DISRUPTION OF OPERATIONS AUTHORIZATION

OBREGON BREWERY

DOA MISC-22-18 / Vialidades


DATE: November 29st,
2023
TO: Obregon Brewery
Attn: CBI Engineering / CCO
Departments Affected: Vialidades Planta
Operations Affected: n/a
ATP: RTA: 004-OB
From: from November 29th 2023 to January 29th, 2024, from 7:00 a.m. to 5:00 p.m.

ITEM DESCRIPTION:

1. Instalacion de postes con señaletica de vialidades en las calles aledañas a Hot and col Block, filtración,
engine room del proyecto 8.5 asi como las vialidades de Packaging 8.5.
2. Instalación de manera manual, con el uso de herramienta como, pala, pico etc.
3. Las ubicaciones se harán de acuerdo a la ingeniería aprobada, así como el sentido de señales.
4. Fijación al suelo con concreto colado y nivelación correspondiente.
5. Orden y limpieza.

Page 1 of 4
DISRUPTION OF OPERATIONS AUTHORIZATION
OBREGON BREWERY

DOA MISC-22-18 / Vialidades

CONTRACTOR/ACM PLANT APPROVAL


Dept Approved

Conceptual CBI –

Alejandro Gomez CBI -

Alberici Construcciones Mexico CCO –

CCO-

Page 2 of 4
DISRUPTION OF OPERATIONS AUTHORIZATION
OBREGON BREWERY

DOA MISC-22-18 / Vialidades

REDUCING FALSE FIRE ALARMS IN BUILDINGS

INTRODUCTION
False alarms are disruptive to the Operations and Maintenance of this Facility contributing to unnecessary
production shutdowns and add to a dangerous complacency in those occupants, who may be slower to
evacuate the facility in an actual emergency. Subcontractors and Construction Managers can help prevent false
alarms by taking the following measures prior to and during construction. As part of your pre-construction
meeting a focus on false alarms should be conducted to discuss preventative measures included in the daily
Permits.

TEMPORARY FIRE PARTITIONS AND DUST BARRIERS

Review and establish what types of temporary fire partition and dust barrier measures are necessary for the
specific job site or location. Barriers should be erected and inspected prior to any demolition or dust generating
activities.

TEMPORARY IMPAIRMENT/ REMOVAL OF DEVICES

If dust, painting or steam producing activity cannot be avoided, assess the proximity of fire detection devices in
the area and confer with CCO Plant Management to identify which devices could be removed, bagged, or
otherwise covered or disabled. Duct detectors and other devices that may be hidden can be identified through
record drawings. Covering of devices must be performed by the Subcontractor of permit record at the beginning
of each shift and immediately removed at the end of each shift. Care should be taken when removing covers as
the act of removing the cover may trip the alarm.

FIRE WATCH REQUIREMENTS

Contact CCO Plant Management to determine if a fire watch will be required by the Subcontractor while the fire
alarm devices are impaired. The Subcontractor may serve as fire watch in most cases.

DISCUSS PROJECT RELATED FALSE ALARMS

If the project has caused a false alarm, the incident must be reviewed, and measures taken to prevent
reoccurrence. This discussion should take place at the regular project construction meeting.

Page 3 of 4
DISRUPTION OF OPERATIONS AUTHORIZATION
OBREGON BREWERY

DOA MISC-22-18 / Vialidades

Page 4 of 4