QW223601 03 MCT 4500004013 PR D156 00001 - 02

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

DRAWING LEGENDS NOTES:-

1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN


B) PIPE LINE IDENTIFICATION TERMINATION POINT AND ONLY WITHIN THE SKID WILL
INSTRUMENT GENERAL EQUIPMENT SYMBOLS (BALLOONS):- BE SUPPLIED BY PACT ENGINEERING.
PIPING / CABLE SYMBOLS VALVE SYMBOLS FLOW INSTRUMENTS TEMPERATURE INSTRUMENTS X-XXX-XXXX-XXXX-XXX-XXXX
2. PIPING MATERIAL
MAIN PROCESS LINE BUTTERFLY VALVE (NORMALLY OPEN) FC FLOW CONTROLLER TE TEMPERATURE ELEMENT PRESSURE RATING CODE FIELD MOUNTED INSTRUMENT LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
FCV FLOW CONTROL VALVE TI TEMPERATURE INDICATOR MATERIAL GROUP HDPE (for size > 250 DN)
SECONDARY PROCESS LINE BUTTERFLY VALVE (NORMALLY CLOSED) FE FLOW ELEMENT PANEL MOUNTED INSTRUMENT
HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)
LINE SIZE
BY CLIENT / BY OTHERS 1-FI FLOW INDICATOR TT TEMPERATURE TRANSMITTER 3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ
BALL VALVE (NORMALLY OPEN) FT FLOW INDICATOR TRANSMITTER LINE SEQUENCE NUMBER 230V, 3PH, 50HZ
ABBREVIATIONS (X) LOCAL PANEL MOUNTED INSTRUMENT
AIR SCOURING FM FLOW METER FLUID CODE 4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
BALL VALVE (NORMAL CLOSED) COND CONDUCTIVITY
FS FLOW SWITCH TRAIN NO SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)
SOFT SIGNAL ORP OXIDATION REDUCTION POTENTIAL
CHECK VALVE INDICATION ON PLC HMI
PRESSURE INSTRUMENTS pH POWER OF HYDROGEN 5. TERMINATION POINT
HARDWIRED SIGNAL C) VALVE IDENTIFICATION
DIAPHGRAM VALVE (NORMALLY OPEN) TDS TOTAL DISSOLVED SOLIDS
BOUNDARY DPS DIFFERENTIAL PRESSURE SWITCH TEMP TEMPERATURE X-XX-XXX-XXX(X)-XXXX I INTERLOCK (IN PLC) By PACT BY CLIENT

DIAPHGRAM VALVE (NORMALLY CLOSED) 1-PG PRESSURE GAUGE TOC TOTAL ORGANIC CARBON
AIR GRID VALVE SIZE
PT PRESSURE TRANSMITTER TSS TOTAL SUSPENDED SOLIDS X = ABBREVIATIONS (INSTRUMENTS)
GLOBE VALVE (NORMALLY OPEN) PSLL PRESSURE SWITCH LOW-LOW SEQUENCE CODE (STREAM)
LINE WITH INSULATION XX = INSTRUMENT FUNCTION LETTERS
PSL PRESSURE SWITCH LOW GENERAL INSTRUMENTS (XX) VALVE CODE 0000 = INSTRUMENT TAG NUMBER
GLOBE VALVE (NORMALLY CLOSED)
LINE CROSSING (UNCONNECTED) PSH PRESSURE SWITCH HIGH ACTUATOR CODE (IF APPLICABLE)
AE ANALYZER ELEMENT
GATE VALVE (NORMALLY OPEN) PSHH PRESSURE SWITCH HIGH-HIGH TRAIN NO
AT ANALYZER INSTRUMENT TRANSMITTER CLIENT MAIN CONTROL SYSTEM
GATE VALVE (NORMALLY CLOSED) CE CONDUCTIVITY ELEMENT (IF APPLICABLE)
TERMINATION POINT LEVEL INSTRUMENTS NOMINAL SIZES
CT CONDUCTIVITY TRANSMITTER
NEEDLE VALVE (NORMALLY OPEN) LG LEVEL GAGE GLASS INCH FOR HIGH PRESSURE SS LINE PACT PLC HMI INDICATION
EQUIPMENTS :- LI LEVEL INDICATOR MISCELLANEOUS (FUNCTIONAL)
NEEDLE VALVE (NORMALLY CLOSED) DN/mm FOR HDPE / UPVC LINE
LIC LEVEL INDICATING CONTROLLER CIP CLEAN-IN-PLACE
PUMP GENERAL PRESSURE RATING CODE NO.
LIT LEVEL INDICATING TRANSMITTER FC FAIL TO CLOSE
PLUG VALVE (NORMALLY OPEN) High Pressure Line (SS/CS) Low Pressure Line (UPVC/CPVC&PVDF)
LS LEVEL SWITCH FO FAIL TO OPEN
PROGRESSIVE CAVITY PUMP LSH LEVEL SWITCH HIGH FD FLUID DISPLAY Code Rating Code Rating ANALYTICAL ELEMENT
PLUG VALVE (NORMALLY CLOSED)
LSHH LEVEL SWITCH HIGH HIGH N.C. NORMALLY CLOSED SH10 Schedule 10 PN6 6 Bar WITH TRANSMETER
AIR RELIES VALVE LSL LEVEL SWITCH LOW N.O. NORMALLY OPEN
DOSING PUMP GENERAL SH20 Schedule 20 PN10 10 Bar
LSLL LEVEL SWITCH LOW LOW SG SIGHT GLASS
PR PRESSURE REGULATOR SH40 Schedule 40 PN16 16 Bar
PRESSURE RELIEF VALVE LSM LEVEL SWITCH MID
AIR BLOWER CENTRIFUGAL / LT LEVEL TRANSMITTER RO RESTRICTION ORIFICE SH80 Schedule 80 PN25 25 Bar
SIDE CHANNEL GENERAL LAL LEVEL ALARM LOW RD RUPTURE DISC MATERIAL GROUP FLUID CODES
LALL LEVEL ALARM LOW-LOW G BSP THREADED CS1 Carbon steel BIO Biocide
BACK PRESSURE VALVE BS BRITISH STANDARD FLANGE MCP
LAH LEVEL ALARM HIGH CS2 Carbon steel epoxy coated CAC Lime (Calcium Carbonate) PACT MAIN CONTROL
DOSING TANK S
LAHH LEVEL ALARM HIGH-HIGH STR BASKET STRAINER PANEL
SOLENOID VALVE CS3 Carbon steel rubber linned CIP Cip water
M GI1 Galvanized iron FIL Filtered water
CARBON CARTRIDGE MOTORIZED ACTUATOR GR1 Glass Fiber Reinforced Plastic IA Instrument air
FILTER
PNEUMATIC ACTUATOR SINGLE GR2 Glass Fiber Reinforced Plastic PA Process air
PE1 High density Polyethylene VFD VARIABLE FREQUENCY
ACTING POL Polyelectrolyte
VERTICAL TYPE PE2 Low density Polyethylene POW Potable water DRIVE
PNEUMATIC ACTUATOR DOUBLE
CARTRIDGE FILTER PV1 U-Poly Vinyl Chloride RAW Raw water
ACTING
PV2 C-Poly Vinyl Chloride RJW RO reject water
HORIZONTAL TYPE PNEUMATIC CONTROL VALVE SS1 Stainless steel 304 RPW RO product water
CARTRIDGE FILTER A) EQUIPMNT NUMBERING SS2 Stainless steel 316 MCC PACT MCC
COA Coagulant
SAMPLE VALVE SS3 Stainless steel 316L HCL Hydrochloric acid
BASKET STRAINER X - XX - XXX - X
SS4 Duplex stainless steel SCA Antiscalant
SS5 Super Duplex stainless steel JB JUNCTION BOX
STREAM CODE SEW Service water
ENERGY RECOVERY DEVICE FLOAT VALVE PP1 Polypropylene SHC Sodium Hypochlorite (Chlorine)
SEQUENCE / TAG NO. PL1 Polyethylene SLU Sludge
RO PRESSURE VESSEL EQUIPMENT CODE SBS SMBS
3 WAY VALVE VALVE AND ACTUATOR CODES
TRAIN CODE SUL Sulfuric acid (H2SO4)
ARV Air Relief Valve
ELECTRIC MOTOR GENERAL EQUIPMENT CODE STEP CODE SOS Sodium Silicate
BFV Butterfly Valve
VACCUM BREAKER CAS Calcium Sulfate
AC AIR CONDITIONER FT DUAL/MULTI MEDIA FILTER A STEP-A BPV Back Pressure Valve
WAS Waste Water
SCREW CONVEYER AD AIR DRYER HE HEAT EXCHANGER B STEP-B BV Ball Valve
FUEL FUEL
AF AIR FAN MMF MULTI MEDIA FILTER CV Check Valve
PENSTOCK VALVE DV Diaphragm Valve
WATER DRAIN AG AGITATOR MX MIXER
BL AIR BLOWER P PUMP FV Foot Valve
CC CALIBRATION COLUMN PD PULSATION DAMPER GLV Globe Valve
CHEMICAL DRAIN MULTI FUNCTION VALVE (PRV + BPV)
PRESSURE REGULATOR GV Gate Valve
CF CARTRIDGE FILTER PR
MA Motorized Actuator
ONLINE INSTRUMENT :- CP COMPRESSOR PU PACKAGE UNIT
MOV Motorized Valve
MIXER OR AGITATOR EF EXHAUST FAN RPV RO PRESSURE VESSEL
MV Multi Port Valve
M MAGNETIC METER EH ELECTRIC HEATER SC SAND CONVEYER NV Needle Valve
STATIC MIXER EJ EJECTOR SCR SCRAPPER PA1 Pneumatic Actuator-single acting
PADDLE WHEEL METER ERD ENERGY RECOVERY DEVICESTM STATIC MIXING PA2 Pneumatic Actuator-double acting
ATMOSPHERE VENT EX ELECTRIC MOTOR STR STRAINER PCV Pneumatic Control Valve
VORTEX FA FUME ABSORBER TK TANK PNS Penstock Valve
"Y" TYPE STRAINER PRV Pressure Relief Valve
FIL FILTER UV ULTRAVIOLET STERILIZATION SYSTEM PV Plug Valve
HEATER ULTRASONIC X MISCELLEANEOUS EQUIPMENT
H HEATER UY Solenoid Valve
XXX FIL FILTER LE LABORATORY EQUIPMENT SV Sample Valve
CALIBRATION COLUMN 000 PRESSURE INSTRUMENT SK SKIMMER V Valve
DIRECT CONNECTED SOV Solenoid Valve
MANWAY XXX
NV Needle Valve
000 PNS Penstock Valve
PULSATION DAMPNER PRESSURE INSTRUMENT MFV Multi Functional Valve
w/ DIAPHRAGM SEAL VB Vacccum Breaker
SB Spectacle Blind
DIAPHRAGM SEAL ROTAMETER
DRAWING CODE
FIRE EXTINGUISHER WATERMETER
PID PIPING AND INSTRUMENTATION
FITTINGS :- DIAGRAM
PFD PROCESS FLOW DIAGRAM
SM SMOKE DETECTOR
CONCENTRIC REDUCER PBD PROCESS BLOCK DIAGRAM
ECCENTRIC REDUCER HFD HYDRAULIC FLOW DIAGRAM
EXHAUST FAN
MP PIPING LAYOUT
BLIND FLANGED END NOZZLE
ME EQUIPMENT GA
EYE WASH / SHOWER
END CAP MC CIVIL LAYOUT QW223601 MOBILE DESALINATION SAFI - 1
FD FABRICATION DETAIL
SPLIT AC FLANGE CONNECTION SK SKETCH DISCIPLINE DRAWING TITLE
VICTUALIC CONNECTION
BASKET STRAINER PR PIPING & INSTRUMENTATION DIAGRAM
EXPANSION JOINT
HOSE CONNECTION VENDOR Drawing Number
AIR COMPRESSURE ORIFICE FLANGES
M
PCT-1245A-PR-PID-001
RS
REMOVABLE SPOOL
JESA Drawing Number
AIR VESSEL
SPECTACLE BLIND QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 01/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
3601-1-STR-101A/B 3601-1-STM-101 NOTES:-
BASKET STRAINER STATIC MIXER 1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
TERMINATION POINT AND ONLY WITHIN THE SKID WILL
FLOW : 460 - 520 m3/hr CAP : 460 - 520 m3/hr BE SUPPLIED BY PACT ENGINEERING.
TYPE : VERTICAL BASKET TYPE : PLATE MODEL 2. PIPING MATERIAL
MOC : HOUSING CARBON STEEL RUBBER LINED SIZE : DN300 LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
BASKET MESH - DUPLEX SS HDPE (for size > 250 DN)
MOC : DUPLEX HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)
CLEANING : MANUAL
QTY : ONE (1) No. 3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ
MESH SIZE : 300 MICRON 230V, 3PH, 50HZ
QUANTITY : TWO (2), (1 DUTY / 1STANDBY) 4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)

5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601

6. TERMINATION POINT

By PACT BY CLIENT

7. PRICE VARIATION

1-P-104A
SODIUM HYPO CHLORITE DN8 PE TUBING
FROM DOSING PUMP
SHEET-10
1-P-104B
SODIUM HYPO CHLORITE DN8 PE TUBING
FROM DOSING PUMP 1-HS
VENT I02 I07 I08
SHEET-10 101A
DN15
I18 I19
1-MCP-101
1-BV-105A
DN40 ATM

1-BV-102A 1-PG
1-TP-101A 1-PG 1-PT SOFT START
DN25 101A 1-RAW-0002-OD315-PE1-PN10
103A 1-RAW-0141-OD400-PE1-PN6 101A

1-RAW-0001-OD400-PE1-PN6 LO

400 x 225 160 x 315 1-CV-101A 1-BFV-102A


1200mm x 400mm 1-BFV-103A 1-BFV-101A
DN400 DN300 DN300
DN400 3601-1-P-101A
1-BV-101A
1-BV-106A
DN25
DN25
3601-1-STR-101A PE TUBE PE TUBE

1-WAS-0087-OD32-PE1-PN10 1-WAS-0067-OD32-PV1-PN10 UPVC UPVC

1-BV-103A 1-BV-103B
DN1200-FRP
(BY CLIENT)

DN25 DN25 3601-1-STM-101 1-FIL-101


DN300
RAW WATER TO
SELF CLEANING FILTER
1-BV-107 1-BV-108 SHEET-03
DN15 DN15
VENT 1-HS
I02 I07 I08 SV SV 1-RAW-0003-OD315-PE1-PN10
DN1 101B

I18 I19
1-MCP-101
1-BV-105B
DN40 ATM
1-PG
102
1-RAW-0142-OD400-PE1-PN6
1-BV-102B 1-PG
1-PG 1-PT SOFT START DN25 1-RAW-0003-OD315-PE1-PN10
1-TP-101B 101B
1-BV-104 103B 101B
DN25 LO
RAW WATER PARAMETER 1-RAW-0006-OD400-PE1-PN6
SOURCE : SEA WATER 1-BFV-103B 400 x 225 160 x 315 1-CV-101B 1-BFV-102B
1200mm x 400mm 1-BFV-101B
DN400 DN300 DN300
FEED FLOW RATE: 463 m3/h - 500 m3/h DN400 3601-1-P-101B
TURBIDITY : <14.2 NTU 1-BV-101B
1-BV-106B
TSS : <16.5 mg/l DN25
3601-1-STR-101B DN25
TDS : 35,580 - 40,900 mg/l
CHLORIDE : 19,130 - 22,177 mg/l
1-WAS-0088-OD32-PE1-PN10 1-WAS-0068-OD32
BORON : < 5.5 mg/l
-PV1-PN10
pH : 7 - 8.1
OIL & GREASE : < 1.03 mg/l
FREE RESIDUAL CHLORINE : NIL
TEMP : 15-20.5°C
PRESSURE: MIN: 0.7 Barg
MAX: 2.0 Barg

1-TP-104 GRAVITY LINE DN400 WASTE WATER


(BY CLIENT) TO WASTE WATER HEADER
SHEET-03
NOTE-7

DN1200-FRP RAW WATER


(BY CLIENT) TO RAW WATER HEADER
SHEET-12

QW223601 MOBILE DESALINATION SAFI - 1

3601-1-P-101A/B DISCIPLINE DRAWING TITLE


RO FEED PUMP
PR PIPING & INSTRUMENTATION DIAGRAM
FLOW : 460 - 520 m3/hr
DIFFERENTIAL PRESSURE : 6.2 - 6.0 bar VENDOR Drawing Number
TYPE : END SUCTION HORIZONTAL - CENTRIFUGAL
MOC : DUPLEX SS CASING/IMPELLER PCT-1245A-PR-PID-001
QUANTITY : TWO (2), (1 DUTY / 1STANDBY)
POWER RATING : 400V/3pH/50Hz/ 132kW
JESA Drawing Number
QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 02/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
NOTES:-
3601-1-FIL-101 3601-1-FIL-102 A/B
1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
SELF- CLEANING FILTER (STAGE-1) SELF- CLEANING FILTER (STAGE-2) TERMINATION POINT AND ONLY WITHIN THE SKID WILL
BE SUPPLIED BY PACT ENGINEERING.
OPERATING FLOW : 463.0 m3/hr OPERATING FLOW : 232 m3/hr
2. PIPING MATERIAL
DESIGN FLOW : 520.0 m3/hr DESIGN FLOW : 260 m3/hr
LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
CLEANING : AUTOMATIC CLEANING : AUTOMATIC HDPE (for size > 250 DN)
HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)
FILTER MESH SIZE : 100 MICRON FILTER MESH SIZE : 10 MICRON
3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ
OPERATING PRESSURE : 5.8 Barg OPERATING PRESSURE : 5.5 Barg 230V, 3PH, 50HZ
DESIGN PRESSURE: 10 Barg DESIGN PRESSURE: 10 Barg 4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)
QTY : ONE (1), (1 DUTY) QTY : ONE (1) SET
5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601
(NOTE-5)
6. DURING DETAIL ENGINEERING AND REFERENCE TO DELIVARY
SCHEDULE THE EQUIPMENT TYPE WILL BE FINALIZED

7. TERMINATION POINT

By PACT BY CLIENT

8. PRICE VARIATION

POWER SOURCE
(1-MCP-101)

1-PDAH 1-PDAH
LOCAL CONTROL 201 202
SYSTEM
1-RJW-0131-OD90-PV1-PN10

220/230V AC
1-FIL-0150-OD90-PV1-PN10

SKID BOUNDARY
1-CV-201
DN80 1-BV-204
DN80
RO REJECT WATER FROM
REJECT HEADER
1-BFV-210 1-RJW-0146-OD90-PV1-PN10
DN80 3601-1-FIL-102 A SHEET-06

1-FIL-0148-OD225-PE1-PN10
UPVC
HDPE SELF- CLEANING FILTER (STAGE-2)
1-FIL-0005-OD225-PE1-PN10
225x90
SKID BOUNDARY

FILTERED WATER FROM


1-PI HEADER
201 1-PI
203 SHEET-04
3601-1-FIL-101 1-PI
202
1-RAW-0003-OD315-PE1-PN10 SELF- CLEANING FILTER (STAGE-1)
HDPE
1-PG 1-PT
1-P-101A/B 201 201 UPVC
RAW WATER FROM 1-PT 1-PG 1-PT 1-PG
202 202 1-FIL-103 A - R
FILTER FEED PUMP 203 203
1-BV-201 1-BFV-201
1-FIL-0004-OD315-PE1-PN10 SKID BOUNDARY FILTERED WATER TO
SHEET-02 DN300
DN15
CARTRIDGE FILTER
1-BV-202 1-BFV-208 1-BV-203 1-FIL-0011-OD315-PE1-PN10
SV SHEET-04

15-RJW-0133-OD110-PV1-PN10
DN15 DN300 DN15
SV
HDPE
3601-1-FIL-102 B
UPVC

1-FIL-0149-OD225-PE1-PN10
SELF- CLEANING FILTER (STAGE-2)

1-WAS-0150-OD110-PV1-PN10
1-FIL-0147-OD225-PE1-PN10

1-WAS-0151-OD110-PV1-PN10

HDPE
UPVC

1-WAS-0152-OD110-PV1-PN10

1-TP-106
WASTE WATER DN400 GRAVITY LINE WASTE WATER
TO WASTE WATER HEADER (BY CLIENT) TO WASTE WATER HEADER
NOTE-8
SHEET-02 SHEET-04

QW223601 MOBILE DESALINATION SAFI - 1

DISCIPLINE DRAWING TITLE

PR PIPING & INSTRUMENTATION DIAGRAM

VENDOR Drawing Number

PCT-1245A-PR-PID-001

JESA Drawing Number


QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 03/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
3601-1-FIL-103 A - R 3601-1-STM-301 3"
1-ARV-301A
SKID BOUNDARY NOTES:-
DN50
CARTRIDGE FILTERS 3601-1-FIL-103A 3601-1-FIL-103B
STATIC MIXER 1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
3" TERMINATION POINT AND ONLY WITHIN THE SKID WILL
TOTAL FLOW : 463.0 m3/hr CAP : 463 m3/h BE SUPPLIED BY PACT ENGINEERING.
FLOW : 38.6 m3/hr EACH CARTRIDGE 1" 3" 1-ARV-302A 3" 1"
TYPE : PLATE MODEL DN50 2. PIPING MATERIAL
TYPE : HORIZONTAL LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
SIZE : DN300
MOC OF HOUSING : FRP HDPE (for size > 250 DN)
MOC : DUPLEX HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)
MOC OF CARTRIDGE : PP (PLEATED) 3601-1-FIL-103C 3601-1-FIL-103D
QTY : ONE (1) No. 3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ
SIZE : 5 MICRON 3" 3" 230V, 3PH, 50HZ
OPERATING PRESSURE : 4.5 Barg 1" 3" 3" 1" 4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)
DESIGN PRESSURE: 8 Barg
QTY : EIGHTEEN (18) No's 5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601
1-WAS-0014-OD32-PV1-PN10 1-WAS-0015-OD32-PV1-PN10
6. TERMINATION POINT
3601-1-FIL-103E 3601-1-FIL-103F
By PACT BY CLIENT
3" 3"
7. PRICE VARIATION
1" 3" 3" 1"

1-WAS-0074-OD32-PV1-PN10

HDPE UPVC 1-BV-302A


1-FIL-0012-OD160-PV1-PN10 DN25
UPVC HDPE
315x160 1-BFV-302A
DN150 1-FIL-0013-OD160-PV1-PN10
1-BFV-303A 315x160
DN150

1-ARV-301B SKID BOUNDARY


DN50
FILTERED WATER TO 3"
SELF- CLEANING FILTER 3601-1-FIL-103G 3601-1-FIL-103H
3"
SHEET-03
3" 1-ARV-302B 3"
1" DN50 1"
1-P-105B
SMBS DN8 PE TUBING
FROM DOSING PUMP
SHEET-10 1-CV-301 3601-1-FIL-103I 3601-1-FIL-103J
DN80
3" 3"
1-P-105A
1" 3" 3" 1"
SMBS DN8 PE TUBING
1-BFV-304
FROM DOSING PUMP
DN80 1-AIC
SHEET-10 301 TO 1-SY-105A/B
1-WAS-0018-OD32-PV1-PN10 1-WAS-0019-OD32-PV1-PN10
1-FIL-0151-OD90-PV1-PN10 SHEET- 10
3601-1-FIL-103K 3601-1-FIL-103L 1-AI
301
3" 3"
PROVISION FOR
FUTURE USE 1" 3" 3" 1" 1-WAS-0078-OD32
PE TUBE 1-AT
(IF ANY) -PV1-PN10 301

UPVC 1-BV-305
1-FIL-0011-OD315-PE1-PN10 DN25 1-AE
1-BV-301 1-BV-304
1-PG 301
DN25 DN25 HDPE
1-FIL-102 A/B 301 UPVC 1-BV-302B Chlorine
DN25 UPVC HDPE
FILTERED WATER FROM 1-FIL-0016-OD160-PV1-PN10 1-BV-303
SELF- CLEANING FILTER 315x90 1-FIL-0017-OD160-PV1-PN10 DN25 1-FIL-0024-OD315-PE1-PN10
315x160 1-BFV-302B 1-PG 1-PT
SHEET-03 3601-1-STM-301 1-BV-306 315x160 1-FIL-104 A - U
DN150 1-BFV-303B 302 302
DN300 DN15 DN150
SV FILTERED WATER TO 1 MICRON
CARTRIDGE FILTER
1-BV-306 SHEET-05
DN15

SKID BOUNDARY SV
1-ARV-301C
3" DN50
3601-1-FIL-103M 3601-1-FIL-103N
3"
3" 1-ARV-302C 3"
1" DN50 1"

3601-1-FIL-103O 3601-1-FIL-103P
3" 3"

1" 3" 3" 1"

1-WAS-0022-OD32-PV1-PN10 1-WAS-0023-OD32-PV1-PN10

3601-1-FIL-103R 3601-1-FIL-103R

3" 3"
1-WAS-0072-OD32 DN400
1" 3" 3" 1" WASTE WATER
-PV1-PN10
(BY CLIENT) TO WASTE WATER HEADER
SHEET-05

1-BV-302C
HDPE UPVC DN25 UPVC HDPE
QW223601 MOBILE DESALINATION SAFI - 1
315x160 1-FIL-0020-OD160-PV1-PN10 1-FIL-0021-OD160-PV1-PN10 DISCIPLINE DRAWING TITLE
1-BFV-302C 1-BFV-303C 315x160
DN150 DN150 PR PIPING & INSTRUMENTATION DIAGRAM

VENDOR Drawing Number

DN400 GRAVITY LINE


1-TP-111 PCT-1245A-PR-PID-001
WASTE WATER
TO WASTE WATER HEADER (BY CLIENT)
NOTE-7 JESA Drawing Number
SHEET-03
QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 04/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
3601-1-FIL-104 A - U 3601-1-STM-401 1-ARV-401A SKID BOUNDARY NOTES:-
DN50 3601-1-FIL-104A
CARTRIDGE FILTERS STATIC MIXER 1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
1-ARV-402A 3"
TERMINATION POINT AND ONLY WITHIN THE SKID WILL
TOTAL FLOW : 463.0 m3/hr CAP : 463 m3/h DN50
BE SUPPLIED BY PACT ENGINEERING.
FLOW : 33.0 m3/hr EACH CARTRIDGE 3" 1"
TYPE : PLATE MODEL 2. PIPING MATERIAL
TYPE : HORIZONTAL LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
SIZE : DN300
MOC OF HOUSING : FRP 3601-1-FIL-104B 3601-1-FIL-104C
HDPE (for size > 250 DN)
MOC : DUPLEX HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)
MOC OF CARTRIDGE : PP (PLEATED) 3" 3"
QTY : ONE (1) No. 3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ
SIZE : 1 MICRON 1" 3" 3" 1" 230V, 3PH, 50HZ

OPERATING PRESSURE : 4.5 Barg 4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)
DESIGN PRESSURE: 8 Barg
5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601
QTY : TWENTY-ONE (21) No's
3601-1-FIL-104D 3601-1-FIL-104E
3" 3" 6. THE LOCATION OF CHECK VALVE (1-CV-403) AND ISOLATION
VALVE (1-BFV-401) SHALL BE AT PLANT BOUNDARY.
1" 3" 3" 1"
7. TERMINATION POINT

By PACT BY CLIENT

1-WAS-0026-OD32-PV1-PN10 1-WAS-0027-OD32-PV1-PN10
8. PRICE VARIATION
3601-1-FIL-104F 3601-1-FIL-104G

3" 3"

1" 3" 3" 1"

1-BV-402A
DN25
HDPE UPVC
1-BFV-403A UPVC HDPE
315x160 1-FIL-0025-OD160-PV1-PN10 DN150 1-FIL-0028-OD160-PV1-PN10
1-BFV-402A 315x160
DN150 SKID BOUNDARY
1-ARV-401B 3601-1-FIL-104H 1-P-106A
DN50 3"
1-WAS-0075-OD32-PV1-PN10
DN8 PE TUBING ANTISCALANT
3" 1" FROM DOSING PUMP
1-ARV-402B
DN50 SHEET-10

1-P-106B
3601-1-FIL-104I 3601-1-FIL-104J
3"
DN8 PE TUBING ANTISCALANT
3"
FROM DOSING PUMP
1" 3" 3" 1"
REDUNDANT SHEET-10

I02 I02 1-P-103


RO PERMEATE
3601-1-FIL-104K 3601-1-FIL-104L
FROM RO FLUSHING/CIP PUMP
3" 3" 1-AAH 1-AAH
401A 401B SHEET-09
1" 3" 3" 1" 1-CIP-0038-OD225-PV1-PN10

1-AI 1-AI
401A 401B
1-WAS-0031-OD32-PV1-PN10

3601-1-FIL-104M 3601-1-FIL-104N 1-AT 1-AT


401A 401B
3" 3" I02

1" 3" 3" 1" 1-AE 1-AE PE TUBE


401A 401B
ORP ORP 1-UY
401 1-RPW-0039-OD225-PV1-PN10
UPVC
1-BV-405A 1-BV-405B DN200
1-FIL-0024-OD315-PE1-PN10 DN25 DN25 1-CV-402
1-BV-404 1-BV-403
1-BV-402B DN25 1-UY
1-WAS-0030-OD32-PV1-PN10 1-PT 1-PG DN25 401
1-FIL-103 A - R HDPE UPVC DN25
1-BFV-403B UPVC HDPE 401 402 315x225 1-P-102
1-FIL-0029-OD160-PV1-PN10 DN150 1-FIL-0037-OD315-PE1-PN10
FILTERED WATER FROM 5 MICRON 1-FIL-0032-OD160-PV1-PN10 FILTERED WATER TO
CARTRIDGE FILTER 1-BFV-402B UV
HIGH PRESSURE PUMP
315x160 315x160 DN300
SHEET-04 DN150 SKID BOUNDARY 1-BV-401 3601-1-STM-401 1-BV-406 401 SHEET-06
DN300 DN15 FL
3601-1-FIL-104O DN25
1-ARV-401C SV
3"
DN50 SDI TEST
3" 1"
1-ARV-402C
DN50

1-WAS-0086-OD32-PV1-PN10
3601-1-FIL-104P 3601-1-FIL-104Q DN250
3" 3" NC
1-UV
1-UY 1-UY
1" 3" 3" 1" 402 I02
402 402

1-WAS-0076-OD280-PE1-PN10 1-TP-115
3601-1-FIL-104R 3601-1-FIL-104S NOTE:06

1-WAS-0071-OD32-PV1-PN10
WASTE WATER
3" 3"
TO REJECT WATER HEADER
1" 3" 3" 1" 1-CV-403 1-BFV-401
DN250 DN250 SHEET-13
LO

GRAVITY LINE WASTE WATER


(BY CLIENT) TO WASTE WATER HEADER
3601-1-FIL-104T 3601-1-FIL-104U SHEET-08
3" 3"

1" 3" 3" 1"


QW223601 MOBILE DESALINATION SAFI - 1
1-BV-402C
DN25
1-WAS-0035-OD32-PV1-PN10 DISCIPLINE DRAWING TITLE
HDPE UPVC 1-WAS-0034-OD32-PV1-PN10 UPVC HDPE
PR PIPING & INSTRUMENTATION DIAGRAM
1-FIL-0033-OD160-PV1-PN10 1-FIL-0036-OD160-PV1-PN10

315x160 1-BFV-402C 1-BFV-403C 315x160 VENDOR Drawing Number


DN150 DN150
PCT-1245A-PR-PID-001
1-TP-114
WASTE WATER DN400
TO WASTE WATER HEADER (BY CLIENT)
JESA Drawing Number
SHEET-04 NOTE-8
QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 05/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
NOTES:-
1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
TERMINATION POINT AND ONLY WITHIN THE SKID WILL
BE SUPPLIED BY PACT ENGINEERING.

2. PIPING MATERIAL
LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
HDPE (for size > 250 DN)
HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)

3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ


230V, 3PH, 50HZ
4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)

5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601

6. THE LOCATION OF CHECK VALVE (1-CV-403) AND ISOLATION


VALVE (1-BFV-401) SHALL BE AT PLANT BOUNDARY.

7. TERMINATION POINT

By PACT BY CLIENT

1-RPV-601-630
1-FIL-0080-10"-SS5-SCH40 FILTERED WATER TO
RO PRESSURE VESSEL
SHEET-07

1-RPV-601-630
1-FIL-0081-8"-SS5-SCH40 RO REJECT WATER
FROM RO PRESSURE VESSEL
SHEET-07

EXTERNAL POWER
POWER SOURCE
(BY CLIENT)

1-MCP-101
WITH HM1

1-RJW-0131-OD90-PV1-PN10 BRINE WATER TO SELF


MCP (MCC+PLC) WITH HM1 12" CLEANING FILTERS (STAGE-1/2)
<235m3/h >255m3/h
SHEET STEEL, FORM-II, IP54 1-PG 1-PG SHEET-03
1-FAL 1-FAH
504 505
PLC - NON REDUNDANT 501 501

STOP
I03 I04 I05 I02 1-PT 1-PT 1-FI 1-RJW-0130-OD225-PV1-PN10 BRINE WATER
501 502 501
TO CIP CARTRIDGE FILER
I03 I07 I08 I18 I19
SHEET-09
<2.0 bar 1-HS 1-FIT
102 503
1-PAL SUPER SUPER PN10 PN6
502 DUPLEX DUPLEX
1-RJW-0129-OD225-PV1-PN6
SUPER 1-FE
DUPLEX 1-PG 1-PG 503
1-PG 1-PSL 1-RJW-0043-OD225-PV1-PN10 TP-102
503 506
1-FIL-104 A - U 501 502 LO
1-FIL-0077-10"-SS5-SCH40 RO REJECT WATER
FILTERED WATER FROM 1-FIL-0037-OD315-PE1-PN10 M
FRP TO REJECT WATER HEADER
CARTRIDGE FILTER 315 x 225
8" x 10" 1-DPV-501 1-CV-501 1-BFV-502 UPVC
1-BFV-501 3601-1-ERD-101 1-BV-501 DN150 DN200 SHEET-12
SHEET-05 SUPER uPVC DN200
DN300 3601-1-P-102 DN15
HDPE DUPLEX SV

RO REJECT PARAMETER
FEED FLOW RATE: 254.63 m3/h
TSS : <1 mg/l
TDS : 76,300 mg/l
pH : 8.34
TEMP : 15-20.5°C

3601-1-P-102 3601-1-ERD-101 QW223601 MOBILE DESALINATION SAFI - 1


RO HIGH PRESSURE PUMP WITH VFD ENERGY RECOVERY DEVICE
DISCIPLINE DRAWING TITLE
FLOW : 460 - 475 m3/hr FEED FLOW :460 - 475 m3/hr
DISCHARGE PRESSURE : 40-42 barg BRINE FLOW : 251-266 m3/hr PR PIPING & INSTRUMENTATION DIAGRAM
TYPE : CENTRIFUGAL TYPE : TURBO CHARGER
MOC : SUPER DUPLEX SS2507 CASING/IMPELLER VENDOR Drawing Number
MOC : SUPER DUPLEX SS2507
QTY : ONE (1), (1 DUTY)
POWER RATING : 400V/3pH/50Hz/660 kW BOOSTING PRESSURE: 27.9 bar PCT-1245A-PR-PID-001
ERD OUTLET SYSTEM PRESSURE : 70.0 barg
QTY : ONE (1), (1 DUTY) JESA Drawing Number
QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 06/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
3601-1-RPV-101 TO 160 NOTES:-
RO PRESSURE VESSEL RO MEMBRANE
1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
TYPE : SEA WATER MODEL : SPIRAL WOUND SKID BOUNDARY TERMINATION POINT AND ONLY WITHIN THE SKID WILL
BE SUPPLIED BY PACT ENGINEERING.
ARRAY: 60:0 MOC: COMPOSITE POLYAMIDE
2. PIPING MATERIAL
WORKING PRESSURE: 70 Barg SIZE: 8" Dia x 40" LENGTH
LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
DESIGN PRESSURE: 81 Barg RECOVERY : 45% HDPE (for size > 250 DN)
HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)
QTY : 420 NOS. (100% DUTY)
PRESSURE RATING: 1200 PSI 3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ
SIZE: 8"DIA,7 ELEMENT LENGTH 230V, 3PH, 50HZ

PORT: MULTI PORT, SUPER DUPLEX 4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
1-CIP-0048-OD225-PV1-PN10 SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)
MOC: FRP
QTY : 60 NOS. (100% DUTY) 1-FIL-0082-8"-SS5-SCH40 1-FIL-0082-8"-SS5-SCH40 5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601

6. TERMINATION POINT
8"x2.5" 8"x2.5" 8"x2.5" 8"x2.5" 8"x2.5" 8"x2.5"
By PACT BY CLIENT
1-RPW-0046-OD160-PV1-PN10

SV SV

SV SV

SV 30-Nos VESSELS SV
1-CIP-0040-OD225-PV1-PN10 1-CIP-0044-OD225-PV1-PN10 3601-1-RPV-101 TO 130

CIP FEED IN
FROM FLUSHING/CIP HEADER
SHEET-09 SV SV

SV SV

3" SUPER DUPLEX


1-RPW-0046-OD160-PV1-PN10

1-FIL-0080-10"-SS5-SCH40
ERD-501 1-BV-601A
8"x3" 8"x3" 8"x3" 8"x3" 8"x3" 8"x3" DN50
FILTERED WATER FROM 10"x8" 1-FIL-0085-8"-SS5-SCH40
ENERGY RECOVERY DEVICE
10"x8"
1-CIP-0045-OD225-PV1-PN10

SHEET-06
1-CIP-0050-OD225-PV1-PN10
3601-1-TK-103
1-FIL-0084-8"-SS5-SCH40 1-CIP-0049-OD225-PV1-PN10 RO CIP RE-CIRCULATION
TO RO FLUSHING/CIP TANK
SHEET-09
SKID BOUNDARY 1-SB-601
ERD-501
RO WATER TO 1-FIL-0083-8"-SS5-SCH40 1-FIL-0083-8"-SS5-SCH40
ENERGY RECOVERY DEVICE 1-ARV-601 1-RPW-0051-OD225-PV1-PN10
8"x2.5" 8"x2.5" 8"x2.5" 8"x2.5" DN50
SHEET-06 8"x2.5" 8"x2.5"
DN200xDN150
1-FIL-0081-8"-SS5-SCH40
1-RPW-0047-OD160-PV1-PN10 RO PERMEATE WATER
TO PERMEATE WATER HEADER
DN200xDN150
SHEET-08
1-BV-601B
DN50

SV SV

SV SV

SV 30-Nos VESSELS SV
3601-1-RPV-131 TO 160

SV SV

SV SV
QW223601 MOBILE DESALINATION SAFI - 1
3" SUPER DUPLEX
DISCIPLINE DRAWING TITLE

PR PIPING & INSTRUMENTATION DIAGRAM


8"x3" 8"x3" 8"x3" 8"x3" 8"x3" 8"x3"
1-FIL-0084-8"-SS5-SCH40 VENDOR Drawing Number

PCT-1245A-PR-PID-001

JESA Drawing Number


QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 07/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
NOTES:-
1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
TERMINATION POINT AND ONLY WITHIN THE SKID WILL
BE SUPPLIED BY PACT ENGINEERING.

2. PIPING MATERIAL
LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
HDPE (for size > 250 DN)
HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)

3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ


230V, 3PH, 50HZ
4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)

5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601

6. THE LOCATION OF CHECK VALVE (1-CV-403) AND ISOLATION


VALVE (1-BFV-401) SHALL BE AT PLANT BOUNDARY.
7. TERMINATION POINT

By PACT BY CLIENT

8. PRICE VARIATION

1-RPW-0057-OD32-PV1-PN10 RO PERMEATE WATER


TO DOSING TANKS
SHEET-10

1-TK-102
1-RPW-0055-OD90-PV1-PN10 RO PERMEATE WATER
I19
TO RO FLUSHING /CIP TANK
I04 I18 SHEET-09
1-AAH 1-AAHH
701 701

>500mg/L >550mg/L
<198m3/h >218m3/h >228m3/h <188m3/h
RO PRODUCT PARAMETER
1-FAL 1-FAH 1-FAHH 1-FALL
701 701 701 701 1-AI FLOW RATE: 208.33 m3/h (5000 m3/d)
701 TSS : <1 mg/l
TDS : ≤ 500 mg/l
1-FI I26
701 1-AT CHLORIDE : ≤ 200 mg/l
701
BORON : < 2 mg/l
1-FIT 1-UY pH : 6.5 - 8.0
701 1-AE 701
701
TEMP : 15-20.5°C
CONDUCTIVITY

1-FE 1-UY PN10 PN6 PN6 PN10 1-BFV-703


701 1-BV-701 701 DN80
DN25 TP-103
1-CV-703
1-RPW-0051-OD160-PV1-PN10 DN200 NOTE:05
RO PERMEATE WATER RO PERMEATE WATER TO
M
FROM RO PRESSURE VESSEL DN200 RO PRODUCT WATER TANK HEADER
NOTE:05 1-BFV-702
1-BV-703 I26 NO DN200 SHEET-12
SHEET-07 1-UV UPVC FRP
DN15 701 LO
SV 1-RPW-0132-OD225-PV1-PN6 1-RPW-0052-OD225-PV1-PN10
1-UY
702

1-UY
702 1-UV
NC 702

DN150

GRAVITY LINE DN400 1-TP-116 GRAVITY LINE


WASTE WATER WASTE WATER
TO WASTE WATER HEADER (BY CLIENT) TO WASTE WATER HEADER
NOTE-8
SHEET-06 SHEET-09

QW223601 MOBILE DESALINATION SAFI - 1

DISCIPLINE DRAWING TITLE

PR PIPING & INSTRUMENTATION DIAGRAM

VENDOR Drawing Number

PCT-1245A-PR-PID-001

JESA Drawing Number


QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 08/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
3601-1-TK-103 3601-1-FIL-105 A/B/C/D/E/F 3601-1-HE-101 NOTES:-
RO FLUSHING/CIP TANK RO CIP CARTRIDGE FILTERS RO FLUSHING/CIP TANK HEATER
1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
TOTAL VOLUME: 28 m3 TOTAL CAPACITY: 270 m3/hr TYPE : ELECTRIC-IMMERSED COIL TERMINATION POINT AND ONLY WITHIN THE SKID WILL
HEATING RANGE : 30-35°C BE SUPPLIED BY PACT ENGINEERING.
TYPE : RECTANGULAR (PANEL TYPE) EACH CAPACITY: 45 m3/hr PER CARTRIDGE
MOC : GRP MOC :INCOLOY 825 2. PIPING MATERIAL
TYPE : HORIZONTAL
QUANTITY : ONE (1) SET, 100% DUTY LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
SIZE : 8.0m Lx 2m Wx 2m H MOC : FRP HOUSING,CARTRIDGE: PP HDPE (for size > 250 DN)
POWER : 400±10V/3P/50HZ/30KW HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)
QTY : ONE (1), 1X100%, 1 DUTY FILTRATION RANGE: 5 MICRON
3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ
QUANTITY : SIX (6), 100% DUTY 230V, 3PH, 50HZ
4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)

5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601

6. TERMINATION POINT

By PACT BY CLIENT

7. PRICE VARIATION

SKID BOUNDARY

3601-1-FIL-105A 3601-1-FIL-105B
3" 3"
1-CIP-0061-OD32-PV1-PN10 1" 3" 3" 1"

1-CIP-0059-OD225-PV1-PN10
3601-1-FIL-105C 3601-1-FIL-105D
I12 I20
3" 3"
REJECT SIDE CIP RETURN 1-CIP-0050-OD225-PV1-PN10 <500mm 800mm
1" 3" 3" 1"
FROM RO SYSTEM 1-LAL 1-LAM
103 103
SHEET-07 VENT
DN100 1-CIP-0062-OD32-PV1-PN10
SPARE 1-LSL 1-LSM
103 103
DN100
24" 3601-1-FIL-105E 3601-1-FIL-105F
DN200 DN200
N6 N13 N4 N8 N9 DN100 x4nos.
3" 3"
DN200 DN50 DN50
1-RPW-0055-OD90-PV1-PN10 1-BFV-811 1" 3" 3" 1"
L1
DN80 DN50
RO PERMEATE WATER N1
FROM RO SYSTEM
I26
SHEET-08 I11 I27 RO
DN50
N2
15-FV-801A/B I20
>35°C 1-HS
DN50 I12 PROVISION FOR 1-RJW-0130-OD225-PV1-PN10 RO REJECT WATER FROM
1-TAH 1-HS 103
1-CIP-0063-OD225-PV1-PN10 I12 FUTURE USE
101 111
1-BFV-809 REJECT WATER HEADER
LAL = 500 mm (IF ANY)
1-MCP-101 DN200
I11 1-BV-801 SHEET-06
1-BFV-803 1-BFV-808 1-BFV-805 1-BFV-806
1-MCP-101 DN25
I27 DN200 DN200 DN200 DN200
N11 1-BV-802 1-BV-803
3601-1-HE-101 1-PG 1-TG DN25 DN25 1-PG
SOFT START 801 801 802 1-FIL-104/402/403 A/B/C/D/E/F/G
1-TAH CIP WATER TO
102 DN250
L1 1-CIP-0058-OD280
1-TT 110 x 225 CARTRIDGE FILTER INLET
-PV1-PN10 280 x 140
801 N3 1-BFV-802 1-BFV-804 1-BV-804 1-BFV-812 SHEET-05
DN50 DN200 DN200 1-CIP-0038-OD225-PV1-PN10
DN100

DN250 DN1
3601-1-TK-103 3601-1-P-103
N7

N12 SV

1-CIP-0060-OD225-PV1-PN10
RPV-601 TO 630 A/B
CIP WATER FEED TO
15-CIP-0066-OD110-PV1-PN10
TO RO PRESSURE VESSEL
15-BFV-801

1-BFV-813
SHEET-07
DN100

DN200
1-CIP-0040-OD225-PV1-PN10

1-TP-117 1-TP-131 1-TP-118


WASTE WATER DN400 GRAVITY LINE WASTE WATER
TO WASTE WATER HEADER (BY CLIENT) TO WASTE WATER HEADER
NOTE-7 NOTE-7
SHEET-08 SHEET-13
NOTE-7

QW223601 MOBILE DESALINATION SAFI - 1

3601-1-P-103 DISCIPLINE DRAWING TITLE


RO FLUSHING/CIP PUMPS
PR PIPING & INSTRUMENTATION DIAGRAM
FLOW : 270 m3/hr
DIFFERENTIAL PRESSURE : 4.0 bar VENDOR Drawing Number
TYPE : CENTRIFUGAL, END SUCTION
MOC : SS316 CASING/IMPELLER PCT-1245A-PR-PID-001
QUANTITY : ONE (1), 1x 100%, 1 DUTY
POWER RATING : 400V/3pH/50Hz/45 kW JESA Drawing Number
QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 09/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
3601-1-TK-104 3601-1-TK-105 3601-1-TK-106 NOTES:-
PRE CHLORINATION DOSING TANK DE-CHLORINATION (SMBS) DOSING TANK ANTISCALANT DOSING TANK
1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
VOLUME : 500 Ltrs VOLUME : 500 Ltrs VOLUME : 500 Ltrs TERMINATION POINT AND ONLY WITHIN THE SKID WILL
BE SUPPLIED BY PACT ENGINEERING.
TYPE : VERTICAL CYLINDRICAL TYPE : VERTICAL CYLINDRICAL TYPE : VERTICAL CYLINDRICAL
MOC : PE/GRP MOC : PE/GRP MOC : PE/GRP 2. PIPING MATERIAL
LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
SIZE : 0.76m DIA. X 1.185m H SIZE : 0.76m DIA. X 1.185m H SIZE : 0.760m DIA. 1.185m H HDPE (for size > 250 DN)
QUANTITY : ONE (1), 1 DUTY QUANTITY : ONE (1), 1 DUTY QUANTITY : ONE (1), 1 DUTY HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)

DN8 PE TUBING SODIUM HYPOCHLORITE 3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ
230V, 3PH, 50HZ
TO FILTER FEED PUMP DISCHARGE
4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHEET-02 SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)

5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601


DN8 PE TUBING SODIUM HYPOCHLORITE
TO FILTER FEED PUMP DISCHARGE 6. TERMINATION POINT
SHEET-02
By PACT BY CLIENT

DN8 PE TUBING SMBS DOSING TO CARTRIDGE


FILTER 5 MICRON INLET
SHEET-04

DN8 PE TUBING SMBS DOSING TO CARTRIDGE


FILTER 5 MICRON INLET
SHEET-04

DN8 PE TUBING ANTISCALANT TO CARTRIDGE


FILTER 1 MICRON OUTLET
SHEET-05

DN8 PE TUBING ANTISCALANT TO CARTRIDGE


FILTER 1 MICRON OUTLET
SHEET-05

FROM 1-AIC-301

SHEET-04

SKID BOUNDARY
SET PR: 6 BAR SET PR: 6 BAR SET PR: 6 BAR SET PR: 6 BAR
1-RPW-0057-OD32-PV1-PN10 1-MFV-104A 1-MFV-104B 1-MFV-105A 1-MFV-105B 1-MFV-106A 1-MFV-106B
SET PR: 6 BAR SET PR: 6 BAR
I14 I14
RO PERMEATE I13 I13 I1 I1
FROM RO SYSTEM
1-BV-901 1-HS 1-SY 1-SY 1-HS
FOR DOSING TANK 105A 105A
SHEET-08 DN25 105B 105B
FILLING 1-HS 1-HS 1-HS 1-HS
104 109 106A 106B
1-MCP-101 1-MCP-101
1-MCP-101 1-MCP-101 1-MCP-101 1-MCP-101

I14

3601-1-P-104A 3601-1-P-104B 3601-1-P-105B 3601-1-P-106A 3601-1-P-106B


3601-1-P-105A 1-HS I14
I13 110 I1

<200mm 1-MCP-101 <200mm <200mm


1-LAL 1-LAL 1-LAL
104 105 106

1-LSL 1-LSL 1-LSL


104 105 106

3601-1-MX-101

LAL = 200 mm LAL = 200 mm LAL = 200 mm

3601-1-TK-104 3601-1-TK-105 3601-1-TK-106

GRP COATED

3601-1-P-106A/B 3601-1-MX-101 QW223601 MOBILE DESALINATION SAFI - 1


3601-1-P-104A/B 3601-1-P-105A/B
PRE-CHLORINATION (SODIUM HYPO CHLORITE) DE-CHLORINATION (SMBS) DOSING PUMP ANTISCALANT DOSING PUMP DE-CHLORINATION (SMBS) DOSING AGITATOR
CAPACITY : 0 - 20 LPH DISCIPLINE DRAWING TITLE
DOSING PUMP CAPACITY : 0 - 20 LPH TYPE: HIGH SPEED AGITATOR.
DIFFERENTIAL PRESSURE : 8.0 bar
CAPACITY : 0 - 20 LPH DIFFERENTIAL PRESSURE : 8.0 bar PR PIPING & INSTRUMENTATION DIAGRAM
TYPE : MOTORIZED DIAPHRAGM PUMP MOC : SS316 SHAFT / PROPELLER
DIFFERENTIAL PRESSURE : 8.0 bar TYPE : MOTORIZED DIAPHRAGM PUMP
MOC : PVC HEAD & PTFE DIAPHRAGM RPM : 700 RPM VENDOR Drawing Number
TYPE : MOTORIZED DIAPHRAGM PUMP MOC : PVC HEAD & PTFE DIAPHRAGM
MOC : PVC HEAD & PTFE DIAPHRAGM STROKE ADJUSTMENT: MANUAL QUANTITY : ONE (1) No.
STROKE ADJUSTMENT: AUTOMATIC (4-20 MA) PCT-1245A-PR-PID-001
STROKE ADJUSTMENT: MANUAL QUANTITY : TWO (2), (1 DUTY / 1STANDBY) QUANTITY : TWO (2), (1 DUTY / 1STANDBY) POWER : 400V 3ph/50 Hz/-0.12kW
QUANTITY : TWO (2), (1 DUTY / 1STANDBY) POWER :400V/3P/50Hz/-0.18KW POWER :400V/3P/50Hz/-0.18KW
JESA Drawing Number
POWER :400V/3P/50Hz/-0.18KW
QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 10/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
3601-1-TK-107 3601-1-TK-108 3601-1-TK-109
POST-CHLORINATION (SODIUM HYPOCHLORITE )DOSING TANK NOTES:-
POST-pH (SODIUM SILICATE)DOSING TANK REMINERALIZATION (CALCIUM SULFATE)DOSING TANK
VOLUME : 1200 Ltrs VOLUME : 6000 Ltrs VOLUME : 6500 Ltrs 1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
TYPE : VERTICAL CYLINDRICAL TYPE : VERTICAL CYLINDRICAL TYPE : VERTICAL CYLINDRICAL TERMINATION POINT AND ONLY WITHIN THE SKID WILL
MOC : PE/GRP MOC : GRP MOC : GRP BE SUPPLIED BY PACT ENGINEERING.
SIZE : 1.2m DIA. X 1.7m H SIZE : 2m DIA. X 2.35m H SIZE : 2m DIA. X 2.35m H
2. PIPING MATERIAL
QUANTITY : ONE (1), 1 DUTY QUANTITY : ONE (1), 1 DUTY QUANTITY : ONE (1), 1 DUTY
LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
HDPE (for size > 250 DN)
FROM AIC-1402 HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)

1-SHC-0128-OD20-PV1-PN10 SHEET- 14 3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ


230V, 3PH, 50HZ
I29
1-SHC-0126-OD20-PV1-PN10 1-SHC-0127-OD20-PV1-PN10
4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)
B-BV-1127 1-LAL 1-PRV-
DN40 107 5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601
1103A
I29
DN10
VENT 6. CLEAR PIPE SHALL BE PROVIDED FOR LEVEL INDICATION.
1-LSL
107
1-SY 1-HS
108A 108A 1-BV-1125A 1-SHC-0123-OD20-PV1-PN10 7. TERMINATION POINT
DN15
1-MCP-201
DN50 3601-1-CC-1101 1-SHC-0121-OD20-PV1-PN10 By PACT BY CLIENT
1/2"x3/8" 1-CV-1103A 1-BV-1126A
1/2"x3/8" DN15 DN15
3601-1-PD-1101
1-BV-1123A 1-STR-1103A 3601-1-P-107A
DN15 DN15
1-SHC-0119-OD63-PV1-PN10 1-BV-1124A
1-BV-1128 DN15 1-BV-1119
DN20 DN15
NOTE 6 1-SHC-0125-OD20-PV1-PN10 POST CHLORINATION TO RO
PERMEATE COMMON OUTLET HEADER
1-PRV- 1-BPV-1103
1103B DN10 SHEET-14
I29
DN10
1-BV-1122
1-BV-1121 DN20
1-SY 1-HS
DN25 1-SHC-0120-OD25-PV1-PN10 108B 108B 1-BV-1125B 1-SHC-0124-OD20-PV1-PN10
3601-1-TK-107 DN15
1-MCP-201
1-SHC-0122-OD20-PV1-PN10
1/2"x3/8" 1-CV-1103B 1-BV-1126B
1/2"x3/8" DN15 DN15

1-BV-1123B 1-STR-1103B 3601-15-P-107B


DN15 DN15
1-BV-1124B
DN15

CIVIL

FROM AIC-1402

1-SOS-0107-OD25-PV1-PN10 SHEET- 14

I21
1-SOS-0105-OD25-PV1-PN10 1-SOS-0106-OD25-PV1-PN10

B-BV-1101 1-LAL 1-PRV-


DN40 108
1101A
I21 I24
DN20
VENT
B-BV-1119 1-LSL
POWER SOURCE 108
DN 50 1-SY 1-HS
108A 108A 1-BV-1106A 1-SOS-0102-OD25-PV1-PN10
1-SOS-0100-OD32-PV1-PN10 DN15
1-MCP-201 1-MCP-201
DN50 3601-1-CC-1102
1-SOS-0097-OD63-PV1-PN10

1-CV-1101A 1-BV-1108A
DN20 DN20
3601-1-PD-1102
1-BV-1104A 1-STR-1101A 3601-1-P-108A
DN25 DN25
1-BV-1105A
1-BV-1103 DN15 1-BV-1109
DN25 DN20
NOTE 6 1-SOS-0104-OD25-PV1-PN10 SODIUM SILICATE TO RO
PERMEATE COMMON OUTLET HEADER
1-PRV- 1-BPV-1101
1101B DN20 SHEET-14
I21 I24
DN20
1-BV-1102
1-BV-1110 DN25
1-SY 1-HS
DN25 1-SOS-0098-OD32-PV1-PN10 108B 108B 1-BV-1106B 1-SOS-0103-OD25-PV1-PN10
3601-1-TK-108 DN15
1-MCP-201
1-SOS-0101-OD32-PV1-PN10
1-CV-1101B 1-BV-1108B
DN20 DN20

1-BV-1104B 1-STR-1101B 36015-1-P-108B


DN25 DN25
1-BV-1105B
DN15

CIVIL

I28 FROM AIC-1403

1-CAS-0118-OD20-PV1-PN10 SHEET- 14
I28
1-HS
109 1-CAS-0116-OD20-PV1-PN10 1-CAS-0117-OD20-PV1-PN10

1-MCP-101 1-LAL
109
1-PRV-
1102A
B-BV-1111 VENT 1-LSL I28
DN20
DN50 109

1-SY 1-HS
109A 109A 1-BV-1116A 1-CAS-0113-OD25-PV1-PN10
3601-1-MX-102 DN50 DN15
1-CAS-0111-OD32-PV1-PN10
1-MCP-201
3601-1-CC-1103
1-CV-1102A 1-BV-1118A
DN20 DN20
3601-1-PD-1103
1-BV-1114A 1-STR-1102A 3601-1-P-109A
DN25 DN25 1-BV-1115A
1-CAS-0108-OD63-PV1-PN10 NOTE 6 1-BV-1113 DN15 1-BV-1119
DN25 DN20 1-CAS-0115-OD25-PV1-PN10 CALCIUM SULFATE TO RO
PERMEATE COMMON OUTLET HEADER
1-PRV- 1-BPV-1102
1102B DN20 SHEET-14
I28
DN20
B-BV-1120 1-BV-1112
DN25 DN25
3601-1-TK-109 1-SY 1-HS
1-CAS-0109-OD32-PV1-PN10 109B 109B 1-BV-1116B 1-CAS-0114-OD25-PV1-PN10
DN15
1-MCP-201
1-CAS-0112-OD32-PV1-PN10
1-CV-1102B 1-BV-1118B
DN20 DN20

1-BV-1114B 1-STR-1102B 3601-1-P-109B


DN25 DN25
1-BV-1115B
DN15 QW223601 MOBILE DESALINATION SAFI - 1
CIVIL
DISCIPLINE DRAWING TITLE

PR PIPING & INSTRUMENTATION DIAGRAM


3601-1-P-107A/B 3601-1-P-108A/B 3601-1-P-109A/B 3601-1-MX-102
POST-CHLORINATION (SODIUM HYPOCHLORITE )DOSING PUMP POST-pH (SODIUM SILICATE )DOSING PUMP REMINERALIZATION (CALCIUM SULFATE)DOSING PUMP CALCIUM SULFATE DOSING AGITATOR
CAPACITY : 60 LPH @ 4 barg CAPACITY : 250 LPH @ 4 barg CAPACITY : 280 LPH @ 4 barg VENDOR Drawing Number
TYPE: HIGH SPEED AGITATOR.
TYPE : MOTORIZED DIAPHRAGM PUMP TYPE : MOTORIZED DIAPHRAGM PUMP TYPE : MOTORIZED DIAPHRAGM PUMP
MOC : PVC HEAD & PTFE DIAPHRAGM MOC : PVC HEAD & PTFE DIAPHRAGM MOC : PVC HEAD & PTFE DIAPHRAGM
MOC : SS316 SHAFT/PROPELLER PCT-1245A-PR-PID-001
RPM : 700 RPM
STROKE ADJUSTMENT: AUTOMATIC (4-20 MA) VFD CONTROLLED STROKE ADJUSTMENT: AUTOMATIC (4-20 MA) VFD CONTROLLED STROKE ADJUSTMENT: AUTOMATIC (4-20 MA) VFD CONTROLLED
QUANTITY : TWO (2), (1 DUTY / 1 STANDBY) QUANTITY : ONE (1) No. JESA Drawing Number
QUANTITY : TWO (2), (1 DUTY / 1 STANDBY) QUANTITY : TWO (2), (1 DUTY / 1 STANDBY)
POWER :400V/3P/50Hz/-0.18KW POWER :400V/3P/50Hz/-0.37KW POWER :400V/3P/50Hz/-0.37KW POWER : 400V 3ph/50 Hz/-1.1kW
QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 11/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
RAW WATER DN1200-FRP 2-TP-101A NOTES:-
2-TP-102
TO RAW WATER HEADER (BY CLIENT) DN1000-FRP RO REJECT WATER 1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
SHEET-13 (BY CLIENT) TO RO REJECT HEADER TERMINATION POINT AND ONLY WITHIN THE SKID WILL
2-TP-103 BE SUPPLIED BY PACT ENGINEERING.
2-TP-101B SHEET-13
TRAIN - 02 2. PIPING MATERIAL
2-TP-115 LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
HDPE (for size > 250 DN)
HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)
DN800-FRP RO PERMEATE WATER 3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ
(BY CLIENT) TO RO PERMEATE HEADER 230V, 3PH, 50HZ
2-TP-104 2-TP-106 2-TP-111 2-TP-114 2-TP-116 2-TP-117 2-TP-118 2-TP-131
SHEET-13 4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)

5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601


3-TP-101A 3-TP-102
6. TERMINATION POINT

3-TP-103 By PACT BY CLIENT


3-TP-101B
TRAIN - 03
3-TP-115

3-TP-104 3-TP-106 3-TP-111 3-TP-114 3-TP-116 3-TP-117 3-TP-118 3-TP-131

4-TP-101A 4-TP-102

4-TP-103

(BY CLIENT)
4-TP-101B

DN600-FRP
TRAIN - 04
4-TP-115

DN800-FRP
(BY CLIENT)
4-TP-104 4-TP-106 4-TP-111 4-TP-114 4-TP-116 4-TP-117 4-TP-118 4-TP-131

5-TP-101A 5-TP-102

5-TP-103
5-TP-101B
TRAIN - 05 WASTE WATER
5-TP-115 TO WASTE WATER HEADER
SHEET-13

5-TP-104 5-TP-106 5-TP-111 5-TP-114 5-TP-116 5-TP-117 5-TP-118 5-TP-131

6-TP-101A 6-TP-102

6-TP-103
6-TP-101B
TRAIN - 06
6-TP-115

6-TP-104 6-TP-106 6-TP-111 6-TP-114 6-TP-116 6-TP-117 6-TP-118 6-TP-131

7-TP-101A 7-TP-102

7-TP-103
7-TP-101B
TRAIN - 07
7-TP-115

0D280-HDPE WASTE WATER


7-TP-104 7-TP-106 7-TP-111 7-TP-114 7-TP-116 7-TP-117 7-TP-118 7-TP-131 (BY CLIENT) FROM CF TRAIN - 1
SHEET-05

8-TP-101A 8-TP-102 DN200-UPVC RO PERMEATE WATER


(BY CLIENT) FROM RO TRAIN - 1
SHEET-08
8-TP-103
8-TP-101B
TRAIN - 08
8-TP-115
RO REJECT WATER
FROM RO TRAIN - 1
SHEET-06
8-TP-104 8-TP-106 8-TP-111 8-TP-114 8-TP-116 8-TP-117 8-TP-118 8-TP-131

RAW WATER DN1200-FRP


FROM RAW WATER HEADER (BY CLIENT)
SHEET-02
QW223601 MOBILE DESALINATION SAFI - 1

DISCIPLINE DRAWING TITLE

PR PIPING & INSTRUMENTATION DIAGRAM

VENDOR Drawing Number

PCT-1245A-PR-PID-001

JESA Drawing Number


QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 12/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
NOTES:-
1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
TERMINATION POINT AND ONLY WITHIN THE SKID WILL
9-TP-101A 9-TP-102 BE SUPPLIED BY PACT ENGINEERING.
DN1000-FRP REJECT WATER 2. PIPING MATERIAL
(BY CLIENT) DISPOSAL TO SEA
LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
9-TP-103
HDPE (for size > 250 DN)
9-TP-101B
TRAIN - 09 HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)

9-TP-115 3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ


230V, 3PH, 50HZ
4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)
DN800-FRP RO PERMEATE WATER
(BY CLIENT) TO RO PRODUCT WATER TANK
9-TP-104 9-TP-106 9-TP-111 9-TP-114 9-TP-116 9-TP-117 9-TP-118 9-TP-131 5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601
SHEET-14

6. TERMINATION POINT

By PACT BY CLIENT

10-TP-101A 10-TP-102

10-TP-103
10-TP-101B
TRAIN - 10
10-TP-115

10-TP-104 10-TP-106 10-TP-111 10-TP-114 10-TP-116 10-TP-117 10-TP-118 10-TP-131

11-TP-101A 11-TP-102

11-TP-103

(BY CLIENT)
11-TP-101B

DN600-FRP
TRAIN - 11
11-TP-115

11-TP-104 11-TP-106 11-TP-111 11-TP-114 11-TP-116 11-TP-117 11-TP-118 11-TP-131

ID600-FRP
DISPOSAL TO SEA
(BY CLIENT)

DN800-FRP
(BY CLIENT)
12-TP-101A 12-TP-102

12-TP-103
12-TP-101B
TRAIN - 12
12-TP-115

12-TP-104 12-TP-106 12-TP-111 12-TP-114 12-TP-116 12-TP-117 12-TP-118 12-TP-131

13-TP-101A 13-TP-102

13-TP-103
13-TP-101B
TRAIN - 13
13-TP-115

13-TP-104 13-TP-106 13-TP-111 13-TP-114 13-TP-116 13-TP-117 13-TP-118 13-TP-131

14-TP-101A 14-TP-102 RO PERMEATE WATER FROM


RO PERMEATE HEADER
14-TP-103 SHEET-12
14-TP-101B
TRAIN - 14
14-TP-115
DN1000-FRP RO REJECT WATER FROM
(BY CLIENT) REJECT WATER HEADER
SHEET-12

14-TP-104 14-TP-106 14-TP-111 14-TP-114 14-TP-116 14-TP-117 14-TP-118 14-TP-131

RAW WATER DN1200-FRP


FROM RAW WATER HEADER (BY CLIENT)
SHEET-12
QW223601 MOBILE DESALINATION SAFI - 1

DISCIPLINE DRAWING TITLE

PR PIPING & INSTRUMENTATION DIAGRAM

VENDOR Drawing Number

PCT-1245A-PR-PID-001

JESA Drawing Number


QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 13/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
NOTES:-
3601-1-STM-701 3601-TK-102
RO PRODUCT WATER TANK 1. PRICE VARIATION
STATIC MIXER
CAP : 2920 m3/h CAPACITY : 600 m3
TYPE : PLATE MODEL TYPE : ABOVE GROUND
SIZE : DN800 DIM : 11.0 mL x 11.0 mW x 5.0 mH
MOC : RCC
MOC : SS316
QTY : ONE (1), 1X100%, 1 DUTY
QTY : ONE (1) No.
(BY CLIENT)

TO SY-107A/B

SHEET-11

TO SY-108A/B

SHEET-11

TO SY-109A/B

SHEET-11
1-P-109A/B
CALCIUM SULFATE 1-CAS-011-OD25-PV1-PN10

FROM DOSING PUMP


SHEET-11

1-P-108A/B
SODIUM SILICATE 1-SOS-0104-OD25-PV1-PN10
FROM DOSING PUMP
SHEET-11

1-P-107A/B I24
1-SHC-0125-OD20-PV1-PN10
SODIUM HYPOCHLORITE I07 I08
FROM DOSING PUMP
1-AIC 1-AAH 1-AAL 1-AIC 1-AAH 1-AAL 1-AIC 1-AAH 1-AAL
SHEET-11 1401 1401 1401 1402 1402 1402 1403 1403 1403
LIH LIM
>8.0pH <6.5pH STOP START

1-AI 1-AI 1-AI


1403 1401 1402 LIT LIT
(BY CLIENT)
1-CV-1401 1-CV-1402 1-CV-1403
1-AT 1-AT 1-AT
1401 1402 1403

DN15 DN20 DN20


1-BV-1401 1-BV-1402 1-BV-1403 1-AE 1-AE 1-AE
1401 1402 1403
CHLORINE pH COND.

1-BV-1404 1-BV-1406
NOTE-1 1-BV-1405
DN25 DN25
DN25
TP-127A TP-127B LAM = HOLD
TP-120 TP-121 TP-122 TP-128 TP-129 TP-130 LAL = HOLD
RO PERMEATE WATER FROM
PERMEATE WATER HEADER
TP-119
SHEET-13 3601-1-STM-1401
DN800
3601-TK-102
1-BV-1407 RO PRODUCT WATER TANK
DN50

RO PERMEATE WATER
TO COMMON DOSING TANKS
SHEET-11

TP-126

TO GRAVITY
DRAIN HEADER

NOTE-1

QW223601 MOBILE DESALINATION SAFI - 1

DISCIPLINE DRAWING TITLE

PR PIPING & INSTRUMENTATION DIAGRAM

VENDOR Drawing Number

PCT-1245A-PR-PID-001

JESA Drawing Number


QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 14/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
NOTES:-
1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
TERMINATION POINT AND ONLY WITHIN THE SKID WILL
BE SUPPLIED BY PACT ENGINEERING.

2. PIPING MATERIAL
LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
HDPE (for size > 250 DN)
HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)
TRAIN - 01
TK-101A 3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ
1-FIL-101 230V, 3PH, 50HZ
SPARE
1-FIL-102 A/B
4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
1-UV 1-UV 1-UV 1-UV SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)
PSL 401 1-BV-1504 402 1-BV-1505 701 1-BV-1506 702 1-BV-1507 1-BV-1508 1-BV-1509
1502 1/4" 1/4" 1/4"
1/4" 1/2" 1/4" 5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601

1-IA-0140-1/4''-GI1-SH40
6. TERMINATION POINT
BV-1511A BV-103
1/2" By PACT BY CLIENT
1"
3601-B-FIL-110 3601-B-PR-102

TRAIN - 02

TRAIN - 03

MCP-102

TRAIN - 04

IA-0139-1''-GI1-SH40

PSH
1501A
IA-0135-1''-GI1-SH40 TRAIN - 05

IA-0137-1''-GI1-SH40
CV-1501A BV-1501A
1" 1"
3601-A-AC-101A
BV-1502A BV-1503A TRAIN - 06
1" 1"
3601-A-FIL-108A 3601-A-FIL-109A 3601-A-AD-101A 3601-A-PR-101A
MCP-102

TRAIN - 07

IA-0138-1''-GI1-SH40

PSH
1501B
BV-1502B BV-1503B TRAIN - 08
1" 1"
3601-A-FIL-108B 3601-A-FIL-109B 3601-A-AD-101B 3601-A-PR-101B
CV-1501B BV-1501B
1" 1" IA-0136-1''-GI1-SH40
3601-A-AC-101B
TRAIN - 09

TRAIN - 10

TRAIN - 11

PSL
TRAIN - 12
1501

TRAIN - 13

TRAIN - 14

QW223601 MOBILE DESALINATION SAFI - 1


3601-B-AC-101A/B 3601-B-FIL-108 A/B 3601-B-FIL-109 A/B 3601-B-AD-101 A/B
DISCIPLINE DRAWING TITLE
AIR COMPRESSOR (OIL FREE) AIR FILTER (STAGE 1) AIR FILTER (STAGE 2) AIR DRYER
CAP : 20 SCFM CAP : 20 SCFM CAP : 20 SCFM CAP : 20 SCFM PR PIPING & INSTRUMENTATION DIAGRAM
DIFFERENTIAL PRESSURE : 8.0 bar SIZE : 5 MICRON SIZE : 1 MICRON DESIGN PRESSURE : 10 barg
DESIGN TEMP. : 40°C DESIGN PRESSURE : 10 barg DESIGN PRESSURE : 10 barg DESIGN TEMPERATURE :40°C
VENDOR Drawing Number
TYPE : SCREW COMPRESSOR DESIGN TEMPERATURE :40°C DESIGN TEMPERATURE :40°C DEW POINT : -40°C PCT-1245A-PR-PID-001
QUANTITY : TWO (2), (1 DUTY / 1STANDBY) QUANTITY : TWO (2), (1 DUTY / 1STANDBY) QUANTITY : TWO (2), (1 DUTY / 1STANDBY) QUANTITY : TWO (2), (1 DUTY / 1STANDBY)
POWER :400V/3Ph/50Hz/-KW JESA Drawing Number
QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 15/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev
NOTES:-
1. EQUIPMENT , PIPING & CABLING AS SHOWN WITHIN
TERMINATION POINT AND ONLY WITHIN THE SKID WILL
BE SUPPLIED BY PACT ENGINEERING.

2. PIPING MATERIAL
LOW PRESSURE PIPING :- UPVC (for size ≤ 250 DN)
HDPE (for size > 250 DN)
HIGH PRESSURE PIPING :- Super Duplex SS, (SS2507)

3. POWER SUPPLY CONSIDERED IS 400V, 3PH, 50HZ


230V, 3PH, 50HZ
4. ALL PRESSURIZED AND GRAVITY DRAIN FROM SKID BOUNDARY
SHALL BE ROUTED TO NEAREST CIVIL TRENCH ( BY CLIENT)

5. VALVES & INSTRUMENT TAG START FROM PREFIX 3601

6. TERMINATION POINT

By PACT BY CLIENT

SPEED RUN FAULT START/STOP SPEED


FEEDBACK FEEDBACK FEEDBACK COMMAND CONTROL
RUN FAULT START/STOP SI XI XA HS SY RUN FAULT START/STOP
FEEDBACK FEEDBACK COMMAND 001 001 001 001 001 FEEDBACK FEEDBACK COMMAND
XI XA HS XI XA HS
001 001 001 001 001 001

HS
START
001
HS HS
START CONTROL PANEL START
001 HS 001
STOP
CONTROL PANEL VFD 001 CONTROL PANEL
HS HS
STOP STOP
M 001 M 001
M

DETAIL A DETAIL B DETAIL C


THREE PHASE MOTOR (WITHOUT VFD) THREE PHASE MOTOR (WITH VFD) ONE PHASE MOTOR

DETAIL E
PNEUMATIC ON/OFF VALVES

QW223601 MOBILE DESALINATION SAFI - 1

DISCIPLINE DRAWING TITLE

PR PIPING & INSTRUMENTATION DIAGRAM

VENDOR Drawing Number

PCT-1245A-PR-PID-001

JESA Drawing Number


QW223601-03-MCT-4500004013-PR-D156-00001
PROJECT LOCATION : SAFI - 1 DOCUMENT HISTORY & REVISION SHEET
JESA S.A
PROJECT DESCRIPTION : QW223601 MOBILE DESALINATION SAFI - 1 4 NO
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca
JE PROJECT NUMBER : QW223601 3 16/16
PURCHASE ORDER REFERENCE : 4500004013-22 15/11/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 2
JESA DRAWING NUMBERING SYSTEM Project Number Code of sub Project Sender Code PO Discipline Code Doc Type Number Rev
OTHER REFERENCE (tag,unit) 20/09/2022 ISSUED FOR APPROVAL IRFAN SALMAN THAYA 1
02/07/2022 ISSUED FOR APPROVAL VIGNESH SALMAN THAYA 0 QW223601 03 MCT 4500004013 PR D156 00001 02
DATE Description Revision Subject prepared by Checked by Approved by Rev

You might also like