Professional Documents
Culture Documents
Matrix 2 (Amendments To Republic Act No. 9184 Comments On House Bill (HB) No. 3704, HB No. 2682, HB No. 0648 and HB No. 1503) .
Matrix 2 (Amendments To Republic Act No. 9184 Comments On House Bill (HB) No. 3704, HB No. 2682, HB No. 0648 and HB No. 1503) .
ARTICLE I
GENERAL
PROVISIONS
SECTION 1. Short Title.
– This Act shall be
known as the
“Government
Procurement
PROCUREMENT BILLS MATRIX
Reform Act.”
SEC. 2. Declaration of
Policy. – It is the
declared policy of the
State to promote the
ideals of good
governance in all its
branches, departments,
agencies, subdivisions,
and instrumentalities,
including government-
owned and/or controlled
corporations, and local
government units.
SEC. 3. Governing
Principles on
Government
Procurement. – All
procurement of the
national government, its
departments, bureaus,
offices and agencies,
including state
universities and colleges,
government-owned
and/or controlled
corporations, government
financial institutions and
local government units,
shall, in all cases, be
governed by these
principles:
PROCUREMENT BILLS MATRIX
(b) Competitiveness by
extending equal
opportunity to enable
private contracting parties
who are eligible and
qualified to participate in
public bidding.
c) Streamlined
procurement process that
will uniformly apply to all
government procurement.
The procurement process
shall be simple and made
adaptable to advances in
modern technology in
order to ensure an
effective and efficient
method.
(d) System of
accountability where both
the public officials directly
or indirectly involved in
the procurement process
as well as in the
implementation of
procurement contracts
and the private parties
PROCUREMENT BILLS MATRIX
Procurement Policy
Board established in
accordance with Article
XX of this Act.
(k) Infrastructure
Projects – include the
construction,
improvement,
rehabilitation, demolition,
repair, restoration or
maintenance of roads
and bridges, railways,
airports, seaports,
communication facilities,
civil works components of
information technology
projects, irrigation, flood
control and drainage,
water supply, sanitation,
sewerage and solid
waste management
systems, shore
protection, energy/power
and electrification
facilities, national
buildings, school
buildings, hospital
buildings and other
related construction
projects of the
government.
75 of this Act.
Section 6.
Standardization of
Procurement Process
and Forms.- To
systematize the
procurement process,
avoid confusion and
ensure transparency, the
procurement process,
including the forms to be
used, shall be
standardized insofar as
practicable.
ARTICLE II
PROCUREMENT
PLANNING
SEC. 7. Procurement
Section 7. Procurement
Planning and Budgeting
Planning and
Linkage. – All procurement
Budgeting Linkage- All
should be within the
procurement should be
approved budget of the
within the approved
Procuring Entity and should
budget of the Procuring
be meticulously and
Entity and should be
judiciously planned by the
meticulously and
Procuring Entity
judiciously planned by the
concerned. Consistent with The Gove
Procuring Entity
government fiscal discipline Procurement
concerned. Consistent
measures, only those Board – TSO w
with government fiscal
considered crucial to the the term, “D
discipline measures, only
efficient discharge of PARAMETERS“
those considered crucial
governmental functions However, the te
to the efficient discharge shall be included in the not defined
of governmental functions Annual Procurement Plan
shall be included in the proposed bill.
to be specified in the IRR. concept is the s
Annual Procurement Plan
t o be specified in the is included
No government Design Eng
IRR. Procurement shall be (i.e. Design St
undertaken unless it is in or Contract Plan
No government accordance with the
Procurement shall be there is no need
approved Annual as this is
undertaken unless it is in Procurement Plan of the
PROCUREMENT BILLS MATRIX
ARTICLE III
PROCUREMENT BY
ELECTRONIC MEANS
Section 8. Procurement
By Electronic Means.-
To promote transparency
and efficiency,
information and
communications
technology shall be
PROCUREMENT BILLS MATRIX
procedures to be
established by the GPPB.
With regard to the
procurement of non-
common use items,
infrastructure projects
and consulting services,
agencies may hire
service providers to
undertake their electronic
procurement provided
these service providers
meet the minimum
requirements set by the
GPPB.
Section 9. Security,
Integrity and
Confidentiality.- The G-
EPS shall ensure the
security, integrity and
confidentiality of
documents submitted
through the system. It
shall include feature that
provides for an audit trail
for on-line transactions
and allow the
Commission on Audit to
verify the security and
integrity of the systems at
any time.
ARTICLE IV
PROCUREMENT BILLS MATRIX
COMPETITIVE BIDDING
ARTICLE V
BIDS AND AWARDS
COMMITTEE
Section 16.
Professionalization of
PROCUREMENT BILLS MATRIX
REQUIREMENTS TO BE
The Procuring Entity may INCLUDED THE BIDDING (attachment to th
require additional DOCUMENTS: of Bid), no need
document requirements to be included
or specifications (K) DESIGN law.
necessary to complete PARAMETERS;
the information required Construction
for the bidders to prepare (L) SITE INFORMATION, Supervision
and submit their WHICH INCLUDES THE safeguard
respective bids. LOT PLAN, successful com
TOPOGRAPHY, of your project
Section 18. Reference SOIL TEST, AND will always be
to Brand Names.- HYDROLOGY REPORT; for this. This is i
Specifications for the in the list o
Procurement of Goods (M) SPACE Personnel, part
shall be based on REQUIREMENTS; bidding docume
relevant characteristics no need for thi
and/or performance (N) BUDGET included in th
requirements. Reference PROJECTION; because it allo
to brand names shall not AND PE to decide if
be allowed. not needed.
(O) WHETHER OR NOT
Section 19. Access to CONSTRUCTION
Information.- In all SUPERVISION IS PART
stages of the preparation OF THE SCOPE.
of the Bidding
Documents, the The Procuring Entity may
Procuring entity shall require additional document
ensure equal access to requirements or
information. Prior to their specifications necessary to
official release, no aspect complete the information
of the Bidding Documents required for the bidders to
shall be divulged or prepare and submit their
released on any respective bids.
PROCUREMENT BILLS MATRIX
prospective bidder or
having direct or indirect
interest in the project to
be procured.
ARTICLE VII
INVITATION TO BID
as consultants hired by
the agency concerned
and the representative of
the end -user.
Act.
The Pre-bid
conference(s) shall be
held within a reasonable
PROCUREMENT BILLS MATRIX
be determine by their
compliance with the 2. ABC OF ABOVE ONE indiscriminately,
eligibility requirements HUNDRED MILLION they compete
prescribed for the PESOS (P100,000,000.00) themselves und
competitive Bidding AND BELOW TWO same set of rule
concerned, within the HUNDRED MILLION specifically, any
period stated in the PESOS (P200,000,000.00). - requirements i
Invitation to bid. The LOCATION OF THE MAIN thereunder
eligibility requirements OFFICE OF THE BIDDER equally to all
shall provide for fair and MUST BE WITHIN THE without exceptio
equal access to all REGION WHERE THE
prospective bidders. The PROJECT SHALL BE In this regar
prospective bidder shall IMPLEMENTED; AND additional requ
certify under oath as to on the list of e
the correctness of the 3. ABC OF ABOVE TWO requirements
statements made, and HUNDRED MILLION PESO provides for a li
the completeness and S (P200,000,000.00). - on the participa
authenticity of theLOCATION OF THE MAIN prospective
documents submitted. OFFICE OF THE BIDDER based on the a
CAN BE ANYWHERE IN budget of contr
A prospective bidder may THE PHILIPPINES.” neither allow
be allowed to submit his participation no
eligibility requirements enhance com
electronically. However, among pros
said bidder shall later on bidders. Clear
certify under oath as to participating bidd
correctness of the not be afforded
statements made and the opportunities to
completeness and award of contrac
authenticity of the
documents submitted. Previously Secti
45 of RA No
The eligible prospective provided prefere
bidders shall then be provincial
PROCUREMENT BILLS MATRIX
evaluated using
numerical ratings on the however, in the
basis of the short listing law, a sunset
requirements prescribed was included.
for the Competitive
Bidding concerned, within We need to und
the period stated in the why there is a
Invitation to Bid to have a limitat
determine the short list of participation of
bidders who shall be because it w
allowed to submit their competition. Mo
respective bids. we need to kno
threshold amo
Section 25. Submission supported by r
and Receipt of Bids.- A and data.
bid shall have two(2)
components, namely the We define the
technical and financial office, for purp
components which registration, oft
should be in separate located either at
sealed envelopes, and or other cities
which shall be submitted National
simultaneously. The bids Region. Mo
shall be received by the long-standing
BAC on such date, time contractors, who
and place specified in the main office
invitation to bid. The registration, will
deadline for the receipt of forced to ide
bids shall be fixed by the specific provin
BAC, giving the region where th
prospective bidders hold office
sufficient time to study participate in
and prepare their bids. bidding process
The deadline shall also This is prejudicia
PROCUREMENT BILLS MATRIX
to participate in the
bidding before the
deadline for the receipt of
bids. In such case, he
shall no longer be
allowed to submit another
Bid or the same contract
either directly or
indirectly.
bidder.
ARTICLE X
POST-QUALIFICATION
Calculate/Rated and
Responsive Bid
Submission. - A single
calculated/rated and
responsive bid shall be
considered for award if it
falls under of the
following circumstances:
a. If after advertisement,
only one prospective
bidder submits a Letter of
Intent and/or applies for
eligibility check, and
meets the eligibility
requirements or criteria,
after which it submits a
bide, which is found to be
responsive to the bidding
requirements;
b. If after the
advertisement, more than
one prospective bidder
applies for eligibility
check, but only one
bidder meets the
eligibility requirements or
criteria, after which in
submits a bid which is
found to be responsive to
the bidding requirements;
or
PROCUREMENT BILLS MATRIX
ARTICLE XI
AWARD,
IMPLEMENTATION AND
TERMINATION OF THE
CONTRACT
Responsive Bid or
Highest Rated
Responsive Bid, and the
recommendation of the
award, the Head of the
Procuring Entity or his
duly authorized
representative shall
approve or disapprove
the said
recommendation. In case
of approval, the Head of
the Procuring Entity or his
duly authorized
representative shall
immediately issue the
Notice of Award to the
bidder with the Lowest
Calculated Responsive
Bid or Highest Rated
Responsive Bid.
In the case of
government-owned
and/or -controlled
corporations, the
concerned board shall
take action on the said
recommendation within
thirty (30) calendar days
from receipt thereof.
If no action on the
contract is taken by the
head of the procuring
entity or by his duly
authorized
representative, or by the
concerned board, in the
case of government-
owned and/or -controlled
corporations, within the
periods specified in the
preceding paragraph, the
contract concerned shall
be deemed approved.
as a measure of
guarantee for the faithful
performance of an
compliance with his
obligations under the
contract prepared in
accordance with the
Bidding Documents, be
required to post a
performance security in
such form and amount as
specified in the Bidding
Documents.
undertake post-
qualification for the next-
ranked Lowest
Calculated Bid or Highest
Rated Bid. This
procedure shall be
repeated until an award is
made. However, if no
award is possible, the
contract shall be
subjected to a new
bidding.
public officers or
employees of the
Procuring Entity, or
between the BAC and
any of the bidders, or if
the collusion is between
or among the bidders
themselves, or between a
bidder and a third party,
including any act which
restricts, suppresses or
nullifies or tends to
restrict, suppress or
nullify competition;
ARTICLE XIII
BIDDING OF
PROVINCIAL
PROJECTS
The Gove
Procurement
Board – TSO
the p
amendment as
line with
constitutional m
that “The Stat
promote the pre
use of Filipino
domestic materi
locally p
goods and
measures tha
make
PROCUREMENT BILLS MATRIX
competitive.”
However, there
need for data, r
or studies to
this Bill.
The use of th
“Shall” mandat
Procuring Entity
preference to
Made goods, s
and m
However, the
Filipon-Made
defined in the b
is open to
application
interpretation b
Procuring Enti
may lead to com
of graft and
practices act.
PROCUREMENT BILLS MATRIX
PROCUREMENT BILLS MATRIX
PROCUREMENT BILLS MATRIX