Unit IG2: Risk assessment

Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).

Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment.Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.

Part 1: Background

You should aim to complete this section in 150 - 200 words.


Topic Comments
Name of organisation* ABC Construction company Pvt Limited
Site location* Hor Al_Anz, Dubai, United Arab Emirates
Number of workers 100
ABC construction company Ltd. is well known construction company established in 1990.It deal with various
construction projects like Chimney projects, Railway bridge projects, power plant high rise building projects
etc.

Currently we have a ongoing project about a Precast Constructions and Girder projects. The major activities
General description of the organisation being carried out are like height work, loading& unloading (breeze girder),lifting,crane operation, rebar work
and hot work (welding &gas cutting) activities etc.

The site runs in two shifts i.e.10.00 hours to 05.00 and 05.00 to 12.00 hours. Work is going on Monday to
Saturday respectively. Sunday declared as holiday.

Description of the area to be included in the risk I will include construction Casting yard,work,mechanical department,fabrication yard,electrical panel board
assessment area,batching plant ,scrap yard area for the purpose of risk assessment.
Any other relevant information Site Health & Safety Officer day to day visit the site and he is responsible for any health and safety issues.
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.

You should aim to complete this section in 100 - 200 words.


Note: this section can be completed after you have competed your risk assessment.
Outline how the risk assessment was carried out I confirmed that the H&S documents complied with the quality, environmental safety, and H&S regulations

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 1 of 22


this should include: of the Dubai Labour Ministry. It also met the standards of Convention C 155, ILO Recommendation 164,
 sources of information consulted; and recommendation R148 regarding air pollution, noise, and vibration. I cited the DM Code of Construction
 who you spoke to; and Safety Practise from the Dubai Occupational Safety and Health Administration, which outlines the
requirements for construction field safety systems.
 how you identified:
In order to start my risk assessment, I looked over the company's safe work method statement, standard
- the hazards; operating procedures for lifting, the environmental aspect impact register, the near miss and
- what is already being done; and incident/accident register, and the rest and welfare register. I also spoke with representatives from each
- any additional controls/actions that group of employees, including supervisors, workers, technicians, helpers, and representatives of the safety
may be required. committee. Senior management, a safety advisor, and site engineers were also present during our meeting.
I also conducted tours of the previously mentioned site. After taking all of these steps, it was determined
that more mitigating and remedial activities were needed.
Although the company is striving to achieve the standards for ISO certification, it is not yet certified in
accordance with these worldwide and local regulations. Raising H&S standards through ISO certification
will enable hazards to be lessened or minimised. I have some suggestions for enhancing the health and
safety culture and the legal penalties for noncompliance based on my site visit and document examination.

Part 2: Risk Assessment


Organisation name:ABC Construction company Pvt. Ltd.
Date of assessment:08.11.23
Scope of risk assessment: Mechanical department, FabricationYard, casting yard,batching plant,construction area,electrical panel board,Store
room,steel scrap yard

Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
1.Load handling Everyone who works in the area,  Adequate  When lifting any loose  1days  Site Supervisor
equipment including employees, supervisors, supervision on objects, make sure
and engineers site while they are securely
. lifting/shifting fastened with sturdy
Lifting loose items and When loose materials are not operation. ropes.  Site Supervisor
not properly attaching securely anchored and fall on  1days
them might cause workers below the crane, they can  Barricaded at  To prevent public
heavy objects to fall on cause serious injuries, disabilities, or all loading and movement while the
people or objects.. even fatalities. This is the risk unloading area . job is being hoisted,
associated with utilising a crane. The barricading will be  Site Engineer

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 2 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
object crashing on pricey  All required implemented.  1 week
commodities resulted in a large PPE’s (like hard
financial loss as well. hat,reflective  To operate cranes
jacket, safety safely, operators need
shoes) to have the necessary  Purchase Manager
provided. training.  2 week

 Safety  For safe lifting


awareness communication, walkie
training talkies will be provided  Purchase Manager
conducted to the crane operator  6 month
regarding safe and the signalman.
loading and
unloading  The majority of
/lifting process. contemporary cranes
are available for
 PTW has been purchase with an
taken. integrated tie feature.

 Ensure no
overhead power
lines crane
movement area

2. Fire Visitors, managers, engineers, and  The fire  Fire curtains should  1 days  Site supervisor
Hazard: workers. extinguishers be covered by the
are in good chemical shelf.
A fire could start in When welding is done next to shelves working order.
storage areas holding that hold volatile chemicals, there is a  To guarantee safety,
combustible materials risk of fire or explosion, which could  Employees assign a fire watcher  2 days  Site Supervisor
or during welding cause serious harm, fatalities, and were mandated to each hot task.
activities. property damage. to adhere to a
permit-to-work  To separate the
system and storage of combustible  2 weeks .
received commodities, use a  Site Supervisor

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 3 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
adequate ventilated chamber
training. that is diluted.
 1 month
 In the storage room,  Site Engineer
provide appropriate
lighting and
ventilation.
 3 month  Purchase Manager
 In especially for the
storerooms, install a
fire detection and
suppression system.
3.Slip and Trip Workers at construction area,  Adequate  Implement the 5S  1 week  Line manager, site
Hazard: Supervisors,line supervision system at the site in supervisor, safety officer
manager,Engineer,Customer,Visiters. provided. order to remove the
Slippery surface ,while  PPEs like loose materials from
using shuttering oil in During the material manual shifting
safety shoes, the pathways.
plates and moulds ,oil on the pathway of construction area,
spillage on the the workers, supervisors and line helmets,  3 days  Supervisor, line manager
workplace and other manager may trip over the loose gloves have  Loose materials to
workers splilled . materials (electrical laying cables, been provided be stacked on the
waste concrete lying on ground, to the racks.  1 days  Site supervisor, Safety
water, scrap steels,shuttring workers. Officer
material,etc.) and fall on the ground  Pathway to be
which may lead to several injuries like  Awareness properly hard
cuts, bruises, fractures, muscle training barricaded with
strain/sprains etc. regarding Slip clear demarcation
and Trip so as to avoid
 15 days  Electrical department,
Hazards has dropping of loose Site Supervisor
been materials.
provided.
 Proper illumination  1 month  Safety Officer
 PTW system to be maintained on
was the pathway.

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 4 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
implemented.
 Slip and Trip
 Designated Signage to be put
walkways on the pathway for  20 days  Safety officer, Supervisor
(indicated by good perception of
yellow paint
trip hazards.
lines)
 Material handling
checklist to be
followed.

4.Health, welfare Cleaning workers might get  Frequent  Conduct a work  10 days  Site
and work harmed. breaks were place incahrge,Envirionmental
environment. provided environmental officer,Line manager
The risk of working under the during the assessment and
In the precast yard the direct sunlight could cause work. identify the level
workers are cleaning irritability, fatigue, heat rashes of temperature at
the shuttering plates of due to sweat duct getting blocked,  Personal which people are
the griders by using heat cramps, fainting, protective exposing.
buffing and grinding Heat exhaustion, heat stroke and equipments like
machine continuosly  2 days
skin burns hard hats,  Conduct training to the
on hot humid condition  Site
safety shoes workers based on Incharge,supervisor,Safet
and gloves heat index which y officer,
were provided. covers the hazards
and consequences in
working under direct
sunlight, uses and
limitation of personal
protective equipment.
 1 months
 Provide shades  Site
and shelters to the incahrge,Supervisor,line
cleaning workers manager,Store incharge

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 5 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
for taking rest
 15 days
 Provide sample
amount of drinking  Site incharge,line
water ,hydrated manager,Supervisor
solutions and foods
at workplace.
 4 days

 Conduct health  Site Incharge,line


surveillance manager,Safety officer
programs to workers
who exposing to
high temperature.  1 months

 Provide air  Store


coolers and incharge,Supervisor,Site
fans facility in incharge,
the working
area.

5.Work Fabricators might be  Personal  Provide the fixed  1) 10 days  1) Mechanical


equipment and harmed. protective machine guard incharge,Site
machinery  equipment’  arrangement incharge,Site supervisor
The risk of contact with the rotating s-cotton s to the
Fabricators using the grinding wheel, drawing into the trap hand pedestal
unguarded pedestal between the tool rest and wheel, the gloves, grinding
grinding machine for ejected parts from the machine could hardhats machine.
grinding tool edge results in cuts, lacerations. and sturdy
footwear,  2 days
were  Provide machinery  Site incahrge,mechanical
provided. safety training to incharge,Safety Officer
workers which

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 6 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
 The pedestal cover safe operating
grinding procedures, hazards
machine was associated with
properly grinding operation,
insulated and uses and limitation
earthed and of personal
well mounted protective
in the floor. equipment.

 Sand  1 days
buckets,  Develop pre- user  Safety
water type checklist for the officer,supervisor,line
portable fire pedestal grinding manager
extinguisher machine
s were
provided.  4 days
 Periodic planned  Mechanical
maintenance should incharge,electrician,super
be provide for the visor
pedestal grinding
machine and visually
inspect the grinding
wheels for any
cracks or damages,
check the electrical
connectivity.  1 days

 .Before starting the  Mechanical


pedestal grinder incharge,supervisor,
manually spin the Electrician

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 7 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
wheel to make sure it
is spinning freely and
also ensure the
grinder speed does
not exceed the  2 days
operating permissible
speed marked on the
machine
 Safety signages were  Line manager,Safety
provided officer,store
 “Do not grind incharge,Safety officer
non-ferrous
metals”
 “Hot work in
progress keep out
flammable
substances”
 1 month
 Provide personal
protective
equipment-hand
cut resistance  Store incharge,Site
sleeve, face incharge,Safety
officer,Supervisor
visor, goggles,
metal mesh hand
gloves and
sturdy
 footwears
6.Vibration Chipping workers involved in the  Personal  To conduct simple  2 days  Site
Hazard: removing of unwanted concrete on protective vibration survey by Incahrge,Supervisor,line
the floor might be get harmed. equipment- using the hand held manager.
In the precast yard cotton gloves, vibration mete for
chipping workers The risk of prolonged usage of hardhats, measuring the

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 8 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
continuously use the pneumatic scaling hammer which sturdy vibration level in
pneumatic jack could cause the hand arm vibration footwear, ear the working area.
hammer for removing of acute effect like whitening of plugs were
unwanted concrete in palm,finger,loss of provided.  Replacing the  1 months
the floor after dexterity, numbness in hands, loss pneumatic jack  Site
completion of of sensation and chronic effect like incharge,Supervisor,line
hammer by providing
concreting work vascular disorder in finger’s blood manager,Store Incharge
 Frequent electric chipping
vessel, neurological disorders. breaks were machine to avoid the
provided during excess vibration.
the work.
 2 days
 Provide training to
the workers on  Site incharge,Safety
electric chipping officer
machine on safe
operating
procedures, hazards
associated with the
machine.
 1 days

 Conduct tool box


talk for the safe  Safety officer,Site
usage of machines  2 days incharge,Supervisor

 To reduce the
 Site
vibration exposure
incharge,Supervisor,,line
time by providing manager
frequent breaks
during the work
with hydrated
drinks and snacks.  1 months

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 9 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)

 Provide suitable
personal protective  Store incharge,site
equipment-warm incharge,Supervisor
hand gloves, dust
mask, safety
goggles,shoes

7.Manual handling: Workers engaged in this activity may  While manual  2 days  Health and Safety
got harmed due to not following safe material  Instead of manually officer,Site incharge or
manual process for shifting,due to handling ,we we can use pick and Manager,site supervisor
At Precast yard while awkward postures provided carry vehicle for safe
worker making the (bending,twisting),highly repetitive required ppe’s lifting the steels.
Girder cage and motions frequent reaching,lifting like (shoulder
shifting the steels carrying),forceful extertions(carrying pad ,shoes,han  Health surveillance  1 month  Site
manually near to the or lifting heavy loads). d gloves,helmet programme must be incharge/Manager,purcha
machine(Steel ) to the workers. implemented on every se department,Store
Bending and cutting three to six months. Incharge,Mechanical
machine),sometimes  Strictly incharge.
they got Instructions  Manual handling must  10 days
musculoskeletal given to be done with proper  Site Incharge,medical
disorders(MSDS) such workers for not supervision and he staff,health and safety
as pain and injuries to taking heavy must watch for safe officer.
arms,legs and joints, amount of handling process
and repetitive strain steels. followed or not.
injuries of various  1 day
sorts. For manual handling  As per machinary
worker are engaged uses for shifting the  Site incahrge/manager
rotational shift for steels we can provide
avoiding the work mechanical handling
stress. training to workers.
 2 days
 Workers are  We can also provide

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 10 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
provided rest training or practices to  Mechanical
for every two workers for kinetic incharge,Safety
hours. manual handling officer,Site Incharge,Site
training. Supervisor
 2 days
 If we use crane for
shifting ,the crane
must have third party  Safety officer,Site
inspections incharge
certificate,the operator  g)Mechanical
must have valild incharge,Site
licence and other Incharge,Safety officer
required documents
must be checked .
 2 months
 We can provide
special training for
safe manual handling
process.
 Safety officer,site
Incharge,
 Supervisor

8.Movement of Workers, supervisors, site engineers,  Working area  Pedestrian way must  2 months  Site Incharge,supervisor,
people and vehicles and tourists are all affected. barricaded ,So separated
in the work place others will know
In addition to causing damage to and get turn.  Traffic light should be  2 months  Site incharge ,Safety
Deployment of an priceless goods, accidents brought install at every corner officer,Supervisor,Store
inexperienced driver on by rookie drivers' incompetence or  Speed limit incharge
for transit of workers. negligence can cause injuries, indicator  banks man or signal  2 days  Site Incharge ,safety
disabilities, and even death to provided on the man must be provided officer,Supervisor
passengers and pedestrians. workplace.
 Traffic signal  1 month  Store incharge,Site

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 11 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
 Work is going indication posters incharge,superviser
on with proper should be provided
supervision. where workers and
vehicle drivers will
knows about road
root.
 2 days  Safety Officer,Site
 For safe driving Incharge
defensive driving
training must be
conducted for all
drivers and operators
 2 days
 Workers awareness  Safety officer,Site
training also Incharge
conducted about
traffic rules and
signals.  2 days

 Speed monitoring  Store incharge,Site


devices must be Incharge,Superviser
provided for monitor
the speed .

 Traffic management  1 months  Site Incharge,Traffic


system need to be controller.
implement.

9.Noise Hazards: The workers, supervisors, engineers  Provided  For control the noise  10 days  Site incharge,Supervisor,
and visitors. required ppe’s we can operate the
Noise pollution from like (ear plugs noise machines during
heavy machinery such Machine noise can be distracting, and other ) the shift where few are
as steel cutters. difficult to communicate with, and whose are exposed.
mentally disorienting. Prolonged working under

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 12 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
exposure can also increase the risk noise activity  We can limit the  1 days  Site incharge,line
of cardiovascular disease. area, amount of time a manager, Supervisor
Employees who operate in noisy person spends at
settings may suffer from temporary or  Area barricaded noise source.
irreversible hearing loss. where heavy
noise activity  we can provide quiet  2 days  Site
carried out, areas where worker incharge,supervisor,line
can get relief from manager.
 Provided low hazardous sources.
noise
equipment and  We can use the  1 months
tools. sound meter for check  Site incharge,Line
the noise level daily manager,supervisor,Stor
basis. e incharge

 We can also provide  1 months


sign boards at noise  Store incharge,safety
activity areas where officer,site incahrge
worker can see and
read it.

 We must provide a  2 days


training to all  Site incharge,line
workers,staff about manager,supervisor,safet
noise hazards ,effects y officer
and how to control.
10.Hazardous Workers,Supervisors,Site  Provided to  Before using the oil  15 days  Site
substances(Chemical engineer,line manager,visiters workers take necessary control incharge ,Supervisors,Saf
or Biological) required ppe’s measures as per ety officer
Workers are using shuttering oil like personal MSDS data
In precast yard openly without any restrictions. protective
workers are using clothings,hand  Should arrange a  5 days
Chemical liquid Sometimes they using it without gloves,goggles, special worker  Site
solutions (shuttering oil proper ppe’s etc. awareness training for incharge,Supervisor,Safe
)for remove the girder workers for safe uses ty officer

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 13 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
shuttering plate. Workers using the chemical  Provided safe of shuttring oil and its
shuttering oil in open bucket or pot ,it equipment to hazards and how it
is not safe for use. carry the harms.
shuttring oil
So it would harm people who are whenever used  Used a daily checklist  2 days
using it unsafely. it. for before use it and  safety officer,Supervisor
take signed over
 It has using with supervisors and
proper concern department.
supervision and
instructions.  It should be inspected  2 days
regular basis  Supervisor,Safety officer
whenever it used .

 Sign boards,posters  1 months


should be hang on  Store incahrge,Site
work places and incharge,Safety
written it local officer,Supervisor
languages about how
toxic the oil ,its effects
to our body and skin
and precautions.
 1 months
 While use it take fire  Site
prevention system incharge,supervisor,line
near by and all other manager,Store incharge
combustable should
be removed from the
place.
11.Working at Workers inside excavation, drivers
height of vehicles, workers around  Shoring was  Set up barriers to  3 week  Site safety officer
Falling of materials, excavated area. offered by stop movement
vehicles and people People and cars excavations close to the
into excavations entering the excavation.

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 14 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
excavation, as well as  Ladder  1 week  Supervisor
objects falling upon access given  daily check of the
the workers. for excavating ladder used to enter  1 month
 When the excavation  Supervisor
workers  Set up mesh
are present barriers to stop
inside objects from  1 month  Site safety
excavation falling into the officer
s, no work room.
is
scheduled.  Create
emergency
 To prevent protocols to
them from handle crisis
falling scenarios
inside,
excavated
dirt or
materials
should be
removed
quickly.

12.Electric hazard Workers and maintenance  Rubber boot  Prior to operating


Mobile cranes are personnel. and rubber cranes close to  Immediate  Site Supervisor
working in close When a crane is moved without gloves were overhead wires,
proximity to live a signalman, It may collide with provided as ensure that live lines
overhead power live wires, resulting in a powerful part of the are discharged by a  Site Engineer
qualified person  1 weeks

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 15 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
lines electric shock that can cause PPE. under the guidance
severe burns or even death. of an expert.
 Around the  There should to be  1 week  Safety officer
maintenance first aid supplies and
area, there emergency vehicles
are signs and on hand.
barricades.  There will be  2 week
dedicated meetings  Site supervisor
to address
procedures related
to mobile cranes
that are in  1 month  Electrical Engineer
communication with
live lines.
 For crane
movement when live
overhead wires are  3 month
present, an  Purchase Manager
exclusive signal man
will be sent
 In the event of an
emergency, an
automatic cut-off
system for live wires
will be built.
 Overhead power
lines that are
insulated and
armoured may be
erected as far as

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 16 of 22


Hazard category and Who might be harmed and how? What are you What further Timescales for Responsible person’s job
hazard already doing? controls/actions are further actions title
required? to be
completed
(within …)
practical.

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 17 of 22


Part 3: Prioritise 3 actions with justification for the selection
Suggested word counts
Moral, general legal and financial arguments for all actions: 300 to 350 words
For EACH action:
Specific legal arguments: 100 to 150 words
Likelihood AND severity: 75 to 150 words
How effective the action is likely to be in controlling the risk: 100 to 150 words

Moral, general legal and financial arguments for ALL actions


Moral, general legal and financial arguments ABC company construction company has the moral duty to provide their workers from any kind of injury and
illness enveloping from the workplace conditions.The employer must provide safe working environment like-
safe equipment ,machinary and safe working conditions.So the worker should remain safe and return home
happily without any injury.It is a responsibility the employer that the coming to work should not go through
physical and mental stress.The worker morale may get shatteredand the productivity may go down.If any
worker getting injured it may affect the family members,friends and relatives of the workers.
The employer must be follow all the legal compliances as per ILO c155 occupational health and safety
conventions act 1981.If the employer fails to comply with all the legal requirement, it may lead to several
accidents or incident followed by enforcement visit.The enforcement authority may issue warning
letter ,impose improvement, prohibition notice,impose fines,and penalties may prosecute the employer.
If the management fails to implement the recommend control actions,it may leads to several accidents and
incidents which may have several financial impact to the organisations. Financial impact like : increase on the
hospital costs ,absence costs of employee, training cost of replaced workers and increase the insurance
premium etc.

Justification for action 1


Action (Taken from column 4 of risk Mobile cranes are operating near live overhead electric lines to be discharged (Hazard category 'Electrical
assessment)

Specific legal arguments ILO Convention C 67 Article 26 states that "adequate steps shall be taken, both before and during the course

of construction, to ascertain the presence of and to guard against danger to workers from any live electrical

cable or apparatus which is under, over, or on the site." Work on electrical lines needs to be done by qualified
Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 18 of
22
personnel under knowledgeable supervision. "Nobody should work under them without seeking guidance

when equipment (e.g. ladders, a crane jib, a tipper-lorry body or a scaffold pole) could approach within a

minimum of six metres of a power line," according to the International Labour Organization's labour

administration and safety guidelines.Local laws are also important, such as Federal Law No. 8 in Dubai.

Consideration of likelihood AND severity A hazard's severity is graded from low to high, as follows: -

 types of injury or ill health


 number of workers at risk Desirable- Minimal effect, no absenteeism, and minimal material loss.
 how often the activity is carried
out
Acceptable- Same-day absenteeism/minor damage to the commodity.
 how widespread the risk is

Undesirable- Accident necessitates a couple of days in the hospital/slight material/equipment damage.

Unacceptable- hospitalisation for more than one week might last months/significant equipment damage.

Catastrophic – death and/or total loss of the commodity. There are also many levels of likelyhood, ranging
from low to high.

Unlikely - Chances are extremely uncommon.

Likely- There are just a few chances.

Very likely- Most circumferences are likely to have them.

Certain- This is a possibility in the majority of circumstances.


Inflicting electric shock while operating mobile cranes in close proximity to live electric lines is "likely" since

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 19 of


22
cranes are typically not in direct contact with the earth because the only portion of the crane that comes into
contact with the earth is the rubber tyre, which is an excellent insulator. If any metal part from cranes comes
into direct touch with the ground, the probability is "Certain."
According to the KVA rating of the power line, the severity of crane injuries that come into direct touch with
the ground might be "Unacceptable or Catastrophic."
How effective the action is likely to be in
If cranes are operating near discharged lines, the only risk is that electric lines will be damaged. Workers will
controlling the risk. This should include:
not be harmed.
 the intended impact of the action;
 justification for the timescale that
you indicated in your risk The timetable is "immediate" because the live lines must be released as soon as possible before cranes may
work near them.
assessment; and
 whether you think the action will
fully control the risk Yes:With the exception of damage to lines caused by discharging power lines while operating cranes near
overhead wires, the risk of causing shock can be completely "Eliminated”.

Justification for action 2


Action (Taken from column 4 of risk Provide a fire warning/arresting system, particularly in areas where combustible products are housed (Hazard
assessment) category "Fire").

Specific legal arguments ILO Convention C 174, 1993, which describes major accident prevention and reporting
procedures to prevent recurrence of fire accidents, is also pertinent. ILO Recommendation R
164, para (m), guarantees protection against fire dangers at work sites. ILO
Recommendation R 167's Article 29 offers detailed guidelines for storing explosive materials
in a storeroom to prevent fire-related mishaps. The UAE Fire and Safety Code Practise 2018,
Federal Law No. 23 of 2006, Ministerial Laws 24 and 505 of 2012, Ministerial Resolution
(213) of 2007, and the Dubai government's own Civil Defence Department are among the
laws that apply to preventing fire threats.
Consideration of likelihood AND severity
According to the category assigned to justification1- The risk of catching fire while welding at a
storeroom containing flammable goods is high. The presence of hot metal grains from the welding
 types of injury or ill health apparatus, a lower humidity environment, and highly flammable compounds are all possible factors.
 number of workers at risk The severity of the accident may be "Catastrophic" because the storeroom is confined, with few
 how often the activity is carried opportunities for escape. Storerooms typically have only one door. Most fires in storerooms result in
burns that are more than 50% of the body's surface area, which might result in death of the

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 20 of


22
personnel.
out
 how widespread the risk is

How effective the action is likely to be in


By installing an automatic fire warning and fire fighting system, it will be feasible to have automatic fire
controlling the risk. This should include:
suppression and early warning. The personnel will have the opportunity to evacuate when the fire alarm
 the intended impact of the action; sounds.
 justification for the timescale that
you indicated in your risk
It takes time to install automatic fire detection and suppression systems and to get local government
assessment; and
permissions and inspections. This is why a minimum of three months is needed.
 whether you think the action will fully
control the risk
Yes: By using an automatic fire alarm/firefighting system, personnel will receive early warning and fire-related
accidents will be reduced to a minimum.

Justification for action 3


Action (Taken from column 4 of risk Place barriers to prevent movement of people and vehicles near excavations. (Working at
assessment) height)

Specific legal arguments The ILO's code of practise for safety and health in construction mandates the deployment of
barriers to prevent vehicles from falling into excavations and the use of necessary
precautions to avoid worker falls as well. According to ILO Convention C155 on Occupational
Health and Safety, companies are required to give employees a safe workplace.
Consideration of likelihood AND severity
The Likelihood categorise into 3 levels:

 types of injury or ill health - Very Unlikely: Rare/Hazard will probably never occur
 number of workers at risk - Likely: It will happen but can’t expect to happen on regular basis
 how often the activity is carried - Very Likely: Will happen again and again/Certain
out
 how widespread the risk is
Because they constantly travel close to the edges, vehicles and employees are at a
significant risk of sliding into excavations where the soil could give way or they could slip. No
obstacles exist to stop the fall.
The magnitude of the fall is major because drivers could sustain serious injuries and

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 21 of


22
personnel within the building could die from plunging into the pit.
How effective the action is likely to be in Because they constantly travel close to the edges, vehicles and employees are at a
controlling the risk. This should include: significant risk of sliding into excavations where the soil could give way or they could slip. No
 the intended impact of the action; obstacles exist to stop the fall.
 justification for the timescale that The magnitude of the fall is major because drivers could sustain serious injuries and
you indicated in your risk personnel within the building could die from plunging into the pit.
assessment; and
 whether you think the action will fully
control the risk

Part 4: Review, communicate and check


Suggested word counts for each section:
 Planned review date or period and reasoning for this: 50 - 100 words
 How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words
 Follow up on the risk assessment: 100 - 150 words.
Planned review date/periodwith reasoning As per the company policy, Risk assessment has to be reviewed at least every 12 months
That is 08/11/2024
.Risk assessment also reviewed if any top management changes or before the dedicated date if any changes
in work process adopted.
How the risk assessment findings will be I will arrange a safety meeting with project manager,HR admin ,site in-charge and store department to go
communicated AND who you need to tell through the actions in risk assessment and agree with the actions and time scale for each actions
provided.The site engineers and supervisors will be also involved in the meeting.After the meeting the
meeting details circulated to all the department through email.The enginees and supervisors called for
training for the finding of risk assessment.
The H&S officer and supervisor told that will be communicate the findings with workers in local languages
during daily TBT.The outcome can also be displays on company notice board and intranet.
How you will follow up on the risk I will prepare an action plan based on the control actions and recommended and will give a reminder to the
assessment to check that the actions have responsible person before 7 days of completion the respective actions.I can also carry out a field visit to
been carried out inspect the workplace and check if the recommended controls actions are being implemented or not.I also
check the purchase copies and orders to ensure the actions recommended for procurement are in trasit.If I
find the actions are not completed within the time period ,I will intimate the same to the project manager to
make the necessary resources available for timely completed the necessary actions.

Learner number: 00724769 Learner name: Dattatreya Keshari Samal Page 22 of