The document outlines a production ramp curve over six months for a steel mill, starting at 25,000 metric tons in the first month and increasing to 180,000 metric tons in the sixth month. It notes the number of heats and grades planned for each month, with a recommendation to begin producing medium strength automotive and API grades after six months of stabilization once tube making grades have been established in the second month.
The document outlines a production ramp curve over six months for a steel mill, starting at 25,000 metric tons in the first month and increasing to 180,000 metric tons in the sixth month. It notes the number of heats and grades planned for each month, with a recommendation to begin producing medium strength automotive and API grades after six months of stabilization once tube making grades have been established in the second month.
The document outlines a production ramp curve over six months for a steel mill, starting at 25,000 metric tons in the first month and increasing to 180,000 metric tons in the sixth month. It notes the number of heats and grades planned for each month, with a recommendation to begin producing medium strength automotive and API grades after six months of stabilization once tube making grades have been established in the second month.
1st Month 25000 150 Low Carbon Post 6 months of stabilisation 2nd Month 50000 290 tube Making we should go for medium 3rd Month 80000 460 grades strength grdes like 4th Month 120000 680 Long/Cross Member, Wheel Low Carbon + Rim/Disc in the automotive 5th Month 150000 860 sector and/or API grades.* Micro Alloyed 6th Month 180000 1030 * Suitable planning for marketing of such grades