CMCT230028 BOQ
S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Labour charges for removing the existing
ceramic Tiles from existing Wall / floor without
12 1M2 1.00
any damage incl. clearing the debris away from
site as directed.
Earth work excavation for foundation and
trenches in all kinds of soil upto a required
depth including refilling the sides of foundation
13
with selected excavated earth, watering,
ramming and consolidation etc. complete.
S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Brick wall in Cement‐mortar 1:6,230mm and
above thick using non‐metric bricks of size
21 230x115x75mm (chamber burnt)including cost
all materials and curing etc.., complete.
S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Supplying and fixing in position of following
Aluminium FG & Window where ever
30
necessary as per sketch and specification.
S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Supplying and fixing in position of MS pipe/box
sections for vertical posts, purlins, rafters
(medium class) and M.S plate, bolts & nuts for
providing holder for purlins, including cost of all
materials, cutting, welding, grinding smooth to
38 1Kg ‐ 1,350.00 ‐
all welding joints, fabrication charges and 1 coat
of metal primer two coat synthetic enamel
etc.complete. (Basic cost of Structural Steel :‐
Rs.80/1kg).
S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Supplying and fixing in position of MS powder
coated curtain brackets of approved make and
colour with necessary wooden plugs/ supports
43 1No 6.00
and screws including cost of all materials etc.,
as directed by the engineer.
S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Painting one coat with exterior acrylic
emulsion paint of approved make and colour
51 over the old walls and ceilings including 1M2 310.00 ‐
cleaning the surface, cost of all materials, brush
etc. complete.
Painting two coats with exterior acrylic
emulsion paint of approved make and colour
over new walls and ceiling with one coat of
52 1M2 30.00 ‐
exterior water based primer incl, cleaning the
surfaces, cost of all materials, brush and
scaffolding etc complete.
Painting two coats with Synthetic enamel paint
of approved make & colour over the old
painted surface of walls & ceilings including
53 1M2 16.00
surface preparation, cost of all materials,
necessary putty, brush etc. complete.
Sub Total
Total