Professional Documents
Culture Documents
Combinepdf
Combinepdf
REMARKS
SP1 6'' SLAB
ALL REINFORCING STEEL MUST BE SECURED IN FINAL POSITION BEFORE
REVISIONS
GRID 10M @12" O.C.
OVER 15 MIL VAPOR BARRIER POURING
A MIN OF 6" THICK LAYER OF
10'-8.0" 10' GRANULAR CRUSHED GRAVEL 10'-4.5" ENGINEER MUST APPROVE SOIL BEFORE POURING
COMPRESSIVE STRENGTH = 32 MPA
8'-5.5" 8'-5.5" 8'-5.5" 8'-5.5" 8'-5.5"
P5 P6 P8 P11 AIR ENTRAINMENT 4-7% (EXTERIOR)
SW 1 P12
P2
NN
SW 2
NN
NN
NG
SLUMP = 60 - 100 MM
1
SP1
6'-3.0"
MM/DD/YY
09/02/22
09/05/22
09/17/22
09/17/22
D 8'-7.0" HELICAL PILES
1'-6.0" INSTALLATION TO BE SUPERVISED BY THE ENGINEER OR HIS/HER
P1 P27 P28 SP2 P29
4
2
5
1
REPRESENTATIVE
SW 2
SP1
T: 250-377-5417
10'-2.0" OVER 15 MIL VAPOR BARRIER
INFO@BCFOUNDATIONS.CA
SP2 REQUIRED TORQUE PER PILE (MIN) = 2530 FT.LBS
PROJECT INFORMATION:
4'-10.5" 11'-10.0" 3'-8.0" 4'-4.0"
BCFOUNDATIONS.CA
P35 SP2 FOR PILES ( P26,30&32)
SP2
PID :018-652-018
10'-1.5" P21 ULS CAPACITY PER PILE IS 110 KN( APROX. 25000 LB)
8'-9.0" SLS CAPACITY PER PILE IS 55 KN
4'-10.5" P36 REQUIRED TORQUE PER PILE (MIN) = 2890 FT.LBS
P25 SP1 P31 P33 SP2 PILES ARE AS PER ASTM A252, BARE STEEL
P22 SHAFTS ARE 2 7/8" X SCHD 40
SW 1 P37
P24 RW 1 P38 DESIGN LOADS
8'-7.0" 1'-6.0" 1'-6.0" 3 THIS FOUNDATION AND THE SLAB ARE DESIGNED FOR THE FOLLOWING
D 8'-6.0" SUPERIMPOSED SERVICE LOADS:
SP2
SW 1
SP2
SP1
ROOF LOADS SS = 1.8 KPa SR = 1.19 KPa RAIN LOAD = 0.2 KPa
6'' SLAB
GRID 10M @12" O.C. DEAD LOAD = 1.0 KPa LIVE LOAD = 1 KPa
P19 P50 P51 P40 OVER 15 MIL VAPOR BARRIER
P39 17'-4.0"
A MIN OF 6" THICK LAYER OF FLOOR LOADS DEAD LOAD = 1.0 KPa LIVE LOAD = 2 KPa
GRANULAR CRUSHED GRAVEL
2 8'' SLAB
GARAGE LOAD =6.0 KPa DECK LOAD=2.4 KPa
23'-6.0" D GRID 10M @12" O.C. TOP & BOTTOM WIND LOADS
8'-7.0" OVER 15 MIL VAPOR BARRIER 8'-6.0"
A MIN OF 6" THICK LAYER OF 1/50 HOURLY PRESSURE = 0.40 KPa 1 /10 HOURLY PRESSURE = 0.31 KPa
GRANULAR CRUSHED GRAVEL
EXPOSURE = ROUGH TERRAIN
SP1
P42 SEISMIC LOADS
P18 P48 P49 P46
2132
JOB:
Sa(0.2) = 0.146 Sa(0.5) = 0.132 Sa(1.0) = 0.091
P47 SW 2
Sa(2.0) = 0.064 Sa(5.0) = 0.029 Sa(10.0) = 0.0087
5'-11.0"
FOUNDATION
2-15M INSTALLING INSULATION
SP1 20 8 10M @ 10”
FOUNDATION LAYOUT PLAN
PLAN
SCALE 1/4"-1'-0'' INSTALLING GUTTERS AND DOWNSPOUTS
18 8 2-15M FINAL GRADING FOR THE FRONT AND BACK YARDS
SP2 10M @ 10”
S 01
2"X6" WOOD STUDS
REMARKS
REVISIONS
2 COATS OF ASPHALT 8'' SLAB
EMULSION DAMPROOFING 2"X6" WOOD STUDS
GRID C/W 10M @12" O.C.
TOP& BOTTOM 6MIL POLYETHYLENE VAPOUR BARRIER 8'' SLAB
8"
2" RIGID POLYSTYRENE FOAM BOARD GRID C/W 10M @12" O.C. FLOOR JOIST HANGER ON LEDGER
FINISHED GRADE
INSULATION (R5 PER INCH) TOP*BOTTOM
DRAIN MAT
NN
NN
NN
NG
3'
COARSE GRANULAR FILL A MIN OF 6" THICK LAYER OF
MM/DD/YY
09/05/22
09/02/22
09/17/22
09/17/22
GRANULAR CRUSHED GRAVEL
4
2
5
1
8" WALL
T: 250-377-5417
OF THE WALL MIN.
8"
2-15M REBAR ,10M @ 10” CL-CL
1'-8" WITH A MIN 2” CONC. COVER 2" RIGID POLYSTYRENE FOAM BOARD
PERFORATED DRAINAGE FROM ALL SIDES INSULATION (R5 PER INCH)
INFO@BCFOUNDATIONS.CA
PIPE WRAPPED IN FILTER CLOTH
PROJECT INFORMATION:
A MIN OF 6" THICK LAYER OF
BCFOUNDATIONS.CA
HELICAL PILE TO BE BURIED
IN CON. 3" TO 6" GRANULAR CRUSHED GRAVEL
PID :018-652-018
8'
8" WALL
STEM WALL DETAIL 15M VERT @ 18" CL-CL
D 15M HORZ. @ 10" CL-CL
2 SCALE 1"-1'-0'' DOWLES HALF HEIGHT BACKER ROD AND CAULKING
FINISHED GRADE 2" RIGID POLYSTYRENE FOAM BOARD FROM ALL SIDES
2 COATS OF ASPHALT
EMULSION DAMPROOFING 6MIL POLYETHYLENE VAPOUR BARRIER
2" RIGID POLYSTYRENE FOAM BOARD
8"
DRAIN MAT A MIN OF 6" THICK LAYER OF 1'-8"
2132
JOB:
INSULATION (R5 PER INCH)
GRANULAR CRUSHED GRAVEL
COARSE GRANULAR FILL HELICAL PILE TO BE BURIED
4'
1'-8"
HELICAL PILE TO BE BURIED
FOUNDATION
IN CON. 3" TO 6"
DETAILS
D STEM WALL DETAIL
1 SCALE 1"-1'-0'' S 02
TREATED AND TINTED POST
REMARKS
6"X6"
REVISIONS
2"X6" WOOD STUDS 18"X8" CONC. FTG TO
6'' SLAB SIMP. CB44/CB46 /CB66
BELOW FROST DEPTH MIN.
GRID C/W 10M @12" OC 2-15M REBAR LONG.
10M @10 " REBAR TRANSVERSE
WITH A MIN 2” CONC.
NN
NN
NN
NG
1/2" FIBERBOARD EXPANSION JOINT
COVER FROM ALL SIDES
MM/DD/YY
09/05/22
09/02/22
09/17/22
09/17/22
6MIL POLYETHYLENE VAPOUR BARRIER
8"
2" RIGID POLYSTYRENE FOAM BOARD
4
2
5
1
INSULATION (R5 PER INCH) 8" X8" CONC. PIER
4'-4"
T: 250-377-5417
1
INFO@BCFOUNDATIONS.CA
PROJECT INFORMATION:
BCFOUNDATIONS.CA
8"
PID :018-652-018
2'
D THICKENED SLAB DETAIL
24"X24" X 90
4 SCALE 1"-1'-0''
D PIER & FOOTING DETAIL
5 SCALE 1"-1'-0''
EXTERIOR BEAM
25 30 35
2132
JOB:
NOTES
FOUNDATION
DETAILS
S 03