL CONNECTION
MQ17881/23
M-P02453/23
DETAIL 1 DETAIL 2 B01 A08
TB TB TB TB TB
J
TB TB TB TB TB
I
TB TB TB TB TB
H
TB TB TB TB TB
G
FLANGE STAY WITH LAP
TB TB TB TB TB
F
TB TB RIDGE LINE TB
TB TB TB TB TB
E
TB TB TB TB TB
D
TB TB TB TB TB
C
FLANGE STAY WITH LAP
TB TB TB TB TB
B
TB TB TB TB TB
A
1 2 3 4 5 6 7 8 9 10 11 12 13
ROOF PLAN
B B DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
ROOF PLAN
VIEW B-B MQ17881/23
M-P02453/23
SAG ARRESTOR DETAIL CABLE BRACING DETAIL PURLIN LOCK DETAIL B01 A09
2 3 4 5 6 7 8 9 10 11 12
ROOF FRAMING (TOP PLAN) FLANGE STAY WITH LAP
2 3 4 5 6 7 8 9 10 11 12
FLANGE STAY WITH LAP
ROOF FRAMING (BOTTOM PLAN)
C
L of ridge C
L of ridge
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
RIDGE VENT 5.0 SAG ARRESTOR DETAIL ZAYET KWIN, NEAR BAGO CITY, MYANMAR
RIDGE VENT 5.0
MQ17881/23
M-P02453/23
B01 A10
J
I
SLOPE: 1.5:10

H SLOPE: 1.5:10
G
F
RIDGE VENT 5.0 RIDGE LINE
E
D
C

SLOPE: 1.5:10

SLOPE: 1.5:10
B
A
1 2 3 4 5 6 7 8 9 10 11 12 13
ROOF SHEETING PLAN
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
ROOF SHEETING PLAN
MQ17881/23
M-P02453/23
B01 A11
J I H G F E D C B A
ENDWALL SHEETING AT GL.1
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
ENDWALL SHEETING AT GL.1
MQ17881/23
M-P02453/23
B01 A12
A B C D E F G H I J
ENDWALL SHEETING AT GL.13
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
ENDWALL SHEETING AT GL.13
MQ17881/23
M-P02453/23
B01 A13
1 2 3 4 5 6 7 8 9 10 11 12 13
SIDEWALL SHEETING AT GL.A
13 12 11 10 9 8 7 6 5 4 3 2 1
SIDEWALL SHEETING AT GL.J
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
SIDEWALL SHEETING AT GL.A & J
MQ17881/23
M-P02453/23
B01 A14
C
B
D
E
E
DETAIL-C
A
A
DETAIL-B VIEW A-A
ROOF PANEL DETAIL
DETAIL AT RIDGE DETAIL FLASHING TRIM
CORNER TRIM DETAIL
DETAIL DOWNSPOUT WALL-PROFILE GABLE TRIM DETAIL DRIP TRIM DETAIL
DMV NPH TMT VTT
0 17.03.2023 ISSUED FOR APPROVAL 00
200'X300' WAREHOUSE
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
DETAIL SHEETING
MQ17881/23
M-P02453/23
B01 A15
DETAIL A
VIEW A-A
DETAIL A1 DETAIL 1
SPECIFICATION:
1. Frame: PL-1 & PL-2:
- Size: 8mm TH'K
DMV NPH TMT VTT
- Material steel: ASTM A-36(or EQUI.) Fy=24.5 kN/cm2
0 17.03.2023 ISSUED FOR APPROVAL 00
- Coating: Galvanized
2. Shaft & Nylon Nut:
- Size: M16
- Material steel: ASTM A-36(or EQUI.) Fy=24.5 kN/c
- Coating: Galvanized 200'X300' WAREHOUSE
3. Bearing:
- Size: 6303
F.F.L
ZAYET KWIN, NEAR BAGO CITY, MYANMAR
DOUBLE SLIDING DOOR 5.0M(W)x5.0M(H)
MQ17881/23
M-P02453/23
BRACKET DETAIL
B01 A16