Application For Approval - Promotion Mr. Tran Thi Thu Ngan - Specialist

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Proposed by:

Application for approval (Notice of approval)


Application #: Date Dept.: CDMR Name
Approver: Deliberation: Request for approval by:
BOM CEO CP RM ACTG
a LGL
CAO COO FNC HR Dept.: CDMR Name
SGM Dept. MFG SOCG Coordinator:
Process #: II-D-1-IV CDMR
(Chapter- clause-section-paragraph-sub paragraph) Dept.: CDMR Name
Contents of
proposal Salary increasing Ms Tran Thi Thu Ngan - Specialist
Decision Signature of approver Conditions for execution / reasons of rejection
Approved
Conditionally
approver
Rejected
Notify to: CP RM ACTG FNC LGL HR SOCG
Explanation on the detailed contents of proposal
We would like to get your approval for the below:

I. Background:
- Ms. Tran Thi Thu Ngan – 105070
- Joining date: 20/06/2018
- Current position: Specialist – Technical service
- Department: Technical Service and Maintenance

II. Proposal:
We would like to increase 20 % from current salary.

III. Reason:
Have graduated university about Paper field, and she work SGP from 2018 to now.
Currently, she is in charge R&D for converting and IP including chemical trial, spare part trial, quality
improvement and saving cost. Besides purchasing spare part for usual placement, support R&D spare part
of maintenance and application for environment.
She is smart, works efficiently and accurately, has good analytical ability and can take on complex multi-
tasks, working as an assistant for reviewing the purchasing application.

Successful R&D in 2022 and 2023 as follow:


TOTAL TRIAL RESULT IN 2022-2023
FY Result Case Est annual saving (VND)
NPD 1
2022 Other 1
Total 2022 2
Cost saving 1 4,742,515,554 COST SAVING
Improve quality 1 FY Material Machine Est annual saving (VND)
2023 NPD 1 2023 Nalco retention aid PM4 4,742,515,554
Other 1 Total 2023 4,742,515,554
Total 2023 4
Successfully submitted above 30 Apps/2years with total amount above 13 billion VND/2years (20% of the
section's total purchasing amount) including trial case and usual replacement case.

Spare Usual replacement Trial Total


part
Case Amount (VND) Case Amount (VND) Case Amount (VND)
3 1,51 5,419
2022
4 ,900,989,500 7 8,650,300 11 ,639,800
6 1,37 7,640
2023
15 ,264,477,075 4 6,304,900 19 ,781,975
10,1 2,894, 13,060,4
Total 19 65,466,575 11 955,200 30 21,775

Spare All line IP Tissue Converting Total


part Amount
Case Amount (VND) Case Amount (VND) Case Amount (VND) Case (VND) Case Amount (VND)

2022 2,98 1,89 5,419,


1 541,900,800 5 2,246,600 - - 5 5,492,400 11 639,800
1 3,51 617 2,34 7,640,
2023
3 ,159,482,200 9 4,706,775 3 ,957,500 4 8,635,500 19 781,975
1,7 6,496, 617,9 4,244, 13,060
Total 4 01,383,000 14 953,375 3 57,500 9 127,900 30 ,421,775

Spare part Chemical Total


Trial
Case Amount (VND) Case Amount (VND) Case Amount (VND)

2022 97 1,518
1 541,900,800 6 6,749,500 7 ,650,300

2023 78 1,376
2 589,221,700 2 7,083,200 4 ,304,900
1,1 1,763, 2,894,9
Total 3 31,122,500 8 832,700 11 55,200

Currently, he is PIC for 22 upcoming trial and ongoing trial program.


Line/
Machi Type Detail Supplier Objective Start date Finish date Note
ne
PM4 Chemical Retention OG To reduce chemical cost Nov 13, 2023 Nov 17, 2023 Done, draft report
To reduce chemical cost
PM4 Chemical DSA Arakawa Nov 28, 2023 Dec 01, 2023 Done, draft report
and steam
To look for a
PM1 Chemical Long trial dyes Archroma replacement for current NA NA Upcoming trial
two suppliers

IV. Effective date: Jan-2024

Kindly consider and approve for this proposal.


Thanks & Best regards.

You might also like