Do You Need A Permit

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

 Applica�ons must be signed by one of Town of

the owners of the property. An agent


ac�ng on the owner’s behalf must have
signed authoriza�on from the owner Wilmington
appoin�ng an agent to work with the
ZA or to speak at a hearing. Do You Need a Local Permit?
 Local Zoning Permits are condi�onal on
receiving any necessary State Permits
like Wastewater Permits, which are filed  Zoning Permits
by the owner with the Town Clerk.  i.e., Homes and Apartments
 A sign design with dimensions, colors,  Addi�ons or Garages
and wording must accompany an  Accessory Buildings
applica�on for a Sign Permit, as well as
 Decks or Porches
a site plan showing the loca�on(s) for
 Parking Lots and Driveways
the proposed sign(s).
 Various Changes of Use
Finding Your Way Around Bylaw Articles to Explore  Subdivisions
No land development shall commence un�l a  Driveway Cut/Access Permits
I Enactment and Purpose  Right-of-Way (ROW) Permits
Permit is issued. The Zoning Administrator can II Administra�ve Procedures
let you know your Parcel ID, your Zoning  Permit Amendments or Extensions
III Boundary Lines and Subdivision
District, and if your lot has any overlays on it  Sign Permits
IV Districts and Uses
(Historic, Design Review, or Flood Hazard). V Historic Design Review
VI Flood Hazard Changes of Use, changes to
Not sure? Need help naviga�ng the Bylaws?
VII Standards a structure, or changes to
Make an appointment to discuss your project.
VIII Signs the landscape
Helpful Tips IX Telecommunica�ons
X Defini�ons
Changes of Use, changes to a structure, or
 A site plan, drawn to scale must
changes to the landscape (such as excava�on)
accompany all applica�ons. Even if the Follow the table of contents to research the
o�en require a permit, though some excep�ons
ZA understands your plans, other town specific rules. Ar�cle VII has the standards all
may apply.
employees, both now and in the future, development must follow and should be read
need to understand your plan. A floor carefully. Use Ar�cle X to look up the exact Change of Use means the way you are using the
plan may some�mes be required. All defini�on for any terms. When searching the lot is different. Maybe it’s turning a garage into
applica�ons for moving or crea�ng Bylaws online, hold the butons Control+F to an apartment, an enclosed porch into a
boundary lines require a signed survey. bring up a search box for items you missed. bedroom, a shop into a restaurant, or a barn
into an event or a retail space.
Step #1
Visit our website or the Zoning Office for an
applica�on packet. Help sheets are included Who’s Who?
with contact informa�on lists or �ps on how to
draw your own site plan.
Legisla�ve
Step #2, (opt.) The Wilmington Planning Commission is
Set up an appointment to discuss your proposed responsible for wri�ng the Zoning Ordinances,
project. The ZA may provide informa�on and also called the Bylaws, and the Town Plan
resources you haven’t yet considered. They will which serves as a framework for the Bylaws.
also let you know if you need other things like a The Select Board votes to adopt the Bylaws.
Right-of Way (ROW) Permit, or a Development Photo: Jessica Twardy Roberts

Review Board (DRB) Hearing. Town Hall Information


Quasi-Judicial
The Development Review Board can grant Loca�on: 2 East Main St
Flood Hazards, Conditional variances, make waivers, or give special Mailing Address: PO Box 217
Uses, and Variances or Waiver allowances on a case-by-case basis. They Wilmington, VT 05363
requests Trigger DRB hearings. can set “condi�ons” for Condi�onal Uses
such as retail, manufacturing, or for large
www.wilmingtonvermont.us
developments. They also oversee design
Step #3 standards for the Historic and Design Review
Complete the correct applica�on(s) with a site overlays in the Village District. Town Hall Ph: 802-464-8591
plan and pay the permit fee. The ZA will then
start working on your project, and if a hearing is Town Clerk Ext. 115
required, will schedule it with the Development Execu�ve M-F 9:00 AM to 5 PM
Review Board. The ZA will warn the hearing to The Zoning Administrator manages or
the public and other Interested Par�es. supervises the execu�on of the Bylaws, and Administra�ve Office Ext. 123
therefore deals with compliance, a�er-the-fact M-F 8:00 AM to 4:30 PM
For Driveway Access Cuts or ROW Permits, the permi�ng, penal�es, and viola�ons. The
Zoning Department will pass your applica�on to ZA also assists the public with obtaining the
the Roads Department for approval. Zoning Office Ext. 124
forms needed to follow the Bylaws. Inquiries
regarding obtained permits or individual
M, T, Th, F 9:00 AM to 4:00 PM
Step #4
proper�es may be directed to this office.
If all is in order, your permit will be issued, filed
The ZA works closely with both Wilmington’s
with the Town Clerk, and mailed or given to you.
Planning Commission and Wilmington’s
You need to wait un�l all appeal periods are Follow for news + updates
Development Review Board.
over before construc�on begins. at instagram.com/zoning05363

You might also like