Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FOUNDATION NOTES:

1
2"Ø
x 10" ANCHOR BOLTS w/ 7"
Control, Grades, and Elevation:
MINIMUM EMBED at 48" o.c. BRICK LEDGE
1. Finished grades shall direct surface water away from
the foundation for a minimum distance of 4'-0". #4 REBAR @ 14'-6"

112"
16" o.c.b.w. (TYP.) 512"
2. Any imported fill material utilized to achieve finish

B
sub-grade elevations shall be select fill having a

2" 4"
plasticity index of at least 4 but not greater than 12
with no more than 40% passing the no. 200 sieve.
3. All imported fill shall be placed in 8" maximum loose CUSHION SAND
lifts and compacted to within 98% of standard proctor OVER SELECT FILL

24"

3" CLR.
density at 2 points above optimum moisture content. #3 STIRRUP
6 MIL. POLY
All soil work must be supervised by a licensed @ 24" o.c.
VAPOR BARRIER (TYP.)
Geotechnical Engineer. (2) #5 TOP
& BOTTOM
Concrete Flatwork and Walks:
4. Expansion Joints: locate where shown in the details or 12"
plan denoted by a bold line. Pier
5. Control Joints: locate as required.
D
6. Finished Slab Elevation: Top of finished slab shall be a
minimum of 3" above surrounding grade. 1 SECTION B: Per. Beam and Pier D
SCALE: 1" = 1'-0"
B

9'-1"
7. Vapor Barrier: 10mil poly vapor barrier over cushion
sand.

8. Cushion Sand: Cushion sand layer beneath concrete


flatwork and walks to be 4 inches in depth.
D
9. Concrete strength to be 4,000 psi at 28 days. Steel
rebar strength to be 60,000 psi.
D
#4 REBAR @ FINISHED SLAB 12'-6"
10. All concrete work should be performed in compliance 16" o.c.b.w. (TYP.)
with the latest edition of ASTM code.

15"
4"

716
15"

11. All concrete to be pumped from a delivery truck.


316

Handmixing is unacceptable.

CUSHION SAND 6 MIL POLY

21'-2"
OVER SELECT FILL #3 STIRRUP VAPOR BARRIER (TYP.)
24"
3" CLR.

@ 24" o.c.

(2) #5 TOP
& BOTTOM
General Notes:
12. All work procedures should be supervised by a licensed
structural engineer(s) to ensure safety and quality. 12"

13. Contractor to be covered with all required and industry


recommended insurance coverages.

14. Contractor to follow all required ACI, ASCI, ASTM, and 2 SECTION C: Interior Beam
IBC codes. SCALE: 1" = 1'-0"

15. Excavation and Construction work to be performed


during the dry season. #4 REBAR @ FINISHED SLAB

9'-1"
16" o.c.b.w. (TYP.) EL: 100'-0"
16. The foundation design is based on the soil test
(geotechnical subsurface investigation).
4" 4"

8"

B
3-2x6 POST 6 MIL POLY
CUSHION SAND
OVER SELECT FILL VAPOR BARRIER (TYP.)

B
3 SECTION D: Slab
SCALE: 1" = 1'-0"
SIMPSON
STRONG TIE
CONNECTION
0 4'-0" 8'-0" 12'
CB 66 1 FOUNDATION PLAN
1/4" = 1'
Prj. #22115 ISSUE RECORD STAMP: LEGEND: CONTACTS: Date:
DATE: ISSUED FOR: COMMENTS:
Ex. = Existing OWNER/AGENT: APPLICANT: ENGINEER: 12-06-2023
OTC = Original Town Commercial
T.O.P. = Top of Parapet Scale:
BFR = Barrier Free Ramp CONSTRUCTION PLANS FOR 1/4" = 1'-0"
FH = Fire Hydrant 921 Hollywood avenue. texas
R.O.W. = Right of Way Drawn By:
SSMH = Sanitary Sewer Manhole H. S.
FDC = Fire Department Connection
Page:

Drawing File:
Conc. = Concrete
Sq. Ft. = Square Feet
Foundation Plan S1

You might also like