ITEM CODE DESCRIPTION

C1 General & Preliminaries


C2 Main Works

• CIVIL / STRUCTURAL WORKS


• ARCHITECTURAL WORKS
• MECHANICAL WORKS
• FIRE PROTECTION WORKS
• ELECTRICAL WORKS
• PLUMBING WORKS

TOTAL
AMOUNT

₱10,772,607.11

₱295,135,415,830.27

(NOT INCLUDED)
(NOT INCLUDED)
(NOT INCLUDED)
(NOT INCLUDED)

₱295,135,415,830.27
MATERIAL COST
A. GENERAL REQUIREMENTS QTY. UNIT
UNIT
I. PRELIMINARIES
1 CARI (Construction All-Risk Insurance) 1 LS.
2 Guarantee Bond 1 LS.
3 Surety Bond 1 LS. Excluded
4 Perfomance Bond 1 LS. Excluded
5 Permits
a. Building Permit 1 L.S. Excluded
b. Occupancy Permit 1 L.S. Excluded
6 LLDA 1 LS. Excluded
7 DENR / ECC 1 LS. Excluded
8 City Tax 1 LS. Excluded
9 Site Preparation
a. Mobilization 1 L.S.
b. Clearing, Cleaning, Hauling 1 L.S.
10 Demolization 1 L.S.
11 Temporary Facilities
a. Temporary Fence and Safety Nets 1 L.S.
Temporary Fence
Safety Nets
b. Warehouse and Field Office 1 L.S.
c. Bunkhouse 1 L.S.
d. Toilet and Sanitation 1 L.S.
12 Site Supervision 1 L.S.
13 Site Security 1 L.S.
14 Safety Engineer 1 L.S.
15 As Built Plan 1 L.S.
16 Utilities Cosumption (water, electricity, telephone) 1 L.S.
17 Others
a. Material Testing 1 L.S.
b. Toll fees 1 L.S.
c. Worker's Housing / Barracks 1 L.S.
d. Warehouseman 1 L.S.
MATERIAL COST LABOR COST LABOR COST
TOTAL TOTAL
TOTAL UNIT TOTAL UNIT TOTAL

0 419740.2 419740.2 419740.2 440727.2 440727.2 440727.2


0 249796.6 249796.6 249796.5964 262286.4 262286.4 262286.4

0 100000 100000 100000 105000 105000 105000


0 220000 220000 220000 231000 231000 231000
0 100000 100000 100000 105000 105000 105000

0 483000 483000 483000 507150 507150 507150


315000
168000
0 240000 240000 240000 252000 252000 252000
0 120000 120000 120000 126000 126000 126000
0 210000 210000 210000 220500 220500 220500
0 825000 825000 825000 866250 866250 866250
0 330000 330000 330000 346500 346500 346500
0 275000 275000 275000 288750 288750 288750
0 50000 50000 50000 52500 52500 52500
0 715000 715000 715000 750750 750750 750750

0 100000 100000 100000 105000 105000 105000


0 212393.5 212393.5 212393.5 223013.2 223013.2 223013.2
0 385000 385000 385000 404250 404250 404250
0 220000 220000 220000 231000 231000 231000
5254930.29635135 5517676.81116892
TOTAL
10772607.1075203
DETAILED QUANTIT

1 EARTH/SITE WORKS QTY

Construction Verification
a Survey
b Staking Layout 1
c Excavation 146.062
d Earthfill 146.062
e Spreading and Leveling 1238.385
g Gravel Bedding 106.91
h Soil Treatment 1175

2 FABRICATION QTY

a Pile Cap 153375.5616


b Pile Err:509
c Column 81413.2768
d Beams 65668.204
e Slab 3583.0065
f Stairs Err:509

3 FORMWORKS QTY
a Pile Foundaton 195
b Column 3100.7
c Beams 898.157
d Slab 2307.934
f f Stairs 2307.934

4 CONCRETING QTY
a Pile Foundaton 146.062
b Column 450.80625
c Beams 898.157
d Slab 223.5725
f Stairs 0

5 MASONRY QTY
a 4" CHB (incl. Reinforceme 0
b 6" CHB (incl. Reinforceme 0
c Plastering on CHB walls
Exterior Plastering Err:509
Interior Plastering Err:509
ETAILED QUANTITY ESTIMATE

MATERIAL COST
UNIT TOTAL Amount
UNIT COST Labor & Other Cost AMOUNT

lot ₱ 409,794.57 ₱ 204,897.29 ₱ 614,691.86 ₱ 614,691.86


m³ ₱ 19,620.91 ₱ 690.00 ₱ 20,310.91 ₱ 2,966,651.90
m³ ₱ 300.00 ₱ 150.00 ₱ 450.00 ₱ 65,727.90
m2 ₱ 1,684.77 ₱ 842.38 ₱ 2,527.15 ₱ 3,129,587.13
m³ ₱ 1,140.00 ₱ 570.00 ₱ 1,710.00 ₱ 182,816.10
m2 ₱ 135.04 ₱ 67.52 ₱ 202.56 ₱ 238,008.00
TOTAL ₱ 7,197,482.89

MATERIAL COST
UNIT TOTAL Amount
UNIT COST Labor & Other Cost AMOUNT

m2 ₱ 41.00 ₱ 1,923,997.47 ₱ 1,924,038.47 ₱ 295,100,480,615.02


m2 Err:509 Err:509 Err:509 Err:509
m2 ₱ 369.00 ₱ 1,021,277.03 ₱ 3,337,944.35 ₱ 4,359,221.38
m2 ₱ 369.00 ₱ 823,765.25 ₱ 2,692,396.36 ₱ 3,516,161.62
m2 ₱ 369.00 ₱ 44,946.50 ₱ 146,903.27 ₱ 191,849.77
m2 Err:509 Err:509 Err:509 Err:509
TOTAL ₱ 295,108,547,847.79

MATERIAL COST
UNIT UNIT COST Labor & Other Cost AMOUNT TOTAL Amount
kg ₱ 880.00 ₱ 1,018,925.00 ₱ 57,200.00 ₱ 1,076,125.00
kg ₱ 7,920.00 ₱ 653,650.00 ₱ 909,538.67 ₱ 1,563,188.67
kg ₱ 7,920.00 ₱ 519,075.00 ₱ 1,556,165.60 ₱ 2,075,240.60
kg ₱ 7,920.00 ₱ 615,200.00 ₱ 676,993.97 ₱ 1,292,193.97
kg ₱ - ₱ - ₱ - ₱ -
TOTAL ₱ 6,006,748.24

MATERIAL COST
UNIT UNIT COST Labor & Other Cost AMOUNT TOTAL Amount
m³ ₱ 5,464.00 ₱ 29,450.00 ₱ 798,082.77 ₱ 827,532.77
m³ ₱ 49,176.00 ₱ 132,525.00 ₱ 2,463,205.35 ₱ 2,595,730.35
m³ ₱ 49,176.00 ₱ 176,700.00 ₱ 4,907,529.85 ₱ 5,084,229.85
m³ ₱ 49,176.00 ₱ 132,525.00 ₱ 1,221,600.14 ₱ 1,354,125.14
m³ ₱ - ₱ 14,725.00 ₱ 161,119.70 ₱ 175,844.70
TOTAL ₱ 9,861,618.11

MATERIAL COST
UNIT UNIT COST Labor & Other Cost AMOUNT TOTAL Amount
kg ₱ - ₱ - ₱ - ₱ -
kg ₱ - ₱ 45,000.00 ₱ - ₱ -

kg Err:509 Err:509 Err:509 Err:509


kg Err:509 Err:509 Err:509 Err:509
TOTAL ₱ 2,469,421.25
SUMMARY (STRUCTURAL)

TOTAL
1 Site Works ₱ 7,197,482.89
2 Concrete Works
a Formworks ₱ 6,006,748.24
b Reinforcing Bars ₱ 295,108,547,847.79
Cast in Place
c Concrete ₱ 9,861,618.11
3 MASONRY ₱ 2,469,421.25
TOTAL ₱ 295,135,415,830.27
STRUCTURAL MATERIALS COST
DESCRIPTION

SITEWORKS
• Construction Verification Survey
• Site Clearing & lay-out
• Excavation
• Earthfill
• Spreading and Leveling
• Gravel Bedding
• Soil Treatment
REINFORCING BARS
FORMWORKS
CAST-IN-PLACE CONCRETE
• 4000 psi
Masonry 4" CHB (incl. Reinforcement, cement
6" CHB (incl. Reinforcement, cement

ARCHITECTURAL MATERIALS COST


DESCRIPTION
FINISHING
FLOOR FINISHES
• FF1
• FF2
• FF3
• FF4
• FF5
• FF6
• FF7
• FF8
• FF9
CEILING FINISHES
• CF1
• CF2
WALL FINISHES
WF1
WF2
WF3

FORMWORKS
CAST-IN-PLACE CONCRETE
• 4000 psi
TURAL MATERIALS COST
Direct Cost
QUANTITY Unit AMOUNT
(Php)

₱ -
1 ₱ 409,794.57 lot ₱ 409,794.57
0 ₱ 19,620.91 m³ ₱ -
396.704 ₱ 300.00 m³ ₱ 119,011.20
1684.77 ₱ 1,684.77 m2 ₱ 2,838,446.58
106.91 ₱ 890.63 m³ ₱ 95,216.72
1175 ₱ 105.50 m² ₱ 123,962.50
150664.4873 ₱ 28.13 kg ₱ 4,237,438.71
10908.744 ₱ 485.75 m² ₱ 5,298,922.40
₱ -
1718.59775 ₱ 5,464.00 m3 ₱ 9,390,418.11
3780.89 ₱ 125.00 m 3
₱ 472,611.25
7689.05 ₱ 200.00 m3 ₱ 1,537,810.00
TOTAL ₱ 24,523,632.03

CTURAL MATERIALS COST


Direct Cost
QUANTITY Unit AMOUNT
(Php)

₱ -
1 ₱ 409,794.57 lot ₱ 409,794.57
0 ₱ 19,620.91 m³ ₱ -
396.704 ₱ 300.00 m³ ₱ 119,011.20
1684.77 ₱ 1,684.77 m2 ₱ 2,838,446.58
106.91 ₱ 890.63 m³ ₱ 95,216.72
1175 ₱ 105.50 m² ₱ 123,962.50

₱ 28.13 kg ₱ -

₱ 485.75 m² ₱ -
₱ -
₱ 5,464.00 m3 ₱ -
II-STRUCTURAL-CIVIL W
CODE DESCRIPTION
QTY
A EARTH/SITE WORKS
1 Site Clearing & lay-out 1
2 Excavation 146.062
3 Earthfill 146.062
4 Spreading and Leveling 1238.385
5 Gravel Bedding 106.91
6 Soil Treatment 1175
B REBAR INSTALLATION
1 Mat Foundation 153375.5616
2 Column
GF - 2F 16203.52224
2F - 3F 15384.52224
3F - 4F 10674.5304
4F - 5F 6558.36032
5F - 6F 6414.45232
6F - 7F 6559.35232
7F - 8F 6539.51232
8F - 9F 6539.51232
9F - RD 6539.51232
3 Beams
2F 11464.998
3F 7344.632
4F 8906.048
5F 7663.246
6F 7528.216
7F 7373.896
8F 6713.086
9F 6524.044
RD 2150.038
4 Slab
2F 789.89725
3F 663.07225
4F 314.437
5F 302.6
6F 302.6
7F 302.6
8F 302.6
9F 302.6
RD 302.6
5 Stairs
GF - 2F 953.544
2F - 3F 953.544
3F - 4F 953.544
4F - 5F 1354.324
5F - 6F 953.544
6F - 7F 953.544
7F - 8F 953.544
8F - 9F 953.544
9F - RD 953.544
C Formworks
1 Mat Foundation 195
2 Column
GF - 2F 585
2F - 3F 585
3F - 4F 453
4F - 5F 252.7
5F - 6F 253.4
6F - 7F 253.4
7F - 8F 239.4
8F - 9F 239.4
9F - RD 239.4
3 Beams
2F 691.35
3F 920.55
4F 683.85
5F 512.56
6F 512.56
7F 512.56
8F 490.56
9F 490.56
RD 490.56
4 Slab
2F 438.91
3F 247.085
4F 271.717
5F 225.85
6F 225.85
7F 225.85
8F 225.85
9F 225.85
RD 220.972
5 Stairs
GF - 2F 57.74
2F - 3F 57.74
3F - 4F 57.74
4F - 5F 52.35
5F - 6F 52.35
6F - 7F 52.35
7F - 8F 52.35
8F - 9F 52.35
9F - RD 52.35
D Cast in Place Conccrete
1 Mat Foundation 146.062
2 Column
GF - 2F 94.6125
2F - 3F 94.6125
3F - 4F 74.8125
4F - 5F 32.64625
5F - 6F 32.83
6F - 7F 32.83
7F - 8F 29.4875
8F - 9F 29.4875
9F - RD 29.4875
3 Beams
2F 119.2725
3F 177.515
4F 130.995
5F 88.7875
6F 88.7875
7F 88.7875
8F 68.004
9F 68.004
RD 68.004
4 Slab
2F 42.004
3F 42.7625
4F 23.3665
5F 19.6425
6F 19.6425
7F 19.6425
8F 19.6425
9F 19.6425
RD 17.227
5 Stairs
GF - 2F 9.8
2F - 3F 9.8
3F - 4F 9.8
4F - 5F 7.4
5F - 6F 7.4
6F - 7F 7.4
7F - 8F 7.4
8F - 9F 7.4
9F - RD 7.4
E MASONRY WORKS
1 4" CHB (incl. Reinforcement, cement and sand)
GF - 2F 180
2F - 3F 1031.5
3F - 4F 552.55
4F - 5F 336.14
5F - 6F 336.14
6F - 7F 336.14
7F - 8F 336.14
8F - 9F 336.14
9F - RD 336.14
2 6" CHB (incl. Reinforcement, cement and sand)
GF - 2F 1218.1
2F - 3F 1477.5
3F - 4F 974.05
4F - 5F 669.9
5F - 6F 669.9
6F - 7F 669.9
7F - 8F 669.9
8F - 9F 669.9
9F - RD 669.9

III-ARCHITECTURAL - FINISHING W
1.00 Finishing
QTY
a. Floor Finishing
1 FF1 - 0.60x 0.60 m Granite Tiles Polish Finish 0.36
Ground Floor 459.87
Second Floor 341.70
2 FF2 - Vinyl Tiles Polish Finish
Ground Floor 47.95
Second Floor 48.30
Third Floor 48.30
Fourth Floor-Ninth Floor 45.57
3 FF3 - 0.60x 0.60 m Ceramic Tiles Polish Finish 0.16
Second Floor 54.95
Third Floor 188.77
4 FF4 - Unglazed Tiles Polish Finish
Second Floor 32.43
Third Floor 32.43
Fourth Floor-Ninth Floor 7.35
5 FF5 - Wood Deck Tiles Polish Finish
Roofdeck 456.29
6 FF6 - Pebble Wash Finish
Third Floor 201.60
Fourth Floor 85.86
7 FF7 - Carpet Tiles 0.25
Second Floor 305.20
Third Floor 510.12
Fourth Floor-Ninth Floor 348.33
8 FF8 - Smooth Cement Finish
Ground Floor 557.00
Second Floor 235.47
Third Floor 36.14
Fourth Floor-Ninth Floor 8.72
Roofdeck 11.45
9 FF9 - Terrazo Tiles Finish
Fourth Floor-Ninth Floor 2.25
b Ceiling Finishing 2.97
1 CF-01 - 12 mm thk. Ordinary Gypsum Board in Plain Paint Finish
Ground Floor 507.82
Second Floor 968.58
Third Floor 478.68
Fourth Floor to Ninth Floor 390.26
2 CF-02 - 12 mm thk. Moisture Resistant Gypsum Board in Plain Paint Finish
Second Floor to Third Floor 32.43
c Wall Finishing
1 WF-01 - Plain Cement Painted Finish
Ground Floor 136.18
Second Floor 1,738.75
Third Floor 748.14
Fourth Floor to Ninth Floor 620.65
2 WF-02 - 0.30 x 0.30 m Glazed Ceramic Tiles
Second Floor to Third Floor 130.12
Fourth Floor to Third Floor 278.59
3 WF-02 - Clear Tempered Glass Wall
Ground Floor 204.74
Third Floor 84.55
2.00 Door & windows
DT1 - Single Swing Type Steel Door
1 Steel Door 1.00
2 Steel door w/ Viewing glass (0.9m x 2.40m) 9.00
3 Steel door w/ Viewing glass (0.72m x 2.40m) 72.00
4 Steel Door 2.00
5 Steel door w/ Viewing glass (0.72m x 2.40m) 2.00
DT2 - Double Swing Type Steel Door
1 Narra 3.00
2 Steel Door w/ Viewing Glass(1.90 x 2.10m) 1.00
3 Steel Door w/ Viewing Glass (1.90m x 2.40m) 1.00
DT3 - Single Swing Type Metal Door
1 Steel Door 12.00
2 Steel Door w/ Bottom Louver 1.00
3 Fully Louvered Steel Door (1.90m x 2.10m) 1.00
4 Fully Louvered Steel Door (0.90m x 2.40m) 4.00
5 Fully Louvered Steel Door (0.90m x 2.40m) 72.00
DT4 - Double Swing Type Metal Door
1 Steel Door 4.00
2 Steel Door w/ Bottom Louver 2.00
DT5 - Sliding Type Glass Door
1 Fully Louvered Steel Door 36.00
WT1 - Swing Window w/ Fixed Glass
1 Aluminum Framed Casement Window w/ Fixed Glass 3.00
WT2 - Fixed Glass Window
1 Aluminum Framed Fixed Glass 9.00
WT3 - Sliding w/ Fixed Glass Window
1 Aluminum Framed Sliding 5.00
WT4 - Awning Window
1 Aluminum Framed 16.00
WT5 - Casement Window w/ Fixed Glass
1 Aluminum Framed 3.00
WT6 - Louvered Window
1 Steel Framed 42.00
WT7 - Casement Window w/ Fixed Glass
1 Aluminum Framed 6.00
3.00 Painting Finish
1 Latex White Paint
Interior walls 3,780.89
Ceiling 1,175.00
Exterior walls 7,689.05
4.00 Misscellaneous
1 Lamited Glass 145.80
2 Perforated Aluminum Wall Panels 44.70
3 PVC Wall Panels 411.91
4 Stainless Steels 150.65
5.00 Waterproofing
1 Comfort Room 108.96
2 Exterior Walls
GF - 2F 1,218.10
2F - 3F 1,477.50
3F - 4F 974.05
4F - 5F 669.90
5F - 6F 669.90
6F - 7F 669.90
7F - 8F 669.90
8F - 9F 669.90
9F - RD 669.90
2 Roofdeck 1,175.00
CTURAL-CIVIL WORKS
MATERIAL COST
UNIT TOTAL AMOUNT
UNIT COST Labor & Other Cost AMOUNT
lot ₱ 409,794.57 ₱ 204,897.29 ₱ 614,691.86 ₱ 614,691.86
m³ 19,620.91 ₱ 690.00 ₱ 20,310.91 ₱ 2,966,651.90
m³ ₱ 300.00 ₱ 150.00 ₱ 450.00 ₱ 65,727.90
m 2
1,684.77 ₱ 842.38 ₱ 2,527.15 ₱ 3,129,587.13
m³ ₱ 1,140.00 ₱ 570.00 ₱ 1,710.00 ₱ 182,816.10
m2 ₱ 135.04 ₱ 67.52 ₱ 202.56 ₱ 238,008.00

kgs ₱ 41.00 ₱ 1,923,997.47 ₱ 1,924,038.47 ₱ 295,100,480,615.02

kgs ₱ 41.00 ₱ 203,262.73 ₱ 664,344.41 ₱ 867,607.14


kgs ₱ 41.00 ₱ 192,988.91 ₱ 630,765.41 ₱ 823,754.32
kgs ₱ 41.00 ₱ 133,905.10 ₱ 437,655.75 ₱ 571,560.84
kgs ₱ 41.00 ₱ 82,270.40 ₱ 268,892.77 ₱ 351,163.17
kgs ₱ 41.00 ₱ 80,465.17 ₱ 262,992.55 ₱ 343,457.71
kgs ₱ 41.00 ₱ 82,282.84 ₱ 268,933.45 ₱ 351,216.29
kgs ₱ 41.00 ₱ 82,033.96 ₱ 268,120.01 ₱ 350,153.97
kgs ₱ 41.00 ₱ 82,033.96 ₱ 268,120.01 ₱ 350,153.97
kgs ₱ 41.00 ₱ 82,033.96 ₱ 268,120.01 ₱ 350,153.97

kgs ₱ 41.00 ₱ 143,821.00 ₱ 470,064.92 ₱ 613,885.92


kgs ₱ 41.00 ₱ 92,133.67 ₱ 301,129.91 ₱ 393,263.58
kgs ₱ 41.00 ₱ 111,720.63 ₱ 365,147.97 ₱ 476,868.59
kgs ₱ 41.00 ₱ 96,130.48 ₱ 314,193.09 ₱ 410,323.56
kgs ₱ 41.00 ₱ 94,436.61 ₱ 308,656.86 ₱ 403,093.47
kgs ₱ 41.00 ₱ 92,500.77 ₱ 302,329.74 ₱ 394,830.50
kgs ₱ 41.00 ₱ 84,211.33 ₱ 275,236.53 ₱ 359,447.86
kgs ₱ 41.00 ₱ 81,839.92 ₱ 267,485.80 ₱ 349,325.73
kgs ₱ 41.00 ₱ 26,970.84 ₱ 88,151.56 ₱ 115,122.40

kgs ₱ 41.00 ₱ 9,908.75 ₱ 32,385.79 ₱ 42,294.54


kgs ₱ 41.00 ₱ 8,317.81 ₱ 27,185.96 ₱ 35,503.78
kgs ₱ 41.00 ₱ 3,944.41 ₱ 12,891.92 ₱ 16,836.33
kgs ₱ 41.00 ₱ 3,795.92 ₱ 12,406.60 ₱ 16,202.52
kgs ₱ 41.00 ₱ 3,795.92 ₱ 12,406.60 ₱ 16,202.52
kgs ₱ 41.00 ₱ 3,795.92 ₱ 12,406.60 ₱ 16,202.52
kgs ₱ 41.00 ₱ 3,795.92 ₱ 12,406.60 ₱ 16,202.52
kgs ₱ 41.00 ₱ 3,795.92 ₱ 12,406.60 ₱ 16,202.52
kgs ₱ 41.00 ₱ 3,795.92 ₱ 12,406.60 ₱ 16,202.52

kgs ₱ 41.00 ₱ 11,961.59 ₱ 39,095.30 ₱ 51,056.90


kgs ₱ 41.00 ₱ 11,961.59 ₱ 39,095.30 ₱ 51,056.90
kgs ₱ 41.00 ₱ 11,961.59 ₱ 39,095.30 ₱ 51,056.90
kgs ₱ 41.00 ₱ 16,989.12 ₱ 55,527.28 ₱ 72,516.40
kgs ₱ 41.00 ₱ 11,961.59 ₱ 39,095.30 ₱ 51,056.90
kgs ₱ 41.00 ₱ 11,961.59 ₱ 39,095.30 ₱ 51,056.90
kgs ₱ 41.00 ₱ 11,961.59 ₱ 39,095.30 ₱ 51,056.90
kgs ₱ 41.00 ₱ 11,961.59 ₱ 39,095.30 ₱ 51,056.90
kgs ₱ 41.00 ₱ 11,961.59 ₱ 39,095.30 ₱ 51,056.90

m² ₱ 880.00 ₱ 1,018,925.00 ₱ 57,200.00 ₱ 1,076,125.00

m² ₱ 880.00 ₱ 115,350.00 ₱ 171,600.00 ₱ 286,950.00


m² ₱ 880.00 ₱ 115,350.00 ₱ 171,600.00 ₱ 286,950.00
m² ₱ 880.00 ₱ 76,900.00 ₱ 132,880.00 ₱ 209,780.00
m² ₱ 880.00 ₱ 57,675.00 ₱ 74,125.33 ₱ 131,800.33
m² ₱ 880.00 ₱ 57,675.00 ₱ 74,330.67 ₱ 132,005.67
m² ₱ 880.00 ₱ 57,675.00 ₱ 74,330.67 ₱ 132,005.67
m² ₱ 880.00 ₱ 57,675.00 ₱ 70,224.00 ₱ 127,899.00
m² ₱ 880.00 ₱ 57,675.00 ₱ 70,224.00 ₱ 127,899.00
m² ₱ 880.00 ₱ 57,675.00 ₱ 70,224.00 ₱ 127,899.00

m² ₱ 880.00 ₱ 76,900.00 ₱ 202,796.00 ₱ 279,696.00


m² ₱ 880.00 ₱ 57,675.00 ₱ 270,028.00 ₱ 327,703.00
m² ₱ 880.00 ₱ 76,900.00 ₱ 200,596.00 ₱ 277,496.00
m² ₱ 880.00 ₱ 57,675.00 ₱ 150,350.93 ₱ 208,025.93
m² ₱ 880.00 ₱ 57,675.00 ₱ 150,350.93 ₱ 208,025.93
m² ₱ 880.00 ₱ 57,675.00 ₱ 150,350.93 ₱ 208,025.93
m² ₱ 880.00 ₱ 57,675.00 ₱ 143,897.60 ₱ 201,572.60
m² ₱ 880.00 ₱ 57,675.00 ₱ 143,897.60 ₱ 201,572.60
m² ₱ 880.00 ₱ 19,225.00 ₱ 143,897.60 ₱ 163,122.60

m² ₱ 880.00 ₱ 115,350.00 ₱ 128,746.93 ₱ 244,096.93


m² ₱ 880.00 ₱ 76,900.00 ₱ 72,478.27 ₱ 149,378.27
m² ₱ 880.00 ₱ 76,900.00 ₱ 79,703.65 ₱ 156,603.65
m² ₱ 880.00 ₱ 57,675.00 ₱ 66,249.33 ₱ 123,924.33
m² ₱ 880.00 ₱ 57,675.00 ₱ 66,249.33 ₱ 123,924.33
m² ₱ 880.00 ₱ 57,675.00 ₱ 66,249.33 ₱ 123,924.33
m² ₱ 880.00 ₱ 57,675.00 ₱ 66,249.33 ₱ 123,924.33
m² ₱ 880.00 ₱ 57,675.00 ₱ 66,249.33 ₱ 123,924.33
m² ₱ 880.00 ₱ 57,675.00 ₱ 64,818.45 ₱ 122,493.45

m² ₱ 880.00 ₱ 19,225.00 ₱ 16,937.07 ₱ 36,162.07


m² ₱ 880.00 ₱ 19,225.00 ₱ 16,937.07 ₱ 36,162.07
m² ₱ 880.00 ₱ 19,225.00 ₱ 16,937.07 ₱ 36,162.07
m² ₱ 880.00 ₱ 19,225.00 ₱ 15,356.00 ₱ 34,581.00
m² ₱ 880.00 ₱ 19,225.00 ₱ 15,356.00 ₱ 34,581.00
m² ₱ 880.00 ₱ 19,225.00 ₱ 15,356.00 ₱ 34,581.00
m² ₱ 880.00 ₱ 19,225.00 ₱ 15,356.00 ₱ 34,581.00
m² ₱ 880.00 ₱ 19,225.00 ₱ 15,356.00 ₱ 34,581.00
m² ₱ 880.00 ₱ 19,225.00 ₱ 15,356.00 ₱ 34,581.00

m3 ₱ 5,464.00 ₱ 29,450.00 ₱ 798,082.77 ₱ 827,532.77

m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 516,962.70 ₱ 531,687.70


m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 516,962.70 ₱ 531,687.70
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 408,775.50 ₱ 423,500.50
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 178,379.11 ₱ 193,104.11
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 179,383.12 ₱ 194,108.12
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 179,383.12 ₱ 194,108.12
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 161,119.70 ₱ 175,844.70
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 161,119.70 ₱ 175,844.70
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 161,119.70 ₱ 175,844.70

m3 ₱ 5,464.00 ₱ 29,450.00 ₱ 651,704.94 ₱ 681,154.94


m3 ₱ 5,464.00 ₱ 29,450.00 ₱ 969,941.96 ₱ 999,391.96
m3 ₱ 5,464.00 ₱ 29,450.00 ₱ 715,756.68 ₱ 745,206.68
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 485,134.90 ₱ 499,859.90
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 485,134.90 ₱ 499,859.90
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 485,134.90 ₱ 499,859.90
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 371,573.86 ₱ 386,298.86
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 371,573.86 ₱ 386,298.86
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 371,573.86 ₱ 386,298.86

m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 229,509.86 ₱ 244,234.86


m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 233,654.30 ₱ 248,379.30
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 127,674.56 ₱ 142,399.56
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 107,326.62 ₱ 122,051.62
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 107,326.62 ₱ 122,051.62
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 107,326.62 ₱ 122,051.62
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 107,326.62 ₱ 122,051.62
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 107,326.62 ₱ 122,051.62
m3 ₱ 5,464.00 ₱ 14,725.00 ₱ 94,128.33 ₱ 108,853.33

m4 ₱ 5,464.00 ₱ 14,725.00 ₱ 53,547.20 ₱ 68,272.20


m5 ₱ 5,464.00 ₱ 14,725.00 ₱ 53,547.20 ₱ 68,272.20
m6 ₱ 5,464.00 ₱ 14,725.00 ₱ 53,547.20 ₱ 68,272.20
m7 ₱ 5,464.00 ₱ 14,725.00 ₱ 40,433.60 ₱ 55,158.60
m8 ₱ 5,464.00 ₱ 14,725.00 ₱ 40,433.60 ₱ 55,158.60
m9 ₱ 5,464.00 ₱ 14,725.00 ₱ 40,433.60 ₱ 55,158.60
m10 ₱ 5,464.00 ₱ 14,725.00 ₱ 40,433.60 ₱ 55,158.60
m11 ₱ 5,464.00 ₱ 14,725.00 ₱ 40,433.60 ₱ 55,158.60
m12 ₱ 5,464.00 ₱ 14,725.00 ₱ 40,433.60 ₱ 55,158.60

m² ₱ 125.00 ₱ 9,000.00 ₱ 22,500.00 ₱ 31,500.00


m² ₱ 125.00 ₱ 45,000.00 ₱ 128,937.50 ₱ 173,937.50
m² ₱ 125.00 ₱ 27,000.00 ₱ 69,068.75 ₱ 96,068.75
m² ₱ 125.00 ₱ 18,000.00 ₱ 42,017.50 ₱ 60,017.50
m² ₱ 125.00 ₱ 18,000.00 ₱ 42,017.50 ₱ 60,017.50
m² ₱ 125.00 ₱ 18,000.00 ₱ 42,017.50 ₱ 60,017.50
m² ₱ 125.00 ₱ 18,000.00 ₱ 42,017.50 ₱ 60,017.50
m² ₱ 125.00 ₱ 18,000.00 ₱ 42,017.50 ₱ 60,017.50
m² ₱ 125.00 ₱ 18,000.00 ₱ 42,017.50 ₱ 60,017.50

m² ₱ 200.00 ₱ - ₱ 243,620.00 ₱ 243,620.00


m² ₱ 200.00 ₱ 45,000.00 ₱ 295,500.00 ₱ 340,500.00
m² ₱ 200.00 ₱ 54,000.00 ₱ 194,810.00 ₱ 248,810.00
m² ₱ 200.00 ₱ 36,000.00 ₱ 133,980.00 ₱ 169,980.00
m² ₱ 200.00 ₱ 27,000.00 ₱ 133,980.00 ₱ 160,980.00
m² ₱ 200.00 ₱ 27,000.00 ₱ 133,980.00 ₱ 160,980.00
m² ₱ 200.00 ₱ 27,000.00 ₱ 133,980.00 ₱ 160,980.00
m² ₱ 200.00 ₱ 27,000.00 ₱ 133,980.00 ₱ 160,980.00
m² ₱ 200.00 ₱ 27,000.00 ₱ 133,980.00 ₱ 160,980.00
TOTAL ₱ 295,135,415,830.27
CHITECTURAL - FINISHING WORKS
MATERIAL COST
UNIT TOTAL
UNIT COST LABOR COST AMOUNT

₱ 1,216.80 ₱ 60,500.00 ₱ 1,554,360.60 ₱ 1,614,860.60


sq.m. ₱ 1,216.80 ₱ 60,500.00 ₱ 1,154,946.00 ₱ 1,215,446.00

sq.m. ₱ 300.00 ₱ 30,250.00 ₱ 14,385.00 ₱ 44,635.00


sq.m. ₱ 300.00 ₱ 30,250.00 ₱ 14,490.00 ₱ 44,740.00
sq.m. ₱ 300.00 ₱ 30,250.00 ₱ 14,490.00 ₱ 44,740.00
sq.m. ₱ 300.00 ₱ 60,500.00 ₱ 60,500.00
₱ 30,250.00 ₱ 30,250.00
sq.m. ₱ 66.00 ₱ 30,250.00 ₱ 22,666.88 ₱ 52,916.88
₱ 66.00 ₱ 30,250.00 ₱ 77,867.63 ₱ 108,117.63

sq.m. ₱ 850.00 ₱ 30,250.00 ₱ 27,565.50 ₱ 57,815.50


sq.m. ₱ 850.00 ₱ 30,250.00 ₱ 27,565.50 ₱ 57,815.50
sq.m. ₱ 850.00 ₱ 30,250.00 ₱ 6,247.50 ₱ 36,497.50

sq.m. ₱ 780.00 ₱ 60,500.00 ₱ 355,905.42 ₱ 416,405.42


sq.m. ₱ 1,150.00 ₱ 30,250.00 ₱ 231,840.00 ₱ 262,090.00
sq.m. ₱ 1,150.00 ₱ 30,250.00 ₱ 98,739.00 ₱ 128,989.00
₱ 30,250.00 ₱ 30,250.00
sq.m. ₱ 170.00 ₱ 60,500.00 ₱ 207,536.00 ₱ 268,036.00
sq.m. ₱ 170.00 ₱ 60,500.00 ₱ 346,881.60 ₱ 407,381.60
sq.m. ₱ 170.00 ₱ 242,000.00 ₱ 236,864.40 ₱ 478,864.40

sq.m. ₱ -
sq.m. ₱ - ₱ 30,250.00 ₱ - ₱ 30,250.00
sq.m. ₱ - ₱ 30,250.00 ₱ - ₱ 30,250.00
sq.m. ₱ - ₱ 30,250.00 ₱ - ₱ 30,250.00
sq.m. ₱ - ₱ 30,250.00 ₱ - ₱ 30,250.00
₱ - ₱ -
sq.m. ₱ 850.00 ₱ 30,250.00 ₱ 1,908.25 ₱ 32,158.25

₱ -
sq.m. ₱ 520.00 ₱ 90,750.00 ₱ 88,911.25 ₱ 179,661.25
sq.m. ₱ 520.00 ₱ 151,250.00 ₱ 169,583.03 ₱ 320,833.03
sq.m. ₱ 520.00 ₱ 90,750.00 ₱ 83,809.29 ₱ 174,559.29
sq.m. ₱ 520.00 ₱ 332,750.00 ₱ 68,328.35 ₱ 401,078.35
₱ -
sq.m. ₱ 520.00 ₱ 30,250.00 ₱ 5,677.98 ₱ 35,927.98

₱ -
sq.m. ₱ 175.00 ₱ 30,250.00 ₱ 30,250.00
sq.m. ₱ 175.00 ₱ 302,500.00 ₱ 304,281.25 ₱ 606,781.25
sq.m. ₱ 175.00 ₱ 121,000.00 ₱ 130,924.50 ₱ 251,924.50
sq.m. ₱ 175.00 ₱ 605,000.00 ₱ 108,613.75 ₱ 713,613.75

sq.m. ₱ 740.00 ₱ 30,250.00 ₱ 96,287.32 ₱ 126,537.32


sq.m. ₱ 30,250.00 ₱ - ₱ 30,250.00

sq.m. ₱ 6,700.00 ₱ 30,250.00 ₱ 1,371,758.00 ₱ 1,402,008.00


sq.m. ₱ 6,700.00 ₱ 30,250.00 ₱ 566,485.00 ₱ 596,735.00

sq.m. ₱ 8,000.00 ₱ - ₱ 8,000.00 ₱ 8,000.00


sq.m. ₱ 11,628.00 ₱ - ₱ 104,652.00 ₱ 104,652.00
sq.m. ₱ 10,420.00 ₱ - ₱ 750,240.00 ₱ 750,240.00
sq.m. ₱ 8,000.00 ₱ - ₱ 16,000.00 ₱ 16,000.00
sq.m. ₱ 11,628.00 ₱ - ₱ 23,256.00 ₱ 23,256.00

sq.m. ₱ 5,300.00 ₱ - ₱ 15,900.00 ₱ 15,900.00


sq.m. ₱ 14,830.00 ₱ - ₱ 14,830.00 ₱ 14,830.00
sq.m. ₱ 16,440.00 ₱ - ₱ 16,440.00 ₱ 16,440.00
₱ -
sq.m. ₱ 5,760.00 ₱ - ₱ 69,120.00 ₱ 69,120.00
sq.m. ₱ 10,800.00 ₱ - ₱ 10,800.00 ₱ 10,800.00
sq.m. ₱ 10,800.00 ₱ - ₱ 10,800.00 ₱ 10,800.00
sq.m. ₱ 11,400.00 ₱ - ₱ 45,600.00 ₱ 45,600.00
sq.m. ₱ 10,800.00 ₱ - ₱ 777,600.00 ₱ 777,600.00
₱ - ₱ -
sq.m. ₱ 15,300.00 ₱ - ₱ 61,200.00 ₱ 61,200.00
sq.m. ₱ 15,800.00 ₱ - ₱ 31,600.00 ₱ 31,600.00
₱ - ₱ - ₱ -
sq.m. ₱ 5,760.00 ₱ - ₱ 207,360.00 ₱ 207,360.00
₱ - ₱ -
sq.m. ₱ 4,600.00 ₱ - ₱ 13,800.00 ₱ 13,800.00
₱ - ₱ - ₱ -
sq.m. ₱ 530.00 ₱ - ₱ 4,770.00 ₱ 4,770.00
₱ - ₱ - ₱ -
sq.m. ₱ 5,320.00 ₱ - ₱ 26,600.00 ₱ 26,600.00
₱ - ₱ - ₱ -
sq.m. ₱ 1,870.00 ₱ - ₱ 29,920.00 ₱ 29,920.00
₱ - ₱ -
sq.m. ₱ 4,600.00 ₱ - ₱ 13,800.00 ₱ 13,800.00
₱ - ₱ - ₱ -
sq.m. ₱ 530.00 ₱ - ₱ 22,260.00 ₱ 22,260.00
₱ - ₱ - ₱ -
sq.m. ₱ 4,600.00 ₱ - ₱ 27,600.00 ₱ 27,600.00

sq.m. ₱ 717.00 ₱ 1,212,750.00 ₱ 451,816.35 ₱ 1,664,566.36


sq.m. ₱ 717.00 ₱ 385,875.00 ₱ 140,412.50 ₱ 526,287.50
sq.m. ₱ 717.00 ₱ 2,462,250.00 ₱ 918,841.47 ₱ 3,381,091.47

sq.m. ₱ 150.00 ₱ - ₱ 21,869.77 ₱ 21,869.77


sq.m. ₱ 100.00 ₱ - ₱ 4,470.00 ₱ 4,470.00
sq.m. ₱ 122.50 ₱ - ₱ 50,458.98 ₱ 50,458.98
sq.m. ₱ 178.50 ₱ - ₱ 26,891.03 ₱ 26,891.03

sq.m. ₱ 717.00 ₱ 12,750.00 ₱ 13,020.72 ₱ 25,770.72


₱ -
sq.m. ₱ 717.00 ₱ 76,500.00 ₱ 145,562.95 ₱ 222,062.95
sq.m. ₱ 717.00 ₱ 51,000.00 ₱ 176,561.25 ₱ 227,561.25
sq.m. ₱ 717.00 ₱ 38,250.00 ₱ 116,398.97 ₱ 154,648.97
sq.m. ₱ 717.00 ₱ 38,250.00 ₱ 80,053.05 ₱ 118,303.05
sq.m. ₱ 717.00 ₱ 38,250.00 ₱ 80,053.05 ₱ 118,303.05
sq.m. ₱ 717.00 ₱ 38,250.00 ₱ 80,053.05 ₱ 118,303.05
sq.m. ₱ 717.00 ₱ 38,250.00 ₱ 80,053.05 ₱ 118,303.05
sq.m. ₱ 717.00 ₱ 38,250.00 ₱ 80,053.05 ₱ 118,303.05
sq.m. ₱ 717.00 ₱ 63,750.00 ₱ 80,053.05 ₱ 143,803.05
sq.m. ₱ 717.00 ₱ 10,531,500.00 ₱ 140,412.50 ₱ 10,671,912.50
₱ 30,398,726.79
Ground floor
0.07 MH/M3
installation
Fabrication 0.1 MH/M3
Formworks 2.54 MH/M2
Concreting 8.54 MH/M3

0.08
12.5
125 200
HEIGTH PERIMETERAREA
GF 5 36 180
2F 5 206.3 1031.5
3F 5 110.51 552.55
4F 3.5 96.04 336.14
5F 3.5 96.04 336.14
6F 3.5 96.04 336.14
7F 3.5 96.04 336.14
8F 3.5 96.04 336.14
9F 3.5 96.04 336.14
3780.89
8.624

396.704
STEEL BARS Length
6 0.22 Kg/m 7.5
10 0.62 Kg/m 9
12 0.89 Kg/m 10.5
16 1.58 Kg/m 12
20 2.469 Kg/m
25 3.858 Kg/m
28 4.825 Kg/m
32 6.3 Kg/m
II-B-1 II-C-1
II-A-1 II-A-2 II-A-4 II-A-5

II-B-2.1 II-C-2.1
II-D-1 II-A-3 II-A-6 II-B-3.1 II-C-3.1 II-D-3.1

II-D-2.1 II-B-4.1 II-C-4.1 II-D-4.1


II-D-3.1 II-B-2.2 II-C-2.2 II-D-2.2 II-B-3.2 II-C-3.2

II-D-4.1 II-C-5.1 II-B-4.1 II-D-5.1 II-B-4.2 II-C-4.2


II-D-3.2 II-B-2.3 II-C-2.3 II-D-2.3 II-B-3.3 II-C-3.3

II-D-4.2 II-C-5.2 II-B-5.2 II-D-5.2 II-B-4.3 II-C-4.3

6
II-C-3.3 II-D-3.3 II-B-2.4 II-C-2.4 II-D-2.4

II-C-4.3 II-D-4.3 II-C-5.3 II-B-5.3 II-D-5.3


II-B-3.4 II-C-3.4 II-D-3.4 II-B-2.5 II-C-2.5 II-D-2.5

II-B-4.4 II-C-4.4 II-D-4.4 II-C-5.4 II-B-5.4 II-D-5.4


II-B-3.5 II-C-3.5 II-D-3.5 II-B-2.6 II-C-2.6 II-D-2.6

II-B-4.5 II-C-4.5 II-D-4.5 II-C-5.5 II-B-5.5 II-D-5.5


II-D-2.6 II-B-3.6 II-C-3.6 II-D-3.6 II-B-2.7 II-C-2.7 II-D-2.7

II-D-5.5 II-B-4.6 II-C-4.6 II-D-4.6 II-C-5.6 II-B-5.6 II-D-5.6


II-B-3.7 II-C-3.7 II-D-3.7 II-B-2.8 II-C-2.8 II-D-2.8

II-B-4.7 II-C-4.7 II-D-4.7 II-C-5.7 II-B-5.7 II-D-5.7


II-B-3.8 II-C-3.8 II-D-3.8 II-B-2.9 II-C-2.9 II-D-2.9 II-B-3.9

II-B-4.8 II-C-4.8 II-D-4.8 II-C-5.8 II-B-5.8 II-D-5.8 II-B-4.9

II-E-1.1 II-E-1.2 II-E-1.3 II-E-1.4 II-E-1.5 II-E-1.6 II-E-1.7

II-E-2.1 II-E-2.2 II-E-2.3 II-E-2.4 II-E-2.5 II-E-2.6 II-E-2.7


II-C-3.9 II-D-3.9

II-C-5.9 II-B-5.9 II-D-5.9 III-1A-8.1

II-C-4.9 II-D-4.9

II-E-1.8 II-E-1.9

II-E-2.8 II-E-2.9
III-1A-2.1
III-1A-8.2 III-1A-8.3 III-1A-8.4 III-1A-8.5 III-1C-1.1 III-1C-1.2

III-5C-1.1
III-1C-1.3 III-1C-1.4 III-1B-1.1 III-1B-1.2 III-1B-1.3 III-1B-1.4
III-1B-1.4 III-1A-2.4 III-1A-2.3 III-1A-1.2 III-1A-1.1 III-1B-2.1

III-1A-4.3 III-1A-3.2 III-1A-2.2

III-1A-7.3 III-1A-4.2 III-1A-3.1

III-1A-5.1 III-1A-6.1 III-1A-4.1

III-1A-6.2 III-1A-7.2 III-1A-7.1

III-1A-9.1
III-1C-2.1 III-5C-1.1 III-5B-1.9 III-5B-1.4 III-3A-1

III-1C-2.2 III-5B-1.8 III-5B-1.3

III-5B-1.7 III-5B-1.2

III-5B-1.6 III-5B-1.1

III-5B-1.5 III-5A
III-3A-1.1 III-3A-1.2
STRUCTURAL CIVIL WORKS

ACTIVITY
CODE DESCRIPTION QTYDURATION
A EARTH/SITE WORKS
II-A-2 1 Site Clearing & lay-out 1 24
II-A-3 2 Excavation 146.062 1
II-A-4 3 Earthfill 146.062 6
II-A-5 4 Spreading and Leveling 1238.385 20
II-A-6 5 Gravel Bedding 106.91 5
II-A-7 6 Soil Treatment 1175 19
II-B B REBAR INSTALLATION
II-B-1 1 Mat Foundation 153376 53
II-B-2 2 Column
II-B-2.1 GF - 2F 16203.52 6
II-B-2.2 2F - 3F 15384.52 6
II-B-2.3 3F - 4F 10674.53 4
II-B-2.4 4F - 5F 6558.36 3
II-B-2.5 5F - 6F 6414.452 3
II-B-2.6 6F - 7F 6559.352 3
II-B-2.7 7F - 8F 6539.512 3
II-B-2.8 8F - 9F 6539.512 3
II-B-2.9 9F - RD 6539.512 3
II-B-3 3 Beams
II-B-3.1 0 2F 11465 4
II-B-3.2 0 3F 7344.632 3
II-B-3.3 0 4F 8906.048 4
II-B-3.4 0 5F 7663.246 3
II-B-3.5 0 6F 7528.216 3
II-B-3.6 0 7F 7373.896 3
II-B-3.7 0 8F 6713.086 3
II-B-3.8 0 9F 6524.044 3
II-B-3.9 0 RD 2150.038 1
II-B-4 4 Slab
II-B-4.1 0 2F 789.8973 1
II-B-4.2 0 3F 663.0722 1
II-B-4.3 0 4F 314.437 1
II-B-4.4 0 5F 302.6 1
II-B-4.5 0 6F 302.6 1
II-B-4.6 0 7F 302.6 1
II-B-4.7 0 8F 302.6 1
II-B-4.8 0 9F 302.6 1
II-B-4.9 0 RD 302.6 1
II-B-5 5 Stairs
II-B-5.1 0 GF - 2F 953.544 1
II-B-5.2 0 2F - 3F 953.544 1
II-B-5.3 0 3F - 4F 953.544 1
II-B-5.4 0 4F - 5F 1354.324 1
II-B-5.5 0 5F - 6F 953.544 1
II-B-5.6 0 6F - 7F 953.544 1
II-B-5.7 0 7F - 8F 953.544 1
II-B-5.8 0 8F - 9F 953.544 1
II-B-5.9 0 9F - RD 953.544 1
II-C C Formworks 0
II-C-1 1 Mat Foundation 195 3
II-C-2 2 Column
II-C-2.1 GF - 2F 585 8
II-C-2.2 2F - 3F 585 8
II-C-2.3 3F - 4F 453 6
II-C-2.4 4F - 5F 252.7 4
II-C-2.5 5F - 6F 253.4 4
#REF!
II-C-2.6 6F - 7F 253.4 4
II-C-2.7 7F - 8F 239.4 4
II-C-2.8 8F - 9F 239.4 4
II-C-2.9 9F - RD 239.4 4
II-C-3 3 Beams
II-C-3.1 2F 691.35 10
II-C-3.2 3F 920.55 13
II-C-3.3 4F 683.85 10
II-C-3.4 5F 512.56 7
II-C-3.5 6F 512.56 7
II-C-3.6 7F 512.56 7
II-C-3.7 8F 490.56 7
II-C-3.8 9F 490.56 7
II-C-3.9 RD 490.56 7
II-C-4 4 Slab
II-C-4.1 2F 438.91 6
II-C-4.2 3F 247.085 4
II-C-4.3 4F 271.717 4
II-C-4.4 5F 225.85 3
II-C-4.5 6F 225.85 3
II-C-4.6 7F 225.85 3
II-C-4.7 8F 225.85 3
II-C-4.8 9F 225.85 3
II-C-4.9 RD 220.972 3
II-C5 5 Stairs
II-C-5.1 GF - 2F 57.74 1
II-C-5.2 2F - 3F 57.74 1
II-C-5.3 3F - 4F 57.74 1
II-C-5.4 4F - 5F 52.35 1
II-C-5.5 5F - 6F 52.35 1
II-C-5.6 6F - 7F 52.35 1
II-C-5.7 7F - 8F 52.35 1
II-C-5.8 8F - 9F 52.35 1
II-C-5.9 9F - RD 52.35 1
II-D D Cast in Place Conccrete 0
II-D-1 1 Mat Foundation 146.062 2
II-D-2 2 Column
II-D-2.1 GF - 2F 94.6125 1
II-D-2.2 2F - 3F 94.6125 1
II-D-2.3 3F - 4F 74.8125 1
II-D-2.4 4F - 5F 32.64625 1
II-D-2.5 5F - 6F 32.83 1
II-D-2.6 6F - 7F 32.83 1
II-D-2.7 7F - 8F 29.4875 1
II-D-2.8 8F - 9F 29.4875 1
II-D-2.9 9F - RD 29.4875 1
II-D-3 3 Beams 0
II-D-3.1 2F 119.2725 2
II-D-3.2 3F 177.515 2
II-D-3.3 4F 130.995 2
II-D-3.4 5F 88.7875 1
II-D-3.5 6F 88.7875 1
II-D-3.6 7F 88.7875 1
II-D-3.7 8F 68.004 1
II-D-3.8 9F 68.004 1
II-D-3.9 RD 68.004 1
II-D-4 4 Slab
II-D-4.1 2F 42.004 1
II-D-4.2 3F 42.7625 1
II-D-4.3 4F 23.3665 1
II-D-4.4 5F 19.6425 1
II-D-4.5 6F 19.6425 1
II-D-4.6 7F 19.6425 1
II-D-4.7 8F 19.6425 1
II-D-4.8 9F 19.6425 1
II-D-4.9 RD 17.227 1
II-D-5 5 Stairs
II-D-5.1 GF - 2F 9.8 1
II-D-5.2 2F - 3F 9.8 1
II-D-5.3 3F - 4F 9.8 1
II-D-5.4 4F - 5F 7.4 1
II-D-5.5 5F - 6F 7.4 1
II-D-5.6 6F - 7F 7.4 1
II-D-5.7 7F - 8F 7.4 1
II-D-5.8 8F - 9F 7.4 1
II-D-5.9 9F - RD 7.4 1
II-E E MASONRY WORKS
II-E-1 1 4" CHB (incl. Reinforcement, cement and sand)
II-E-1.1 GF - 2F 180 1
II-E-1.2 2F - 3F 1031.5 5
II-E-1.3 3F - 4F 552.55 3
II-E-1.4 4F - 5F 336.14 2
II-E-1.5 5F - 6F 336.14 2
II-E-1.6 6F - 7F 336.14 2
II-E-1.7 7F - 8F 336.14 2
II-E-1.8 8F - 9F 336.14 2
II-E-1.9 9F - RD 336.14 2
II-E-2 2 6" CHB (incl. Reinforcement, cement and sand)
II-E-2.1 GF - 2F 1218.1 5
II-E-2.2 2F - 3F 1477.5 6
II-E-2.3 3F - 4F 974.05 4
II-E-2.4 4F - 5F 669.9 3
II-E-2.5 5F - 6F 669.9 3
II-E-2.6 6F - 7F 669.9 3
II-E-2.7 7F - 8F 669.9 3
II-E-2.8 8F - 9F 669.9 3
II-E-2.9 9F - RD 669.9 3
III III-ARCHITECTURAL WORKS
III-1 1.00 Finishing
QTYDURATION
III-1A a. Floor Finishing
III-1A-1 1 FF1 - 0.60x 0.60 m Granite Tiles Polish Finis 0.36
III-1A-1.1 Ground Floor 459.87 2
III-1A-1.2 Second Floor 341.70 2
III-1A-2 2 FF2 - Vinyl Tiles Polish Finish
III-1A-2.1 Ground Floor 47.95 1
III-1A-2.2 Second Floor 48.30 1
III-1A-2.3 Third Floor 48.30 1
III-1A-2.4 Fourth Floor-Ninth Floor 273.42 2
III-1A-3 3 FF3 - 0.60x 0.60 m Ceramic Tiles Polish Fini 0.16 1
III-1A-3.1 Second Floor 54.95 1
III-1A-3.2 Third Floor 188.77 1
III-1A-4 4 FF4 - Unglazed Tiles Polish Finish
III-1A-4.1 Second Floor 32.43 1
III-1A-4.2 Third Floor 32.43 1
III-1A-4.3 Fourth Floor-Ninth Floor 44.10 1
III-1A-5 5 FF5 - Wood Deck Tiles Polish Finish
III-1A-5.1 Roofdeck 456.29 2
III-1A-6 6 FF6 - Pebble Wash Finish
III-1A-6.1 Third Floor 201.60 1
III-1A-6.2 Fourth Floor 85.86 1
III-1A-7 7 FF7 - Carpet Tiles 0.25 1
III-1A-7.1 Second Floor 305.20 2
III-1A-7.2 Third Floor 510.12 2
III-1A-7.3 Fourth Floor-Ninth Floor 2,089.98 8
III-1A-8 8 FF8 - Smooth Cement Finish
III-1A-8.1 Ground Floor 557.00 2
III-1A-8.2 Second Floor 235.47 1
III-1A-8.3 Third Floor 36.14 1
III-1A-8.4 Fourth Floor-Ninth Floor 52.29 1
III-1A-8.5 Roofdeck 11.45 1
III-1A-9 9 FF9 - Terrazo Tiles Finish
III-1A-9.1 Fourth Floor-Ninth Floor 13.47 1
III-1B b Ceiling Finishing 2.97
III-1B-1 1 CF-01 - 12 mm thk. Ordinary Gypsum Board in Plain Paint Finish
III-1B-1.1 Ground Floor 507.82 3
III-1B-1.2 Second Floor 968.58 5
III-1B-1.3 Third Floor 478.68 3
III-1B-1.4 Fourth Floor to Ninth Floor 2,341.56 11
III-1B-2 2 CF-02 - 12 mm thk. Moisture Resistant Gypsum Board in Plain Paint Finish
III-1B-2.1 Second Floor to Third Floor 64.86 1
III-1C c Wall Finishing
III-1C-1 1 WF-01 - Smooth Cement Plaster
III-1C-1.1 Ground Floor 136.18 1
III-1C-1.2 Second Floor 1,738.75 10
III-1C-1.3 Third Floor 748.14 4
III-1C-1.4 Fourth Floor to Ninth Floor 3,723.90 20
III-1C-2 2 WF-02 - 0.30 x 0.30 m Glazed Ceramic Tiles
III-1C-2.1 Second Floor to Third Floor 130.12 1
III-1C-2.2 Fourth Floor to Third Floor 278.59 1
III-1C-3 3 WF-03 - Clear Tempered Glass Wall
III-1C-3.1 Ground Floor 204.74 1
III-1C-3.2 Third Floor 84.55 1
III-1C-2.1
III-2 2.00 Door & windows
D1 - Narra (Double swing type steel
13.68
III-2-1.1 1 door) 1
D2 - steel door w/ viewing glass III-1C-2.2
6mm thk. Tempered glass (single 3.16
III-2-1.2 1 swing type steel door) 1
D3 - Steel door (single swing type 19.44
III-2-1.3 1 steel door) 1
D4 - Steel door w/ bottom louver
15.12
III-2-1.4 2 (single swing type steel door) 1
III-1C-3.1
D5 - steel door (single swing type 25.92
III-2-1.5 1 metal door) 1
D6 - Fully louvered steel door 2.16
III-2-1.6 1 (double swing type metal door) 1
D7 - Steel door (single swing type
4.56
III-2-1.7 1 metal door) 1
III-1C-3.2
D8 - steel door w/ bottom louvered 8.64
III-2-1.8 1 (single swing type metal door) 1
D9 - narra (double swing type steel 3.99
III-2-1.9 1 door) 1
D10 - narra (single swing type steel
4.32
III-2-1.10 1 door) 1
III-2-1.11
D11 - steel door (double swing type 2.16
III-2-1.11 1 steel door) 1
D12 - steel door (single swing type 3.84
III-2-1.12 1 steel door) 1
D13 - glass door (double swing type
18.24
III-2-1.13 1 metal door) 1
III-2-1.12
D14 - steel door (double swing type 7.20
III-2-1.14 1 metal door) 1
D15 - Narra (single swing type metal 155.52
III-2-1.15 3 door) 1
D16 - glass door (sliding type glass
215.28
III-2-1.16 4 door) 1
III-2-1.13
D17 - glass door (sliding type glass 168.48
III-2-1.17 4 door) 1
III-2F F WT1 - Swing Window w/ Fixed Glass
III-2F-1.1 1 Aluminum Framed Casement Window w/ Fixe 3.00 1
III-2-1.15
III-2G G WT2 - Fixed Glass Window 0
III-2G-1.1 1 Aluminum Framed Fixed Glass 9.00 1
III-2H H WT3 - Sliding w/ Fixed Glass Window 0
III-2-1.17
III-2H-1.1 1 Aluminum Framed Sliding 5.00 1
III-2I I WT4 - Awning Window 0
III-2I-1.1 1 Aluminum Framed 16.00 1
#REF!
III-2J J WT5 - Casement Window w/ Fixed Glass 0
III-2J-1.1 1 Aluminum Framed 3.00 1
III-2K K WT6 - Louvered Window 0
#REF!
III-2K-1.1 1 Steel Framed 42.00 1
III-2L L WT7 - Casement Window w/ Fixed Glass 0
III-2L-1.1 1 Aluminum Framed 6.00 1
III-3 3.00 Painting Works
III-3A a Latex White Paint
III-3A-1 Interior walls 3,780.89 66
III-3A-1.1 Ceiling 1,175.00 21
III-3A-1.2 Exterior walls 7,689.05 134
III-4 4.00 Misscellaneous
III-5A
III-4A a Lamited Glass 145.80
III-4B b Perforated Aluminum Wall Panels 44.70
III-4C c PVC Wall Panels 411.91
III-5B-1.1
III-4D d Stainless Steels 150.65
III-5 5.00 Waterproofing
III-5A a Comfort Room 108.96 1
III-5B-1.2
III-5B b Exterior Walls
III-5B-1.1 GF - 2F 1,218.10 5
III-5B-1.2 2F - 3F 1,477.50 6
III-5B-1.3
III-5B-1.3 3F - 4F 974.05 4
III-5B-1.4 4F - 5F 669.90 3
III-5B-1.5 5F - 6F 669.90 3
III-5B-1.4
III-5B-1.6 6F - 7F 669.90 3
III-5B-1.7 7F - 8F 669.90 3
III-5B-1.8 8F - 9F 669.90 3
III-5B-1.5
III-5B-1.9 9F - RD 669.90 3
III-5C-1.1 C Roofdeck 1,175.00 5
852
III-5B-1.6

III-5B-1.7

III-5B-1.8

III-5B-1.9
III-2-1.1 III-2-1.4

III-2-1.2

III-2-1.3

III-2-1.5

III-2-1.7

III-2-1.8
III-1B-2.1
III-2F-1.1

III-2G-1.1

III-2H-1.1

III-2I-1.1
III-3A-1

III-2J-1.1
III-3A-1.1

III-2K-1.1
III-3A-1.2

III-2L-1.1
III-4A

III-4B

III-4C
III-4D
DESCRIPTION
ACTIVITY QTYDURATION
EARTH/SITE WORKS 0 0 0 24 24 24 1 25
II-A Construction Verification Survey II-A II-A-1 II-A-2
II-A-1 Site Clearing & lay-out 1 24
II-A-2 Excavation 146.062 1
II-A-3 Earthfill 146.062 3
II-A-4 Spreading and Leveling 1238.39 49
II-A-5 Gravel Bedding 106.91 5
II-A-6 Soil Treatment 1175 19
II-B REBAR INSTALLATION 1175
II-B-1 Mat 153376 53
II-B-2 Column
II-B-2.1 GF - 2F 16203.5 6
II-B-2.2 2F - 3F 15384.5 6
II-B-2.3 3F - 4F 10674.5 4
II-B-2.4 4F - 5F 6558.36 3
II-B-2.5 5F - 6F 6414.45 3
II-B-2.6 6F - 7F 6559.35 3
II-B-2.7 7F - 8F 6539.51 3
II-B-2.8 8F - 9F 6539.51 3
II-B-2.9 9F - RD 6539.51 3
II-B-3 Beams
II-B-3.1 2F 11465 4
II-B-3.2 3F 7344.63 3
II-B-3.3 4F 8906.05 4
II-B-3.4 5F 7663.25 3
II-B-3.5 6F 7528.22 3
II-B-3.6 7F 7373.9 3
II-B-3.7 8F 6713.09 3
II-B-3.8 9F 6524.04 3
II-B-3.9 RD 2150.04 1
II-B-4 Slab
II-B-4.1 2F 789.897 1
II-B-4.2 3F 663.072 1
II-B-4.3 4F 314.437 1
II-B-4.4 5F 302.6 1
II-B-4.5 6F 302.6 1
II-B-4.6 7F 302.6 1
II-B-4.7 8F 302.6 1
II-B-4.8 9F 302.6 1
II-B-4.9 RD 302.6 1
II-B-5 Stairs
II-B-5.1 GF - 2F
II-B-5.2 2F - 3F
II-B-5.3 3F - 4F
II-B-5.4 4F - 5F
II-B-5.5 5F - 6F
II-B-5.6 6F - 7F
II-B-5.7 7F - 8F
II-B-5.8 8F - 9F
II-B-5.9 9F - RD
II-C Formworks
II-C-1 Mat 195
II-C-2 Column
II-C-2.1 GF - 2F 585 8
II-C-2.2 2F - 3F 585 8
II-C-2.3 3F - 4F 453 6
II-C-2.4 4F - 5F 252.7 4
II-C-2.5 5F - 6F 253.4 4
II-C-2.6 6F - 7F 253.4 4
II-C-2.7 7F - 8F 239.4 4
II-C-2.8 8F - 9F 239.4 4
II-C-2.9 9F - RD 239.4 4
II-C-3 Beams
II-C-3.1 2F 691.35 10
II-C-3.2 3F 920.55 13
II-C-3.3 4F 683.85 10
II-C-3.4 5F 512.56 7
II-C-3.5 6F 512.56 7
II-C-3.6 7F 512.56 7
II-C-3.7 8F 490.56 7
II-C-3.8 9F 490.56 7
II-C-3.9 RD 490.56 7
II-C-4 Slab
II-C-4.1 2F 438.91 6
II-C-4.2 3F 247.085 4
II-C-4.3 4F 271.717 4
II-C-4.4 5F 225.85 3
II-C-4.5 6F 225.85 3
II-C-4.6 7F 225.85 3
II-C-4.7 8F 225.85 3
II-C-4.8 9F 225.85 3
II-C-4.9 RD 220.972 3
II-C5 Stairs
II-C-5.1 GF - 2F
II-C-5.2 2F - 3F
II-C-5.3 3F - 4F
II-C-5.4 4F - 5F
II-C-5.5 5F - 6F
II-C-5.6 6F - 7F
II-C-5.7 7F - 8F
II-C-5.8 8F - 9F
II-C-5.9 9F - RD
II-D Cast in Place Conccrete
II-D-1 Mat
II-D-2 Column
II-D-2.1 GF - 2F 94.6125 1
II-D-2.2 2F - 3F 94.6125 1
II-D-2.3 3F - 4F 74.8125 1
II-D-2.4 4F - 5F 32.6463 1
II-D-2.5 5F - 6F 32.83 1
II-D-2.6 6F - 7F 32.83 1
II-D-2.7 7F - 8F 29.4875 1
II-D-2.8 8F - 9F 29.4875 1
II-D-2.9 9F - RD 29.4875 1
II-D-3 Beams
II-D-3.1 2F 119.273 2
II-D-3.2 3F 177.515 2
II-D-3.3 4F 130.995 2
II-D-3.4 5F 88.7875 1
II-D-3.5 6F 88.7875 1
II-D-3.6 7F 88.7875 1
II-D-3.7 8F 68.004 1
II-D-3.8 9F 68.004 1
II-D-3.9 RD 68.004 1
II-D-4 Slab
II-D-4.1 2F 42.004 1
II-D-4.2 3F 42.7625 1
II-D-4.3 4F 23.3665 1
II-D-4.4 5F 19.6425 1
II-D-4.5 6F 19.6425 1
II-D-4.6 7F 19.6425 1
II-D-4.7 8F 19.6425 1
II-D-4.8 9F 19.6425 1
II-D-4.9 RD 17.227 1
II-D-5 Stairs 0
II-D-5.1 GF - 2F
II-D-5.2 2F - 3F
II-D-5.3 3F - 4F
II-D-5.4 4F - 5F
II-D-5.5 5F - 6F
II-D-5.6 6F - 7F
II-D-5.7 7F - 8F
II-D-5.8 8F - 9F
II-D-5.9 9F - RD
II-E MASONRY WORKS
II-E-1 4" CHB (incl. Reinforcement, cement and sand)
II-E-1.1 GF - 2F 180 1
II-E-1.2 2F - 3F 1031.5 5
II-E-1.3 3F - 4F 552.55 3
II-E-1.4 4F - 5F 336.14 2
II-E-1.5 5F - 6F 336.14 2
II-E-1.6 6F - 7F 336.14 2
II-E-1.7 7F - 8F 336.14 2
II-E-1.8 8F - 9F 336.14 2
II-E-1.9 9F - RD 336.14 2
II-E-2 6" CHB (incl. Reinforcement, cement and sand)
II-E-2.1 GF - 2F 1218.1 5
II-E-2.2 2F - 3F 1477.5 6
II-E-2.3 3F - 4F 974.05 4
II-E-2.4 4F - 5F 669.9 3
II-E-2.5 5F - 6F 669.9 3
II-E-2.6 6F - 7F 669.9 3
II-E-2.7 7F - 8F 669.9 3
II-E-2.8 8F - 9F 669.9 3
II-E-2.9 9F - RD 669.9 3
III
III-1
QTYDURATION
III-1A Floor Finishing
III-1A-1 FF1 - 0.60x 0.60 m Granite 0.36
III-1A-1.1 Ground Floor 459.87 2
III-1A-1.2 Second Floor 341.70 2
III-1A-2 FF2 - Vinyl Tiles Polish Finish
III-1A-2.1 Ground Floor 47.95 1
III-1A-2.2 Second Floor 48.30 1
III-1A-2.3 Third Floor 48.30 1
III-1A-2.4 Fourth Floor-Ninth Floor 45.57 1
III-1A-3 FF3 - 0.60x 0.60 m Ceramic 0.16 1
III-1A-3.1 Second Floor 54.95 1
III-1A-3.2 Third Floor 188.77 1
III-1A-4 FF4 - Unglazed Tiles Polish Finish
III-1A-4.1 Second Floor 32.43 1
III-1A-4.2 Third Floor 32.43 1
III-1A-4.3 Fourth Floor-Ninth Floor 7.35 1
III-1A-5 FF5 - Wood Deck Tiles Polish Finish
III-1A-5.1 Roofdeck 456.29 2
III-1A-6 FF6 - Pebble Wash Finish
III-1A-6.1 Third Floor 201.60 1
III-1A-6.2 Fourth Floor 85.86 1
III-1A-7 FF7 - Carpet Tiles 0.25 1
III-1A-7.1 Second Floor 305.20 2
III-1A-7.2 Third Floor 510.12 2
III-1A-7.3 Fourth Floor-Ninth Floor 348.33 2
III-1A-8 FF8 - Smooth Cement Finish
III-1A-5.1
III-1A-5.1
III-1A-8.1 Ground Floor 0
III-1A-8.2 Second Floor 235.47 1
III-1A-8.3 Third Floor 36.14 1
III-1A-6.1
III-1A-8.4 Fourth Floor-Ninth Floor 8.72 1
III-1A-8.5 Roofdeck 11.45 1
III-1A-9 FF9 - Terrazo Tiles Finish
III-1A-9.1 Fourth Floor-Ninth Floor 2.25 1
III-1B Ceiling Finishing 2.97
III-1B-1 CF-01 - 12 mm thk. Ordinary Gypsum Board in
III-1B-1.1 Ground Floor 507.82 3
III-1B-1.2 Second Floor 968.58 5
III-1B-1.3 Third Floor 478.68 3
III-1B-1.4 Fourth Floor to Ninth Floor 390.26 2
III-1B-2 CF-02 - 12 mm thk. Moisture Resistant Gypsum Board in Plain Paint Finish
III-1B-2.1 Second Floor to Third Floor 32.43 1
III-1C Wall Finishing
III-1C-1 WF-01 - Smooth Cement Plaster
III-1C-1.1 Ground Floor 136.18 1
III-1C-1.2 Second Floor 1,738.75 10
III-1C-1.3 Third Floor 748.14 4
III-1C-1.4 Fourth Floor to Ninth Floor 3,723.90 20
III-1C-2 WF-02 - 0.30 x 0.30 m Glazed Ceramic Tiles
III-1C-2.1 Second Floor to Third Floor 130.12 1
III-1C-2.2 Fourth Floor to Third Floor 278.59 1
WF-03 - Clear Tempered
III-1C-3 Glass Wall
III-1C-3.1 Ground Floor 204.74 1
III-1C-3.2 Third Floor 84.55 1
III-2 Door & windows
III-2A DT1 - Single Swing Type Steel Door
III-2A-1.1 Steel Door 1.00
III-2A-1.2 Steel door w/ Viewing glass 9.00
III-2A-1.3 Steel door w/ Viewing glass 72.00
III-2A-1.4 Steel Door 2.00
III-2A-1.5 Steel door w/ Viewing glass 2.00
III-2B DT2 - Double Swing Type Steel Door
III-2B-1.1 Narra 3.00
III-2B-1.2 Steel Door w/ Viewing Glass 1.00
III-2B-1.3 Steel Door w/ Viewing Glas 1.00
III-2C DT3 - Single Swing Type Metal Door
III-2C-1.1 Steel Door 12.00
III-2C-1.2 Steel Door w/ Bottom Louve 1.00
III-2C-1.3 Fully Louvered Steel Door ( 1.00
III-2C-1.4 Fully Louvered Steel Door ( 4.00
III-2C-1.5 Fully Louvered Steel Door ( 72.00
III-2D DT4 - Double Swing Type Metal Door
III-2D-1.1 Steel Door 4.00
III-2D-1.2 Steel Door w/ Bottom Louve 2.00
III-2E DT5 - Sliding Type Glass Door
III-2E-1.1 Fully Louvered Steel Door 36.00
III-2F WT1 - Swing Window w/ Fixed Glass
III-2F-1.1
III-2F-1.1 Aluminum Framed Casement 3.00
III-2G WT2 - Fixed Glass Window
III-2G-1.1 Aluminum Framed Fixed Gla 9.00
III-2G-1.1
III-2H WT3 - Sliding w/ Fixed Glass Window
III-2H-1.1 Aluminum Framed Sliding 5.00
III-2I WT4 - Awning Window
III-2H-1.1
III-2I-1.1 Aluminum Framed 16.00
III-2J WT5 - Casement Window w/ Fixed Glass
III-2J-1.1 Aluminum Framed 3.00
III-2I-1.1
III-2K WT6 - Louvered Window
III-2K-1.1 Steel Framed 42.00
III-2L WT7 - Casement Window w/ Fixed Glass
III-2J-1.1
III-2L-1.1 Aluminum Framed 6.00
III-3 Painting Works
III-3A Latex White Paint
III-2K-1.1
III-3A-1 Interior walls 3,780.89 66
III-3A-1.1 Ceiling 1,175.00 21
III-3A-1.2 Exterior walls 7,689.05 134
III-2L-1.1
III-4 Misscellaneous
III-4A Lamited Glass 145.80
III-4B Perforated Aluminum Wall P 44.70
III-4C PVC Wall Panels 411.91
III-4D Stainless Steels 150.65
III-5 Waterproofing
III-5A Comfort Room 108.96 1
III-5B Exterior Walls
III-5B-1.1 GF - 2F 1,218.10 5
III-5B-1.2 2F - 3F 1,477.50 6
III-5B-1.3 3F - 4F 974.05 4
III-5B-1.4 4F - 5F 669.90 3
III-5B-1.5 5F - 6F 669.90 3
III-5B-1.6 6F - 7F 669.90 3
III-5B-1.7 7F - 8F 669.90 3
III-5B-1.8 8F - 9F 669.90 3
III-5B-1.9 9F - RD 669.90 3
III-5C-1.1 Roofdeck 1,175.00 5
804
79 53### ### 0 II-A-3
25 49 74 74 5 79 II-B-1 II-C-1 II-D-1
II-A-4 II-A-5

79 6 85
II-B-2.1 II-C-2.1
II-A-6 II-B-3.1 II-C-3.1 II-D-3.1
II-B-2.2 II-C-2.2

II-B-4.1 II-C-4.1
II-D-4.1 II-C-5.1 II-B-4.1
II-C-2.2 II-D-2.2 II-B-3.2 II-C-3.2 II-D-3.2 II-B-2.3 II-C-2.3

II-B-4.1 II-D-5.1 II-B-4.2 II-C-4.2 II-D-4.2 II-C-5.2 II-B-5.2


II-C-2.3 II-D-2.3 II-B-3.3 II-C-3.3 II-D-3.3 II-B-2.4

II-B-5.2 II-D-5.2 II-B-4.3 II-C-4.3 II-D-4.3 II-C-5.3


II-C-2.4 II-D-2.4 II-B-3.4 II-C-3.4 II-D-3.4 II-B-2.5

II-B-5.3 II-D-5.3 II-B-4.4 II-C-4.4 II-D-4.4 II-C-5.4


II-B-2.5 II-C-2.5 II-D-2.5 II-B-3.5 II-C-3.5 II-D-3.5

II-C-5.4 II-B-5.4 II-D-5.4 II-B-4.5 II-C-4.5 II-D-4.5


II-B-2.6 II-C-2.6 II-D-2.6 II-B-3.6 II-C-3.6 II-D-3.6 II-B-2.7

II-C-5.5 II-B-5.5 II-D-5.5 II-B-4.6 II-C-4.6 II-D-4.6 II-C-5.6


II-B-2.7 II-C-2.7 II-D-2.7 II-B-3.7 II-C-3.7 II-D-3.7 II-B-2.8

II-C-5.6 II-B-5.6 II-D-5.6 II-B-4.7 II-C-4.7 II-D-4.7 II-C-5.7


II-B-2.8 II-C-2.8 II-D-2.8 II-B-3.8 II-C-3.8 II-D-3.8 II-B-2.9

II-C-5.7 II-B-5.7 II-D-5.7 II-B-4.8 II-C-4.8 II-D-4.8 II-C-5.8

II-E-1.1 II-E-1.2 II-E-1.3 II-E-1.4

II-E-2.1 II-E-2.2 II-E-2.3 II-E-2.4


II-C-2.9 II-D-2.9 II-B-3.9 II-C-3.9 II-D-3.9

II-C-5.9 II-B-5.9

II-B-5.8 II-D-5.8 II-B-4.9 II-C-4.9 II-D-4.9

II-E-1.5 II-E-1.6 II-E-1.7 II-E-1.8 II-E-1.9

II-E-2.5 II-E-2.6 II-E-2.7 II-E-2.8 II-E-2.9


III-1A-1.1 III-1A-3.1 III-1A-4.1
III-1A-2.1

II-D-5.9

III-1A-1.2 III-1A-3.2
III-1A-2.2

III-1A-8.1 III-1A-2.3 III-1A-4.2 III-1A-4.3

III-1A-2.4 III-1A-6.2

III-1A-7.1 III-1A-7.2

III-1A-8.2 III-1A-8.3
III-1A-4.1
Productivity Rate
PHILIPPINE PRODUCTIVITY RATIOS

DESCRIPTION MANHOUR/UNIT UNIT


1.STRUCTURAL EXCAVATION
Common excavation
Hand 6 MH/M3
Machine 0.5 MH/M3
Rock excavation 8 MH/M3
Hauling of spoils 1 MH/M3
2.STRUCTURAL BACKFILL
By hand 5 MH/M3
By machine 2 MH/M3
3.TRENCHING
By hand 6 MH/M3
By machine 0.5 MH/M3
EXCAVATION- MANUAL
Common earth 8 MH/M3
Loam of sand 1.31 MH/M3
Clay or heavy soil 1.64 MH/M3
Rock 2.63 MH/M3
EXCAVATION- MECHANICAL
Common earth 6.67 MH/M3
Rock with jack hammer 16.67 MH/M3
BACKFILLING
Common manual 0.82 MH/M3
Gravel fill manual 5 MH/M3

TRENCHING & BACFILLING OF UNDERGROUND PIPING USING


EXCAVATION MATLS MANUAL FROM:

0 – 2m Depth 1.25 MH/LM


2 – 3m Depth 1.67 MH/LM
3 – 4m Depth 2.5 MH/LM
4 – 5m Depth 3.33 MH/LM
Placing binder gravel 0.11 MH/M3
Escombro backfilling 0.21 MH/M3
Spreading,tamping & grading 0.48 MH/M2

Mechanical compaction, plate compaction 0.06 MH/M3

MANUAL CLEARING & GRUBBING

Clearing under growth & trees – 12″ 0.05 MH/M2


Clearing under growth & shrubs 0.03 MH/M2
Disposal of soil 1.69 MH/M3
Hauling of soil 1 MH/M3
Gravel fill 2.07 MH/M3
EXCAVATION – CRANE & CLAMPSHELL

With 8 men & 2 carpenters 1.07 MH/M3


5.ROOFING AND SIDING
Roofing
Metallic 0.97 MH/m2
Non-Metallic 1.51 MH/m2
Siding
Metallic 1.29 MH/m2
Non-Metallic 1.51 MH/m2
CONCRETE WORKS
4.CONCRETE WORKS
Grade members
Formworks 2.54 MH/M2
Concreting 8.54 MH/M3
Rebar 0.07 MH/kg
Finishing 0.4 MH/M2
Suspended members
Formworks 3.28 MH/M2
Concreting 16.7 MH/M3
Rebar 0.08 MH/kg
Finishing 0.8 MH/M2
Embeded metal 0.27 MH/kg
Water proofing 1.82 MH/M2
Joint filler 0.3 MH/lLm
PLACING CONCRETE
Slab on Fill 5 MH/M3
Slip Form 25 MH/M3
Floor Finish Unhardened 1 MH/M3
Concrete finished hardened 1.43 MH/M3
REBAR WORKS
Ground floor installation 0.07 MH/M3
Upper floor installation 0.08 MH/M3
Fabrication 0.1 MH/M3
Mixing manual 16 MH/M3
Mixing machine 1.8 MH/M3
MORE THAN 1.8 M3 POUR
Chute from truck 7 MH/M3
Crane & bucket 14 MH/M3
Wheeling 27 MH/M3
Finishing 2.8 MH/M3

FORMWORKS & CARPENTRY WORKS

FORM WORKS INSTALLATION


Wall on ground 2 MH/M2
Wall above ground 2.35 MH/M2
Beams 3.08 MH/M2
Columns 2.35 MH/M2
Suspended slab
Suspended slab 0 – 18″ 1.67 MH/M2
Suspended slab 10 – 36″ up 3.33 MH/M2
Elevated & shored slab forming
Forming only 8.6 MH/M2
Forming & Shoring 11 MH/M2
Wood wall & Partition 0.5 MH/M2
FORM WORKS FABRICATION
Form works fabrication 1 MH/M2
STRIPPING OF FORMS
Wall on ground 0.25 MH/M2
Wall above 10″ 1.29 MH/M2
Beams 1.03 MH/M2
Columns 0.85 MH/M2
Suspended slab
Suspended slab 0 – 18″ 0.83 MH/M2
Suspended slab 10 – 36″ up 1.08 MH/M2
Elevated & shored slab forming – strip of
3.5 MH/M2
forms
Floor slab at grade – strip of forms 2.8 MH/M2

INSTALLATION OF CARPENTRY WORKS

Plywood partition 1 MH/PC


T & G Flooring and Siding 0.14 MH/B.F. 1.506997
Ceiling & frame work 0.36 MH/B.F. 3.875135 0.152525 1.830304
Siding frame work 0.27 MH/B.F. 2.906351
Flooring framing 0.97 MH/B.F. 10.44133
Wooden post errection 0.43 MH/B.F.
Truss Fabrication 0.35 MH/B.F.
Truss Installation 0.8 MH/B.F.
Girt Installation 0.21 MH/B.F.
Plates Installation 0.13 MH/B.F.
Purlins Installation 0.27 MH/B.F.
Fascia board Installation 0.46 MH/B.F.
1/4″ or 3/4″ thk. plywood
Cutting by manual 1 MH/PC
Assembly 0.42 MH/M2

ARCHITECTURAL SPECIALTIES

DOORS
Wooden 2.37 MH/M2
Steel 7.64 MH/M2
Aluminum 8.07 MH/M2
Cyclone wire 7.64 MH/M2
WINDOWS
Glass 3.23 MH/M2
Louver 4.63 MH/M2
Steel 32.29 MH/M2
PARTITIONS
single wall 2.48 MH/M2
Wooden wall 3.44 MH/M2
Wooden Louver 3.44 MH/M2
cyclone Louver 5.38 MH/M2
PAINTING ( 3 coats )
Equipment 0.24 MH/f2
Pipes 0.3 MH/f2
Miscillaneous 0.24 MH/f2
STRUCTURAL STEEL WORKS
7. STRUCTURAL STEEL
Fabrication
Light 110-130 MH/MT
Heavy 60-90 MH/MT
Errection
Light 70-100 MH/MT
Heavy 40-60 MH/MT
WELDING ( one pass only )
1- Welder and 1- Helper ( 16 total mh ) 40-50 Lf/day
G.1 STRUCTURAL STEEL
Fabrication
Heavy weight 50-90 MH/MT
Light weight 100-125 MH/MT
Grating 1 1/4″ x 3/16″ 3.0 – 3.5 MH/SF
Star threat grating 4.0 – 5.0 MH/SF
Errection
Heavy Structural teel 30 – 60 MH/MT
Light Structural steel 60- 90 MH/MT
Stacks ( Inc. full welding ) 250 – 300 MH/MT
Tanks ( Inc. full welding ) 200 – 275 MH/MT

FINISHING AND MASONRY WORKS

H. CHB
4” CHB 16
Laying 8.0 – 10 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
6” CHB
Laying 7.0 – 9.0 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
8” CHB
Laying 6.0 – 8.0 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
Construction Labor Rates
Description Unit Rate
Foreman hourly 87.36
Electrician hourly 74.72
Plumber hourly 74.72
Leadman hourly 74.72
Heavy Equipment Operator hourly 69.72
Highly Skilled Worker hourly 69.72
Light Equipment Operator hourly 65.81
Driver hourly 58.63
Skilled Worker hourly 58.63
Semi-skilled Worker hourly 50.46
Unskilled Worker hourly 42.33
bd 25 L 5.5
a OFFSET TOP lap splice OFFSET bot
300 1.375 1000 1.1