QUALITY TESTING PROCEDURE
Revision History
Version Control
Version No. 00
Reviewed By
Summary of
No. Date Name Designation Signature
Changes
Concurred By
Summary of
No. Date Name Designation Signature
Changes
Approved By
Summary of
No. Date Name Designation Signature
Changes
0DMQL00-DLVR-00-SEV-QM-PRO-00008 Page | 2
QUALITY TESTING PROCEDURE
Table of Contents
Revision History ................................................................................................................................ 2
1 Overview.................................................................................................................................... 4
0DMQL00-DLVR-00-SEV-QM-PRO-00008 Page | 3
QUALITY TESTING PROCEDURE
1 Overview
1.1 Purpose
This procedure establishes the governance of permanent work and material testing processes and describes
the process, tools, roles, and responsibilities for Lab testing processes and related notifications and reporting
requirements in construction phase.
Role Responsibility
Third-party Lab • Updates weekly quality testing schedule and sends it to SEVEN Project
Representative document controllers.
• Issue official test reports to SEVEN Project Document Controllers that show
test results, acceptance criteria, and compliance status of actual results
(comply or not comply).
Contractor • Checks latest revision of ITPs, communicates with SEVEN Concerned, and
Quality Engineer coordinates with required personnel for test attendance.
• Notifies the contractor PM for any failed results and recommends the
appropriate Correction/ NCR issuance if needed.
Contractor • Coordinates with SEVEN and proposes and agrees on the proper correction
Project Manager in case of failed results trend or major failures.
• Put action plan with a time frame for implementing the agreed correction and
follow up till completion.
SEVEN Project • Receives the updated weekly quality testing schedule and official test reports
Document from External Lab and stamps dated received.
Controller
• Develop, maintain and update Test reports log sheet.
0DMQL00-DLVR-00-SEV-QM-PRO-00008 Page | 4
QUALITY TESTING PROCEDURE
• Forward the updated weekly quality testing schedule, and official test reports
to the SEVEN Program Delivery team and the concerned team as per the
project distribution matrix.
SEVEN Program • Receive updated weekly Quality Testing Schedule, coordinate and agree
Delivery Team with SEVEN Quality Rep. on the following:
(Identified in the • Random tests to be witnessed if any
ITP for each
• An assigned person for Test Witness
activity)
• Update List of Tests to highlight witnessed tests and return it to Contractor
Quality Engineer, Lab Representative, and the assigned Test Witness.
• Receive Test reports & coordinate with the Assigned test witness to review
the reports against recorded readings and notes.
• Coordinate and discuss with SEVEN Quality Rep. any failed test results and
the proposed Correction or the need for NCR issuance.
Assigned Person • Coordinate with Contractor Quality Engineer and Lab Representative for
to Witness the attending the test.
Test
• Takes notes of readings during the attended test
• Copy SEVEN Project Concerned Team and Quality Rep. any noted readings
during the test.
• Receive official test reports and compare them with noted readings during
the test.
2 Testing Procedure
In the project’s execution phases, SEVEN contractors are responsible for ensuring that all tests for
permanent work and materials are performed in compliance with project documents, standard testing
procedures, and specifications and follow approved ITP. All parties are responsible for ensuring that all test
results follow project specifications and regulatory requirements, and that proper Corrections/NCRs (if
needed) are initiated and implemented in case of failed results.
BACK PAGE