Ocean Jade Shipping Date : 1st Jan. 14
ENG CHECKLISTS Pre. by : SOT
App. by : DPA
MT ………………………………………………………………………………….
The below procedures fully conform to the requirements of the USCG Code of Federal
Regulations [CFR) 33, Part 155 and is applicable to all OJS managed vessels.
Below requirements must be updated prior to commencement of each bunker transfer
operation.
Rank Duty
Chief Engineer Overall in charge of bunkering
In charge of bunker station on
deck
In charge in the Engine Room
In charge of sounding
.750(a)(5) The Duty deck crew will tend the vessel’s mooring lines during
bunker transfer operation in accordance with the Duty Deck Officer
or Chief Officer orders.
.750(a)(6) Procedures for emergency shutdown are as follows:
___________________________________________________________
_____
___________________________________________________________
_____
Procedures for communication between vessel’s personnel and
bunker barge / shore personnel (voice, VHF channel etc.) are as
follows:
___________________________________________________________
_____
Date: Port:
Sign:
Chief Engineer
Sign:
Master
Stamp:
- This form must be completed by the Chief Engineer and the Master prior to commencement of each bunkering.
- The copies of completed form will be made available at following locations:
Manifold area
Bunker station
ECR (Engine Control Room)
At vessel’s Oil Transfer Piping Diagram