Professional Documents
Culture Documents
General Construction Notes:: Two Story Residential Building Jerg Sunogan S-1
General Construction Notes:: Two Story Residential Building Jerg Sunogan S-1
General Construction Notes:: Two Story Residential Building Jerg Sunogan S-1
GENERAL NOTES
NOTES IN REINFORCEMENT
1. ALL THE REINFORCING BARS MUST FOLLOW NATIONAL STRUCTURAL CODE
1. STANDARDS AND REFERENCES. THE FOLLOWING SHALL GOVERN THE DESIGN
OF THE PHILIPPINES.
FABRICATION AND CONSTRUCTION OF THE PROJECT.
2. ALL REINFORCING BARS SHALL BE FREE FROM MATERIALS THAT WILL AFFECT
2. IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS AND ELEVATIONS
BOND.
BETWEEN THE STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE
NOTES IN FOOTINGS
CONTRACTOR SHALL INFORM STRUCTURAL ENGINEER AND ARCHITECTS.
1. UNLESS OTHERWISE SPECIFIED IN PLANS, ALL FOOTING MUST BE AT LEAST
3. IN REFERENCES, SEE THE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS IN FLOOR
1400MM BELOW THE NATURAL GRADE LINE.
SLABS, OPENINGS IN THE WALLS AND SLABS, AND LOCATIONS OF DRAINS.
2. THE CONTRACTOR SHALL INFORM THE ENGINEER THE ACTUAL CONDITIONS
4. IN INTERPRETATIONS, INDICATED SHALL GOVERN DISTANCES AND SIZES SHALL NOT
UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF THE SOIL.
BE SCALES FOR CONSTRUCTION PURPOSES.
3. MINIMUM CONCRETE ON THE GROUND AND CLEAR CONCRETE DEPOSITS
5. ALL CONCRETE WORKS SHALL BE DONE IN ACCORDANCE WITH THE BUILDING
OF 50MM AGAINST FROM WORK.
CODE REQUIREMENT AND ALL STRUCTURAL STEEL WORKS AS LONG AS THEY DO
NOTES ON CONCRETE SLABS
NOT CONFLICT WITH THE LOCAL BUILDING CODE REQUIREMENT.
1. SLAB REINFORCEMENTS MUST BE 20MM CLEAR FROM TOP AND BOTTOM OF
6. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS
SLAB.
SHOWN OR NOTED. ALTER DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
2. REINFORCEMENT IN CONTINUOUS ELEVATED SLAB SHALL BE CUT.
7. CONTRACTOR SHALL NOTE AND PROVIDE MISCELLANEOUS BASES THAT ARE
3. THE BARS ALONG THE SHORTER SPAN SHALL BE PLACED BELOW THOSE
REQUIRED BY THE ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS.
ALONG THE LONG SPAN AT THE CENTER AND LONGER SPAN FOR
8. ALL THE RESULTS IN MATERIAL TESTING MUST BE NOTED AND APPROVED BY THE
REINFORCING BARS NEAR SUPPORTS.
MATERIALS ENGINEER/ STRUCTURAL DESIGNER.
NOTES ON CONCRETE MIXES & PLACING
1. ALL DAYS SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF
TWENTY EIGHT DAYS WITH CORRESPONDING MAXIMUM SIZE AGGREGATE
AND SLUMP.
NOTES ON REINFORCED CONCRETE BEAMS
1. NO SPLICE IN BEAMS A POINT WHERE CRITICAL BENDING STRESS OCCUR.
2. MINIMUM CONCRETE PROTECTION OF REINFORCING BARS SHALL BE
SHOWN.
3. BEAM REINFORCING BARS IN A WALL THE CLEAR DISTANCE FROM THE BAR
TO THE FURTHER FACE OF THE WALL SHALL NOT BE LESS THAN 5 DIAMETERS.
WF1
RCB1
2574
RCB1
RCB1
3500
3500
WF1
RCB1
WF1
WF1
RCB1 RCB1
812
F1C1
F1C1
F1C1
7000
7000
2 WF1
2 2 RCB1 RCB1 2
WF1
RCB1
RCB1
WF1
WF1
RCB1
3500
3500
F1C1
F1C1
3
WF1
3 3 3
1000
RCB1 RCB1
WF1
F1C1
A B C
A B C
Property line
Truss
A B
8000
C Truss
1 1 Truss
5.84
RB1
Truss
RB1
RB1
3500
RB1
RB1 RB1 Truss
7000
2 RB1 RB1
2 8.4 3.27
Truss
Truss
RB1
RB1
RB1
Truss
Property line
Truss
3 RB1 RB1 3
Truss
2.57 2.57
Truss
A B C Truss
0.70
1 ROOF BEAM FRAMING PLAN SCALE 1:100 MTS
S-3
Property line
7
Project Title: Client Name:
1.20
1.20
0.30
0.45
3.50
0.10mm THICK
GRAVEL BASE
COARSE
PLAN
SECTION
C.M. Recto Avenue Lapasan IOAPA No: O.R. No: Date: Residential Building
PTR No: Date:
Cagayan de Oro City Tel. 088-123-1823
Place: TIN:
0.17
10mm ⌀
HORIZONTAL
REBARS SPACED
@ EVERY 3RD
LAYER
4"
THICK
CHB
WALL
PLASTER
FINISH
Natural Grade Line
@
BOTHSIDES
10mm ⌀
VERTICAL
REBARS
SPACED @
0.60m O.C 0.60
0.85
3-10mm ⌀
LONGITUDINAL
BARS SPACED
EQUALLY
0.25
0.10m
COMPACTED
GRAVEL BED
0.40
C.M. Recto Avenue Lapasan IOAPA No: O.R. No: Date: Residential Building
PTR No: Date:
Cagayan de Oro City Tel. 088-123-1823
Place: TIN:
L/4 L/4
L/5 L/5
(VARIES)
L/4 L/4
10 mm Ø BAR
SPACED AT 0.25m
L/4 L/4
L/5
(VARIES)
10 mm Ø ALTERNATE BEND-UP
SPACED AT 0.25m 2-12mm Ø EXTRA BARS
2-12mm Ø BOTTOM BARS 2-12mm Ø BOTTOM BARS
2-12mm Ø BOTTOM BARS