Professional Documents
Culture Documents
Water Tunnel
Water Tunnel
马兰奇引水工程项目经理部
China Railway 15 Bureau Group Corporation
China CMIIC Engineering Corporation
J/V for Construction of Headwork and Diversion Tunnel, Melamchi Water Supply Project
FORMAT_MWSP/002
GEOLOGICAL MAP
Date:
Ambathan Scale 1:100
Worksite: Water Tunnel
Face Chainage: Mapping No:
Time (hrs):
Right Wall
Left Wall
Ch Ch
Spring Line
Invert
Geological Description:
Engineer's Comment:
中铁十五局集团公司 ★ 中国机械建设总公司
马兰奇引水工程项目经理部
China Railway 15 Bureau Group Corporation
China CMIIC Engineering Corporation
J/V for Construction of Headwork and Diversion Tunnel, Melamchi Water Supply Project
FORMAT_MWSP/002
GEOLOGICAL MAP
Date:
Ambathan Scale 1:100
Worksite: Water Tunnel
Face Chainage: Mapping No:
Time (hrs):
Right Wall
Left Wall
Ch Ch
Spring Line
Invert
Geological Description:
Engineer's Comment:
中铁十五局集团公司 ★ 中国机械建设总公司
马兰奇引水工程项目经理部
China Railway 15 Bureau Group Corporation
China CMIIC Engineering Corporation
J/V for Construction of Headwork and Diversion Tunnel, Melamchi Water Supply Project
FORMAT_MWSP/002
GEOLOGICAL MAP
Date:
Ambathan Scale 1:100
Worksite: Water Tunnel
Face Chainage: Mapping No:
Time (hrs):
Right Wall
Left Wall
Ch Ch
Spring Line
Invert
Geological Description:
Engineer's Comment: