LEGEND;

Traffic Flow
NOTES; Arrow Flasher
a) The design of the traffic control zones and the placement of warning signs is based as per Traffic Guidance Cones
ATJ 2C/85 (Pindaan 2017)
- design criteria is based on urban road classification for High speed profile (>60kph), Plastic Barrier
b) All signs faces shall be Fluorescent Orange Prismatic retro-reflective sheeting (background) and Concrete Barrier
High Intensity Prismatic retro-reflective sheeting (others), Work Area
c) Plastic barrier should be in alternate of red & white and must be interlocked along construction area
and shall also in filled with water or sand to restraint arrant vehicles from "punching through" and Traffic Light
crash into the work zone at spacing of 2 - 5 meter interval,
d) Concrete barrier should be used at areas which involve excavation works of more than 1 meter in depth,
e) Traffic Guidance Cones to be placed 5 meter interval at taper and 15 meter interval at buffer & work area,
f) Access to work site - Flagman required if the construction vehicle enter or exit the working area,
g) For night works, the contractor shall install a flood light at the construction area,
h) Blinkers to be placed 5 meter interval at taper and 30 meter interval at straight stretch (night work only),
i) Arrow Flasher to be used at taper (night work only),
MATCHLINE

MATCHLINE
PROPOSED R.O.W.

A4 PROPOSED R.O.W.
CH 1325.00 M

CH 1350.00 M

CH 1375.00 M

CH 1400.00 M

CH 1425.00 M

CH 1475.00 M

CH 1500.00 M

CH 1525.00 M

CH 1550.00 M

CH 1575.00 M

CH 1600.00 M

CH 1625.00 M

CH 1650.00 M

CH 1675.00 M
CH 1450.00 M

CH 1700.00 M

CH 1725.00 M

CH 1750.00 M

CH 1775.00 M

CH 1800.00 M

CH 1825.00 M

CH 1850.00 M

CH 1875.00 M

CH 1900.00 M

CH 1925.00 M

CH 1950.00 M

CH 1975.00 M

CH 2000.00 M

CH 2025.00 M

CH 2050.00 M

CH 2100.00 M

CH 2125.00 M
CH 2075.00 M
PROPOSED R.
O.W.

TRAFFIC TO MIRI / SIBU TRAFFIC TO BINTULU

CL C
L

3.5 Metres 3.5 Metres Varies 3.5 Metres 3.5 Metres


EXISTING ROAD ROAD MEDIAN EXISTING ROAD

GOVERNMENT OF MALAYSIA
JABATAN KERJA RAYA SARAWAK
JABATAN KERJA RAYA PEMBINAAN FLYOVER JALAN MEDAN JAYA -
SARAWAK
JALAN TUN HUSSEIN ONN, BINTULU.
AF CONSTRUCTION SDN. BHD. KONSORTIUM MALAYSIA SARAWAK
TRAFFIC MANAGEMENT PLAN
EXISTING ROAD 4

JUL. 2022 JKRS/AFC/TRAMAROSA/TMP-ER/2022/000004 T00 000