中铁十五局集团公司 ★ 中国机械建设总公司

马兰奇引水工程项目经理部
China Railway 15 Bureau Group Corporation
China CMIIC Engineering Corporation

J/V for Construction of Headwork and Diversion Tunnel, Melamchi Water Supply Project
FORMAT_MWSP/002
GEOLOGICAL MAP
Date:
Ambathan Scale 1:100
Worksite: Water Tunnel
Face Chainage: Mapping No:
Time (hrs):

Right Wall
Left Wall
Ch Ch

Spring Line

Invert

Geological Description:

Parameter Description Rating


RQD (Average) Q Value
Q EVALUATION

Joint Set Number (Jn)


Joint Roughness Number (Jr)
Joint Alteration (Ja)
Water Flow in Joints (Jw)
Stress Reduction Factor (SRF)
Rock Support Class

Engineer's Comment:
中铁十五局集团公司 ★ 中国机械建设总公司
马兰奇引水工程项目经理部
China Railway 15 Bureau Group Corporation
China CMIIC Engineering Corporation

J/V for Construction of Headwork and Diversion Tunnel, Melamchi Water Supply Project
FORMAT_MWSP/002
GEOLOGICAL MAP
Date:
Ambathan Scale 1:100
Worksite: Water Tunnel
Face Chainage: Mapping No:
Time (hrs):

Right Wall
Left Wall

Ch Ch

Spring Line

Invert

Geological Description:

Parameter Description Rating


RQD (Average) Q Value
Q EVALUATION

Joint Set Number (Jn)


Joint Roughness Number (Jr)
Joint Alteration (Ja)
Water Flow in Joints (Jw)
Stress Reduction Factor (SRF)
Rock Support Class

Engineer's Comment:
中铁十五局集团公司 ★ 中国机械建设总公司
马兰奇引水工程项目经理部
China Railway 15 Bureau Group Corporation
China CMIIC Engineering Corporation

J/V for Construction of Headwork and Diversion Tunnel, Melamchi Water Supply Project
FORMAT_MWSP/002
GEOLOGICAL MAP
Date:
Ambathan Scale 1:100
Worksite: Water Tunnel
Face Chainage: Mapping No:
Time (hrs):

Right Wall
Left Wall

Ch Ch

Spring Line

Invert

Geological Description:

Parameter Description Rating


RQD (Average) Q Value
Q EVALUATION

Joint Set Number (Jn)


Joint Roughness Number (Jr)
Joint Alteration (Ja)
Water Flow in Joints (Jw)
Stress Reduction Factor (SRF)
Rock Support Class

Engineer's Comment:

Contractor's Geologist: Engineer's Geologist: