REF.NO.

CMCT230028 BOQ

NAME OF WORK : MODIFICATIONS TO BALA NILAYAM BAGAYAM .


FOR DISTANCE EDUCATION PHASE‐III(CONFERENCE ROOM,STORE ROOM,TWO WHEELAR PARKING SHED AND PAVER WORK.)

Store Room & Two Wheelar


SCHEDULE‐A Paver block
Conference Room Parking shed
S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Labour charges for removing the existing
wooden / Aluminium/Steel doors, windows,
cupboards and ventilators frame with shutters
1 1No 6.00
complete set without any damage including all
available fittings as directed.

Labour charges for removing the existing


wooden / Aluminium/Steel doors, windows,
2 cupboards and ventilators (only shutters) 1No 8.00
complete set without any damage including all
available fittings as directed.
Labour Chargrs for removing existing mosquito
3 mesh and wherever necessary site as directed. 1M2 4.00

Labour charges for removing the existing


precast slabs/kadappa slab/ stone from
4 cupboards,open shelves and wherever 1M2 2.50
necessary without any damage incl. clearing the
debris away from site as directed.
Labour charges for removing the existing
GI/PVC/C.I. pipes upto 75mm dia with all
5 1RM 10.00
available specials without any damage as
directed.
Labour charges for removing the existing
GI/PVC/C.I. pipes above 75mm dia upto
6 1RM 15.00
150mm dia with all available specials without
any damage as directed.
Demolishing brick walls in cement mortar
manually/ by mechanical means including
stacking of serviceable material and disposal of
7 1M3 2.00
unserviceable material within 50 metres lead as
per direction of Engineer‐in‐charge.

Demolishing stone walls in cement mortar


manually/ by mechanical means including
stacking of serviceable material and disposal of
8 1M3 1.00
unserviceable material within 50 metres lead as
per direction of Engineer‐in‐charge.

Labour charges for chipping and removing the


existing cement plastering from wall surface
9 and wherever necessary and clearing the debris 1M2 20.00
away from site as directed.

Labour charges for demolition of lean Cement


Concrete manually/ by mechanical means from
existing foundation and flooring completely
10 including clearing the debris away from site 1M3 0.50
within 50 metres lead as directed. For 1:4:8 or
leaner mix

Labour charges for demolition of reinforced


cement concrete manually/ by mechanical
means including stacking of steel bars without
11 1M3 0.50
affecting the adjacent structure incl. clearing
the debris away from site, as directed.
REF.NO.CMCT230028 BOQ

S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Labour charges for removing the existing
ceramic Tiles from existing Wall / floor without
12 1M2 1.00
any damage incl. clearing the debris away from
site as directed.
Earth work excavation for foundation and
trenches in all kinds of soil upto a required
depth including refilling the sides of foundation
13
with selected excavated earth, watering,
ramming and consolidation etc. complete.

a Upto 1.50M 1M3 8.00 9.50 165.00


Supplyiing and filing of sand for in layers of
14 required thick including watering, ramming and 1M3 6.00 60.00
consolidation etc., complete

Plain Cement concrete 1:4:8 using 40mm size


HBG machine broken jelly,coarse sand including
15
mixing in mixer machine, laying, consolidation
and curing etc. complete
a Foundation and Basement 1M3 0.75 4.25 9.50
Plain cement concrete 1:2:4 using 20mm size
HBG machine broken jelly, coarse river sand
including cost of all materials, mixing in mixer
16 machine, laying, consolidation, self finishing and 1M3 0.25 1.25 ‐
curing etc. complete under foundation/bed
block/Pedastal

Supplying, fixing and removing of steel sheet


centering and shuttering to correct line and
levels fully leak proof to avoid leakage of
cement slurry including strutting rate shall be
inclusive of rendering the joints and applying
17
coarse putty to make surface smooth & even
and no extra payment will be given to the same.
For Roof slab & beams etc. complete

a Plinth beam 1M2 30.00


Casting and fixing in position of RCC M20 (1:2:4)
for precast lintel using 20mm size HBG machine
broken jelly, coarse well graded river sand incl.
mixing, laying, consolidation, curing, cost of all
18 1M3 0.22
materials, necessary mould and platform etc.
complete but excl. cost of steel and fabrication

Reinforced cement concrete M20 of nominal


volumetric mix of 1:1.66:3.33 using 20mm
down graded HBG machine broken jelly free
from flakes and fine aggregate of coarse well
graded sand free of silt and other impurities
19 incl. mixing in mixer machine, laying,
consolidation using vibrator, cost of all
materials, curing etc. complete but excl. cost of
steel reinforcement and form work upto Floor V
level

a Plinth beam 1M3 2.50


Supplying, fabricating, placing and tying in
position of steel reinforcement including cost
20 1Kg 50.00 600.00
of 18 gauge MS binding wire etc. complete for
all RCC works
REF.NO.CMCT230028 BOQ

S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Brick wall in Cement‐mortar 1:6,230mm and
above thick using non‐metric bricks of size
21 230x115x75mm (chamber burnt)including cost
all materials and curing etc.., complete.

a Foundation and Basement 1M3 5.00 5.25 25.00


b Superstructure level upto floor five level 1M3 1.00
Brick work in CM 1:4 for partition wall using
non‐metric bricks of size
230x115x75mm(chamber burnt) including cost
22
of all materials, labour for placing 2nos ‐ 6mm
dia MS rods at every 5th course and curing etc.
complete
In superstructure above plinth level and upto
a 1M2 28.00
floor five level.
Plastering with CM 1:5, 12mm thick over new
surface of internal brick walls including cost of
23 1M2 46.00
all materials and curing etc. complete.

Plastering with CM 1:5, 20mm thick over


external surface of new brick walls including
24 providing grooves as required, cost of all 1M2 25.00 35.00 90.00
materials and curing etc. complete

Base Plastering with CM 1:5, 20mm thick over


chipped surface of existing brick walls
25 1M2 10.00 ‐ ‐
including cost of all materials and curing etc.
complete .
Supplying,laying and fixing in position of PVC
vinyl flooring of approved make and colour
including cost of all materials,surface
preparation,vamicol rubber based RB 1003
26
adhesive without formation of air bubbles & to
avoid more sheet joints and fixing and finishing
in all respects etc.., complete.

a 2.00mm tk. 1M2 49.00


Supplying,laying and fixing in position of PVC
vinyl flooring of approved make and colour
including cost of all materials,surface
preparation,vamicol rubber based RB 1003
adhesive without formation of air bubbles & to
avoid more sheet joints, welding the joints with
27 1RM 10.00
PVC welding of matching colour and fixing
including skirting100mm PVC Coving ,self
levelling and fixing and finishing in all respects
etc.., complete. asper manufacturer's standard
specification.

Grano floor finishing with CC 1:1.5:3 using sand


and 3mm to 8mm size HBG machine broken
chips including cost of all materials, laying,
28 1M2 5.00 30.00 ‐
consolidation, thread lining if necessary, neat
finishing and curing etc. complete. 40mm
average thick.
Supplying and fixing in position of Wooden
door frame with shutter incl cost of all
29
furniture fittings etc complete. as per Sketch
and Specification
a D1‐ 1200 x 2100 1M2 5.04 ‐ ‐
b D2 ‐ 1000 X2100mm 1M2 2.52
c D3 ‐ 1200 X2100mm (Double shutter ) 1M2 1.08
REF.NO.CMCT230028 BOQ

S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Supplying and fixing in position of following
Aluminium FG & Window where ever
30
necessary as per sketch and specification.

a FG ‐3000 x 2100mm 1M2 6.30


b Window ‐ 1800 x 1200mm 1M2 2.00
Supplying and fixing in position of following
31 Wooden ventilator where ever necessary as
per sketch and specification.
a Ventilator ‐V‐600x450 1M2 0.54 ‐ ‐
Supplying and fixing in position of Ventilator
frame with Bison Board on Both Side incl cost
32
of all furniture fittings etc complete. as per
Sketch and Specification
a Ventilator V1 ‐ 1200 x 900 1M2 2.10
b Ventilator V2 ‐ 1000 x 900 1M2 0.90
Supplying and fixing in position of following
Ventilator closing using plywood to existing
33 frame, with necessary screws, nails &
accessories etc., complete. (For Covering
Openings)
a Ventilator closing using 12MM plywood 1M2 3.00
b Ventilator closing using 18MM plywood 1M2 1.00
Supplying and fixing in position of Hydraulic
door closer to wooden/aluminium doors
34 complete set including required screws and 1No 2.00
nails etc.., complete.

Providing & fixing ''DAIKEN'' gypsum ceiling tiles


9mm thick with Aluminium foil laminated on
one side and PVC sheet laminated on the other
side with hot dipped galvanised steel grid work,
surface chemically cleaned capping PVC
finished inbacked polyster paint, main tees of
size 33(H) x 24mm every 1.20m centre to
centre, stiched cross tee at 0.60m centre to
35 centre to form a grid of size 600x600mm & 1M2 51.00
suspending the grid from roof using 3mm GI
rod, 6mm nylon, rawl plug & I bolt at every
1200 intervals laying ''DAIKEN'' gypsum 155
ceiling tiles of size 600x600mm over the
formed grid having fire rating of 60 minutes as
per BS 479/23 of 1987, light reflection of 85%

Supplying and fixing Purlin using MS Medium


Box Section Size of 32x32mm (Medium)
including cost of all materials, base plates, cleat
36 angles, bolts & Nuts fabrication , one coat of 1KG 100.00
metal primer and two coats of 1st quality
synthetic enamal paint etc,. Complete.

Supplying fabrication , erection and fixing of


structural steel (M.S/G.I.) staircase, and
platform including aligning and finishing in all
37 respects one coat of yellow oxide primer, 2 1KG 1,300.00
coats of synthetic enamel paint etc. complete
as per sketch and specifications.etc.,complete..
REF.NO.CMCT230028 BOQ

S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Supplying and fixing in position of MS pipe/box
sections for vertical posts, purlins, rafters
(medium class) and M.S plate, bolts & nuts for
providing holder for purlins, including cost of all
materials, cutting, welding, grinding smooth to
38 1Kg ‐ 1,350.00 ‐
all welding joints, fabrication charges and 1 coat
of metal primer two coat synthetic enamel
etc.complete. (Basic cost of Structural Steel :‐
Rs.80/1kg).

Providing and fixing precoated galvalume


iron profile sheets (size, shape and pitch of
corrugation as approved by Engineer‐in‐
charge) 0.50 mm (+ 0.05 %) total coated
thickness with zinc coating 120 grams per
sqm as per IS: 277, in 240 mpa steel grade,
5‐7 microns epoxy primer on both side of
the sheet and polyester top coat 15‐18
microns. Sheet should have protective
guard film of 25 microns minimum to avoid
39 scratches during transportation and should 1M2 2.00 75.00 ‐
be supplied in single length upto metre or
as desired by Engineer‐in‐charge. The sheet
shall be fixed using self drilling /self tapping
screws of size (5.5x 55 mm) with EPDM
seal, complete upto any pitch in horizontal/
vertical or curved surfaces, excluding the
cost of purlins, rafters and trusses and
including cutting to size and shape
wherever required.

Supplying and fixing in position of following


sizes of pvc rain water gutter 4Kgs/CM2
arrangements including cost of all materials,
necessary supporting arrangements using
40x6mm M.S. flat which is to be bent to
40
required shape and welded with truss ends
&painting 2 coats of 1st quality of synthetic
enamel paint over one coat of Zinc chromate
primer, etc.., complete

a 160mm dia half round PVC pipe 1RM ‐ 10.00 ‐


Supplying and fixing of the following dia SWR
PVC pipes including cutting charges,cost of
cement solvent for joining and fixing with
necessary SWR PVC plumbing specials for
41 external sewage line, waste water line including
necessary scaffolding etc.., complete but
excluding cost of specials and MS brackets
which will be paid seperately.

a 110 mm dia ‐ Type‐A ( Rain water pipe) 1RM 10.00


Supplying of SWR PVC specials of the following
42 sizes and specifications etc. complete.

a 110mm dia 87.5 plain bend 1No 2.00


b 110mm dia 45 bend (shoe) 1No 2.00
REF.NO.CMCT230028 BOQ

S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Supplying and fixing in position of MS powder
coated curtain brackets of approved make and
colour with necessary wooden plugs/ supports
43 1No 6.00
and screws including cost of all materials etc.,
as directed by the engineer.

Supplying and fixing in position of 25mm dia


(OD) MS powder coated curtain rod 20 gauge of
approved make and colour including cutting
44 1RM 8.00
and including cost of all materials etc., as
directed by the engineer.

Weathering course with brick jelly lime


concrete in the proportion of 2.5:1 over roof
including giving necessary slope, soaking in
45 1M3 5.00
jaggery and gallnut water, well beaten with
wooden beaters, incl. cost of all materials and
curing etc. complete.
Supplying and laying of one course of machine
pressed tiles 230x230x18mm size of approved
make in CM 1:3 mixed with water proof
compound 2% by weight of cement used,
46 1M2 9.00
splash tile at junction of wall and roof and
pointing the joints with the same mortar
including cost of all materials and curing etc.
complete.
Construction of Manhole chamber with
230mm thick brick wall using non metric bricks
of size 230x115x75mm (chamber burnt)
Plastering inside with CM 1:3, 20mm thick,
Plastering outside with cm 1:5, 12mm thick
upto 150mm below Finished Ground level,
47 providing 50mm thick precast cover slab on
top (But excluding cost of steel reinforcement)
including earth work excavation, sand filling
75mm thick, CC 1:4:8 100mm thick, refilling the
sides with excavated earth, finishing in all
respects and curing etc. complete.

a Inner size‐600 x 600 upto a depth of 750mm 1No ‐ 2.00


Scraping completely and cleaning the white (or)
colour washed surface (or) snowcem of old
stone walls and ceilings using putty plate, sand
48 1M2 10.00 ‐
paper and wire brush including scaffolding and
clearing the debris away from site etc ,complete

Painting one coat with Acrylic emulsion paint


of approved make & colour over old painted
surfaces of walls & ceilings including surface
49 1M2 116.00 ‐
preparation with necessary putty, brush, cost of
all materials etc. complete.

Painting two coats with Acrylic emulsion paint


of approved make and colour over new walls
and ceilings with one coat of water based
primer after preparation of the surface smooth
50 1M2 60.00 ‐ 13.60.
and even with Birla wall care putty/ approved
equivalent including cost of all materials,
proper roller finish, brush etc. complete.
REF.NO.CMCT230028 BOQ

S.No Description Rate Unit Qty Amount Qty Amount Qty Amount
Painting one coat with exterior acrylic
emulsion paint of approved make and colour
51 over the old walls and ceilings including 1M2 310.00 ‐
cleaning the surface, cost of all materials, brush
etc. complete.
Painting two coats with exterior acrylic
emulsion paint of approved make and colour
over new walls and ceiling with one coat of
52 1M2 30.00 ‐
exterior water based primer incl, cleaning the
surfaces, cost of all materials, brush and
scaffolding etc complete.
Painting two coats with Synthetic enamel paint
of approved make & colour over the old
painted surface of walls & ceilings including
53 1M2 16.00
surface preparation, cost of all materials,
necessary putty, brush etc. complete.

Painting one coat using synthetic enamel paint


of approved make & color over the old
woodwork including painting the furniture
54 fittings where required surface preparation 1M2 10.00 ‐
with application of putty, cost of all materials,
brush & scaffolding etc. complete.

Painting two coats with synthetic enamel paint


of approved make and colour over new wood
works with one coat of wood primer incl,
55 painting the furniture fittings where required, 1M2 6.00 ‐
surface preparation with application of putty,
cost of all materials brush and scaffolding etc
complete.
Painting one coat using synthetic enamel of
approved make & colour over the old ironwork
56 incl. surface preparation, necessary putty, cost 1M2 35.00 ‐
of all materials, brush and scaffolding etc
complete.
Painting two coats of synthetic enamel paint of
approved make and colour over new iron
works with one coat of zinc chromate primer
57 1M2 10.00 ‐
incl. surface preparation, necessary putty, cost
of all materials brush and scaffolding etc.
complete.
Supply and laying cement concrete interlocking
paver blocks(Rubber mould) of any
design/shape laid in required line, level,
curvature, colour and pattern over and
58 1M2 ‐ 65.00 550.00
excluding bed of filling the joints, hire charges
for plate vibrator etc., all complete as per the
direction of Engineer ‐in‐charge (60mm thk)

Making through holes with Diamond Core


59 Drilling System by using BOSCH power tools of
following diameter
a upto 200mm (Brickwork) 1No 3.00
Transporting the debris by lorry from Bala
Nilayam Campus to with in the campus/Out
1Lorry
60 side Campus including loading and unloading 1.00 1.00
load
charges etc. complete.(capacity 5.5M3/load).

Sub Total