Professional Documents
Culture Documents
Deep Production SFOC
Deep Production SFOC
Deep Production SFOC
Qty
Mode Of Payments
1. All Payments cheques /DDs to be made favour of "Deep Production".
2. Goods & service tax @ 18% extra will be applicable on total billing. If client want bill
7. Cancellation needs to be notified one week in advance the client will face 50% of total cost as expenses.
8. In case of delay the client will have to pay an additional 25% as late cancellation fee.
9. Full 100% will have to be paid in case of cancellation on the day of the event.
10. Full 100% Guarantee cannot be given on any technical equipment. The charges would have to be Bourne anyways by the client/your
company
11. In case of any cancellations due to forces of nature, the client will have to bear the complete cost (100% Charges).
Particular
Venue Construction
Frame Near Main Gate Entrance
Standees
Entrance Gate in Flex
Registration Desk Backdrop Frame in Lobby
Main Led wall raiser
Main led wall Skirting in flex
Led wall raiser
Flower arrangment
Table arrangment in real flowers ( exotic Flowers ) centerpices
Backdrop
Flower arrangment
Confrence Table from Tip Top Hotel
Podium Branding
Podium
Samai with Candle 2, match box, floral décor, trey for candle
Audio Visual
Led Wall P3 on sides
Led wall P3 On stage
Switcher
Photographer
Videographer
Preview Monitor on Stage
Preview monitor Masking
Sound system
JBL VRX Top's Front
JBL VRX Top's Delay
Audio Mixing Console
Sennheiser G4 Hand Cordless Microphone
Mipro Coller / Headset Microphone
Sennheiser Podium Microphone
Amplifier
And All Required Accessories For Setup
Sound Engineer
Technician
Transport
If Client Required Media Box For Camera Out
Podium Microphone For Round Table
Additional Mixing Console For 60 Microphone
Conference Itenary
Logo Designing
Flex Designing
Dairy with Logo Printing
Pen with Logo Printing
Hand Bag with Logo Printing
Confrence table name plate
Name Plate printing
Pendrive with Conference Photographs and Other Data
Photoframe Group Photo Hardcopy
Paper Bags with Logo Printing for photoframe
I-cards
Photoframe Printing
Momento
Power Supply
Genset 82 kva
Missllennious
Manpower & Labour cost ( 4th floor setup )
Transport for all Equipments
Note** Parking and toll Charges to be paid by client
Sub Total
Agency Fees
Grand Total
CGST 9%
SGST 9%
Total
Mode Of Payments
1. All Payments cheques /DDs to be made favour of "Deep Production".
2. Goods & service tax @ 18% extra will be applicable on total billing. If client want bill
7. Cancellation needs to be notified one week in advance the client will face 50% of total cost as expenses.
8. In case of delay the client will have to pay an additional 25% as late cancellation fee.
9. Full 100% will have to be paid in case of cancellation on the day of the event.
10. Full 100% Guarantee cannot be given on any technical equipment. The charges would have to be Bourne anyways by the client/your
company
11. In case of any cancellations due to forces of nature, the client will have to bear the complete cost (100% Charges).