Corrective Action Request (CAR)


Date: 12 / 04 / 2023 CAR No.: 4

Subject: Discipline: Work Area:

ABH.0000001 SUPERVISION
SPM: Keyavash Ahmadi

CAR Source:-
control of nonconforming work, management reviews Staff observations.

internal or external audits, feedback from customers Analyses of data

Other Source

Description of Nonconformity:-

During the audit found there are Some WIRs Raised without approved Mock-up or Benchmark and
there is some work near to finish at site without Method Statement same of retaining wall.

Name: Audit team Signature:

Section (2) (Filled by the investigation team)


Root Cause:-
_ Delay in the submission of Method Statement, no approved/Clear baseline.
__________________________________________________________________________

The Correction:-
_ Awareness Workshops of MS and Mock-ups have to conduct and Pro-active letter will be send officially for list of planed
Mock-ups based on the Planed activity and baseline. ______________________________

Corrective action:-
_ An awareness Workshops of MS and Mock-ups procedure and practice have been
Conducted and the Follow up will be in each quality weekly meetings, and to add Check item
Due Date16/ 04 /2023
In all the Inspection Check lists to verify and re check the Mock-ups and records
Approvals of relative activities. _________________________________________________

Responsibility of Execution assigned to:

Name: Meshaal Mohammed Position: Quality Engineer Signature:

Section (3) Follow up Action

Date: - 16 /04 /2023

Completed

Not Completed , Because:


Postponed to date: / /
Need reevaluation
Submit this Request the Management Representative

Signature:

Page 1 of 1
The electronic version of this document is the latest version. It is the responsibility of the individual to ensure that any paper material
is the current version. Printed material is uncontrolled documentation.

You might also like