The document outlines a time schedule for a construction project in Makassar, Sulawesi Selatan from January 2023 to December 2023. It includes preparation work from January to March 2023, with land analysis, architectural design, structure design, and MEP design taking place from February to April 2023. Main construction is scheduled to take place from April to December 2023, with projected completion by the end of December 2023.
The document outlines a time schedule for a construction project in Makassar, Sulawesi Selatan from January 2023 to December 2023. It includes preparation work from January to March 2023, with land analysis, architectural design, structure design, and MEP design taking place from February to April 2023. Main construction is scheduled to take place from April to December 2023, with projected completion by the end of December 2023.
The document outlines a time schedule for a construction project in Makassar, Sulawesi Selatan from January 2023 to December 2023. It includes preparation work from January to March 2023, with land analysis, architectural design, structure design, and MEP design taking place from February to April 2023. Main construction is scheduled to take place from April to December 2023, with projected completion by the end of December 2023.
LOKASI : MAKASAR REGION : SULAWESI SEL KONSULTAN DESIGN : PERIODE : 1/1/2023- 31/12/2023 Jan-17 Feb-17 Mar-17 Apr-17 REMARK No DESCRIPTIONS OF WORK W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 1 Preparation Start
2 Land Analisis
Topografy
Soil Test
Land clearing
3 Architech design
Pre Design
Full design
4 Structure design 5 MEP design
6 Construction Finish 31 des. 2017
Jakarta , January 2017
Menyetujui PT. ………………………………………… PT. …………………………………..
TEAM LEADER Suwarman Wibowo