NEW TANKS EARTHING INSPECTION

CHECKLIST

INSP. REPORT NO:


CONSULTANT TLD GLOBAL SERVICES LIMITED.
DATE: 30/09/2022
CONTRACTOR ROUTINE SYSTEMS.
JOB LOCATION:

PROJECT NAME PINNACLE OIL AND GAS BULK STORAGE TANK LAGOS FREE TRADE
FARM PROJECT. ZONE, IBEJU LEKKI
JOB TITLE EARTHING OF TANKS 115 AND 116 CONTRACT NO.

DOCUMENT NAME TICK AS


COMLETED NOT COMPLETED
TGSL/GEN/EL/FZE/001 APPROPRIATE
NOT APPLICABLE: N/A

AVG. TEST REQUIRED REMARKS


S/NO ACTIVITY DESCRIPTION STATUS RESULT RESULT
Install Earth Points at Four equidistant Earth
Pits around Tank 115 Tanks with 6ft Copper N/A N/A

1. Electrodes, Earth Mat and Bentonite.


Install Earth Points at Four equidistant Earth
Pits around Tank 116 Tanks with 6ft Copper N/A N/A.
Electrodes, Earth Mat and Bentonite.
Install PVC Earth Inspection Chambers for
each Earth point. N/A N/A
2.
Install Earth Lugs and bare copper cables to
properly bond earth points in earth loop. N/A N/A
3.
Install Earth tapes and bus to properly bond
earth loop to the tank earth bus. N/A N/A
4.
Carry out earth resistance tests for each
4. earth point on Tank 115. 2 to 5ohms

Carry out earth resistance tests for each


earth point on Tank 116. 2 to 5ohms
5.

INSTALLATION APPROVED:

By signing below, it is confirmed that the above works are completed and approved for issuance
of Job Completion Certificate.

Approved By: __________________________ Witnessed By_________________________


Co. Name: __________________________ Co. Name _________________________

Sign/Date: __________________________ Sign/Date: _________________________

PUNCH LIST: REQUIRED TO BE COMPLETED BEFORE THE RELEASE OF JCC

1. ________________________________________________

2. ________________________________________________

3. ________________________________________________

QA/QC: __________________________ Sign/Date_________________________