SH&E Site Observation Report S3ME-718-FM6

Project Name TBC Date and time of Observation August 7th,2014 @ 1220

Project no. RI.SDP.05 AECOM Representative Carlito Agtarap

Contractor Name TEBRAK / AL-MOUSA Contractor Representative CS: JAMAL

Risk rating/
Observation/ Date
No. Photo Close-out Contractor close-out comments Close-out photo
Suggested improvement closed-out
time

Electrical cable on the road, vehicles passing


over it will cause damages and short.
Critical -
1 Electrical Hazard and Unsafe Condition.
Immediately
Remove and manage the cable in a safe
position.

Contractor's drivers and heavy equipment


operators had not been provided with
mandatory PPEs. - UNSAFE CONDITION and Critical -
2
PRACTICE Ensure that workers must be Immediately
issued and wear mandatory and tasks related
PPEs

Su-standard access to work site for workers –


UNSAFE CONDITION AND PRACTICE – Risk of Critical -
3 slip and fall Install a safe access Immediately
to work site as per safety standards

Spraying water for dust control – GOOD


4 PRACTICE- Continue in all places of relevant Compliant
work

SHE Site Observation ReportRevision 0 October 11, 2011 Page 1 of 7


Risk rating/
Observation/ Date
No. Photo Close-out Contractor close-out comments Close-out photo
Suggested improvement closed-out
time

SHE Site Observation ReportRevision 0 October 11, 2011 Page 2 of 7


Risk rating/
Observation/ Date
No. Photo Close-out Contractor close-out comments Close-out photo
Suggested improvement closed-out
time

SHE Site Observation ReportRevision 0 October 11, 2011 Page 3 of 7


SAFETY OBSERVATION REPORT
Project Name South & Secondary Road Project Date and Time of Observation

Project Number Supervision Consultant : DAR Al-Riyadh Representatives / Inspector Ata Ul Mohsin

Contractor Name ADVACON SOR Reference :

Note: High, Medium, Low, Positive Observation

Risk Rating/
Observation/ Contractor Close-Out
No. Photos Recommendation Close-out Close-Out Photo Date Closed-Out
Suggested improvement Comments
time

Low

Medium

Low
SAFETY OBSERVATION REPORT
Project Name South & Secondary Road Project Date and Time of Observation

Project Number Supervision Consultant : DAR Al-Riyadh Representatives / Inspector Ata Ul Mohsin

Contractor Name ADVACON SOR Reference :

Note: High, Medium, Low, Positive Observation

High

High

High
SAFETY OBSERVATION REPORT
Project Name South & Secondary Road Project Date and Time of Observation

Project Number Supervision Consultant : DAR Al-Riyadh Representatives / Inspector Ata Ul Mohsin

Contractor Name ADVACON SOR Reference :

Note: High, Medium, Low, Positive Observation

7 High

8 Medium

9 High

10 High
SAFETY OBSERVATION REPORT
Project Name South & Secondary Road Project Date and Time of Observation

Project Number Supervision Consultant : DAR Al-Riyadh Representatives / Inspector Ata Ul Mohsin

Contractor Name ADVACON SOR Reference :

Note: High, Medium, Low, Positive Observation

11 Medium

12 High

Note: All Major/High Risk violation should be rectified 30-Dec-99


HSE Specialist immediately.