MY-SK410B-LLCPP-ME-DS-0036-00 Rev F0 - Fuel Gas Treatment
MY-SK410B-LLCPP-ME-DS-0036-00 Rev F0 - Fuel Gas Treatment
REVISION HISTORY
Revision
Rev. Revised Paragraphs Reason for Revision
Description
HOLD LIST
DISCLAIMER STATEMENT
The information provided by PTTEP is confidential and shall only be used by the party to
whom it is disclosed to (“the Receiving Party”). The Receiving Party shall not disclose,
publish, reproduce or reveal the information received to any other third party whatsoever
except with the specific prior written authorization of PTTEP. The Receiving Party shall
within five (5) days from notice from PTTEP return or destroy (upon instruction of PTTEP)
all confidential Information furnished by PTTEP.
The Receiving Party shall also take such precautions as are reasonably necessary to
protect the confidential information, including taking measures to prevent loss, theft and
misuse.
The Receiving Party shall fully indemnify and keep PTTEP at all time fully indemnified from
and against any loss or disclosure of confidential information and from all actions,
proceedings, claims, demands, costs, awards and damages arising directly or indirectly as
a result of such unauthorized disclosure.
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 3 of 26 Rev. F0
Item Name: Fuel Gas Treatment Package
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1A-6200
1 APPLICABLE TO PROPOSAL PURCHASE AS-BUILT VENDOR *
2 OWNER PTTEP PLATFORM CPP LANG LEBAH QTY 1 x 100%
3 SECTION A : PACKAGE DESIGN DATA
4 PACKAGE DESIGN CAPACITY Note 3 P&ID NO. MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01
TIE-IN MARK NOZZLE SIZE (IN) RATING TYPE OF FLANGE SERVICE DESCRIPTION
28
29
30
31 VENDOR TO FURNISH
32
33
34
35
36
37
3 14) COATING FOR EXTERNAL BOLTS & NUTS: REFER 10008-STD-6-COR-042-R01 (CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND
4 TOPSIDE APPLICATIONS) AND 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
5 15) HAZARDOUS AREA CLASSIFICATION REFER TO HAZARDOUS AREA CLASSIFICATION SCHEDULE DOC. NO: .MY-SK410B-LL-HS-RE-0002-00
6 16) FUEL GAS TREATMENT PACKAGE SHALL BE DESIGNED TO OPERATE CONTINUOUSLY WITHOUT INTERVENTION OR ANY REQUIRED MAINTENANCE FOR AT
7 LEAST 6 MONTHS. VENDOR SHALL ADVISE IF THERE IS ANY ACTIVITY OR INTERVENTION REQUIRED EARLIER THAN 6 MONTHS.
8 17) FUEL GAS TREATMENT PACKAGE SHALL BE DESIGNED TO MINIMIZE NUMBER OF INTERVENTION PERSONNEL REQUIRED FOR OPERATION AND
9 MAINTENANCE TASKS.
10 18) FUEL GAS TREATMENT PACKAGE SHALL BE DESIGNED FOR REMOTE MONITORING SYSTEM. VENDOR SHALL RECOMMEND MONITORED PARAMETERS AND
11 PROPOSE EQUIPMENT HEALTH MONITORING SYSTEM IN THE BID PACKAGE TO ENSURE SAFETY AND INTEGRITY OF EQUIPMENT COMPONENTS WITHIN
12 THE PACKAGE.
13 19) VENDOR TO ADVISE WHETHER COALESCER CAN BE INTEGRAL WITH SCRUBBER.
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 5 of 26 Rev. F0
Item Name: Fuel Gas Scrubber
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1V-6210
1 APPLICABLE TO PROPOSAL PURCHASE AS-BUILT
2 OWNER PTTEP INSIDE DIA. 1750* mm (Note-11) TYPE VERTICAL
3 PLATFORM CPP LANG LEBAH HEIGHT TL/TL 3500* mm (Note-11) QTY 1 x 100%
4 GENERAL DESIGN DATA
5 FLUID HANDLED Gas/ Condensate / Water P&ID REFERENCE MY-SK410B-LLCPP-PR-PNID-0044-01
6 SERVICE CLASSIFICATION Fuel Gas System FLUID DETAILS Gas Condensate Water
13 DESIGN TEMPERATURE (MAX / MIN) 70 / -46(*) °C CORROSIVE COMPONENTS: (Note-11) SAND PARTICLES: No
14 SOUR SERVICE REQUIREMENT YES (LETHAL) (Note-44) HEATING/COOLING MEDIUM: No WAXY LIQUID: No
15 MECHANICAL DESIGN DATA
16 DESIGN CODE ASME SEC VIII Div.1 (Note 3) CORROSION ALLOWANCE (ON CS) Nil (3mm Clad) mm
17 APPLICABLE SPECIFICATION Note 3 SHELL THICKNESS * mm
18 MAX. ALLOW. WORKING PRESSURE * BarG HEAD THICKNESS (Btm / Top) */* mm
19 + LIQUID STATIC HEAD * m WIND VELOCITY (BASIC) 22 (3-Sec Gust)-(Hold-1) m/s
34 MIST ELIMINATOR SS 316L (NACE) EXTERNAL GASKET (Note-4) Spiral Wound SS316L
48 INSPECTION AUTHORITY (Note 35) 3rd Party Inspection HYDROSTATIC TEST Yes Per Code &Spec
49 RADIOGRAPHY Yes Per Code &Spec PMI TEST Yes Per Code &Spec
50 ULTRASONIC Yes Per Code &Spec IMPACT TEST * Per Code &Spec
51 MAGNETIC PARTICLE Yes Per Code &Spec PWHT Yes Per Code &Spec
52 DYE PENETRANT Yes Per Code &Spec SPECIAL HEAT TREATMENT * Per Code &Spec
53 SOAP-AIR LEAK TEST Yes Per Code &Spec MATERIAL CERT. (EN 10204) Yes Note 34
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 6 of 26 Rev. F0
Item Name: Fuel Gas Scrubber
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1V-6210
1 NOZZLE / CONNECTION SCHEDULE (Note-5, 6, 7,36)
2 SIZE SCH. No./ FLANGE PER ASME B16.5
MARKS QTY. SERVICE NAME REMARKS
3 Inch THK. RATING TYPE FACE
4 N1 1 6* * * SR RF Feed Inlet*
5 N2 1 6* * * SR RF Hydrocarbon Gas Outlet*
6 N3 1 2* * * LWN RF *
7 N4 1 6* * * SR RF PSV*
8 N5 1 2* * * LWN RF Utility Connection*
9 N6 1 4* * * SR RF *
10 N7 1 2* * * LWN RF Drain*
11
12 INSTRUMENT CONNECTIONS
13 K1A/B 2 2* * * LWN RF Level Transmitter w/ Integral Gauge*
18
19
20 ACCESS OPENING
21 MW 1 1 24 * * SR RF Manway c/w Blind, Davit, Bolts, Nuts
22 and Gasket
23 GENERAL NOTES
24
25 1) VENDOR / BIDDER TO COMPLETE DATA MARKED ( * ) AND SUBMIT WITH THE BID.
27 3) VESSEL SHALL BE DESIGNED, CONSTRUCTED , INSPECTED AND TESTED ACCORDING TO ASME SECTION VIII DIV. 1(LATEST ED.) with U & L STAMP,
28 UNFIRED PRESSURE VESSELS DOC NO. 10008-STD-6-STA-001-R00, PROJECT PARTICULAR SPECIFICATION FOR PRESSURE VESSELS DOC NO.
29 MY-SK410B-LL-ME-SP-0003-00 AND PROJECT PARTICULAR SPECIFICATION FOR FUEL GAS PACKAGE MY-SK410B-LLCPP-ME-SP-0020-00.
30 4) NOZZLE GASKETS AS PER ASME B16.20: SPIRAL WOUND 4mm THK, GRAPHITE FILLED WITH SS 316L WINDING WITH CS CENTERING AND SS 316L INNER RING.
31 5) NOZZLE PROJECTIONS SHALL BE AS PER UNFIRED PRESSURE VESSELS, DOCUMENT NO. 10008-STD-6-STA-001-R00
32 6) VENDOR TO FURNISH WITH HIS BID THE REQUIRED NOZZLES (SIZE & QTY.) FOR FUEL GAS SCRUBBER.
33 7) MINIMUM NOZZLE SIZE SHALL BE 2" NB UNLESS OTHERWISE SPECIFIED. ALL 2" NB NOZZLES SHALL BE LONG WELD NECK
36 INTERNALS SHALL BE DESIGNED TO PASS THROUGH THE ACCESS OPENING AND MAXIMUM WEIGHT OF EACH PART SHALL BE 25 kgs.
37 9) WHEN THERE ARE MORE THAN ONE OPENING PROVIDED FOR THE INSTALLATION OF INSTRUMENTS, THEN THOSE NOZZLES
40 11) VENDOR TO SIZE AND CONFIRM THE VESSEL DIMENSIONS TO MEET THE PROCESS CONDITIONS AND REQUIREMENTS AS
44 14) DELETED
(* )
6
TL
7
9
DEMISTER
10
11
12
N8
HALF OPEN PIPE (*)
13 N1
14
N4
( 3500* ) TL/TL
15
16
17 K3
18 K1A
19
(*)
20
(*)
(*) ID ( 1750* )
21
22 K2A
K1B
23
24
LZAHH * K2B
25
LAH * MW
26
LCH * N3
27
LCL * N5
(* )
28 LAL *
29 LZALL * TL
VORTEX BREAKER
30 VESSEL BTL
31 SKIRT VENT
36
37
38
ELEVATION EARTHING BOSS
39 (2EACH) DIAGONALLY
LOCATED
40 (*) VENDOR TO ADVISE (Sketch above is Indicative Only)
41
42 ACCESSORIES:
43 1) INTERNAL LADDER & GRAB RUNG Yes
47 5) HINGE No
50 8) INSULATION SUPPORTS No
12 23) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.
13 24) ALLOWABLE NOZZLE LOADS AND MOMENTS SHALL BE AS PER APPENDIX 2 OF UNFIRED PRESSURE VESSELS DOCUMENT NO. 10008-STD-6-STA-001-R00.
14 25) VENDOR SHALL SUBMIT VESSEL SIZING CALCULATION AND PERFORMANCE CALCULATIONS FOR ALL OPERATING CASES.
15 26) VENDOR SHALL SELECT MATERIAL WHICH SUITABLE FOR 20 YEARS DESIGN LIFE.
16 27) NOZZLE FLANGES SHALL BE AS PER ASME B16.5 FOR SIZES UP TO AND INCLUDING 600 DN AND ASME B16.47 SERIES A FOR SIZES
20 30) MATERIALS IN SOUR SERVICE SHALL MEET THE REQUIREMENTS OF LATEST EDITION OF NACE MR01-75 AND ISO 15156-1/2/3, MATERIALS FOR SOUR SERVICE
21 DOC NO. '10008-STD-6-COR-032-R00', UNFIRED PRESSURE VESSEL DOC NO. '10008-STD-6-STA-001-R00' AND MY-SK410B-LL-CM-RP-0001-00 MATERIAL
22 SELECTION AND CORROSION STUDY REPORT FOR TRUNKLINE#9 PIPELINE FROM WP2 TO CPP AND TOPSIDE FACILITIES OF CPP, WP01, WP02, FR, LQ.
23 31) VENDOR SHALL CONSIDER VESSEL EXPLOSION DRAG LOAD OF 0.1barg (HOLD)
25 33) SUPPORT BRACKET FOR INTERNALS SHALL BE WELDED DEEP INTO THE VESSEL PARENT MATERIAL.
26 34) ALL CS, CLADDED CS, AND SS PRESSURE RETAINING PARTS (WETTED AND NON-WETTED) SHALL BE TYPE 3.1. ALL PLATES
27 WITH NOMINAL THICKNESS 50 mm AND MORE SHALL BE PROVIDED SHALL BE TYPE 3.2 FOR NON PRESSURE AND PRESSURE
28 RETAINING PARTS. OTHER PARTS SHALL BE MINIMUM TYPE 2.2.
29 35) APPROVED THIRD PARTY INSPECTION AGENCIES ARE DNV GL, ABS, BV, LLOYDS OR EQUIVALENT.
30 36) ALL SOUR SERVICE NOZZLES SHALL BE DESIGNED AS SELF REINFORCED NOZZLE.
31 37) COATING FOR EXTERNAL CS BOLTS & NUTS: REFER 10008-STD-6-COR-042-R01 (CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND
32 TOPSIDE APPLICATIONS) AND 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
33 38) WELD OVERLAY SHALL BE OF SUFFICIENT THICKNESS TO GIVE A MINIMUM 3MM THICK UNDILUTED CORROSION RESISTANT LAYER
34 WHEN FINISHED THAT PROVIDES A CHEMICAL COMPOSITION, STRUCTURE AND MECHANICAL PROPERTIES OF THE CLADDING MATERIAL.
35 39) NOZZLES INTERNAL AND FLANGE SHALL BE PROVIDED WITH OVERLAY WELD DEPOSIT PROTECTION. THE FLANGE FACES SHALL
36 BE RE-MACHINED TO THE REQUIRED SURFACE FINISH. AFTER RE-MACHINING, THE MIN. CLADDING THICKNESS AVAILABLE SHALL BE 3mm.
37 GASKET MATERIAL TO BE SOFTER THAN THE NOZZLE CLADDING TO AVOID DAMAGE TO THE NOZZLE GASKET FACE. VENDOR TO ADVISE
38 RESPECTIVE HARDNESS.
39 40) VENDOR SHALL PROVIDE PERFORMANCE GUARANTEES AS MENTIONED IN FUEL GAS PACKAGE PROCESS DATASHEET.
40 41) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.
41 42) THE HARDNESS OF BASE MATERIAL/ BACKING CARBON STEEL SHALL NOT BE MORE THAN 248Hv10.
42 43) VESSEL SHALL BE PROVIDED WITH NECESSARY INTERNALS TO MEET THE PROCESS REQUIREMENTS. AS MINIMUM, THE
51 46) SMALL NOZZLE WHICH CANNOT BE WELD OVERLAY, SHALL BE PROVIDED WITH SOLID CRA SAME AS CLADDING MATERIAL.
52 47) SELF-REINFORCED NOZZLES SHALL BE PROVIDED FOR ALL NOZZLES AND MANWAYS IN SOUR SERVICE.
53 48) VENDOR TO CONSIDER MINIMUM 2D STRAIGHT LENGTH REQUIREMENT FOR GAS OUTLET NOZZLE.
54
55
56
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 9 of 26 Rev. F0
Item Name: Fuel Gas Filter Coalescers
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1F-6220A/B
1 APPLICABLE TO PROPOSAL PURCHASE AS-BUILT
2 OWNER PTTEP INSIDE DIA. mm * Type of filter : *
3 PLATFORM CPP LANG LEBAH LENGTH TL/FOF mm * QTY : 2 x 100%
4 GENERAL DESIGN DATA
49 RADIOGRAPHY Yes Per Code & SPEC PMI TEST Yes Per Code & SPEC
50 ULTRASONIC Yes Per Code & SPEC IMPACT TEST * Per Code & SPEC
51 MAGNETIC PARTICLE Yes Per Code & SPEC PWHT Yes Per Code & SPEC
52 DYE PENETRANT Yes Per Code & SPEC SPECIAL HEAT TREATMENT * Per Code & SPEC
53 SOAP-AIR LEAK TEST Yes Per Code & SPEC MATERIAL CERT. (EN 10204) Yes (Note-25)
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 10 of 26 Rev. F0
Item Name: Fuel Gas Filter Coalescers
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1F-6220A/B
1 NOZZLE / CONNECTION SCHEDULE (Note-6, 7, 8)
2 SIZE SCH. No./ FLANGE PER ASME B16.5
MARKS QTY. SERVICE NAME REMARKS
3 Inch THK. RATING TYPE FACE
4 N1 1 4* * * SR RF Feed Inlet*
5 N2 1 4* * * SR RF Gas Outlet*
6 N4 1 2* * * LWN RF PSV*
7 N6 1 2* * * LWN RF *
8 N7 1 2* * * LWN RF *
9 N8 1 2* * * LWN RF Drain* c/w Vortex Breaker
10
11 INSTRUMENT CONNECTIONS
12 K2 1 2* * * LWN RF Pressure Gauge
13 K3A/B 1 2* * * LWN RF Level Transmitter w/ Integral Gauge
14 K4 1 2* * * LWN RF Pressure Gauge
15 K5A/B 1 2* * * LWN RF Level Transmitter w/ Integral Gauge
16 K6A/B 1 2* * * LWN RF Level Transmitter w/ Integral Gauge
17 K7A/B 1 2* * * LWN RF Level Transmitter w/ Integral Gauge
18 ACCESS OPENING
19 MW 1 * * * * RF Access Opening c/w Blind, Davit, Bolts, Nuts
20 and Gasket
21
22 FILTER INFORMATION
23 MANUFACTURER * ELEMENT CHANGE OUT DIFFERENTIAL PRESSURE * BarG
24 VENDOR MODEL NO. * BURSTING PRESSURE * BarG
25 NO.OF ELEMENTS IN EACH FILTER * FILTER ELEMENT SIZE (OD x L) * mm
26 DIRECTION OF FLOW * FILTER ELEMENT SURFACE AREA * mm2
27 ELEMENT FIXING DETAIL * BACKWASH FLOWRATE *
28 MAXIMUM FLOW PER ELEMENT * FILTRATION EFFICIENCY *
29 EXPECTED LIFE OF ELEMENT * PARTICLE SIZE TO BE REMOVED *
30
31 GENERAL NOTES
32 1) VENDOR / BIDDER TO COMPLETE/ RE-CONFIRM DATA MARKED ( * ) AND SUBMIT WITH THE BID.
33 2) ALL DIMENSIONS ARE IN ' mm ' UNLESS SPECIFIED OTHERWISE.
34 3) COALESCER SHALL BE DESIGNED, CONSTRUCTED , INSPECTED AND TESTED ACCORDING TO ASME SECTION VIII DIV. 1 (LATEST ED.)
35 WITH U & L STAMP , UNFIRED PRESSURE VESSELS DOC NO. 10008-STD-6-STA-001-R00 AND PROJECT PARTICULAR SPECIFICATION FOR PRESSURE
36 VESSELS DOC NO. MY-SK410B-LL-ME-SP-0003-00 AND PROJECT PARTICULAR SPECIFICATION FOR FUEL GAS PACKAGE MY-SK410B-LLCPP-ME-SP-0020-00.
37 4) REFER PROCESS DATA SHEET, DOCUMENT NO.: MY-SK410B-LLCPP-PR-DS-0024-00 FOR PROCESS DATA AND REQUIREMENTS.
38 5) COATING FOR EXTERNAL BOLTS & NUTS: REFER 10008-STD-6-COR-042-R01 (CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND
39 TOPSIDE APPLICATIONS) AND 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
40 6) NOZZLE PROJECTIONS SHALL BE AS PER UNFIRED PRESSURE VESSELS, DOCUMENT NO. 10008-STD-6-STA-001-R00.
41 7) GIVEN NOZZLES ARE INDICATIVE ONLY. VENDOR TO CONFIRM THE REQUIRED NOZZLES SIZE AND QUANTITY.
42 8) SELF-REINFORCED (SR) NOZZLES SHALL BE PROVIDED FOR ALL NOZZLES AND MANWAYS IN SOUR SERVICE.
43 9) FILTER ELEMENT SHALL BE REMOVABLE THROUGH FILTER SIDE ACCESS OPENING. ALL REMOVABLE INTERNALS SHALL BE
44 DESIGNED TO PASS THROUGH THE ACCESS OPENING AND MAXIMUM WEIGHT OF EACH PART SHALL BE 25 kgs.
45 10) WHEN THERE ARE MORE THAN ONE OPENING PROVIDED FOR THE INSTALLATION OF INSTRUMENTS, THEN THOSE OPENINGS
46 SHALL BE SET WITH JIGS.
47 11) VENDOR SHALL PERFORM FILTER SIZING FOR FUEL GAS FILTER COALESCER TO MEET PROCESS CONDITIONS AND REQUIREMENTS AS
48 SPECIFIED IN PROCESS DATASHEET AND PROCESS SIZING CRITERIA DOC NO. 10008-STD-6-PRO-002-R01.
49 12) GASKETS TO BE SPIRAL WOUND GRAPHITE FILLED WITH 4mm THK SS 316L WINDING , 3.2 mm THK SS 316L INNER & CENTER RING AS PER
50 ASME B16.20.
51 13) APPROVED THIRD PARTY INSPECTION AGENCIES ARE DNV GL, ABS, BV, LLOYDS OR EQUIVALENT.
52 14) THE FILTER HOUSING SHALL BE PROVIDED WITH A TOP FLANGE COMPLETE WITH BLIND FLANGE DESIGNED TO ASME16.5.
53 TOP COVER OF FILTER SHALL BE PROVIDED WITH DAVIT AND HANDLE.
54
55 FOR ADDITIONAL NOTES REFER SHEET 12 OF 26.
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 11 of 26 Rev. F0
Item Name: Fuel Gas Filter Coalescers
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1F-6220A/B
1 VESSEL SKETCH / GUIDE DRAWING (SCHEMATIC)
2
(*)
6
MW
7
9
FOF
10
11
12
K4
13
N6
14
15 N4 N2
16
K5A
17 K2
18
K3A
(*)
19
K5B
20
K3B
21
22 N7
N1
23
24 K6A
25 K7A
26 K6B ID *
27 THK ( * )
28 K7B
29 TL
30
VORTEX BREAKER
31 2:1 S.E. HEAD
MIN. Thk. *
32
(AFTER FORMING)
33
(*)
34
35
36 N8
37
38
EARTHING BOSS
39 (2EA)
40
41 ELEVATION
42 (Sketch above is indicative only)
43
44 ACCESSORIES:
45 1) CLIPS FOR LADDER & PLATFORM *
46 2) CLIPS FOR PIPE SUPPORT *
47 3) DAVIT Yes
48 4) HINGE No
49 5) LIFTING LUG Yes
50 6) EARTHING BOSSES Yes
51 7) INSULATION SUPPORTS No
52
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 12 of 26 Rev. F0
Item Name: Fuel Gas Filter Coalescers
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1F-6220A/B
1 GENERAL NOTES (Cont'd)
2 15) VENDOR TO INDICATE MAXIMUM ALLOWABLE PRESSURE DROPS (NORMAL FLOW AND REVERSE FLOW) ALLOWABLE FOR THE
5 17) MINIMUM NOZZLE SIZE SHALL BE 2" UNLESS OTHERWISE SPECIFIED. ALL 2" NOZZLES SHALL BE LONG WELD NECK TYPE.
7 19) TWO EARTHING BOSSES SHALL BE PROVIDED DIAGONALLY OPPOSITE AT VESSEL SUPPORT WITH SS 316 STUD (1),
10 21) ALLOWABLE NOZZLE LOADS AND MOMENTS SHALL BE AS PER APPENDIX 2 OF UNFIRED PRESSURE VESSELS DOCUMENT NO. 10008-STD-6-STA-001-R00.
11 22) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.
15 25) ALL CS AND SS PRESSURE RETAINING PARTS (WETTED AND NON-WETTED) INCLUDING INTERNALS SHALL
16 BE TYPE 3.1. ALL PLATES WITH NOMINAL THICKNESS 50 MM AND MORE SHALL BE PROVIDED WITH TYPE 3.2 CERTIFICATION.
17 OTHER PARTS SHALL BE MINIMUM TYPE 2.2.
18 26) MATERIALS IN SOUR SERVICE SHALL MEET THE REQUIREMENTS OF LATEST EDITION OF NACE MR01-75 AND ISO 15156-1/2/3, MATERIALS FOR
19 SOUR SERVICE DOC NO. '10008-STD-6-COR-032-R00', UNFIRED PRESSURE VESSEL DOC NO. '10008-STD-6-STA-001-R00'
20 AND MY-SK410B-LL-CM-RP-0001-00 MATERIAL SELECTION AND CORROSION STUDY REPORT FOR TRUNKLINE#9 PIPELINE FROM WP2 TO CPP
21 AND TOPSIDE FACILITIES OF CPP, WP01, WP02, FR, LQ.
22 27) VENDOR SHALL SELECT MATERIAL WHICH SUITABLE FOR 20 YEARS DESIGN LIFE.
23 28) SURFACE PREPARATION, PAINTING AND COATING OF EQUIPMENT SHALL BE AS PER 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL.
24 STRUCTURES AND FACILITIES) AND 10008-STD-6-COR-004-R01 (INTERNAL COATING OF PRESSURE VESSELS AND TANKS)
25 29) LEVEL INSTRUMENTS SHALL BE DESIGNED TO TAKE CARE OF ALL CASES ARISING OUT OF VARIOUS DESIGN CONDITIONS.
26 30) UPPER AND LOWER NOZZLE CONNECTIONS FOR ILIA (ALARM) AND ILZA (SHUTDOWN) SHALL HAVE THE SAME ELEVATION
29 ALL FLANGE / QOC RATING SHOULD NOT BE LIMITING FACTOR FOR MAWP.
30 32) FOR EQUIPMENT HANDLING HC WITH H2S MORE THAN 1000 ppm, "L" STAMP FOR LETHAL SERVICE SHALL BE PROVIDED AS PER
33 34) ALL STAINLESS STEEL FLANGE MATERIAL SHALL BE DUAL CERTIFIED I.E SS316/SS316L.
34 35) VENDOR SHALL DESIGN AND SIZE THE FILTERS TO OPERATE CONTINUOUSLY WITHOUT INTERVENTION OR ANY REQUIRED MAINTENANCE FOR AT
35 LEAST 6 MONTHS. VENDOR SHALL ADVISE IF THERE IS ANY ACTIVITY OR INTERVENTION REQUIRED EARLIER THAN 6 MONTHS.
36 36) VENDOR SHALL DESIGN FOR REMOTE MONITORING SYSTEM. VENDOR SHALL RECOMMEND MONITORED PARAMETERS AND PROPOSE EQUIPMENT
41
42
43
44
45
46
47
48
49
50
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 13 of 26 Rev. F0
Item Name: Fuel Gas Superheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6230A/B
1 APPLICABLE TO PROPOSAL PURCHASE AS-BUILT
2 OWNER PTTEP INSIDE DIA. * mm (Note-11) TYPE HORIZONTAL
3 PLATFORM CPP LANG LEBAH LENGTH TL/FOF * mm (Note-11) QTY 2 x 100%
4 GENERAL DESIGN DATA
5 FLUID HANDLED Hydrocarbon Gas P&ID REFERENCE MY-SK410B-LLCPP-PR-PNID-0046-01
6 VAPOUR FLOW RATE Note 11 MMscfd SOUR SERVICE REQUIREMENT YES (LETHAL) (Note-37)
3
7 LIQUID FLOW RATE -- m /hr INLET PRESSURE Note 11 BarG
8 TEMPERATURE (MAX/ MIN) Note 11 °C PRESSURE DROP * Bar
9 DENSITY Note 11 kg/m³ DUTY * kW
10 VISCOSITY Note 11 cP EXCESS AREA * %
11 THERMAL CONDUCTIVITY * W/m°C SPARE ELEMENTS 20% (Note 15)
12 SPECIFIC HEAT Note 11 KJ/Kg°C MAXIMUM SHEATH TEMPERATURE * °C
2
13 VAPOUR MOLECULAR WEIGHT Note 11 FLUX DENSITY (Max.) * kW/m
14 CORROSIVE COMPONENTS Yes
15 MECHANICAL DESIGN DATA
16 DESIGN PRESSURE 47* BarG CORROSION ALLOWANCE (ON CS) Nil mm
17 DESIGN TEMPERATURE (MAX/ MIN) 115/-46* °C SHELL THICKNESS * mm
18 DESIGN CODE (Note 3) ASME Sec.VIII Div.1 HEAD THICKNESS * mm
19 SPECIFICATION Note 3 WIND VELOCITY 22 (3sec-gust) (Hold-1) m/s
20 MAX. ALLOW. WORKING PRESSURE * BarG SEISMIC FACTOR Hold-2
21 HYDROSTATIC TEST PRESSURE * BarG TRANSPORT LOADING Note 13
22 SUPPORT TYPE Saddles (2 Nos.) TOTAL VOLUME * m3
23 RADIOGRAPHY (X-rays) 100% INSULATION (IF YES, TYPE / THICK) Yes (By Others) mm
24 JOINT EFFICIENTCY (SHELL / HEAD) 1.0 / 1.0 FIRE PROOFING (IF YES, TYPE) Hold-3 (Note 29) mm
25 TYPE OF HEAD 2:1 S.E. & Flanged
26 MATERIAL SPECIFICATION
27 SHELL SA-240 gr 316L (NACE) NOZZLE FLANGES & BLINDS (Note 36) SA 182 F 316 (NACE)
28 HEAD(S) SA-240 gr 316L (NACE) NOZZLE NECKS PIPE SA 312 TP 316L (NACE)
29 INTERNAL LINING / CLADDING -- PLATE -
30 STIFFENER RINGS (EXTERNAL) SA-240 gr 316L (NACE) FORGING SA 182 F 316 (NACE)
31 SUPPORTS (SADDLE/BASE PLATE) SA-240 gr 316L/ SA 516 GR 70N WELDING FITTINGS SA 403 WP 316L(NACE)
32 INTERNALS : EXT. ATTACH. SA-240 gr 316L*
33 BAFFLE PLATE SA-240 gr 316L (NACE) EXTERNAL STUDS (Note 34) SA-193 Gr.B8M Class 1
34 HEATER SHEATH Incoloy 800 (NACE)* EXTERNAL NUTS (HEAVY) (Note 34) SA-194 Gr.8MA
35 INT. BOLTS / GASKET SS 316L (NACE)/- EXTERNAL GASKET (Note 4) Spiral Wound
36 TERMINAL BOX SS 316 LIFTING LUGS `
37 HEATER FLANGE / TUBESHEET SA-182-F316/SS316L* (NACE) EARTHING BOSS (M10) (Note 20) SS 316
38 HEATER COUPLING SS 316 * NAMEPLATE / BRACKET SS 316 / SA-516 Gr.70N
39 ANCHOR / SETTING BOLTS SA-325 Type-1
39 PAINTING / COATING DATA (Note 21)
40 SURFACE PREPARATION INSIDE: No OUTSIDE: Yes SPEC. No.: 10008-STD-6-COR-010-R01
41 PAINTING / COATING INSIDE: No OUTSIDE: Yes SPEC. No.: 10008-STD-6-COR-010-R01
42 WEIGHTS
43 EMPTY WEIGHT * kg FREIGHT (SHIPPING) WEIGHT * kg
44 MAX. OPERATING WEIGHT * kg WEIGHT OF INSULATION * kg
45 FULL WATER WEIGHT * kg WEIGHT OF INTERNALS * kg
46 FABRICATION AND INSPECTION REQUIREMENTS
REGULATING AUTHORITY (DOSH) Offshore Self-Regulation Inspector (OSRI) CODE STAMP REQUIREMENT Yes ASME "U" & "L" Stamp (Note-37)
47
48 INSPECTION AUTHORITY 3rd Party Inspection (Note-31) HYDROSTATIC TEST Yes Per Code & SPEC
49 RADIOGRAPHY Yes Per Code & SPEC PMI TEST Yes Per Code & SPEC
50 ULTRASONIC Yes Per Code & SPEC IMPACT TEST * Per Code & SPEC
51 MAGNETIC PARTICLE Yes Per Code & SPEC PWHT Yes Per Code & SPEC
52 DYE PENETRANT Yes Per Code & SPEC SPECIAL HEAT TREATMENT * Per Code & SPEC
53 SOAP-AIR LEAK TEST Yes Per Code & SPEC MATERIAL CERT. (EN 10204) Yes (Note 30)
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 14 of 26 Rev. F0
Item Name: Fuel Gas Superheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6230A/B
1 NOZZLE / CONNECTION SCHEDULE (Note 7, 8)
2 SIZE SCH. No./ FLANGE PER ASME B16.5
MARKS QTY. SERVICE NAME REMARKS
3 inch THK. RATING TYPE FACE
4 N1 1 4* * * SR RF Feed Inlet*
5 N2 1 4* * * SR RF Gas Outlet*
6 N3 1 2* * * LWN RF Drain*
7 N4 1 2* * * LWN RF *
8
9 INSTRUMENT CONNECTIONS
10
11
VENDOR TO FURNISH
12
13
14 ACCESS OPENING
15
16
17
30 GENERAL NOTES
31 1) ALL DIMENSIONS ARE IN ' mm ' UNLESS SPECIFIED OTHERWISE.
32 2) VENDOR / BIDDER TO COMPLETE/ RE-CONFIRM DATA MARKED ( * ) AND SUBMIT WITH THE BID.
33 3) VESSEL SHALL BE DESIGNED, CONSTRUCTED , INSPECTED AND TESTED ACCORDING TO ASME SECTION VIII DIV. 1 (LATEST ED.) WITH U & L STAMP ,
34 UNFIRED PRESSURE VESSELS DOC NO. 10008-STD-6-STA-001-R00 AND PROJECT PARTICULAR SPECIFICATION FOR PRESSURE VESSELS DOC NO.
35 MY-SK410B-LL-ME-SP-0003-00 AND PROJECT PARTICULAR SPECIFICATION FOR FUEL GAS PACKAGE MY-SK410B-LLCPP-ME-SP-0020-00.
36 4) GASKETS TO BE SPIRAL WOUND GRAPHITE FILLED WITH 4mm THK SS 316L WINDING , 3.2 mm THK SS 316L INNER & CENTER RING
37 AS PER ASME B16.20.
38 5) NOZZLE PROJECTIONS SHALL BE AS PER UNFIRED PRESSURE VESSELS, DOCUMENT NO. 10008-STD-6-STA-001-R00
39 6) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.
40 7) VENDOR TO FURNISH WITH HIS BID THE REQUIRED NOZZLES (SIZE & QTY.) FOR FUEL GAS HEATER.
41 8) MINIMUM NOZZLE SIZE SHALL BE 2" UNLESS OTHERWISE SPECIFIED. 2" NOZZLES SHALL BE OF "LWN" TYPE EXCEPT
42 BOTTOM NOZZLES WITH ELBOWS.
43 9) VENDOR TO SIZE THE BUNDLE TO MEET THE PROCESS REQUIREMENTS.
44 10) ALL INTERNAL BOLTING SHALL BE PROVIDED WITH DOUBLE NUTS.
45 11) REFER PROCESS DATA SHEET, DOCUMENT No.: MY-SK410B-LLCPP-PR-DS-0024-00 FOR PROCESS DATA AND REQUIREMENTS.
46 12) THE SKIN TEMPERATURE OF HEATING ELEMENT SHALL NOT EXCEED 80% OF THE IGNITION TEMPERATURE OF PROCESS FLUID
47 BEING HEATED.
48 13) TRANSPORTATION LOADS : SEA TRANSPORTATION : 0.8g IN ANY DIRECTION
49 : LAND TRANSPORTATION : 0.3g LONGITUDINAL AND 0.1 g VERTICAL AND TRANSVERSE
50
53
54
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 15 of 26 Rev. F0
Item Name: Fuel Gas Superheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6230A/B
1 VESSEL SKETCH / GUIDE DRAWING (SCHEMATIC)
2
10
11
12
13
2 - LIFTING LUGS
14 HEATER BUNDLE
REMOVAL LENGTH *
15
16
17
2:1 S.E. HEAD
18 N1 N4 MIN. Thk. *
(AFTER FORMING)
19 THK (*)
20
21
22
23
CLL
C
ID *
24
25
26
27
*
28
29
30 EARTHING BOSS (2
FOF
N3 EACH) N2
TL
31
32 * *
33
FIXED END SLIDING END
34 *
35 *
36
ELEVATION
37
38
39
40
48
49
50
51
52
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 16 of 26 Rev. F0
Item Name: Fuel Gas Superheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6230A/B
1 GENERAL NOTES (Cont'd)
2 14) ELECTRIC HEATER SHALL BE PROVIDED WITH MINIMUM TWO (2) TEMPERATURE SENSING DEVICES OF PT 100 (3 WIRE TYPE)
3 FOR TEMPERATURE MEASUREMENT OF THE HEATER ELEMENTS AND SUPERHEATER FLANGE, RESPECTIVELY, FOR EACH FUEL GAS
4 SUPERHEATER TO CUT OFF POWER SUPPLY. THE MAXIMUM SKIN TEMPERATURE OF HEATER SHALL NOT EXCEED 80% OF FUEL GAS IGNITION
5 TEMPERATURE. VENDOR TO PROVIDE THE SET TEMPERATURE (TZAHH) FOR ELEMENT AND FLANGE TEMPERATURE SENSING DEVICES.
6 15) THE MINIMUM SPARE ELEMENT REQUIREMENT IS 20% OF EACH HEATER ELEMENTS REQUIRED TO FULFIL THE OPERATIONAL
7 DUTIES OF THE UNIT FOR EACH UNIT.
8 16) HEATER THEMAL DUTY SHALL BE CONFIRMED BY VENDOR. SIZING TO BE PROVIDED FOR PURCHASER REVIEW AND APPROVAL.
9 17) VENDOR TO ADVISE THE HEATING ELEMENTS CONFIGURATION FOR THE HEATER CONSIDERING VARYING LOAD THROUGHOUT
10 THE OPERATING YEARS AS DESCRIBED IN PROCESS DATASHEET.
11 18) FLANGE TEMPERATURE SENSING DEVICE AND ELEMENT TEMPERATURE SENSING DEVICE SHALL BE FURNISHED BY VENDOR.
12 19) SURFACE PREPARATION, PAINTING AND COATING OF EQUIPMENT SHALL BE AS PER 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL.
13 STRUCTURES AND FACILITIES) AND 10008-STD-6-COR-004-R01 (INTERNAL COATING OF PRESSURE VESSELS AND TANKS).
14 20) TWO EARTHING BOSSES SHALL BE PROVIDED DIAGONALLY OPPOSITE AT VESSEL SUPPORT WITH SS 316 STUD (1), NUTS (2), WASHERS (2)
15 AND SPRING WASHER (1).
16 21) UNPAINTED STAINLESS STEEL/ CRA SURFACES SHALL BE ACID PICKLED AND PASSIVATED AFTER FABRICATION.
17 22) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.
18 23) ALLOWABLE NOZZLE LOADS AND MOMENTS SHALL BE AS PER APPENDIX 2 OF UNFIRED PRESSURE VESSELS DOCUMENT NO. 10008-STD-6-STA-001-R00.
19 24) VENDOR SHALL SUBMIT VESSEL SIZING CALCULATION AND PERFORMANCE CALCULATIONS FOR ALL OPERATING CASES.
20 25) VENDOR SHALL SELECT MATERIAL WHICH SUITABLE FOR 20 YEARS DESIGN LIFE.
21 26) NOZZLE FLANGES SHALL BE AS PER ASME B16.5 FOR SIZES UP TO AND INCLUDING 600 DN AND ASME B16.47 SERIES A
22 FOR SIZES ABOVE 600 DN.
23 27) MATERIALS IN SOUR SERVICE SHALL MEET THE REQUIREMENTS OF LATEST EDITION OF NACE MR01-75 AND ISO 15156-1/2/3, MATERIALS FOR SOUR SERVICE
24 DOC NO. '10008-STD-6-COR-032-R00', UNFIRED PRESSURE VESSEL DOC NO. '10008-STD-6-STA-001-R00' AND MY-SK410B-LL-CM-RP-0001-00 MATERIAL
25 SELECTION AND CORROSION STUDY REPORT FOR TRUNKLINE#9 PIPELINE FROM WP2 TO CPP AND TOPSIDE FACILITIES OF CPP, WP01, WP02, FR, LQ.
26 28) VENDOR SHALL CONSIDER VESSEL EXPLOSION DRAG LOAD OF 0.1barg (HOLD-4)
27 29) REQUIREMENTS FOR FIREPROOFING: HOLD-3
28 30) ALL CS, CLADDED CS, AND SS PRESSURE RETAINING PARTS (WETTED AND NON-WETTED) SHALL BE TYPE 3.1. ALL PLATES WITH
29 NOMINAL THICKNESS 50 mm AND MORE SHALL BE PROVIDED SHALL BE TYPE 3.2 FOR NON PRESSURE
30 AND PRESSURE RETAINING PARTS. OTHER PARTS SHALL BE MINIMUM TYPE 2.2.
31 31) APPROVED THIRD PARTY INSPECTION AGENCIES ARE DNV GL, ABS, BV, LLOYDS OR EQUIVALENT.
32 32) ALL SOUR SERVICE NOZZLES SHALL BE DESIGNED AS SELF REINFORCED NOZZLE.
33 33) VESSEL SHALL BE DESIGNED AND CONSTRUCTED ACCORDING TO PROJECT SPECIFICATION FOR FUEL GAS
34 PACKAGE DOC. NO: MY-SK410B-LLCPP-ME-SP-0020-00.
35 34) COATING FOR EXTERNAL BOLTS & NUTS: REFER 10008-STD-6-COR-042-R01 (CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND
36 TOPSIDE APPLICATIONS) AND 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
37 35) ELECTRIC HEATER SHALL COMPLY WITH ELECTRICAL ENGINEERING GUIDELINE 1008-STD-ELE-001-R00.
38 36) ALL STAINLESS STEEL FLANGE MATERIAL SHALL BE DUAL CERTIFIED I.E SS316/SS316L.
39 37) FOR EQUIPMENT HANDLING HC WITH H2S MORE THAN 1000 ppm, "L" STAMP FOR LETHAL SERVICE SHALL BE PROVIDED AS PER
40 ASME SECTION Vlll DIV 1.
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
Document No.: MY-SK410B-LLCPP-ME-DS-0036-00
Sheet No.: 17 of F0
26 Rev : FB
DATA SHEET - ELECRTICAL HEATER CONTROL PANEL Fuel Gas Superheater
Item Name:
Tag No: 1H-6230A/B
1 GENERAL
2 Manufacturer ( * ) MAKE : MODEL :
3 Tag Number Qty:
4 Standards, Codes IEC BS NEMA ATEX
5 Certifying Authority (*) PTB BASEEFA ASTA
6 Certificate Nr. (*)
7 Language On Equipment English
7 Language On Documentation English
8 DESIGN CONDITIONS
9 Installation Location (indoor) / Ambient Type Indoor Outdoor Air-conditioned pressurised room
10 Ambient Temperature Design : 40 °C Min : °C
11 Relative Humidity Design: 100 % Min : %
12 Area Classification Safe Area Zone 1 Zone 2
13 GENERAL REQUIREMENTS
14 Supply Network Voltage/Frequency/Phases 400 V 50 Hz N°: 3
15 Supply Voltage Fault Level Max. / Withstand time (Note-14) 80 kA 1 s
16 Earhting Configuration IT
17 Upstream Protection Circuit Breaker (ACB)
18 HCP Input Side Isolating Device (Type / Rating) MCCB (preferred) or ACB (Note-4,5,8)
19 HCP Breaking Device (Type/ Rating) (*) Contactor (Note-6)
25 Unit Transformer (*)
26 Transformer data (if applicable) (*)
20 Ouput Side Isolating Device (Type/Rating) (*)
21 Auxiliary Rated Voltage (*)
22 Type of Fuse gG type (Note-7)
23 Thyrisytor Control Stage Single Cycling System (Note -2,17)
24 Guarantee Harmonic Content of Thyristor Controller HCP < 2% in the worst case - 50% load on fifth harmonic (Note-19)
25 Communication Between PCS Modbus TCP/IP (Note-10)
26 Cooling Natural Ventilation or 2x100% Fans
27 Earthing Copper Earth Bar (min 25mm x 5mm cross section)
28 Internal Wiring Flame Retardant
29 Marking As per Requisition document
30 Ramp Unit (Note-24) Yes No
31 Temperature Controller / Indicator Yes No
32 Space heater / Voltage / Frequency (Note-11) Yes X No 230 V AC 50 Hz
33 PANEL CONSTRUCTION
34 Degree of protection IP 41
35 Compartment Min 3 separate compartments (Note-15)
36 Power Cable Entry / Cable Type / Cable Size - Incoming (Note-12) Bottom CU/XLPE/PVC TBA
37 Power Cable Entry / Cable Type / Cable Size - Outgoing (Note-20) Bottom CU/XLPE/SWA/PVC TBA
38 Space Heater Cable Entry / Cable Type / Cable Size Bottom CU/XLPE/SWA/PVC 2C x 2.5sq.mm
37 Temperature Transmitter Cable Entry / Cable Type / Cable Size Bottom By Instrument By Instrument
38 Cable gland plate Undrilled, Non-Magnetic, Unpainted Removable Gland Plate
39 Access Front
40 Painting (Mfr standard,... / color) RAL 7032
41 REMOTE CONTROL
42 Auto - Manual selector switch Yes X No
43 Trip From SIS Yes X No
44 Start/Stop HCP From PCS Yes X No
45 REMOTE MONITORING AND SIGNALLING
46 Unit On/Off Status to PCS Yes X No
47 Local Remote Status to PCS Yes X No
48 Load Current Signal to PCS Yes X No type: 4-20 mA signal
49 Fault/Trip Alarm Status to PCS Yes X No
50 MEASUREMENT, PROTECTION AND ALARMS
51 Earth Fault Alarm Trip X With display X
52 Thyristor Over-Temperature Alarm Trip With display X
53 Fan Failure Alarm Trip With display X
54
Document No.: MY-SK410B-LLCPP-ME-DS-0036-00
Sheet No.: 18 of 26 Rev : F0
DATA SHEET - ELECRTICAL HEATER CONTROL PANEL Fuel Gas Superheater
Item Name:
Tag No: 1H-6230A/B
1 MANUFACTURER DATA
2 HCP Power Requirements (Note-18) (*) kW
3 Peak inrush current (*) A
4 Transformer data (if applicable) (*)
5 Heat Load Dissipation At Full Load (*)
6 ELECTRICAL HEATER DIMENSIONS AND WEIGHT
7 Length x Depth x Height in mm (*)
8 Dimension Limit From Equipment Layout N/A
9 Weight in kg (*)
10 LOAD CONFIGURATION
11 Nos. of Stage Control / Type of Control / Duty kW (*)
12 Load Configuration (*)
13
14 Notes:
15 1. ( * ) indicates information or data to be confirmed and completed by VENDOR.
16 2. Regulation of power to the heater shall use complete full cycles of mains power rather than chopped cycles. Switching ON and OFF shall be
17 done at the zero voltage crossover points of the mains complete full cycles. Vendor shall advise the impact to power system during
18 switching in particularly when big heater load is provided.
19 3. VENDOR to provide auto/manual selector switch on HCP to facilitate manual override control of the thyristor via local potentiometer inside
20 HCP.
21 4. Incoming ACB or MCCB for the HCP shall interlock with panel door.
22 5. Incoming CB shall be 3-pole. The selectivity category for the incoming CB (if rated 800A and above) as defined in IEC 60947-2 shall be
23 category B. CB shall be padlockable in the "Off" position.
24 For CB feeding electrical heater, CB selectivity category shall be category A.
25 6. Contactors shall comply with IEC 60947-4-1 and rated for both uninterrupted duty and interminttent duty. The utilisation category for AC
26 contactors shall be AC-1. VENDOR shall advice on the Contactor intermittent duty class for Purchaser review and approval.
27 7. General purpose fuse links shall be type gG and comply with IEC 60269. Fuses shall be screened from each other and arranged so that they
28 can safely removed.
29 8. CB shall have a rated short-circuit making and service breaking capacity in conformity with the prospective short circuit current as specified
30 in the datasheet.
31 9. The input signal shall be galvanically separated from the driver unit and its power supply.
32 10. PCS shall have the option to control and monitor the HCP via 4-20 mA from PCS. Status can be Modbus TCP/IP communication links.
33 To be quote as optional.
34 11. Anti-condensation heating shall be provided inside the assembly and it shall be supplied from a separate source. The heating system shall
35 be switched for isolation purpose by means of MCB in combination with an earth leakage protecting device of 30mA sensitivity.
36 12. Size and armour type (SWA or AWA) for incoming power cable to the HCP shall be confirm upon confirmation of Heater power from
37 Vendor data.
38 13. In the event of internal fault in one of the compartments, the damage shalll be confined to that compartment. Other compartments shall
39 remain fit for further service.
40 14. The terminals for the power cable shall be located so that a free space of at least 400mm remains between the gland plate and the lowest
41 terminal. Facilities shall be provided for clamping the cables where these enter the enclosure.
42 15. The enclosure shall have 3 separate compartments (incoming supply, power control, and measurment and control).
43 16. The HCP shall be able to provide 10% margin performance design at nominal voltage and frequency.
44 17.Thyristor shall be effectively protected against overload, e.g. by means of ultrarapid fuses.
45 18. A ramp unit shall be provided in order to protect the heater or power system from damage that could occur as a result of electrical,
46 mechanical and thermal shock caused by direct full load switching.
47 19. Vendor to advise Purchaser on the harmonic content during low loading or worst case condition. Vendor shall guarantee the nominal
48 harmonic generation across all values would not exceed 5%.
49 20. Size for outgoing power cable to the electrical heater shall be confirm upon confirmation of heater power and heater configuration from
50 Vendor data.
51
52
53
54
55
56
57
58
59
60
61
62
63
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 19 of 26 Rev. F0
Item Name: Start-Fuel Gas Preheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6240
1 APPLICABLE TO PROPOSAL PURCHASE AS-BUILT
2 OWNER PTTEP INSIDE DIA. * mm (Note-11) TYPE HORIZONTAL
3 PLATFORM CPP LANG LEBAH LENGTH TL/FOF * mm (Note-11) QTY 1 x 100%
4 GENERAL DESIGN DATA
5 FLUID HANDLED Hydrocarbon Gas P&ID REFERENCE MY-SK410B-LLCPP-PR-PNID-0048-01
6 VAPOUR FLOW RATE Note 11 MMscfd SOUR SERVICE REQUIREMENT YES (LETHAL) (Note-44)
7 LIQUID FLOW RATE -- m3/hr INLET PRESSURE Note 11 BarG
8 TEMPERATURE (MAX/ MIN) Note 11 °C PRESSURE DROP * Bar
9 DENSITY Note 11 kg/m³ DUTY * kW
10 VISCOSITY Note 11 cP EXCESS AREA * %
11 THERMAL CONDUCTIVITY * W/m°C SPARE ELEMENTS 20% (Note 15)
12 SPECIFIC HEAT Note 11 KJ/Kg°C MAXIMUM SHEATH TEMPERATURE * °C
13 VAPOUR MOLECULAR WEIGHT Note 11 FLUX DENSITY (Max.) * kW/m2
14 CORROSIVE COMPONENTS Yes
15 MECHANICAL DESIGN DATA
16 DESIGN PRESSURE 140* BarG CORROSION ALLOWANCE (ON CS) Nil mm
17 DESIGN TEMPERATURE (MAX/ MIN) */-46* °C SHELL THICKNESS * mm
18 DESIGN CODE (Note 3) ASME Sec.VIII Div.1 HEAD THICKNESS * mm
19 SPECIFICATION Note 3 WIND VELOCITY 22 (3sec-gust) (Hold-1) m/s
20 MAX. ALLOW. WORKING PRESSURE * BarG SEISMIC FACTOR Hold-2
21 HYDROSTATIC TEST PRESSURE * BarG TRANSPORT LOADING Note 13
22 SUPPORT TYPE Saddles (2 Nos.) TOTAL VOLUME * m3
23 RADIOGRAPHY (X-rays) 100% INSULATION (IF YES, TYPE / THICK) Yes (By Others) mm
24 JOINT EFFICIENTCY (SHELL / HEAD) 1.0 / 1.0 FIRE PROOFING (IF YES, TYPE) Hold-3 mm
25 TYPE OF HEAD 2:1 S.E. & Flanged
26 MATERIAL SPECIFICATION
27 SHELL SA-240 gr 316L (NACE) NOZZLE FLANGES & BLINDS SA 182 F 316 (NACE)
28 HEAD(S) SA-240 gr 316L (NACE) NOZZLE NECKS PIPE (Note 38) SA 312 TP 316L (NACE)
29 INTERNAL LINING / CLADDING -- PLATE -
30 STIFFENER RINGS (EXTERNAL) SA-240 gr 316L (NACE) FORGING SA 182 F 316 (NACE)
31 SUPPORTS (SADDLE/BASE PLATE) SA-240 gr 316L/ SA 516 GR 70N WELDING FITTINGS (Note 38) SA 403 WP 316L(NACE)
32 INTERNALS : EXT. ATTACH. SA-240 gr 316L*
33 BAFFLE PLATE SA-240 gr 316L (NACE) EXTERNAL STUDS (Note 34) SA-193 Gr.B8M Class 1
34 HEATER SHEATH * EXTERNAL NUTS (HEAVY) (Note 34) SA-194 Gr.8MA
35 INT. BOLTS / GASKET SS 316L (NACE)/- EXTERNAL GASKET (Note 4) Spiral Wound
36 TERMINAL BOX SS 316 LIFTING LUGS SA-240 gr 316L*
37 HEATER FLANGE / TUBESHEET SA-182-F316/SS316L* (NACE) EARTHING BOSS (M10) (Note 20) SS 316
38 HEATER COUPLING SS 316 * NAMEPLATE / BRACKET SS 316 / SA-516 Gr.70N
39 ANCHOR / SETTING BOLTS SA-325 Type-1
40 PAINTING / COATING DATA (Note-21)
41 SURFACE PREPARATION INSIDE: No OUTSIDE: Yes SPEC. No.: 10008-STD-6-COR-010-R01
42 PAINTING / COATING INSIDE: No OUTSIDE: Yes SPEC. No.: 10008-STD-6-COR-010-R01
43 WEIGHTS
44 EMPTY WEIGHT * kg FREIGHT (SHIPPING) WEIGHT * kg
45 MAX. OPERATING WEIGHT * kg WEIGHT OF INSULATION * kg
46 FULL WATER WEIGHT * kg WEIGHT OF INTERNALS * kg
47 FABRICATION AND INSPECTION REQUIREMENTS
REGULATING AUTHORITY (DOSH) Offshore Self-Regulation Inspector (OSRI) CODE STAMP REQUIREMENT Yes ASME "U" & "L" Stamp (Note-44)
48
49 INSPECTION AUTHORITY 3rd Party Inspection (Note-31) HYDROSTATIC TEST Yes Per Code & SPEC
50 RADIOGRAPHY Yes Per Code & SPEC PMI TEST Yes Per Code & SPEC
51 ULTRASONIC Yes Per Code & SPEC IMPACT TEST * Per Code & SPEC
52 MAGNETIC PARTICLE Yes Per Code & SPEC PWHT Yes Per Code & SPEC
53 DYE PENETRANT Yes Per Code & SPEC SPECIAL HEAT TREATMENT * Per Code & SPEC
54 SOAP-AIR LEAK TEST Yes Per Code & SPEC MATERIAL CERT. (EN 10204) Yes (Note 30)
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 20 of 26 Rev. F0
Item Name: Start-Fuel Gas Preheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6240
1 NOZZLE / CONNECTION SCHEDULE (Note 7, 8)
2 SIZE SCH. No./ FLANGE PER ASME B16.5
MARKS QTY. SERVICE NAME REMARKS
3 inch THK. RATING TYPE FACE
4 N1 1 4* * * SR RF Feed Inlet*
5 N2 1 4* * * SR RF Gas Outlet*
6 N3 1 2* * * LWN RF Drain*
7 N4 1 2* * * LWN RF *
8
10
11
12 INSTRUMENT CONNECTIONS
13
14
VENDOR TO FURNISH
15
16
17 ACCESS OPENING
18
19
20
49 11) REFER PROCESS DATA SHEET, DOCUMENT No.: MY-SK410B-LLCPP-PR-DS-0024-00 FOR PROCESS DATA AND REQUIREMENTS.
50 12) THE SKIN TEMPERATURE OF HEATING ELEMENT SHALL NOT EXCEED 80% OF THE IGNITION TEMPERATURE OF PROCESS FLUID
51 BEING HEATED.
52 13) TRANSPORTATION LOADS : SEA TRANSPORTATION : 0.8g IN ANY DIRECTION
53 : LAND TRANSPORTATION : 0.3g LONGITUDINAL AND 0.1 g VERTICAL AND TRANSVERSE
54
55 FOR ADDITIONAL NOTES REFER SHEET 22 OF 26.
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 21 of 26 Rev. F0
Item Name: Start-Fuel Gas Preheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6240
1 VESSEL SKETCH / GUIDE DRAWING (SCHEMATIC)
2
10
11
12
13
2 - LIFTING LUGS
14 HEATER BUNDLE
REMOVAL LENGTH *
15
16
17
2:1 S.E. HEAD
18 N1 N4 MIN. Thk. *
(AFTER FORMING)
19 THK (*)
20
21
22
23
CLL
C
ID *
24
25
26
27
*
28
29
30 EARTHING BOSS (2
FOF
N3 EACH) N2
TL
31
32 * *
33
FIXED END SLIDING END
34 *
35 *
36
ELEVATION
37
38
39
40
48
49
50
51
52
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 22 of 26 Rev. F0
Item Name: Start-Fuel Gas Preheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: H-6240
1 GENERAL NOTES (Cont'd)
2 14) ELECTRIC HEATER SHALL BE PROVIDED WITH MINIMUM TWO (2) TEMPERATURE SENSING DEVICES OF PT 100 (3 WIRE TYPE)
3 FOR TEMPERATURE MEASUREMENT OF THE HEATER ELEMENTS AND SUPERHEATER FLANGE, RESPECTIVELY, FOR EACH FUEL GAS
4 SUPERHEATER TO CUT OFF POWER SUPPLY. THE MAXIMUM SKIN TEMPERATURE OF HEATER SHALL NOT EXCEED 80% OF FUEL GAS IGNITION
5 TEMPERATURE. VENDOR TO PROVIDE THE SET TEMPERATURE (TZAHH) FOR ELEMENT AND FLANGE TEMPERATURE SENSING DEVICES.
6 15) THE MINIMUM SPARE ELEMENT REQUIREMENT IS 20% OF EACH HEATER ELEMENTS REQUIRED TO FULFIL THE OPERATIONAL
7 DUTIES OF THE UNIT FOR EACH UNIT.
8 16) HEATER THEMAL DUTY SHALL BE CONFIRMED BY VENDOR. SIZING TO BE PROVIDED FOR PURCHASER REVIEW AND APPROVAL.
9 17) VENDOR TO ADVISE THE HEATING ELEMENTS CONFIGURATION FOR THE HEATER CONSIDERING VARYING LOAD THROUGHOUT
10 THE OPERATING YEARS AS DESCRIBED IN PROCESS DATASHEET.
11 18) FLANGE TEMPERATURE SENSING DEVICE AND ELEMENT TEMPERATURE SENSING DEVICE SHALL BE FURNISHED BY VENDOR.
12 19) SURFACE PREPARATION, PAINTING AND COATING OF EQUIPMENT SHALL BE AS PER 10008-STD-6-COR-010 (PAINTING OF OFFSHORE AND COASTAL.
13 STRUCTURES AND FACILITIES) AND 10008-STD-6-COR-004-R01 (INTERNAL COATING OF PRESSURE VESSELS AND TANKS).
14 20) TWO EARTHING BOSSES SHALL BE PROVIDED DIAGONALLY OPPOSITE AT VESSEL SUPPORT WITH SS 316 STUD (1), NUTS (2), WASHERS (2)
15 AND SPRING WASHER (1).
16 21) UNPAINTED STAINLESS STEEL/ CRA SURFACES SHALL BE ACID PICKLED AND PASSIVATED AFTER FABRICATION.
17 22) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.
18 23) ALLOWABLE NOZZLE LOADS AND MOMENTS SHALL BE AS PER APPENDIX 2 OF UNFIRED PRESSURE VESSELS DOCUMENT NO. 10008-STD-6-STA-001-R00.
19 24) VENDOR SHALL SUBMIT VESSEL SIZING CALCULATION AND PERFORMANCE CALCULATIONS FOR ALL OPERATING CASES.
20 25) VENDOR SHALL SELECT MATERIAL WHICH SUITABLE FOR 20 YEARS DESIGN LIFE.
21 26) NOZZLE FLANGES SHALL BE AS PER ASME B16.5 FOR SIZES UP TO AND INCLUDING 600 DN AND ASME B16.47 SERIES A
22 FOR SIZES ABOVE 600 DN.
23 27) MATERIALS IN SOUR SERVICE SHALL MEET THE REQUIREMENTS OF LATEST EDITION OF NACE MR01-75 AND ISO 15156-1/2/3, MATERIALS FOR SOUR SERVICE
24 DOC NO. '10008-STD-6-COR-032-R00', UNFIRED PRESSURE VESSEL DOC NO. '10008-STD-6-STA-001-R00' AND MY-SK410B-LL-CM-RP-0001-00 MATERIAL
25 SELECTION AND CORROSION STUDY REPORT FOR TRUNKLINE#9 PIPELINE FROM WP2 TO CPP AND TOPSIDE FACILITIES OF CPP, WP01, WP02, FR, LQ.
26 28) VENDOR SHALL CONSIDER VESSEL EXPLOSION DRAG LOAD OF 0.1barg (HOLD)
27 29) REQUIREMENTS FOR FIREPROOFING: HOLD
28 30) ALL CS, CLADDED CS, AND SS PRESSURE RETAINING PARTS (WETTED AND NON-WETTED) SHALL BE TYPE 3.1. ALL PLATES WITH NOMINAL
29 THICKNESS 50 mm AND MORE SHALL BE PROVIDED SHALL BE TYPE 3.2 FOR NON PRESSURE AND PRESSURE RETAINING PARTS.
30 OTHER PARTS SHALL BE MINIMUM TYPE 2.2.
31 31) APPROVED THIRD PARTY INSPECTION AGENCIES ARE DNV GL, ABS, BV, LLOYDS OR EQUIVALENT.
32 32) ALL SOUR SERVICE NOZZLES SHALL BE DESIGNED AS SELF REINFORCED NOZZLE.
33 33) VESSEL SHALL BE DESIGNED AND CONSTRUCTED ACCORDING TO PROJECT SPECIFICATION FOR FUEL GAS TREATMENT
34 PACKAGE DOC. NO: MY-SK410B-LLCPP-ME-SP-0020-00.
35 34) COATING FOR EXTERNAL BOLTS & NUTS: REFER 10008-STD-6-COR-042-R01 (CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND
36 TOPSIDE APPLICATIONS) AND 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
37 35) ELECTRIC HEATER SHALL COMPLY WITH ELECTRICAL ENGINEERING GUIDELINE 1008-STD-ELE-001-R00.
38 36) DELTETED
39 37) DELETED
40 38) DELETED
41 39) DELETED
42 40) DELETED
43 41) DELETED
44 42) DELETED
45 43) ALL STAINLESS STEEL FLANGE MATERIAL SHALL BE DUAL CERTIFIED I.E SS316/SS316L.
46 44) FOR EQUIPMENT HANDLING HC WITH H2S MORE THAN 1000 ppm, "L" STAMP FOR LETHAL SERVICE SHALL BE PROVIDED AS PER
47 ASME SECTION Vlll DIV 1.
48
49
50
51
Document No.: MY-SK410B-LLCPP-ME-DS-0036-00
Sheet No.: 23 of 26 Rev : F0
DATA SHEET - ELECRTICAL HEATER CONTROL PANEL Start-Fuel Gas Preheater
Item Name:
Tag No: 1H-6240
1 GENERAL
2 Manufacturer ( * ) MAKE : MODEL :
3 Tag Number Qty:
4 Standards, Codes IEC BS NEMA ATEX
5 Certifying Authority (*) PTB BASEEFA ASTA
6 Certificate Nr. (*)
7 Language On Equipment English
7 Language On Documentation English
8 DESIGN CONDITIONS
9 Installation Location (indoor) / Ambient Type Indoor Outdoor Air-conditioned pressurised room
10 Ambient Temperature Design : 40 °C Min : °C
11 Relative Humidity Design: 100 % Min : %
12 Area Classification Safe Area Zone 1 Zone 2
13 GENERAL REQUIREMENTS
14 Supply Network Voltage/Frequency/Phases 400 V 50 Hz N°: 3
15 Supply Voltage Fault Level Max. / Withstand time (Note-14) 80 kA 1 s
16 Earhting Configuration IT
17 Upstream Protection Circuit Breaker (ACB)
18 HCP Input Side Isolating Device (Type / Rating) MCCB (preferred) or ACB (Note-4,5,8)
19 HCP Breaking Device (Type/ Rating) (*) Contactor (Note-6)
25 Unit Transformer (*)
26 Transformer data (if applicable) (*)
20 Ouput Side Isolating Device (Type/Rating) (*)
21 Auxiliary Rated Voltage (*)
22 Type of Fuse gG type (Note-7)
23 Thyrisytor Control Stage Single Cycling System (Note -2,17)
24 Guarantee Harmonic Content of Thyristor Controller HCP < 2% in the worst case - 50% load on fifth harmonic (Note-19)
25 Communication Between PCS Modbus TCP/IP (Note-10)
26 Cooling Natural Ventilation or 2x100% Fans
27 Earthing Copper Earth Bar (min 25mm x 5mm cross section)
28 Internal Wiring Flame Retardant
29 Marking As per Requisition document
30 Ramp Unit (Note-24) Yes No
31 Temperature Controller / Indicator Yes No
32 Space heater / Voltage / Frequency (Note-11) Yes X No 230 V AC 50 Hz
33 PANEL CONSTRUCTION
34 Degree of protection IP 41
35 Compartment Min 3 separate compartments (Note-15)
36 Power Cable Entry / Cable Type / Cable Size - Incoming (Note-12) Bottom CU/XLPE/PVC TBA
37 Power Cable Entry / Cable Type / Cable Size - Outgoing (Note-20) Bottom CU/XLPE/SWA/PVC TBA
38 Space Heater Cable Entry / Cable Type / Cable Size Bottom CU/XLPE/SWA/PVC 2C x 2.5sq.mm
37 Temperature Transmitter Cable Entry / Cable Type / Cable Size Bottom By Instrument By Instrument
38 Cable gland plate Undrilled, Non-Magnetic, Unpainted Removable Gland Plate
39 Access Front
40 Painting (Mfr standard,... / color) RAL 7032
41 REMOTE CONTROL
42 Auto - Manual selector switch Yes X No
43 Trip From SIS Yes X No
44 Start/Stop HCP From PCS Yes X No
45 REMOTE MONITORING AND SIGNALLING
46 Unit On/Off Status to PCS Yes X No
47 Local Remote Status to PCS Yes X No
48 Load Current Signal to PCS Yes X No type: 4-20 mA signal
49 Fault/Trip Alarm Status to PCS Yes X No
50 MEASUREMENT, PROTECTION AND ALARMS
51 Earth Fault Alarm Trip X With display X
52 Thyristor Over-Temperature Alarm Trip With display X
53 Fan Failure Alarm Trip With display X
54
Document No.: MY-SK410B-LLCPP-ME-DS-0033600
Sheet No.: 24 of 26 Rev : F0
DATA SHEET - ELECRTICAL HEATER CONTROL PANEL Start-Fuel Gas Preheater
Item Name:
Tag No: 1H-6240
1 MANUFACTURER DATA
2 HCP Power Requirements (Note-18) (*) kW
3 Peak inrush current (*) A
4 Transformer data (if applicable) (*)
5 Heat Load Dissipation At Full Load (*)
6 ELECTRICAL HEATER DIMENSIONS AND WEIGHT
7 Length x Depth x Height in mm (*)
8 Dimension Limit From Equipment Layout N/A
9 Weight in kg (*)
10 LOAD CONFIGURATION
11 Nos. of Stage Control / Type of Control / Duty kW (*)
12 Load Configuration (*)
13
14 Notes:
15 1. ( * ) indicates information or data to be confirmed and completed by VENDOR.
16 2. Regulation of power to the heater shall use complete full cycles of mains power rather than chopped cycles. Switching ON and OFF shall be
17 done at the zero voltage crossover points of the mains complete full cycles. Vendor shall advise the impact to power system during
18 switching in particularly when big heater load is provided.
19 3. VENDOR to provide auto/manual selector switch on HCP to facilitate manual override control of the thyristor via local potentiometer inside
20 HCP.
21 4. Incoming ACB or MCCB for the HCP shall interlock with panel door.
22 5. Incoming CB shall be 3-pole. The selectivity category for the incoming CB (if rated 800A and above) as defined in IEC 60947-2 shall be
23 category B. CB shall be padlockable in the "Off" position.
24 For CB feeding electrical heater, CB selectivity category shall be category A.
25 6. Contactors shall comply with IEC 60947-4-1 and rated for both uninterrupted duty and interminttent duty. The utilisation category for AC
26 contactors shall be AC-1. VENDOR shall advice on the Contactor intermittent duty class for Purchaser review and approval.
27 7. General purpose fuse links shall be type gG and comply with IEC 60269. Fuses shall be screened from each other and arranged so that they
28 can safely removed.
29 8. CB shall have a rated short-circuit making and service breaking capacity in conformity with the prospective short circuit current as specified
30 in the datasheet.
31 9. The input signal shall be galvanically separated from the driver unit and its power supply.
32 10. PCS shall have the option to control and monitor the HCP via 4-20 mA from PCS. Status can be Modbus TCP/IP communication links.
33 To be quote as optional.
34 11. Anti-condensation heating shall be provided inside the assembly and it shall be supplied from a separate source. The heating system shall
35 be switched for isolation purpose by means of MCB in combination with an earth leakage protecting device of 30mA sensitivity.
36 12. Size and armour type (SWA or AWA) for incoming power cable to the HCP shall be confirm upon confirmation of Heater power from
37 Vendor data.
38 13. In the event of internal fault in one of the compartments, the damage shalll be confined to that compartment. Other compartments shall
39 remain fit for further service.
40 14. The terminals for the power cable shall be located so that a free space of at least 400mm remains between the gland plate and the lowest
41 terminal. Facilities shall be provided for clamping the cables where these enter the enclosure.
42 15. The enclosure shall have 3 separate compartments (incoming supply, power control, and measurment and control).
43 16. The HCP shall be able to provide 10% margin performance design at nominal voltage and frequency.
44 17.Thyristor shall be effectively protected against overload, e.g. by means of ultrarapid fuses.
45 18. A ramp unit shall be provided in order to protect the heater or power system from damage that could occur as a result of electrical,
46 mechanical and thermal shock caused by direct full load switching.
47 19. Vendor to advise Purchaser on the harmonic content during low loading or worst case condition. Vendor shall guarantee the nominal
48 harmonic generation across all values would not exceed 5%.
49 20. Size for outgoing power cable to the electrical heater shall be confirm upon confirmation of heater power and heater configuration from
50 Vendor data.
51
52
53
54
55
56
57
58
59
60
61
62
63
Equipment No : 1A-6200
Data Sheet for Service : Fuel Gas Treatment Package
EQUIPMENT NOISE LIMITATION Numbers Rqd : One (1)
Datasheet No : MY-SK410B-LLCPP-ME-DS-0036-00
Type of equipment: Fuel Gas Treatment Package Mechanical Power: kW
VENDOR / Manufacturer: Speed: r / min
Type no.: Size I x b x h: m
1. GENERAL
This requisition covers the noise limits of the equipment, given below.
Revision
Sheet No. 26 of 26 Rev. F0
WEIGHT / CENTRE OF MASS FUEL GAS PACKAGE
Equipment
DATASHEET Description
FUEL GAS TREATMENT PACKAGE
3 TENDER ESTIMATE
FUEL GAS TREATMENT PACKAGE
4 DESIGN ESTIMATE
5 HEAVIEST COMPONENT TO BE HANDLED DURING MAINTENANCE: DESIGN UPDATE
6 DESCRIPTION: WEIGHT: Kg AS SUPPLIED
7 WEIGHT DATA
8 NOTES:
9 1) ONE SHEET SHALL BE COMPLETED FOR EACH SEPARATELY INSTALLED SKID OR ITEM.
10 2) AS SUPPLIED EQUIPMENT SHALL BE WEIGHED BY VENDOR AND WITNESSED BY PURCHASER OR NOMINEE.
11 3) VENDOR SHALL PROVIDE CURRENT CALIBRATION CERTIFICATE OR WEIGHING EQUIPMENT CALIBRATION
12 METHODS SHALL BE TO BS EN ISO 7500-1:2004.
13 4) VENDOR SHALL SUBMIT DESIGN UPDATE FOR SIGNIFICANT CHANGES IN WEIGHT.
14
17 DESCRIPTION:
OTHER TEMPORARY WEIGHTS KG
18
19
20
CERTIFIED FINAL WEIGHT DATE NAME COMPANY
21 INSPECTOR
22 VENDOR
23
24 DIMENSIONAL DATA
25 ‘L’
26
‘X’
27 OVERALL SIZES, mm (NOTE 4)
28 DIMENSION ‘L’ *
29 DIMENSION ‘W’ *
C of M *
30 DIMENSION ‘H’
‘W’
31
‘Y’
32
33 CENTRE OF MASS, mm
34 (0, 0) DIM. DRY OPERATING
PLAN
35 ‘X’
36 ‘Y’
37 ‘Z’
C of M
38
‘H’
39
‘Z’
40
41 (0, 0)
ELEVATION
42
43 NOTES:
44 1) EQUIPMENT ORIENTATION ON EACH SKID OR ITEM TO BE INDICATED.
45 2) C of G CO-ORDINATES TO BE CLEARLY SHOWN ON G.A. DRAWINGS.
46 3) VENDOR SHALL DULY FILL-IN WITH SIGNATURE/ STAMP AND SUBMIT AT VARIOUS STAGES:
47 FOR REVIEW / APPROVAL AND CERTIFIED DURING FINAL TESTING / INSPECTION.
48 4) OVERALL PROPOSED SKID SHALL BE DESIGNED WITHIN THESE DIMENSION PARAMETER LIMIT.
49
50
51
52
53
54
55 VENDOR'S SEAL VENDOR'S SIGNATURE & DATE
DOCUMENT PROCESS DATASHEET CPP FUEL GAS PACKAGE 1A-6200 PTTEPHK
MY-SK410B-LLCPP-PR-DS-0024-00 Rev.FB
TITLE Rev.FB DOC. NO.
COMMENT STATUS
COMMENT NO. SECT. PAGE & REF. CLIENT COMMENTS (REVIEWER) PRW RESPONSE
OPEN/CLOSED
7 7 is this thyristor? If yes, please specify Yes. Item 6 in Section 6.3 has been added.
N:\Engineering\Process\00- Projects\LL FEED 412020-00342\04-D-Sheet\A-Latest\01-For Mech Equip\CPP Fuel Gas Package\Rev. F0\MY-SK410B-LLCPP-PR-DS-0024-00 Rev.FB_Comment Sheet_1 Page 1 of 1
PTTEP HK Offshore Limited
PTTEP Sarawak Oil Limited
PTTEP Sabah Oil Limited
Process Datasheet
CPP Fuel Gas Package 1A-6200
REVISION HISTORY
F0 06-Apr-2023 Approved For Design Norashikin Mohd Hatta Chan Kok Wei Dhanaseelan Gunasekaran
FB 28-Dec-2022 Issued For Approval Abdullah Rafaee Farmand Masoomi Miri Saravana S.
FA 03-Oct-2022 Issued For Review Norashikin Mohd Hatta Farmand Masoomi Miri Liz Mullis
Revision
Rev. Revised Paragraphs Reason for Revision
Description
st
FA Issued for Review 1 Issuance
FB All Sections Issued for Approval Incorporated Comments
F0 All Sections Approved for Design Final Issuance
DISCLAIMER STATEMENT
The information provided by PTTEP is confidential and shall only be used by the party to whom it is disclosed to (“the
Receiving Party”). The Receiving Party shall not disclose, publish, reproduce or reveal the information received to
any other third party whatsoever except with the specific prior written authorization of PTTEP. The Receiving Party
shall within five (5) days from notice from PTTEP return or destroy (upon instruction of PTTEP) all confidential
Information furnished by PTTEP.
The Receiving Party shall also take such precautions as are reasonably necessary to protect the confidential
information, including taking measures to prevent loss, theft and misuse.
The Receiving Party shall fully indemnify and keep PTTEP at all time fully indemnified from and against any loss or
disclosure of confidential information and from all actions, proceedings, claims, demands, costs, awards and
damages arising directly or indirectly as a result of such unauthorized disclosure.
MY-SK410B-LLCPP-PR-DS-0024-00
Process Datasheet
Rev.: F0
CPP Fuel Gas Package 1A-6200
Page 3 of 21
TABLE OF CONTENTS
Appendices:
APPENDIX 1 – UFD FUEL GAS SYSTEM
APPENDIX 2 – P&ID FUEL GAS SYSTEM
APPENDIX 3 – HMB FUEL GAS PACKAGE INLET
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 1.0 GENERAL DESCRIPTION
7 1. This datasheet defines the minimum process requirements for the fuel gas package 1A-6200 on the LLCPP Platform.
8 2. The fuel gas package shall be a single package and shall be integrated into the overall platform design.
9 3. Vendor shall provide performance guarantee on both process and mechanical performance of the equipment supplied within the
10 scope of the supply of the fuel gas skid. Refer to Section 8.0 for the details of required performance guarantee.
11
12 2.0 SCOPE OF SUPPLY
13 The fuel gas package system shall comprise of the key components/ equipment as a minimum:
14 • 1 x 100% Fuel Gas Scrubber (1V-6210)
15 • 2 x 100% Fuel Gas Filter Coalescers (1F-6220A/B)
16 • 2 x 100% Fuel Gas Heaters (1H-6230A/B)
17 • 1 x 100% Start-Fuel Gas Preheater (1H-6240)
18 • Heater Control panel for Fuel Gas Heaters and Start Fuel Gas Preheater
19 • All control and safety devices which include but not limited to pressure control valve (PCV) , shutdown valve (SDV), blowdown valve (BDV)
20 and pressure safety valve (PSV) as required by facilities inside the skid.
21 • All instrument which include pressure transmitters, temperature transmitters, flow transmitters and level transmitters.
22 • All piping and valves within package.
23
24 3.0 PROCESS DESCRIPTION
25 1. The fuel gas system supplies HP superheated fuel gas to the Gas Turbine Generators at LLCPP platform. The system also supplies low
26 pressure fuel gas as pilot gas/ignition gas for flare ignition package and as primary purge gas for the HP/LP flare headers.
27 2. There are three (3) sources of fuel gas as feed gas to the Fuel Gas package :-
28 i - Primary fuel gas source (during normal operation) - Gas from downstream Dry Gas / Lean Glycol Heat Exchanger (1E-4515/4525)
29 ii - Secondary fuel gas source (as back-up/start-up) - From export piping / pipeline with alternative to tap from Inlet Separator Gas
30 Outlet (1V-4110/4115).
31 3. The feed fuel gas pressure will be let down via 2x100% pressure control valve upstream of the Fuel Gas Scrubber to 40 barg.
32 Fuel Gas Scrubber is provided to knock-out any potential liquid formed associated to pressure letdown. The liquid that is knocked out from
33 Fuel Gas Scrubber is disposed to Closed Drain Vessel through on/off level actuated valve and restriction orifice.
34 4. The fuel gas at gas outlet of Fuel Gas Scrubber (1V-6210) is then routed to Fuel Gas Filter Coalescers (1F-6220A/B) to remove any fine liquid
35 droplets and particles that may be carried over from the Fuel Gas Scrubber 1V-6210.
36 5. Fuel Gas Heaters are provided to give 30⁰C with respect to the Fuel Gas Scrubber (1V-6210) gas outlet temperature.
37 6. For start-up the supply gas from the gas outlet of Inlet Separator is 120 barg and will be sent to Start-Fuel Gas Preheater for preheating.
38 The pressure of the preheated gas will be reduced to 40 barg by Pressure Control Valve before sending to Fuel Gas Scrubber.
39
40
41 4.0 PACKAGE BOUNDARY
42 4.1 Package Design Condition
43 Design Pressure : 140 (inlet) / 47 barg (downstream of letdown PCV) / 0 barg (Note 8)
44 Design Temperature : 70 / -29 ⁰C (Hold 1)
45 Design Capacity : Normal 12 MMscfd (at package outet)
46 : Startup 5.5 MMscfd (at package outet)
47
48 4.2 Inlet Feed Gas to Fuel Gas Package 1A-6200
49 Operating Conditions
50 i - Primary fuel gas source : Refer to the HMB Case 1 - 4 (Normal Operation) in Attachment B
51 ii - Secondary fuel gas source : Refer to the HMB Case 1 - 7 (Start-Up / Back-Up) in Attachment B
52
53 Design Conditions
54 i - Primary fuel gas source
55 Design Pressure : 140 barg
56 Design Temperature : 70 / -29 ⁰C
57
58 ii - Secondary fuel gas source
59 Design Pressure : 140 barg
60 Design Temperature : 70 / -29 ⁰C
61
62 4.3 Fuel Gas Package (1A-6200) Gas Outlet Condition
63 Operating Pressure : 38.5 barg (40 barg minus system pressure drop) (Note 9)
64 Operating Temperature : 30⁰C Superheat
65 Filtration Requirement : 100% efficiency for solids removal for 3 micron size and above
66 100% efficiency for liquid droplets removal for 10 micron size and above
67 99% efficiency for liquid droplets removal for 5 micron to 10 micron size
68