1. Purpose: The purpose of this procedure is to ensure that a consistent and common system is
implemented for identifying and managing health, safety and environmental risks within the Company
operations.
2. Scope: The scope of this procedure is applicable to all the activities, products and services
provided by CSCEC throughout its operations, including staff, employees, visitors, sub- contractors
etc.
3. Cross reference:
3.1. Site Waste Management Plan
3.2. Site Environmental Management Plan
3.3. Procedure for Control of Records
3.4. Procedure for Codification.
5. Procedure: The following flow chart will explain the procedure, kindly refer the respective
forms mention on the Red box and responsible people are mentioned on Green box.
The only official, current & controlled version of any documented procedure and its related record(s) is the one available on
the network. If any document is printed it becomes uncontrolled and for reference only.
INTEGRATED MANAGEMENT SYSTEM Doc. # HSE-P-01-Rev A
HSE team
No
Define parameters of the job – determine what tasks are involved in the job and identify the competencies required to perform the job.
No
Is assessment still relevant? HSE team
Y
Carry out initial review of hazards and aspects and potential methods of mitigation
HSE
Identify any additional controls specific to the task team and personnel involved
location,
Identify hazard/ aspect and corresponding effect/ impacts
HSE team
Identify risk rating – express risk as a measurable value and determine significance
HSE team
No
Are controls adequate and risk acceptable
HSE Manager
Yes
Residual Risk shall be reviewed for acceptable levels (As Low As Reasonably Possible) and develop management programs if necessary for high residual ris
No
Approval to proceed with task Do not start job
HSE Manager
HSE Officer
The only official, current & controlled version of any documented procedure and its related record(s) is the one available on
the network. If any document is printed it becomes uncontrolled and for reference only.
INTEGRATED MANAGEMENT SYSTEM Doc. # HSE-P-01-Rev A
Communicate to concerned employees (Tool Box talk) and indentify any final controls
Foreman/ Supervisor
Re-assess if
required
No
Do not Agree to
start job proceed with
task HSE Manager
Re- Yes
assess
Do not start job if any changeImplement controls, undertake the job and perform the tasks.
Foreman/ Supervisor
Feedb
Capture lessons learned and update procedures/ risk assessments etc
HSE Manager
6. Definitions:
6.1. MRM: Management Review Meeting
6.2. MRM members: Management Review Meeting Members
6.3. CSCEC: China State Construction Engineering Corporation.
6.4. UAE: United Arab Emirates.
6.5. KPI: Key Performance Indicator
7. Forms & Records : The following are the forms & records used in this procedure
7.1. COSHH Assessment: HSE-F-01-Rev A
7.2. Risk Assessment: HSE-F-02-Rev A
7.3. Manual Handling Assessment: HSE-F-03-Rev A
7.4. DSE Assessment: HSE-F-06-Rev A
7.5. COSHH Assessment Register: HSE-F-07-Rev A
7.6. Risk Assessment Register: HSE-F-08-Rev A
7.7. Environmental Risk Assessment: HSE-F-09-Rev A
7.8. Incident Report: HSE-F-11-Rev A
7.9. Dust Management Checklist: HSE-F-12-Rev A
7.10. Noise Assessment: HSE-F-14-Rev A
7.11. Hazardous Liquid Storage Checklist: HSE-F-16-Rev A
The only official, current & controlled version of any documented procedure and its related record(s) is the one available on
the network. If any document is printed it becomes uncontrolled and for reference only.
INTEGRATED MANAGEMENT SYSTEM Doc. # HSE-P-01-Rev A
Corporate Corporate
A 12-8-08 Original Copy HSE HSE MR
Manager Manager
Rev. Date of Reviewed
Nature of Revision Prepared By Approved By
No Revision By
The only official, current & controlled version of any documented procedure and its related record(s) is the one available on
the network. If any document is printed it becomes uncontrolled and for reference only.