PT, NUSA CIPTA SARANA
INSPECTION PRE ALIGNMENT REPORT
Project RELOCATION DLAIPHOEPER 1
ProjctCade =: PHONES
Pane
Drawing No.
Equipe Name
te Name
PartNo.
‘SKETCH ALIGNMENT
pura Pay
muta
a
Te
Lion =
EASON OF | MERSORE OP
THTigNO| MEANORE SF [MEASURE OF | pesur
1 0,01 0.05 {Acc
2 : :
3 [aor | ns ee
x pba :
Tea
Rey ie Tory = Temovetey Dae
aq See
Ves
DANIEL PAA]
+s
aay Cr
PT MUSA CIPTA SARANA
PTINDEXIM COALINDO
PEINDEXIM COALINDO.PT. NUSA CIPTA SARANA
INSPECTION PRE ALIGNMENT REPORT
Proet RELOCATION DUMP HORPER 18,
‘Ghent -PEINDENIM COALINDO
Projet Code miosis
Pune
Drawing Na.
Equipt. Name
tom Name
PartNo
DOCUMENTATION FOR ALIGNMENT.
PHOTOGRAPH
(DESCRIPTION
alignment process under inspection of cient
ligament process under inspection of client
Tae
[Prepured by Date approved [Dae approved by Paw
sien sien sien
| fg
Sune.
“ps
DaNEt DAAS
‘Quality Contor
PL MUSA CIPTA SARANA
PTLINDEXIM COALINDO
PLINDEXIM COALINDO.AEF |
PT, NUSA GIPTA SARANA
INSPECTION PRE ALIGNMENT REPORT
Project RELOCATION DUA HOPPER 18
Ghent PINDENMCOALINDO
Project Coe P1033
Pune Aa
Drawing No
Equipt. Name
em Name
PartNo
KCEM-ONGTC-001-0 SHEET OF 1
SKETCH ALIGNMENT
Pulley Pulleys
Sa"
ks
Te
ALIONMENT nn
MEASURE OF | MEASURE OF
fix no] MEASUREOF [MEASURE OF | pasuct
i ou a KOC
2
3 we or ACC
z : 5 =
ia
IRepred as Tappovad Dae Tipper Dae
sien sen sen
Vhad 7
Zn Danel CAA
VU" Quality Control
DL MUSA CPA SARANA PLINDEXIM COALINDO PLINDEXIM COALINDOPT. NUSA CIPTA SARANA
INSPECTION PRE ALIGNMENT REPORT
Projet RHLOCATON DP HOPPER Drawing No. KeFACOTC-O01.0 SHEET OF
Ghent PEINDENIMCOALINDD Equipe Name ‘DRUAC PULLEY TALL FRAME
Projet Code moss em Name rev
PAN : art No
DOCUMENTATION FOR ALIGNMENT.
alignment process under inspection of cient
slignment process under inspection of client
pee a Poi De emoeTey Da
Ys
ve
ne Sans 2
‘Qualiy Conwor
PT MUSA CIPTA SARANA PL INDEXIM COALINDO PT. INDEXIM COALINDO.