Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Public Middle School Of Labarthe-Sur-Lèze PERSPECTIVES

Architects: LCR Architectes For the facades, coherent expressive


Area : 7463 m² materials were chosen.
Year : 2012 For communication and education,
Program : ELEMENTARY & MIDDLE premium glass transcribes the edu-
SCHOOL cational of exchange and openness.
Location : LABARTHE-SUR-LÈZE, The volume created by glass and
FRANCE aluminium bars alongside copper
The aim of the project was to create siding seems to play a stretching
a school answering to the High game.
Environmental Quality and educa- The inner orange copper hue of the
tional standards. common spaces contrasts with the
outside brown tone to create a
As material Steel, Concrete and smooth transition with the land.
glass were primarily used, the steel The copper, a material that is natural
mainly served as both structural and alive, serves the intention of
and expressive unit of the whole giving the building a skin which
project, serving as a structure to patina would smooth with the age
form the long and wide spaces and while also reinforcing value of sus-
PLANS as an expressive element for the tainability.
facade and interior spaces.

SECTIONS
WATERLOO YOUTH FAMILY COMMUNITY CENTRE Weave (Working to Educate, Advocate and
Empower) was formed in the 1970s by a
group of parents in Sydney who were con-
ARCHITECTS: COLLINS AND TURNER
cerned about the welfare of local children. In
AREA : 252 M²
2008 the city held a small, invitation-only
YEAR : 2013
competition to convert the building (this
LOCATION : SYDNEY, AUSTRALIA
time in earnest) into a contemporary work-
place for Weave and Headspace, the nation-
To minimize the impact on the park, the al youth mental health organization.
brief required that there be little or no
increase in the building footprint. Other PERSPECTIVES
suggestions were that it be vandal-proof
and that entrants explore ideas for a green
roof as a means to address the outlook for
surrounding high-rise residential build-
ings.
PLANS SECTIONS
- So the project was an intervention on a pre
- existing building.
- There was an introduction of new pro-
grams
- Increase in building footprint was restrict-
ed
- Introduction of green was encouraged

In-order to fulfill these requirements the


architects used steel as their main building
material.

Due to its high strength to area ratio, slim


and few steel columns were used to support
the new introduced steel framework that
gives the project a contemporary look, that
provides additional community spaces, and
a structure that structure that supports the
vine.
1
333

512
2

676
3

440
4
1
99

1254 563 1233 636

5
71
A B C D E

Site
2 1 : 200

2
A105 1
3
A105
A105
5 1
A105

200
20 100

512
Storage
5
100

A105 12 m²
4
178 A105
100

Fast Make
2
1 63 631951 60 60 60 60 60 60 60 60 60 65120

4
29 m²
161

A105
Taste
Product Storage 37 m²
63

3 m²
150

Traditional Kitchen
Raw material

676
56 m² 153
805

32 m²
6 6
A105 A105

Dinning
231 m²
Loading | Unloading 3
756

7 m²
20

440
78 405 5920 321 388

247
1 40
4
1 87
297
1 60
Dinning Level
21 2
200
1 40
3 1 : 100
220
234
1 70
232

1254 563 1233 636

A B C D E
A105 1
3
A105
A105
1
333

512
2

676
3

440
4
1
99

1254 563 1233 636

5
71
A B C D E

Site
2 1 : 200

2 3 1
A105 A105 A105

5 1
A105

200
20 100

512
Storage
5
100

A105 12 m²
4

178 A105
100

Fast Make
2
60 60 60 60 60 65120

4
29 m²
161

A105
Taste
Product Storage 37 m²
63

3 m²
150

Traditional Kitchen
Raw material

676
56 m² 153
805

32 m²
120

6 6
A105 A105
1 68 78 51 60 60

Dinning
231 m²
Loading | Unloading 3
756

7 m²
20

440
78 405 5920 321 388

247
1 40
4
1 87
297
1 60
Dinning Level
21 2
200
1 40
3 1 : 100
220
234
1 70
232

1254 563 1233 636

A B C D E
A105 1
3
A105
A105
2
A105 1
3
A105
A105

1 5
A105

581 1214 651

512
5

10
A105
4
A105
Roasting Space
4 20 m² 2
A105

Collective Working
Space DN

122 m²

676
Storage Dinning Space
1313

6 20 m² 56 m² 6
A105 A105

1491
690 750
628
593
3

313

440
Coffee sell
36 m²

Drying Space 4
126 m²

Processing Level 3066

1 1 : 100
1 2 3 4
1254 563 1233 636

2 3 1
A A105 B C A105 D A105 E
893
Roof Level

593
Processing Level

265
340
Mezanin

193
Dinning Level

58
Raw Material Storage
0
Bottom Natural
Ground

Left Elevation
3 1 : 100

893
Roof Level

300
593
Processing Level
253

340
Mezanin

193
148

Dinning Level

58
Raw
0 Material
Bottom Storage
Natural
Ground

Front Elevation
2 1 : 100
4 3 2 1
E D C B A

893 893
Roof Level Collective Working Roof Level
Dinning Space Roasting Space Space

453
56 m² 20 m² 122 m²

593 593
Processing Level Processing

Fast Make Dinning

253
Dinning 1370
340 340
231 m² 29 m² 231 m²
424

Mezanin Mezanin
Storage
193 193
Dinning Level 12 m² Dinning Lev

58 58
Raw Material Storage Raw
0 Materia
Bottom Nat
Ground
0
Bottom Natural
Ground
Section Along Short Side Section Along Topography
B-B 4 A-A
1 : 100 1 : 100

1 2 3 4
E D C B A

893 893
Roof Level Roof Level

593 593
Processing Level Processing

340 340
Mezanin Mezanin

193 193
Dinning Level Dinning Lev

58 58
Raw
0 Material
Bottom Storage
Natural Raw
0 Materi
Bottom Nat
Ground Ground

Section Along Short Side Section Along Topography


B-B1 5 A-A1
1 : 100 1 : 100

1 2 3 4
E D C B A

893 893
Roof Level Roof Level

593 593
Processing Level Processing Leve

340 340
Mezanin Mezanin

193 193
Dinning Level Dinning Level

58 58
Raw
0 Material
Bottom Storage
Natural Raw
0 Material
Bottom Sto
Natural
Ground Ground

Section Along Short Side Section Along Topography


3 B-B2
1 : 100
6 A-A2
1 : 100

You might also like