Contents
10 PPA Planning 10.5 Check PPA Planning 1 23
I Introduction 3 10.5.1 Check and Reject PPA Planning 1 23
II Process overview 4 10.5.2 Plan or Edit Spec. Verifications 1 24
10.5.3 Release PPA Planning / No. of sample parts 1 26
10.1 Enter Planning Data 5
10.1.1 Open „Create PPA planning“ Screen 5 10.6 Create PPAR based on PPA Planning 27
10.1.2 Select Supplier Plant 6 10.6.1 Create PPAR / No. of sample parts 27
10.1.3 Select Sampling-Form, -Type, -Reason 7
10.1.4 Select Submission Level, Modification Scope and 9 10.7 Overall 29
Delivery date 10.7.1 Copy PPA Planning 29
10.1.5 Select Customer Plant(-s) 10 10.7.2 Forward PPA Planning 30
10.7.3 Cancel PPA Planning 1 31
10.2 Add Part(-s) 11 10.7.4 Delete PPA Planning 32
10.2.1 Add Part(-s) 11 10.7.5 PPA Planning – ToDo-List 33
10.2.2 Manage Part Revision Level 13 10.7.6 PPA Planning - Search 34
10.2.3 Manage Part Revision Level (Single Record) 16
10.2.4 Change, Delete and Check Part(-s) 17 Contact 35
Required Attachments
Submit Plan Agreement regarding the required attachment types.
PPA Planning Spec. Verifications Agreement regarding the required scopes within the attachment
types.
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 3
10 PPA Planning
II Process overview
10 PPA Planning
10.1 Enter Planning Data 10.2 Add Part(-s) 10.3 Customer Specific Requirements
10.1.1 Screen „Create PPA Planning“ 10.2.1 Add Part(-s) 10.3.1 Screen „Sampling - Requirements“
10.1.2 Select Supplier Plant 10.2.2 Manage Part Revision Level 10.3.2 Customer Specific Requirements
10.1.3 Sampling-Form, -Type, -Reason 10.2.3 Manage Part Revision Level 10.3.3 Download Templates
10.1.4 Submission Level, Modification (Single Record)
Scope, Delivery Date 10.2.4 Change or Delete Part(-s)
10.1.5 Select Customer Plant(-s)
10.4.1 Submit PPA Planning 10.5.1 Check an Reject PPA Planning 1 10.6.1 Create PPAR
10.4.2 Select Recipient of PPA Planning 10.5.2 Plan or Edit Spec. Verifications 1
10.5.3 Release PPA Planning 1
10.7 Overall
10.7.1 Copy PPA Planning 10.7.3 Cancel PPA Planning 1 10.7.5 PPA Planning – ToDo-List
10.7.2 Forward PPA Planning 10.7.4 Delete PPA Planning 10.7.6 PPA Planning – Search
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 4
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.1.1 Open „Create PPA Planning“ Screen Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
1
2 Click "Create PPA Planning".
2
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 5
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.1.2 Select Supplier Plant Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
Reject Create PPAR H You can filter the selection of supplier plants
by entering details. To do so, enter search
criteria. The wildcards "*" and "?" can be
used here. The "*" stands for any number of
characters, while the "?" stands for a single
character.
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 6
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.1.3 Select Sampling-Form, -Type, -Reason (1 of 2) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 7
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.1.3 Select Sampling-Form, -Type, -Reason (2 of 2) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
Software with
> Software sampling > Technical sampling
colorless parts
Software with
> Software sampling > Technical sampling > Color sampling
color parts
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 8
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.1.4 Select Submission Level, Modification Scope Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
and Delivery date PPA-Plan PPA-Plan
10.7 Overall
based on PPA Pl.
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 9
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.1.5 Select Customer Plant(-s) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 10
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.2.1 Add Part(-s) (1 of 2) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 11
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.2.1 Add Part(-s) (2 of 2) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 12
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.2.2 Manage Part Revision Level (1 of 3) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
Q-status (if "Initial sampling" specified as reason for sampling and When color parts are sampled for the first time in the SQMS, you have to
"Technical sampling" specified as sampling type) enter both the Q- and F-status manually (regardless of the selected
sampling type). If you are starting technical sampling (normal case), enter
F-status (if "Initial sampling" specified as reason for sampling and Q-status "1" and F-status "0". If you are starting color sampling (only
"Color sampling" specified as sampling type) following consultation with the QM contact at Daimler AG), enter F-status
IMDS number "1“, the Q-status “0” will be set by system automatically.
When you carry out initial sampling subsequently in the SQMS, the SQMS
You also have to mark a part as a reference part. When sampling is offers a selection of the available Q- and F-statuses.
carried out for individual parts, the selected part is set as the reference
When carrying out technical sampling for color parts, use the same Q-
part by default.
status for all color parts with the same parts master.
Effects of the choice of reference part: If the part has already been sampled outside the SQMS (Q- and/or F-
status > 1), this must be taken into account in the SQMS.
With parts bundles, only the reference part is physically sent to Daimler
(Example: A colorless part has already been sampled outside the SQMS
AG.
with Q-status 4. Subsequent initial sampling is carried out in the SQMS.
In the PPAR search, you can search for a PPAR with reference to the Enter Q-status 5 manually.)
reference part (e.g. detail number) – this does not work with
information about other parts in the bundle.
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 13
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.2.2 Manage Part Revision Level (2 of 3) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 14
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.2.2 Manage Part Revision Level (3 of 3) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
Notes:
Part revision level is not declared as ready for sampling.
This part number has no {0}-release. Please contact your QM contact person.
Directed part sampling for this part number has not been completed yet.
First a PSTO must be selected.
Part family already contains this part number.
Software sampling for this part number has not been completed yet.
A PPAR based on "{0}" reasons is invalid. The part number has not been approved in any production plant.
The sampling due to "additional production plant" reasons is invalid. This production plant has already started the production after having approved the part.
The part number is already being used in the sampling process {0}. Unless this sampling process has not been declared capable for sampling yet the part number
cannot be used within a new sampling process.
The highest part revision level of the part number has not yet been declared ready for sampling in the current production plant.
The sampling due to "additional production plant" reasons is invalid. This production plant has already started the production after having approved the part.
The part number must be sampled technically first. The remaining color variants are used in PPAR {0}. Please try to add this part to that PPAR or perform a subsequent
sampling for PPAR {0}.
The PPAR based on "{0}" reasons is invalid. The part number has not yet been produced and approved in this production plant.
The highest part revision level of the part number has not yet been declared ready for sampling in the current production plant.
Sampling reason "production relocation" is invalid. Part number has not yet been released for the former production plant.
The highest part revision level has not yet been declared ready for sampling in the former production plant.
The sampling due to "production relocation" reasons is invalid. The manufacturing of the part has been relocated already within another PPAR.
The PPAR due to "new part" reasons is invalid. Part number has already been approved in at least one other production plant.
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 15
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.2.3 Manage Part Revision Level (Single Record) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
1
H If you want to add information about another
part in your parts bundle, you can call up the
next data record by selecting "Apply & Next".
2 Once you have clicked "Apply", you
automatically return to the main screen.
When you click "SPL quality", the system
displays the quality history for this part.
Software is only assigned a Q-status. A new
part number is assigned if the software is
3 H changed. This appears in the header, where
applicable. If not, enter the previous part
number in the "Remarks" field on the PPA
Planning.
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 16
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.2.4 Change, Delete an Check Part(-s) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 17
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.3.1 Open „Sampling – Requirements“ Screen Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 18
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.3.2 Determine Customer Specific Requirements Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 19
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.3.3 Download Templates Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 20
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.4.1 Submit PPA Planning Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 21
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.4.2 Select Recipient of PPA Planning Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
The recipient of the PPA Planning at Daimler AG is characterized by two attributes: plant and client.
Both attributes can occur in different combinations (e.g. 0500 Sindelfingen Purchased Parts and 0680 Hamburg / Purchased Parts, etc.).
A plant is denoted by a plant number and plant location (e.g. "0500 The client is an organizational unit of Daimler AG, which is independent of the
Sindelfingen"). Select the plant to which you supply the part in series plant location.
production.
You generally have the choice between
0100 Untertürkheim
0400 Berlin • Purchased Parts
0500 Sindelfingen
0513 MBCC for MBUSI (starting Jan. 2014) • QM central (smart)
0514 MBCC for BBAC
0515 MBCC for MBSA Other clients are possible. In this case, you will receive the required information
0540 Rastatt at the sampling planning stage.
0670 Bremen
0680 Hamburg
1040 Bejing (China)
1170 Hambach (F) Shipping information:
1330 Daimler Greater China Ltd.
1380 Tuscaloosa (USA) By selecting the client do you normally get the shipping information, to which
1750 East London (SA) you have to send the samples.
3710 Kecskemét (HU)
3950 Novo Mesto (SLO) Please note, that the shipping address could be different from the plant you
supply in series production and also from the address of the responsible
You can only select one leading plant among further plants.
Q-engineer.
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 22
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.5.1 Check and Reject PPA Planning Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
Note:
As in case of release the PPA Planning data will
be transferred into a PPAR, therefore the PPA
Planning needs to be checked carefully.
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 23
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.5.2 PPA Planning – Plan and Edit Spec. Verifications (1 of 2) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 24
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.5.2 PPA Planning – Plan and Edit Spec. Verifications (2 of 2) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 25
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.5.3 Release PPA Planning Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 26
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.6.1 Create PPAR based on PPA Planning (1 of 2) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
3
H To transfer a PPA Planning into a PPAR the PPA
Planning must have status „Released“.
1 Pop-Up screen shows no. of sample parts
needed per plant.
2
Create PPAR
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 27
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.6.1 Create PPAR based on PPA Planning (2 of 2) Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 28
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.7.1 Copy PPA Planning Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 29
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.7.2 Forward PPA Planning Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 30
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.7.3 Cancel PPA Planning Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
1
Reject
3
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 31
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.7.4 Delete PPA Planning Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
1
Reject Create PPAR
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 32
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.7.5 PPA Planning - ToDo-List Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 33
10 PPA Planning
10.1 Enter 10.3 Cust.Spec.
10.2 Add Parts
10.7.6 PPA Planning - Search Planning Data
10.4 Submit 10.5 Check
Requirements
10.6 Create PPAR
PPA-Plan PPA-Plan based on PPA Pl.
10.7 Overall
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 34
Contact
SQMS Manual for Suppliers and Daimler Employees
Q
Quality Management, Production and Systems; HPC: G036
Hotline
Tel.: +49(0)711 / 17 95 12 0
Fax: +49(0)711 / 30 52 18 56 49
E-Mail: sqms-support@daimler.com
Daimler AG
71059 Sindelfingen
http://www.daimler.com
Basis: SQMS Version 4.4 , Build 020 dated May, 27th 2014
SQMS Manual for Suppliers and Daimler Employees – PPA Planning SQMS Version 4.4 (July 2014) – Hotline +49(0)711-17-95120 35