Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment.Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.
Part 1: Background
Currently we have a ongoing project about a Precast Constructions and Girder projects. The major activities
General description of the organisation being carried out are like height work, loading& unloading (breeze girder),lifting,crane operation, rebar work
and hot work (welding &gas cutting) activities etc.
The site runs in two shifts i.e.10.00 hours to 05.00 and 05.00 to 12.00 hours. Work is going on Monday to
Saturday respectively. Sunday declared as holiday.
Description of the area to be included in the risk I will include construction Casting yard,work,mechanical department,fabrication yard,electrical panel board
assessment area,batching plant ,scrap yard area for the purpose of risk assessment.
Any other relevant information Site Health & Safety Officer day to day visit the site and he is responsible for any health and safety issues.
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.
Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
1.Load handling Everyone who works in the area, Adequate When lifting any loose 1days Site Supervisor
equipment including employees, supervisors, supervision on objects, make sure
and engineers site while they are securely
. lifting/shifting fastened with sturdy
Lifting loose items and When loose materials are not operation. ropes. Site Supervisor
not properly attaching securely anchored and fall on 1days
them might cause workers below the crane, they can Barricaded at To prevent public
heavy objects to fall on cause serious injuries, disabilities, or all loading and movement while the
people or objects.. even fatalities. This is the risk unloading area . job is being hoisted,
associated with utilising a crane. The barricading will be Site Engineer
Ensure no
overhead power
lines crane
movement area
2. Fire Visitors, managers, engineers, and The fire Fire curtains should 1 days Site supervisor
Hazard: workers. extinguishers be covered by the
are in good chemical shelf.
A fire could start in When welding is done next to shelves working order.
storage areas holding that hold volatile chemicals, there is a To guarantee safety,
combustible materials risk of fire or explosion, which could Employees assign a fire watcher 2 days Site Supervisor
or during welding cause serious harm, fatalities, and were mandated to each hot task.
activities. property damage. to adhere to a
permit-to-work To separate the
system and storage of combustible 2 weeks .
received commodities, use a Site Supervisor
4.Health, welfare Cleaning workers might get Frequent Conduct a work 10 days Site
and work harmed. breaks were place incahrge,Envirionmental
environment. provided environmental officer,Line manager
The risk of working under the during the assessment and
In the precast yard the direct sunlight could cause work. identify the level
workers are cleaning irritability, fatigue, heat rashes of temperature at
the shuttering plates of due to sweat duct getting blocked, Personal which people are
the griders by using heat cramps, fainting, protective exposing.
buffing and grinding Heat exhaustion, heat stroke and equipments like
machine continuosly 2 days
skin burns hard hats, Conduct training to the
on hot humid condition Site
safety shoes workers based on Incharge,supervisor,Safet
and gloves heat index which y officer,
were provided. covers the hazards
and consequences in
working under direct
sunlight, uses and
limitation of personal
protective equipment.
1 months
Provide shades Site
and shelters to the incahrge,Supervisor,line
cleaning workers manager,Store incharge
Sand 1 days
buckets, Develop pre- user Safety
water type checklist for the officer,supervisor,line
portable fire pedestal grinding manager
extinguisher machine
s were
provided. 4 days
Periodic planned Mechanical
maintenance should incharge,electrician,super
be provide for the visor
pedestal grinding
machine and visually
inspect the grinding
wheels for any
cracks or damages,
check the electrical
connectivity. 1 days
To reduce the
Site
vibration exposure
incharge,Supervisor,,line
time by providing manager
frequent breaks
during the work
with hydrated
drinks and snacks. 1 months
Provide suitable
personal protective Store incharge,site
equipment-warm incharge,Supervisor
hand gloves, dust
mask, safety
goggles,shoes
7.Manual handling: Workers engaged in this activity may While manual 2 days Health and Safety
got harmed due to not following safe material Instead of manually officer,Site incharge or
manual process for shifting,due to handling ,we we can use pick and Manager,site supervisor
At Precast yard while awkward postures provided carry vehicle for safe
worker making the (bending,twisting),highly repetitive required ppe’s lifting the steels.
Girder cage and motions frequent reaching,lifting like (shoulder
shifting the steels carrying),forceful extertions(carrying pad ,shoes,han Health surveillance 1 month Site
manually near to the or lifting heavy loads). d gloves,helmet programme must be incharge/Manager,purcha
machine(Steel ) to the workers. implemented on every se department,Store
Bending and cutting three to six months. Incharge,Mechanical
machine),sometimes Strictly incharge.
they got Instructions Manual handling must 10 days
musculoskeletal given to be done with proper Site Incharge,medical
disorders(MSDS) such workers for not supervision and he staff,health and safety
as pain and injuries to taking heavy must watch for safe officer.
arms,legs and joints, amount of handling process
and repetitive strain steels. followed or not.
injuries of various 1 day
sorts. For manual handling As per machinary
worker are engaged uses for shifting the Site incahrge/manager
rotational shift for steels we can provide
avoiding the work mechanical handling
stress. training to workers.
2 days
Workers are We can also provide
8.Movement of Workers, supervisors, site engineers, Working area Pedestrian way must 2 months Site Incharge,supervisor,
people and vehicles and tourists are all affected. barricaded ,So separated
in the work place others will know
In addition to causing damage to and get turn. Traffic light should be 2 months Site incharge ,Safety
Deployment of an priceless goods, accidents brought install at every corner officer,Supervisor,Store
inexperienced driver on by rookie drivers' incompetence or Speed limit incharge
for transit of workers. negligence can cause injuries, indicator banks man or signal 2 days Site Incharge ,safety
disabilities, and even death to provided on the man must be provided officer,Supervisor
passengers and pedestrians. workplace.
Traffic signal 1 month Store incharge,Site
9.Noise Hazards: The workers, supervisors, engineers Provided For control the noise 10 days Site incharge,Supervisor,
and visitors. required ppe’s we can operate the
Noise pollution from like (ear plugs noise machines during
heavy machinery such Machine noise can be distracting, and other ) the shift where few are
as steel cutters. difficult to communicate with, and whose are exposed.
mentally disorienting. Prolonged working under
Specific legal arguments ILO Convention C 67 Article 26 states that "adequate steps shall be taken, both before and during the course
of construction, to ascertain the presence of and to guard against danger to workers from any live electrical
cable or apparatus which is under, over, or on the site." Work on electrical lines needs to be done by qualified
Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 18 of
22
personnel under knowledgeable supervision. "Nobody should work under them without seeking guidance
when equipment (e.g. ladders, a crane jib, a tipper-lorry body or a scaffold pole) could approach within a
minimum of six metres of a power line," according to the International Labour Organization's labour
administration and safety guidelines.Local laws are also important, such as Federal Law No. 8 in Dubai.
Consideration of likelihood AND severity A hazard's severity is graded from low to high, as follows: -
Unacceptable- hospitalisation for more than one week might last months/significant equipment damage.
Catastrophic – death and/or total loss of the commodity. There are also many levels of likelyhood, ranging
from low to high.
Specific legal arguments ILO Convention C 174, 1993, which describes major accident prevention and reporting
procedures to prevent recurrence of fire accidents, is also pertinent. ILO Recommendation R
164, para (m), guarantees protection against fire dangers at work sites. ILO
Recommendation R 167's Article 29 offers detailed guidelines for storing explosive materials
in a storeroom to prevent fire-related mishaps. The UAE Fire and Safety Code Practise 2018,
Federal Law No. 23 of 2006, Ministerial Laws 24 and 505 of 2012, Ministerial Resolution
(213) of 2007, and the Dubai government's own Civil Defence Department are among the
laws that apply to preventing fire threats.
Consideration of likelihood AND severity
According to the category assigned to justification1- The risk of catching fire while welding at a
storeroom containing flammable goods is high. The presence of hot metal grains from the welding
types of injury or ill health apparatus, a lower humidity environment, and highly flammable compounds are all possible factors.
number of workers at risk The severity of the accident may be "Catastrophic" because the storeroom is confined, with few
how often the activity is carried opportunities for escape. Storerooms typically have only one door. Most fires in storerooms result in
burns that are more than 50% of the body's surface area, which might result in death of the
Specific legal arguments The ILO's code of practise for safety and health in construction mandates the deployment of
barriers to prevent vehicles from falling into excavations and the use of necessary
precautions to avoid worker falls as well. According to ILO Convention C155 on Occupational
Health and Safety, companies are required to give employees a safe workplace.
Consideration of likelihood AND severity
The Likelihood categorise into 3 levels:
types of injury or ill health - Very Unlikely: Rare/Hazard will probably never occur
number of workers at risk - Likely: It will happen but can’t expect to happen on regular basis
how often the activity is carried - Very Likely: Will happen again and again/Certain
out
how widespread the risk is
Because they constantly travel close to the edges, vehicles and employees are at a
significant risk of sliding into excavations where the soil could give way or they could slip. No
obstacles exist to stop the fall.
The magnitude of the fall is major because drivers could sustain serious injuries and