HANDOVER & SNAGGING REPORT

TOTAL NUMBER OF ITEMS 128


NUMBER OF ITEMS COMPLETED 128 PLAN OF ACTION
NUMBER OF ITEMS OUTSTANDING 0

SL NO UPDATED DATE : 28.01.23 SNAG & COMMENT ACTION BY STARTING DATE COMPLETION DATE PRIORITY

Bainemarie

1 fixing of ss steel rods on the serving counter MEHUL 25.01.23 27.01.23

2 finishing of ss rod with quartz silicon Merul/Meeraj 25.01.23 27.01.23

3 Commissioning of plumbing line Kailash 19.01.23 21.01.23

4 fixing of electrical industrial socket for bainmarie ghosh 21.01.23 23.01.23

5 grouting of tiles skirting behind baine marie - outer area GOVIND 21.01.23 25.01.23

Aldecor interiors Pvt Ltd..,


6 fixing of handle for the counter manish 16.01.23 20.01.23

7 removing tiles - damaged GOVIND 21.01.23 25.01.23

8 fixing of water drain with silicon Merul/Meeraj 25.01.23 27.01.23

9 Finishing of SS frame - touch up yellow frame GOLDEN YELLOW 0313 SATIN ENEMAL ajay 28.01.23 30.01.23

10 Painting touchup - grey for raceway and sprinkler system ajay 20.01.23 28.01.23

11 touchup of gaps between fluted panel near water dispenser niche ajay 29.01.23

12 cutting of projected skirting tiles below near water dispenser sonu 24.01.23 24.03.23

13 touch up grey paing in the ceiling ajay 29.01`.23

14 Dining tabel veneer - final polishing . ajay 28.01.23

15 finishing of column edges neately- Cyan ajay


fixing of vertical plat for ceiling raceway opening, below the
16 double door entry ghosh 29.01.23
Aldecor interiors Pvt Ltd..,
17 Cleaning of skirting - paint stains 27.01.23

18 cleaing of floor trap 25.01.23

19 fixing of water dispenser - 2 nos 25.01.23 27.01.23

20 placdment of bainmeri 24.01.23 24.01.23

Executive lounge
21 Texture paint 13.01.23 20.01.23

22 fixing of acoustic false ceiling 25.01.23

23 Commissioning of AC 25.01.23
24 touchup of swith plates on the green wall 25.01.23

25 Cleaning of skirting - paint stains 24.01.23


26 wall panelling MDF rectification 29.01.23
27 Finishing of skirting line with POP 25.01.23

28 finishing of electrical dummy plate at the ceiling 25.01.23

29 removal of tag on the acoustic panelling 27.01.23 27.01.23

30 painting of electrical hose pipe 25.01.23

17 cleaning of frame for acoustic panelling 25.01.23


18 grouting for skirting tiles on the texture wall 25.01.23

19 clean finishing of ply around the column 23.01.23


20 fixing of floor spring at the back entry glass door 29.01.23

DINING - PROJECTOR AREA

21 neat finishing of cyan rafters 18.01.23

22 cleaning of pelmet for projector. 28.01.23


23 cleaning of raceway - white patches at the AC box 21.01.23
24 removal of masking tape at the hanging light frame 24.01.23
25 grouting of skirting tiles. 25.01.23
26 Cleaning of skirting - paint stains, column 28.01.23
27 leveling of conduit and bulg below the projector 28.01.23
alignment of raceway to the column line- external glazing facing
28 the office area
29 additional
Aldecor interiors Pvt Ltd..,
EXTERNAL GLAZING - LIGHT
45 Cleaning of ac box - white patch 25.01.23
46 fixing of ply for external glazing
47 alignment of raceway rods and trays 01.02.23
48 Cleaning of fire above ceiling fire alaram box 28.01.23
49 fixing of light fixtures 25.01.23
50 cleaning of external glazing bottom frame 28.01.23
51 painting of column towards external surface 28.01.23

52 removal of unwanted support rod at the end of standing table 25.01.23


53 finishing of pelmet from inside 29.01.23 02.02.23
54 refixinf of damaged tiles - 2 grey, 2 dark gray 25.01.23
55 Alignment of light - white 25.01.23
56 cleaning of raceway - white patches 27.01.23
57 cleaning of the fire pipe 27.01.23
58 Cleaning behing the space of external column 28.01.23

HAND WASH AREA - ELECTRICAL ROOM


59 grouting of glazed tiles below mirror 25.01.23
60 grouting of wall tiles left corner next to W/B 25.01.23
61 conceiling of led light wiring. 01.02.23
62 finishing of trap door corner 28.01.23 29.01.23
63 tile grouting in the floor 27.01.23
64 finishing of floor trap 25.01.23
65 cleaning of ceiling light fittings 27.01.23
66 removal of masking tape at the smoke detector 25.01.23
67 finishing of corner alu guard 25.01.23
68 cleaning of granite 25.01.23
69 Cleaning of skirting - paint stains, column 25.01.23
70 25.01.23
71
72 ELECTRICAL ROOM
73 closing of wooden flatform at the corner 27.01.23
74 laying of skirting near the door 25.01.23
75 cleaning of dust on the wires- vaccume cleaning 29.01.23

76 Closing of opening near the raceway tray with ply and painting 25.01.23
77
78
79 PLATE DISPOSING AREA
80 grouting of tiles below the niche 24.01.23
81 cleaning of metal frame base 28.01.23
82 fixing alu l angle around the plate rack 25.01.23
83 cleaning of floor tiles 27.01.23
Aldecor interiors Pvt Ltd..,
84 fixing of glass - broken
85
86

DRY PANTRY
87 Finishing of the tiles - grouting below the counter 25.01.23
88 removal of masking tiles 27.01.23
89 finishing of electrical switch plates 30.01.23
90 finishing of tile grouring at the ceiling junction 25.01.23
91 removal of unwanted switch control on the tile cladding 30.01.23
92 alignment of switch plates 29.01.23

ENTRANCE
93 skirting finishing on both side of glass door 25.01.23

94 cleaning of skirting entrance foyer- and near the sofa seating 24.01.23
95 removal of masking tape tape on the fire alaram 27.01,23
96 finishing of glass aluminium frame 30.01.23 01.02.23
97 punning of wall above the glass 27.01.23
98 alignment of ply panelling inline with the beam 25.01.23

HAND WASH AREA - Kitchen


99 cleaning of glazed tiles 27.01.23
100 finishing of glazing frame 27.01.23
101 closing of dummy opening - electrical 28.01.23
102 floor grouting 25.01.23
103 corner guard - 38mm X 38mm 25.01.23
104 arresting of water seapage in bottle trap 23.01.23
105 front facia fixing 25.01.23
106 MS back cladding 24.01.23
107 unwanted wires to be removed 30.01.23 01.02.23
108 Grounting of glazed tiles - rest room 28,01.23
109 closing of electrical oopening - mirror area 28.01.23
110 finising of door jamb with putty and finishing 28.01.23
111 skirting - pending 25.01.23 25.01.23
112 tile fixing 24.01.23 25.01.23

EMERENCY EXIT BACK DOOR


113 GLAZED PARTITION GAP WORK 25.01.23 25.01.23
114 HAND RAILS BLACK PAINT ENEMAL 25.01.23 27.O1.23
115 ROLLER BLINDS FOR EMERGENCY AREA 01.02.23

Aldecor interiors Pvt Ltd..,


DISH WASH
116 DOOR FIXING 27.01.23
117 DOOR GRAY ENEMAL PAINT 28.01.23
118 CLEANING DADO TILES 25.01.23
119 GROUTING and FINISHING 25.01.23
120 WINDOW CLEANING 28.01.23

TRINING ROOM WORK


121 CARPET LAYING BALANCE 5 TILE 28.01.23
122 TRINING ROOM TABLE INSTALLATION 29.01.23
123 ALUMINIUM SKIERTING WORK 27.01.23
124 ELECTRIC SUPPLY FOR AC 30.01.23
125 AC COMMISIONING 01.02.23
126 FALSE CEILING WORK
WAITING FOR LEGRAND SERVICE
127 LEGRAND JUNCTION BOX ENGINEER 23.02.23
128 YELLOW PAINTING TOUCHUP 21.02.23

BASHA SIR GIVEN SOME POINTS


THURSDAY WII BE INSTALLING DUE
1 M LOGO IN CANTEEN TO MATERIAL SUPPLY 23.02.23

2 FOLDABLE TABLES
3 LEVELING OF THE TABLES WILL BE RECTIFING TODAY 21.02.23
4 HIGH BAR CHAIRS
5 LIGHT COVER CHANGING ONE WIPRO LIGHT WAITING FOR THE MATERIAL
6 POLISHING CORIEN SHEET UNDER WASH BASIN 19.02.23 19.02.23
7 POLISHING ONE TABLE IN VIP AREA PU FINISHING SATURDAY WILL BE RECTIFING

Aldecor interiors Pvt Ltd..,


PROJECT HEAD REPRESENTATIVE CLIENT SIGNATURE

Aldecor interiors Pvt Ltd..,


REMARKS

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

Aldecor interiors Pvt Ltd..,


COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED
Aldecor interiors Pvt Ltd..,
COMPLETED

COMPLETED

C0MPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED
COMPLETED

COMPLETED
COMPLETED

COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED

Aldecor interiors Pvt Ltd..,


COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED

COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
Aldecor interiors Pvt Ltd..,
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED

Aldecor interiors Pvt Ltd..,


COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

WIP
WIP

PENDING

PENDING
WIP
PENDING
PENDING
COMPLETED
PENDING

Aldecor interiors Pvt Ltd..,