Download as pdf or txt
Download as pdf or txt
You are on page 1of 48

PTTEP HK Offshore Limited

PTTEP Sarawak Oil Limited


PTTEP Sabah Oil Limited

LANG LEBAH DEVELOPMENT PROJECT


PROVISION OF FRONT-END ENGINEERING DESIGN (FEED)
SERVICES FOR OFFSHORE FACILITIES FOR SK410B LANG LEBAH
DEVELOPMENT

Mechanical Datasheet for


Fuel Gas Treatment Package (1A-6200)

REVISION HISTORY

Rev. Date Description Author Checked Approved

F0 20-Apr-2023 Approved for Design Aidi Hakeem Nashakir BH Tan


FB 06-Feb-2023 Issued for Approval Aidi Hakeem Rajasekhar BH Tan
FA 28-Oct-2022 Issued for Review Aidi Hakeem Aniza BH Tan

COUNTRY FIELD/ASSET FACILITY DISCIPLINE DOCUMENT SEQUENCE SHEET


REV
Document CODE CODE CODE CODE TYPE NO. NO.
Number
MY SK410B LLCPP ME DS 0036 00 F0
MY-SK410B-LLCPP-ME-DS-0036-00
Mechanical Datasheet for
Rev.: F0
Fuel Gas Treatment Package (1A-6200)
Page 2 of 21

REVISION STATUS / SUMMARY OF CHANGES

Revision
Rev. Revised Paragraphs Reason for Revision
Description

FA - Issued for Review First Issuance

FB - Issued for Approval Update as per commented

F0 - Approved for Design Update as per commented,


process, and heater data

HOLD LIST

No. Section HOLD Description Remark

HOLD-1 Page 3 Line 14 Wind speed and ambient temperature to be


confirmed with latest Metocean data.

HOLD-2 Page 3 Line 18 Seismic design requirements to be confirmed.

HOLD-3 Page 9 Line 24 Fireproofing requirements to be confirmed.

HOLD-4 Page 16 Line 26 Vessel Explosion Drag Load to be confirmed.

DISCLAIMER STATEMENT
The information provided by PTTEP is confidential and shall only be used by the party to
whom it is disclosed to (“the Receiving Party”). The Receiving Party shall not disclose,
publish, reproduce or reveal the information received to any other third party whatsoever
except with the specific prior written authorization of PTTEP. The Receiving Party shall
within five (5) days from notice from PTTEP return or destroy (upon instruction of PTTEP)
all confidential Information furnished by PTTEP.
The Receiving Party shall also take such precautions as are reasonably necessary to
protect the confidential information, including taking measures to prevent loss, theft and
misuse.
The Receiving Party shall fully indemnify and keep PTTEP at all time fully indemnified from
and against any loss or disclosure of confidential information and from all actions,
proceedings, claims, demands, costs, awards and damages arising directly or indirectly as
a result of such unauthorized disclosure.
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 3 of 26 Rev. F0
Item Name: Fuel Gas Treatment Package
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1A-6200
1 APPLICABLE TO PROPOSAL PURCHASE AS-BUILT VENDOR *
2 OWNER PTTEP PLATFORM CPP LANG LEBAH QTY 1 x 100%
3 SECTION A : PACKAGE DESIGN DATA
4 PACKAGE DESIGN CAPACITY Note 3 P&ID NO. MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01

5 FUEL GAS COMPOSITION Note 3 PROCESS DATASHEET Note 3


6 FEED GAS FLOWRATE Note 3 mmscfd PERFORMANCE CRITERIA Note 3
7 INLET PRESSURE Note 3 bara PACKAGE OUTLET CONDITIONS: *
8 INLET TEMPERATURE Note 3 °C SUPPLY PRESSURE (MINIMUM) *
9 TURNDOWN * % ACTUAL PRESSURE DROP *
10 SOUR SERVICE (NACE) Yes DEW POINT (WATER/HYDROCARBON) *
11 UTILITIES AVAILABLE SITE ENVIRONMENTAL CONDITONS
12 ELECTRIC POWER 400V AC, 50Hz, 3ph, 3 wires SITE ENVIRONMENT Tropical, Humid, Offshore Marine
13 NON-UPS 230V AC, 50Hz, 1ph, 2 wires Saliferous Environment.
14 UPS 230V AC, 50Hz, 1ph, 2 wires WIND SPEED 22 (3-Sec Gust)-(Hold-1) m/s
15 INSTRUMENT AIR(MIN,MAX,DESIGN) 4.5 / 8.5 / 13.8 Barg AMBIENT TEMPERATURE 22 - 39.9 (Hold-1) °C
16 HP FLARE (MIN,MAX,DESIGN) 0.5 / 9 / 10 Barg HUMIDITY (%) 100%
17 CLOSED DRAIN (MIN,MAX,DESIGN) 0.2 / - / 7 Barg AREA CLASSIFICATION Zone 2, Gas IIB, T3
18 OPEN DRAIN (MIN,MAX,DESIGN) ATM / - / 3.5 Barg SEISMIC FACTOR Hold-2
19 NOISE LIMITATIONS - SOUND PRESSURE LEVEL JUNCTION BOX DETAIL

20 ANTICIPATED NOISE LEVEL dB(A) * TYPE / MANUFACTURER *


21 NOISE LIMIT dB(A) * IP RATING *
22 ACOUSTIC TREATMENT YES NO DIMENSION (LXWXH) * mm
23 SKID WEIGHTS SKID DIMENSIONS

24 EMPTY WEIGHT * kg. SKID LENGTH, L * mm


25 OPERATING WEIGHT * kg. SKID WIDTH, W * mm
26 TEST WEIGHT * kg. SKID HEIGHT, H * mm
27 INTERFACE CONNECTIONS

TIE-IN MARK NOZZLE SIZE (IN) RATING TYPE OF FLANGE SERVICE DESCRIPTION
28

29

30

31 VENDOR TO FURNISH
32

33

34

35

36

37

38 NOTES FOR SECTION A

39 1) (*/**) INDICATES INFORMATION TO BE FILLED OR CONFIRMED BY VENDOR DURING BID SUBMISSION.


40 2) FUEL GAS PACKAGE SHALL BE DESIGNED, FABRICATED AND INSTALLED AS A SINGLE ASSEMBLED SKID UNIT.
41 3) REFER PROCESS DATA SHEET DOC. NO: .MY-SK410B-LLCPP-PR-DS-0024-00 FOR PROCESS REQUIREMENTS AND OPERATING CONDITIONS.
42 4) VENDOR SHALL IDENTIFY AND RECOMMEND THE EQUIPMENT WITHIN PACKAGE SKID LIMIT TO MEET THE PROCESS REQUIREMENTS.
43 5) ALL MATERIAL SHALL BE SELECTED SUITABLE FOR ITS SERVICE AND DESIGN LIFE OF 20 YEARS.
44 6) VENDOR TO ADVISE AND PROVIDE UTILITIES REQUIREMENT AND CONSUMPTION.
45 7) SURFACE PREPARATION, PAINTING AND COATING OF PACKAGE EQUIPMENT AND SKID SHALL BE AS PER 10008-STD-6-COR-010-R01
46 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
47 8) PROCESS PERFORMANCE GUARANTEE AND MECHANICAL WARRANTY FOR THE PACKAGE SHALL BE PROVIDED BY PACKAGE VENDOR.
48 9) THE SKID AND ASSOCIATED SUPPORT STRUCTURES SHALL BE DESIGNED FOR SINGLE POINT LIFT AND TRANSPORT. NO PART OF THE SYSTEM
49 SHALL OVERHANG THE SKID EDGE. THE SKID SHALL BE PROVIDED WITH FOUR LIFTING LUGS TO FACILITATE LIFTING.
50 10) THE INTERCONNECTING PIPING, INSTRUMENTATION & CONTROLS, ELECTRICAL WIRING, JUNCTION BOXES, CABLE/TUBING TRAYS,
51 LOCAL START/STOP PUSH BUTTON STATIONS ETC. WITHIN THE SKID LIMIT AS PER P&ID SHALL BE DESIGNED AND SUPPLIED BY VENDOR.
52 11) VENDOR SCOPE OF SUPPLY SHALL INCLUDE PROVIDING E3D SMARTPLANT MODEL OF THE PACKAGE.
53 12) THE FUEL GAS PACKAGE SHALL CONSIST OF THE FOLLOWING EQUIPMENT AS MINIMUM:
54 - 1 x 100% FUEL GAS SCRUBBER, (1V-6210)
55 - 2 x 100% FUEL GAS FILTER COALESCERS , (1F-6220A/B)
56 - 2 x 100% FUEL GAS SUPERHEATERS (1H-6230A/B)
57 - 1 x 100% START-FUEL GAS PREHEATER (1H-6240)
58 - OTHER EQUIPMENT AS REQUIRED (Eg. FUEL GAS COOLER)
59
60 FOR ADDITIONAL NOTES REFER SHEET 4 OF 26.
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 4 of 26 Rev. F0
Item Name: Fuel Gas Treatment Package
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1A-6200
1 GENERAL NOTES (Cont'd)
2 13) INSULATION GASKET TO BE PROVIDED FOR DISSIMILAR MATERIAL.

3 14) COATING FOR EXTERNAL BOLTS & NUTS: REFER 10008-STD-6-COR-042-R01 (CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND

4 TOPSIDE APPLICATIONS) AND 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
5 15) HAZARDOUS AREA CLASSIFICATION REFER TO HAZARDOUS AREA CLASSIFICATION SCHEDULE DOC. NO: .MY-SK410B-LL-HS-RE-0002-00

6 16) FUEL GAS TREATMENT PACKAGE SHALL BE DESIGNED TO OPERATE CONTINUOUSLY WITHOUT INTERVENTION OR ANY REQUIRED MAINTENANCE FOR AT

7 LEAST 6 MONTHS. VENDOR SHALL ADVISE IF THERE IS ANY ACTIVITY OR INTERVENTION REQUIRED EARLIER THAN 6 MONTHS.
8 17) FUEL GAS TREATMENT PACKAGE SHALL BE DESIGNED TO MINIMIZE NUMBER OF INTERVENTION PERSONNEL REQUIRED FOR OPERATION AND

9 MAINTENANCE TASKS.
10 18) FUEL GAS TREATMENT PACKAGE SHALL BE DESIGNED FOR REMOTE MONITORING SYSTEM. VENDOR SHALL RECOMMEND MONITORED PARAMETERS AND

11 PROPOSE EQUIPMENT HEALTH MONITORING SYSTEM IN THE BID PACKAGE TO ENSURE SAFETY AND INTEGRITY OF EQUIPMENT COMPONENTS WITHIN
12 THE PACKAGE.
13 19) VENDOR TO ADVISE WHETHER COALESCER CAN BE INTEGRAL WITH SCRUBBER.

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48
49
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 5 of 26 Rev. F0
Item Name: Fuel Gas Scrubber
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1V-6210
1 APPLICABLE TO PROPOSAL PURCHASE AS-BUILT
2 OWNER PTTEP INSIDE DIA. 1750* mm (Note-11) TYPE VERTICAL
3 PLATFORM CPP LANG LEBAH HEIGHT TL/TL 3500* mm (Note-11) QTY 1 x 100%
4 GENERAL DESIGN DATA
5 FLUID HANDLED Gas/ Condensate / Water P&ID REFERENCE MY-SK410B-LLCPP-PR-PNID-0044-01
6 SERVICE CLASSIFICATION Fuel Gas System FLUID DETAILS Gas Condensate Water

7 NOMINAL CAPACITY Note 11 MMscfd FLOW RATE


8 OPERATING PRESSURE (MAX/MIN) Note 11 BarG MOLECULAR WEIGHT Kg/kmol
REFER TO PROCESS DATASHEET
Note 11 (MY-SK410B-LLCPP-PR-DS-0024-00)
9 OPERATING TEMPERATURE °C FLUID DENSITY @ T,P kg/m³
10 ALLOWABLE P (Max.) (Note-11) * Bar FLUID VISCOSITY @ T,P cP
11 DESIGN PRESSURE (INT) @ TOP 47(*) BarG COMP. FACTOR @ T,P Z
12 DESIGN PRESSURE (EXT) FV BarG SURFACE TENSION dyne/cm

13 DESIGN TEMPERATURE (MAX / MIN) 70 / -46(*) °C CORROSIVE COMPONENTS: (Note-11) SAND PARTICLES: No
14 SOUR SERVICE REQUIREMENT YES (LETHAL) (Note-44) HEATING/COOLING MEDIUM: No WAXY LIQUID: No
15 MECHANICAL DESIGN DATA
16 DESIGN CODE ASME SEC VIII Div.1 (Note 3) CORROSION ALLOWANCE (ON CS) Nil (3mm Clad) mm
17 APPLICABLE SPECIFICATION Note 3 SHELL THICKNESS * mm
18 MAX. ALLOW. WORKING PRESSURE * BarG HEAD THICKNESS (Btm / Top) */* mm
19 + LIQUID STATIC HEAD * m WIND VELOCITY (BASIC) 22 (3-Sec Gust)-(Hold-1) m/s

20 HYDROSTATIC TEST PRESSURE * BarG SEISMIC FACTOR Hold-2


21 SUPPORT TYPE Skirt TRANSPORT LOADING (Note-15)

22 RADIOGRAPHY (X-rays) 100% TOTAL VOLUME * m3


23 JOINT EFFICIENCY (SHELL / HEAD) 1.0 / 1.0 INSULATION (If Yes, Type / Thick) No mm
24 TYPE OF HEAD 2:1 Semi Ellipsoidal FIRE PROOFING (If Yes, Type / Thick) Hold (Note-32) mm
25 MATERIAL SPECIFICATION
26 SHELL SA-516 Gr.70N + Clad FLANGES & BLINDS / QOC SA-105N + WOL
27 HEAD(S) SA-516 Gr.70N + Clad NOZZLE NECKS PIPE SA-106 gr B + WOL
28 INTERNAL CLAD/WELD OVERLAY (WOL) SS 316L (NACE) PLATE -
29 STIFFENER RINGS (EXTERNAL) SA-516 Gr.70N FORGING SA-105N + WOL
30 SUPPORTS SA-516 Gr.70N WELDING FITTINGS SA-234 WPB + WOL
31 INTERNALS: EXT. ATTACHMENT SA-516 Gr.70N
32 PARTS WELDED TO VESSEL SS 316L (NACE) EXTERNAL STUDS (Note-37) SA-193 Gr.B7M

33 INLET VANE DEVICE - EXTERNAL NUTS (Note-37) SA-194 Gr.2HM

34 MIST ELIMINATOR SS 316L (NACE) EXTERNAL GASKET (Note-4) Spiral Wound SS316L

35 BAFFLE / WEIR PLATE - LIFTING LUGS SA-516 Gr.70


36 OTHER REMOVABLE INTERNALS SS 316L (NACE) EARTHING BOSS (M10) (Note-21) SS-316

37 VORTEX BREAKER SS 316L (NACE) NAMEPLATE / BRACKET SS 316 / SA-516 Gr.70


38 INT. BOLTS / GASKET SS 316L (NACE)/Viton or PTFE* ANCHOR/ SETTING BOLTS SA-325 Type 1
39 PAINTING / COATING DATA
40 SURFACE PREPARATION INSIDE: No OUTSIDE: Yes SPEC. No.: 10008-STD-6-COR-010-R01
41 PAINTING / COATING INSIDE: No OUTSIDE: Yes SPEC. No.: 10008-STD-6-COR-010-R01
42 WEIGHTS
43 EMPTY WEIGHT * kg FREIGHT (SHIPPING) WEIGHT * kg
44 MAX. OPERATING WEIGHT * kg WEIGHT OF INSULATION * kg
45 FULL WATER WEIGHT * kg WEIGHT OF INTERNALS * kg
46 FABRICATION AND INSPECTION REQUIREMENTS
REGULATING AUTHORITY (DOSH) Offshore Self-Regulation Inspector (OSRI) CODE STAMP REQUIREMENT Yes ASME "U" & "L" Stamp (Note-44)
47

48 INSPECTION AUTHORITY (Note 35) 3rd Party Inspection HYDROSTATIC TEST Yes Per Code &Spec

49 RADIOGRAPHY Yes Per Code &Spec PMI TEST Yes Per Code &Spec

50 ULTRASONIC Yes Per Code &Spec IMPACT TEST * Per Code &Spec

51 MAGNETIC PARTICLE Yes Per Code &Spec PWHT Yes Per Code &Spec

52 DYE PENETRANT Yes Per Code &Spec SPECIAL HEAT TREATMENT * Per Code &Spec

53 SOAP-AIR LEAK TEST Yes Per Code &Spec MATERIAL CERT. (EN 10204) Yes Note 34
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 6 of 26 Rev. F0
Item Name: Fuel Gas Scrubber
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1V-6210
1 NOZZLE / CONNECTION SCHEDULE (Note-5, 6, 7,36)
2 SIZE SCH. No./ FLANGE PER ASME B16.5
MARKS QTY. SERVICE NAME REMARKS
3 Inch THK. RATING TYPE FACE
4 N1 1 6* * * SR RF Feed Inlet*
5 N2 1 6* * * SR RF Hydrocarbon Gas Outlet*
6 N3 1 2* * * LWN RF *
7 N4 1 6* * * SR RF PSV*
8 N5 1 2* * * LWN RF Utility Connection*
9 N6 1 4* * * SR RF *
10 N7 1 2* * * LWN RF Drain*
11

12 INSTRUMENT CONNECTIONS
13 K1A/B 2 2* * * LWN RF Level Transmitter w/ Integral Gauge*

14 K2A/B 2 2* * * LWN RF Level Transmitter w/ Integral Gauge*


15 K3 1 2* * * LWN RF Temperature Gauge*
16 N8 1 2* * * LWN RF Pressure Transmitter w/ Integral Gauge*
17

18

19

20 ACCESS OPENING
21 MW 1 1 24 * * SR RF Manway c/w Blind, Davit, Bolts, Nuts
22 and Gasket
23 GENERAL NOTES
24

25 1) VENDOR / BIDDER TO COMPLETE DATA MARKED ( * ) AND SUBMIT WITH THE BID.

26 2) ALL DIMENSIONS ARE IN ' mm ' UNLESS SPECIFIED OTHERWISE.

27 3) VESSEL SHALL BE DESIGNED, CONSTRUCTED , INSPECTED AND TESTED ACCORDING TO ASME SECTION VIII DIV. 1(LATEST ED.) with U & L STAMP,

28 UNFIRED PRESSURE VESSELS DOC NO. 10008-STD-6-STA-001-R00, PROJECT PARTICULAR SPECIFICATION FOR PRESSURE VESSELS DOC NO.
29 MY-SK410B-LL-ME-SP-0003-00 AND PROJECT PARTICULAR SPECIFICATION FOR FUEL GAS PACKAGE MY-SK410B-LLCPP-ME-SP-0020-00.
30 4) NOZZLE GASKETS AS PER ASME B16.20: SPIRAL WOUND 4mm THK, GRAPHITE FILLED WITH SS 316L WINDING WITH CS CENTERING AND SS 316L INNER RING.

31 5) NOZZLE PROJECTIONS SHALL BE AS PER UNFIRED PRESSURE VESSELS, DOCUMENT NO. 10008-STD-6-STA-001-R00

32 6) VENDOR TO FURNISH WITH HIS BID THE REQUIRED NOZZLES (SIZE & QTY.) FOR FUEL GAS SCRUBBER.

33 7) MINIMUM NOZZLE SIZE SHALL BE 2" NB UNLESS OTHERWISE SPECIFIED. ALL 2" NB NOZZLES SHALL BE LONG WELD NECK

34 (LWN) TYPE EXCEPT NOZZLES WITH ELBOW.


35 8) ALL REMOVABLE INTERNALS SHALL BE SECTIONALIZED FOR INSTALLATION AND REMOVAL THROUGH THE MAN-WAY. ALL REMOVABLE

36 INTERNALS SHALL BE DESIGNED TO PASS THROUGH THE ACCESS OPENING AND MAXIMUM WEIGHT OF EACH PART SHALL BE 25 kgs.
37 9) WHEN THERE ARE MORE THAN ONE OPENING PROVIDED FOR THE INSTALLATION OF INSTRUMENTS, THEN THOSE NOZZLES

38 SHALL BE SET WITH JIGS.


39 10) LEVEL INSTRUMENT SHALL BE DESIGNED FOR ALL CASES ARISING OUT OF VARIOUS OPERATING CONDITIONS.

40 11) VENDOR TO SIZE AND CONFIRM THE VESSEL DIMENSIONS TO MEET THE PROCESS CONDITIONS AND REQUIREMENTS AS

41 PER PROCESS DATASHEET MY-SK410B-LLCPP-PR-DS-0024-00.


42 12) VENDOR SHALL PROVIDE SERVICE PLATFORMS / WALKWAYS / LADDERS / PIPING WHERE REQUIRED.

43 13) ALL INTERNAL BOLTING SHALL BE PROVIDED WITH DOUBLE NUTS.

44 14) DELETED

45 15) TRANSPORTATION LOADS : SEA TRANSPORTATION : 0.8g IN ANY DIRECTION


46 : LAND TRANSPORTATION : 0.3g LONGITUDINAL AND 0.1 g VERTICAL AND TRANSVERSE
47
48 FOR ADDITIONAL NOTES REFER SHEET 7 OF 26.
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 7 of 26 Rev. F0
Item Name: Fuel Gas Scrubber
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1V-6210
1 VESSEL SKETCH / GUIDE DRAWING (SCHEMATIC)
2 N2 N6
3

4 2:1 S.E HEAD


MIN. Thk. ( * )
5 (AFTER FORMING)

(* )
6
TL
7

9
DEMISTER
10

11

12
N8
HALF OPEN PIPE (*)
13 N1
14
N4

( 3500* ) TL/TL
15

16

17 K3

18 K1A
19

(*)
20
(*)

(*) ID ( 1750* )
21

22 K2A
K1B
23

24
LZAHH * K2B
25
LAH * MW
26
LCH * N3
27
LCL * N5
(* )

28 LAL *
29 LZALL * TL
VORTEX BREAKER
30 VESSEL BTL
31 SKIRT VENT

32 LIQUID LEVEL DIAGRAM (*)


2:1 S.E HEAD
(*)

33 MIN. Thk. (* mm)


34 (AFTER FORMING) N7
35
(*)

36

37

38
ELEVATION EARTHING BOSS
39 (2EACH) DIAGONALLY
LOCATED
40 (*) VENDOR TO ADVISE (Sketch above is Indicative Only)
41

42 ACCESSORIES:
43 1) INTERNAL LADDER & GRAB RUNG Yes

44 2) CAGED LADDERS Yes


45 3) CLIPS FOR PIPE SUPPORT/FIRE PROOFING Yes
46 4) DAVIT Yes

47 5) HINGE No

48 6) LIFTING LUG Yes

49 7) EARTHING BOSSES Yes

50 8) INSULATION SUPPORTS No

51 9) STIFFENING RING Yes

52 10) TAILING LUG Yes


53 11) SERVICE PLATFORM (ATTACHED TO VESSEL) Yes
54
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 8 of 26 Rev. F0
Item Name: Fuel Gas Scrubber
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1V-6210
1 GENERAL NOTES (Cont'd)
2 16) DELETED
3 17) VENDOR TO OPTIMISE THE LEVEL SETTINGS BASED ON THE PROPOSED INTERNALS.
4 18) UPPER AND LOWER NOZZLE CONNECTIONS FOR LEVEL ALARM AND SHUTDOWN SHALL HAVE THE SAME ELEVATION
5 (CENTER TO CENTER)TO ALLOW COMPARISON.
6 19) LIQUID LEVEL DIAGRAM TO BE ADVISED BY VENDOR.
7 20) SURFACE PREPARATION, PAINTING AND COATING OF EQUIPMENT SHALL BE AS PER 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL
8 STRUCTURES AND FACILITIES) AND 10008-STD-6-COR-004-R01 (INTERNAL COATING OF PRESSURE VESSELS AND TANKS)
9 21) TWO EARTHING BOSSES SHALL BE PROVIDED DIAGONALLY OPPOSITE AT VESSEL SUPPORT WITH SS 316 STUD (1), NUTS (2), WASHERS (2)
10 AND SPRING WASHER (1).
11 22) UNPAINTED STAINLESS STEEL/ CRA SURFACES SHALL BE ACID PICKLED AND PASSIVATED AFTER FABRICATION.

12 23) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.

13 24) ALLOWABLE NOZZLE LOADS AND MOMENTS SHALL BE AS PER APPENDIX 2 OF UNFIRED PRESSURE VESSELS DOCUMENT NO. 10008-STD-6-STA-001-R00.

14 25) VENDOR SHALL SUBMIT VESSEL SIZING CALCULATION AND PERFORMANCE CALCULATIONS FOR ALL OPERATING CASES.

15 26) VENDOR SHALL SELECT MATERIAL WHICH SUITABLE FOR 20 YEARS DESIGN LIFE.

16 27) NOZZLE FLANGES SHALL BE AS PER ASME B16.5 FOR SIZES UP TO AND INCLUDING 600 DN AND ASME B16.47 SERIES A FOR SIZES

17 ABOVE 600 DN.


18 28) VENDOR TO CONSIDER MINIMUM 10D STRAIGHT LENGTH REQUIREMENT FOR INLET NOZZLE.

19 29) VORTEX BREAKER SHALL BE ELEVATED BY 150MM FROM BOTTOM OF VESSEL.

20 30) MATERIALS IN SOUR SERVICE SHALL MEET THE REQUIREMENTS OF LATEST EDITION OF NACE MR01-75 AND ISO 15156-1/2/3, MATERIALS FOR SOUR SERVICE

21 DOC NO. '10008-STD-6-COR-032-R00', UNFIRED PRESSURE VESSEL DOC NO. '10008-STD-6-STA-001-R00' AND MY-SK410B-LL-CM-RP-0001-00 MATERIAL
22 SELECTION AND CORROSION STUDY REPORT FOR TRUNKLINE#9 PIPELINE FROM WP2 TO CPP AND TOPSIDE FACILITIES OF CPP, WP01, WP02, FR, LQ.
23 31) VENDOR SHALL CONSIDER VESSEL EXPLOSION DRAG LOAD OF 0.1barg (HOLD)

24 32) REQUIREMENTS FOR FIREPROOFING: HOLD

25 33) SUPPORT BRACKET FOR INTERNALS SHALL BE WELDED DEEP INTO THE VESSEL PARENT MATERIAL.

26 34) ALL CS, CLADDED CS, AND SS PRESSURE RETAINING PARTS (WETTED AND NON-WETTED) SHALL BE TYPE 3.1. ALL PLATES

27 WITH NOMINAL THICKNESS 50 mm AND MORE SHALL BE PROVIDED SHALL BE TYPE 3.2 FOR NON PRESSURE AND PRESSURE
28 RETAINING PARTS. OTHER PARTS SHALL BE MINIMUM TYPE 2.2.
29 35) APPROVED THIRD PARTY INSPECTION AGENCIES ARE DNV GL, ABS, BV, LLOYDS OR EQUIVALENT.

30 36) ALL SOUR SERVICE NOZZLES SHALL BE DESIGNED AS SELF REINFORCED NOZZLE.

31 37) COATING FOR EXTERNAL CS BOLTS & NUTS: REFER 10008-STD-6-COR-042-R01 (CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND

32 TOPSIDE APPLICATIONS) AND 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
33 38) WELD OVERLAY SHALL BE OF SUFFICIENT THICKNESS TO GIVE A MINIMUM 3MM THICK UNDILUTED CORROSION RESISTANT LAYER

34 WHEN FINISHED THAT PROVIDES A CHEMICAL COMPOSITION, STRUCTURE AND MECHANICAL PROPERTIES OF THE CLADDING MATERIAL.
35 39) NOZZLES INTERNAL AND FLANGE SHALL BE PROVIDED WITH OVERLAY WELD DEPOSIT PROTECTION. THE FLANGE FACES SHALL

36 BE RE-MACHINED TO THE REQUIRED SURFACE FINISH. AFTER RE-MACHINING, THE MIN. CLADDING THICKNESS AVAILABLE SHALL BE 3mm.
37 GASKET MATERIAL TO BE SOFTER THAN THE NOZZLE CLADDING TO AVOID DAMAGE TO THE NOZZLE GASKET FACE. VENDOR TO ADVISE
38 RESPECTIVE HARDNESS.
39 40) VENDOR SHALL PROVIDE PERFORMANCE GUARANTEES AS MENTIONED IN FUEL GAS PACKAGE PROCESS DATASHEET.

40 41) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.

41 42) THE HARDNESS OF BASE MATERIAL/ BACKING CARBON STEEL SHALL NOT BE MORE THAN 248Hv10.

42 43) VESSEL SHALL BE PROVIDED WITH NECESSARY INTERNALS TO MEET THE PROCESS REQUIREMENTS. AS MINIMUM, THE

43 FOLLOWING INTERNALS SHALL BE PROVIDED:


44 a) HALF OPEN PIPE Yes e) VORTEX BREAKER Yes
45 b) VERTICAL DIP PIPE No * f) INLET BAFFLE DEFLECTOR No
46 c) ADJUSTABLE DOUBLE WEIR No * g) LIQUID COALESCING BAFFLE No
47 d) INCLINED/PERFORATED PLATE No * h) VERTICAL DEMISTER OR EQ Yes (VANE PACK)*
48 44) FOR EQUIPMENT HANDLING HC WITH H2S MORE THAN 1000 ppm, "L" STAMP FOR LETHAL SERVICE SHALL BE PROVIDED

49 AS PER ASME SECTION Vlll DIV 1.


50 45) ALL FLANGE BOLT HOLES ORIENTATION SHALL STRADDLE VESSEL CENTRE LINE.

51 46) SMALL NOZZLE WHICH CANNOT BE WELD OVERLAY, SHALL BE PROVIDED WITH SOLID CRA SAME AS CLADDING MATERIAL.

52 47) SELF-REINFORCED NOZZLES SHALL BE PROVIDED FOR ALL NOZZLES AND MANWAYS IN SOUR SERVICE.

53 48) VENDOR TO CONSIDER MINIMUM 2D STRAIGHT LENGTH REQUIREMENT FOR GAS OUTLET NOZZLE.

54

55
56
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 9 of 26 Rev. F0
Item Name: Fuel Gas Filter Coalescers
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1F-6220A/B
1 APPLICABLE TO PROPOSAL PURCHASE AS-BUILT
2 OWNER PTTEP INSIDE DIA. mm * Type of filter : *
3 PLATFORM CPP LANG LEBAH LENGTH TL/FOF mm * QTY : 2 x 100%
4 GENERAL DESIGN DATA

5 FLUID HANDLED Hydrocarbon Gas P&ID REFERENCE MY-SK410B-LLCPP-PR-PNID-0045-01

6 NOMINAL CAPACITY Note 4 m3/hr FLUID DETAILS


7 OPERATING PRESSURE (NORM.) * BarG FLOW RATE (TOTAL /PER FILTER) m3/hr
8 OPERATING TEMPERATURE (NORM.) * °C MOLECULAR WEIGHT REFER TO PROCESS DATASHEET
(MY-SK410B-LLCPP-PR-DS-0024-00)
9 ALLOWABLE P (CLEAN / DIRTY) */* Bar FLUID DENSITY @ T,P kg/m³
10 DESIGN PRESSURE (INT.) @ TOP 47* BarG FLUID VISCOSITY @ T,P cP
11 DESIGN PRESSURE (EXT.) FV BarG CORROSIVE COMPONENTS: SAND PARTICLES: No
12 DESIGN TEMPERATURE (MAX / MIN) 70 / -46 * °C HEATING/COOLING MEDIUM: No WAXY LIQUID: No
13 SOUR SERVICE REQUIREMENT YES (LETHAL) (Note-32)
14 TURNDOWN RATIO *
15 MECHANICAL DESIGN DATA
16 DESIGN CODE ASME Sec.VIII Div.1 (Note 3) CORROSION ALLOWANCE (ON CS) Nil mm
17 APPLICABLE SPECIFICATION Note 3 SHELL THICKNESS * mm
18 MAX. ALLOW. WORKING PRESSURE * BarG HEAD THICKNESS (MIN. / NOM.) */* mm
19 + LIQUID STATIC HEAD * m WIND VELOCITY (BASIC) 22 (3sec-gust) (Hold-1) m/s
20 HYDROSTATIC TEST PRESSURE * BarG SEISMIC FACTOR Hold-2
21 SUPPORT TYPE Skirt TRANSPORT LOADING (Note-23)

22 RADIOGRAPHY (X-rays) 100% TOTAL VOLUME * m3


23 JOINT EFFICIENCY (SHELL / HEAD) 1.0/1.0 INSULATION (If Yes, Type / Thick) No mm
24 TYPE OF HEAD (Note-31) Bot-2:1 S.E Top-QOC* FIRE PROOFING (If Yes, Type / Thick) Hold-3 (Note-33) mm
25 MATERIAL SPECIFICATION
26 SHELL SA-240 gr 316L (NACE)* FLANGES & BLINDS (Note-34) SA 182 F 316 (NACE)
27 HEAD(S) SA-240 gr 316L (NACE)* NOZZLE NECKS PIPES SA 312 TP 316L (NACE)
28 INTERNAL LINING / CLADDING - PLATE -
29 STIFFENER RINGS SA-240 gr 316L* FORGINGS SA 182 F 316(NACE)
30 SUPPORTS SA-240 gr 316L/ SA 516 GR 70N WELDING FITTINGS SA 403 WP 316L(NACE)*
31 INTERNALS: REINFORCEMENT PAD -
32 PARTS WELDED TO VESSEL SS316L (NACE)* EXTERNAL BOLTS (Note-5) SA-193 Gr.B8M Class 1
33 FILTER ELEMENT * EXTERNAL NUTS (Note-5) SA-194 Gr.8MA
34 FILTER SUPPORTS SS316L (NACE)* EXTERNAL GASKET (Note-12) Spiral Wound
35 TUBESHEETS SS316L (NACE)* LIFTING LUGS SA-240 gr 316L*
36 VORTEX BREAKER SS316L (NACE)* EARTHING BOSS (M10) (Note-19) SS 316
37 INT. BOLTS / GASKET SS316L (NACE)/* NAMEPLATE / BRACKET SA-240 gr 316L / SA-516 Gr.70N
38 EXT. ATTACH. SA-240 gr 316L* ANCHOR / SETTING BOLTS SA-325 Type-1
39 PAINTING / COATING DATA (Note-24)
40 SURFACE PREPARATION INSIDE: No OUTSIDE Y
: es SPEC. No.: 10008-STD-6-COR-010-R01
41 PAINTING / COATING INSIDE: No OUTSIDE Y
: es SPEC. No.: 10008-STD-6-COR-010-R01
42 WEIGHTS
43 EMPTY WEIGHT * kg FREIGHT (SHIPPING) WEIGHT * kg
44 MAX. OPERATING WEIGHT * kg WEIGHT OF INSULATION N/A kg
45 FULL WATER WEIGHT * kg WEIGHT OF INTERNALS * kg
46 FABRICATION AND INSPECTION REQUIREMENTS
Offshore Self-Regulation Inspector
REGULATING AUTHORITY (DOSH) CODE STAMP REQUIREMENT Yes ASME "U" & "L" Stamp (Note-32)
47 (OSRI)
48 INSPECTION AUTHORITY 3rd Party Inspection (Note-13) HYDROSTATIC TEST Yes Per Code & SPEC

49 RADIOGRAPHY Yes Per Code & SPEC PMI TEST Yes Per Code & SPEC

50 ULTRASONIC Yes Per Code & SPEC IMPACT TEST * Per Code & SPEC

51 MAGNETIC PARTICLE Yes Per Code & SPEC PWHT Yes Per Code & SPEC

52 DYE PENETRANT Yes Per Code & SPEC SPECIAL HEAT TREATMENT * Per Code & SPEC

53 SOAP-AIR LEAK TEST Yes Per Code & SPEC MATERIAL CERT. (EN 10204) Yes (Note-25)
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 10 of 26 Rev. F0
Item Name: Fuel Gas Filter Coalescers
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1F-6220A/B
1 NOZZLE / CONNECTION SCHEDULE (Note-6, 7, 8)
2 SIZE SCH. No./ FLANGE PER ASME B16.5
MARKS QTY. SERVICE NAME REMARKS
3 Inch THK. RATING TYPE FACE
4 N1 1 4* * * SR RF Feed Inlet*
5 N2 1 4* * * SR RF Gas Outlet*
6 N4 1 2* * * LWN RF PSV*
7 N6 1 2* * * LWN RF *
8 N7 1 2* * * LWN RF *
9 N8 1 2* * * LWN RF Drain* c/w Vortex Breaker
10

11 INSTRUMENT CONNECTIONS
12 K2 1 2* * * LWN RF Pressure Gauge
13 K3A/B 1 2* * * LWN RF Level Transmitter w/ Integral Gauge
14 K4 1 2* * * LWN RF Pressure Gauge
15 K5A/B 1 2* * * LWN RF Level Transmitter w/ Integral Gauge
16 K6A/B 1 2* * * LWN RF Level Transmitter w/ Integral Gauge
17 K7A/B 1 2* * * LWN RF Level Transmitter w/ Integral Gauge
18 ACCESS OPENING
19 MW 1 * * * * RF Access Opening c/w Blind, Davit, Bolts, Nuts
20 and Gasket
21

22 FILTER INFORMATION
23 MANUFACTURER * ELEMENT CHANGE OUT DIFFERENTIAL PRESSURE * BarG
24 VENDOR MODEL NO. * BURSTING PRESSURE * BarG
25 NO.OF ELEMENTS IN EACH FILTER * FILTER ELEMENT SIZE (OD x L) * mm
26 DIRECTION OF FLOW * FILTER ELEMENT SURFACE AREA * mm2
27 ELEMENT FIXING DETAIL * BACKWASH FLOWRATE *
28 MAXIMUM FLOW PER ELEMENT * FILTRATION EFFICIENCY *
29 EXPECTED LIFE OF ELEMENT * PARTICLE SIZE TO BE REMOVED *
30

31 GENERAL NOTES
32 1) VENDOR / BIDDER TO COMPLETE/ RE-CONFIRM DATA MARKED ( * ) AND SUBMIT WITH THE BID.
33 2) ALL DIMENSIONS ARE IN ' mm ' UNLESS SPECIFIED OTHERWISE.
34 3) COALESCER SHALL BE DESIGNED, CONSTRUCTED , INSPECTED AND TESTED ACCORDING TO ASME SECTION VIII DIV. 1 (LATEST ED.)
35 WITH U & L STAMP , UNFIRED PRESSURE VESSELS DOC NO. 10008-STD-6-STA-001-R00 AND PROJECT PARTICULAR SPECIFICATION FOR PRESSURE
36 VESSELS DOC NO. MY-SK410B-LL-ME-SP-0003-00 AND PROJECT PARTICULAR SPECIFICATION FOR FUEL GAS PACKAGE MY-SK410B-LLCPP-ME-SP-0020-00.
37 4) REFER PROCESS DATA SHEET, DOCUMENT NO.: MY-SK410B-LLCPP-PR-DS-0024-00 FOR PROCESS DATA AND REQUIREMENTS.
38 5) COATING FOR EXTERNAL BOLTS & NUTS: REFER 10008-STD-6-COR-042-R01 (CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND
39 TOPSIDE APPLICATIONS) AND 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
40 6) NOZZLE PROJECTIONS SHALL BE AS PER UNFIRED PRESSURE VESSELS, DOCUMENT NO. 10008-STD-6-STA-001-R00.
41 7) GIVEN NOZZLES ARE INDICATIVE ONLY. VENDOR TO CONFIRM THE REQUIRED NOZZLES SIZE AND QUANTITY.
42 8) SELF-REINFORCED (SR) NOZZLES SHALL BE PROVIDED FOR ALL NOZZLES AND MANWAYS IN SOUR SERVICE.
43 9) FILTER ELEMENT SHALL BE REMOVABLE THROUGH FILTER SIDE ACCESS OPENING. ALL REMOVABLE INTERNALS SHALL BE
44 DESIGNED TO PASS THROUGH THE ACCESS OPENING AND MAXIMUM WEIGHT OF EACH PART SHALL BE 25 kgs.
45 10) WHEN THERE ARE MORE THAN ONE OPENING PROVIDED FOR THE INSTALLATION OF INSTRUMENTS, THEN THOSE OPENINGS
46 SHALL BE SET WITH JIGS.
47 11) VENDOR SHALL PERFORM FILTER SIZING FOR FUEL GAS FILTER COALESCER TO MEET PROCESS CONDITIONS AND REQUIREMENTS AS
48 SPECIFIED IN PROCESS DATASHEET AND PROCESS SIZING CRITERIA DOC NO. 10008-STD-6-PRO-002-R01.
49 12) GASKETS TO BE SPIRAL WOUND GRAPHITE FILLED WITH 4mm THK SS 316L WINDING , 3.2 mm THK SS 316L INNER & CENTER RING AS PER
50 ASME B16.20.
51 13) APPROVED THIRD PARTY INSPECTION AGENCIES ARE DNV GL, ABS, BV, LLOYDS OR EQUIVALENT.
52 14) THE FILTER HOUSING SHALL BE PROVIDED WITH A TOP FLANGE COMPLETE WITH BLIND FLANGE DESIGNED TO ASME16.5.
53 TOP COVER OF FILTER SHALL BE PROVIDED WITH DAVIT AND HANDLE.
54
55 FOR ADDITIONAL NOTES REFER SHEET 12 OF 26.
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 11 of 26 Rev. F0
Item Name: Fuel Gas Filter Coalescers
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1F-6220A/B
1 VESSEL SKETCH / GUIDE DRAWING (SCHEMATIC)
2

(*)
6
MW
7

9
FOF
10

11

12
K4
13
N6
14

15 N4 N2
16
K5A
17 K2
18
K3A

(*)
19
K5B
20
K3B
21

22 N7
N1
23

24 K6A
25 K7A
26 K6B ID *
27 THK ( * )
28 K7B
29 TL
30
VORTEX BREAKER
31 2:1 S.E. HEAD
MIN. Thk. *
32
(AFTER FORMING)
33
(*)

34

35

36 N8
37

38
EARTHING BOSS
39 (2EA)

40

41 ELEVATION
42 (Sketch above is indicative only)
43

44 ACCESSORIES:
45 1) CLIPS FOR LADDER & PLATFORM *
46 2) CLIPS FOR PIPE SUPPORT *
47 3) DAVIT Yes
48 4) HINGE No
49 5) LIFTING LUG Yes
50 6) EARTHING BOSSES Yes
51 7) INSULATION SUPPORTS No
52
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 12 of 26 Rev. F0
Item Name: Fuel Gas Filter Coalescers
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1F-6220A/B
1 GENERAL NOTES (Cont'd)
2 15) VENDOR TO INDICATE MAXIMUM ALLOWABLE PRESSURE DROPS (NORMAL FLOW AND REVERSE FLOW) ALLOWABLE FOR THE

3 FILTERING/COALESCING ELEMENTS. VENDOR TO ALSO ADVISE ELEMENT BURST PRESSURE.


4 16) ALL INTERNAL BOLTING SHALL BE PROVIDED WITH DOUBLE NUTS.

5 17) MINIMUM NOZZLE SIZE SHALL BE 2" UNLESS OTHERWISE SPECIFIED. ALL 2" NOZZLES SHALL BE LONG WELD NECK TYPE.

6 18) LIQUID LEVEL DIAGRAM TO BE ADVISED BY VENDOR.

7 19) TWO EARTHING BOSSES SHALL BE PROVIDED DIAGONALLY OPPOSITE AT VESSEL SUPPORT WITH SS 316 STUD (1),

8 NUTS (2), WASHERS (2) AND SPRING WASHER (1).


9 20) VORTEX BREAKER SHALL BE ELEVATED BY 150MM FROM BOTTOM OF VESSEL.

10 21) ALLOWABLE NOZZLE LOADS AND MOMENTS SHALL BE AS PER APPENDIX 2 OF UNFIRED PRESSURE VESSELS DOCUMENT NO. 10008-STD-6-STA-001-R00.

11 22) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.

12 23) TRANSPORTATION LOADS : SEA TRANSPORTATION : 0.8g IN ANY DIRECTION


13 : LAND TRANSPORTATION : 0.3g LONGITUDINAL AND 0.1 g VERTICAL AND TRANSVERSE
14 24) UNPAINTED STAINLESS STEEL SURFACES SHALL BE ACID PICKLED AND PASSIVATED AFTER FABRICATION.

15 25) ALL CS AND SS PRESSURE RETAINING PARTS (WETTED AND NON-WETTED) INCLUDING INTERNALS SHALL

16 BE TYPE 3.1. ALL PLATES WITH NOMINAL THICKNESS 50 MM AND MORE SHALL BE PROVIDED WITH TYPE 3.2 CERTIFICATION.
17 OTHER PARTS SHALL BE MINIMUM TYPE 2.2.
18 26) MATERIALS IN SOUR SERVICE SHALL MEET THE REQUIREMENTS OF LATEST EDITION OF NACE MR01-75 AND ISO 15156-1/2/3, MATERIALS FOR

19 SOUR SERVICE DOC NO. '10008-STD-6-COR-032-R00', UNFIRED PRESSURE VESSEL DOC NO. '10008-STD-6-STA-001-R00'
20 AND MY-SK410B-LL-CM-RP-0001-00 MATERIAL SELECTION AND CORROSION STUDY REPORT FOR TRUNKLINE#9 PIPELINE FROM WP2 TO CPP
21 AND TOPSIDE FACILITIES OF CPP, WP01, WP02, FR, LQ.
22 27) VENDOR SHALL SELECT MATERIAL WHICH SUITABLE FOR 20 YEARS DESIGN LIFE.

23 28) SURFACE PREPARATION, PAINTING AND COATING OF EQUIPMENT SHALL BE AS PER 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL.

24 STRUCTURES AND FACILITIES) AND 10008-STD-6-COR-004-R01 (INTERNAL COATING OF PRESSURE VESSELS AND TANKS)
25 29) LEVEL INSTRUMENTS SHALL BE DESIGNED TO TAKE CARE OF ALL CASES ARISING OUT OF VARIOUS DESIGN CONDITIONS.

26 30) UPPER AND LOWER NOZZLE CONNECTIONS FOR ILIA (ALARM) AND ILZA (SHUTDOWN) SHALL HAVE THE SAME ELEVATION

27 (CENTER TO CENTER) TO ALLOW COMPARISON.


28 31) FILTER COVER SHALL BE FLANGED TYPE. AS OPTIONAL, VENDOR TO SUBMIT QUICK OPENING CLOSURE FOR COMPANY APPROVAL.

29 ALL FLANGE / QOC RATING SHOULD NOT BE LIMITING FACTOR FOR MAWP.
30 32) FOR EQUIPMENT HANDLING HC WITH H2S MORE THAN 1000 ppm, "L" STAMP FOR LETHAL SERVICE SHALL BE PROVIDED AS PER

31 ASME SECTION Vlll DIV 1.


32 33) REQUIREMENTS FOR FIREPROOFING: HOLD-3

33 34) ALL STAINLESS STEEL FLANGE MATERIAL SHALL BE DUAL CERTIFIED I.E SS316/SS316L.

34 35) VENDOR SHALL DESIGN AND SIZE THE FILTERS TO OPERATE CONTINUOUSLY WITHOUT INTERVENTION OR ANY REQUIRED MAINTENANCE FOR AT

35 LEAST 6 MONTHS. VENDOR SHALL ADVISE IF THERE IS ANY ACTIVITY OR INTERVENTION REQUIRED EARLIER THAN 6 MONTHS.
36 36) VENDOR SHALL DESIGN FOR REMOTE MONITORING SYSTEM. VENDOR SHALL RECOMMEND MONITORED PARAMETERS AND PROPOSE EQUIPMENT

37 HEALTH MONITORING SYSTEM IN THE BID PACKAGE.


38 37) DUPLEX CONFIGURATION SHALL BE APPLIED TO CRITICAL COALESCERS WHERE FLOW CANNOT BE SHUTDOWN. REMOTE/AUTOMATIC CHANGE-OVER

39 SHALL BE CONSIDERED AND PROPOSED TO ACCOMMODATE NNM CONCEPT.


40

41

42

43

44

45

46

47

48

49
50
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 13 of 26 Rev. F0
Item Name: Fuel Gas Superheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6230A/B
1 APPLICABLE TO PROPOSAL PURCHASE AS-BUILT
2 OWNER PTTEP INSIDE DIA. * mm (Note-11) TYPE HORIZONTAL
3 PLATFORM CPP LANG LEBAH LENGTH TL/FOF * mm (Note-11) QTY 2 x 100%
4 GENERAL DESIGN DATA
5 FLUID HANDLED Hydrocarbon Gas P&ID REFERENCE MY-SK410B-LLCPP-PR-PNID-0046-01
6 VAPOUR FLOW RATE Note 11 MMscfd SOUR SERVICE REQUIREMENT YES (LETHAL) (Note-37)
3
7 LIQUID FLOW RATE -- m /hr INLET PRESSURE Note 11 BarG
8 TEMPERATURE (MAX/ MIN) Note 11 °C PRESSURE DROP * Bar
9 DENSITY Note 11 kg/m³ DUTY * kW
10 VISCOSITY Note 11 cP EXCESS AREA * %
11 THERMAL CONDUCTIVITY * W/m°C SPARE ELEMENTS 20% (Note 15)
12 SPECIFIC HEAT Note 11 KJ/Kg°C MAXIMUM SHEATH TEMPERATURE * °C
2
13 VAPOUR MOLECULAR WEIGHT Note 11 FLUX DENSITY (Max.) * kW/m
14 CORROSIVE COMPONENTS Yes
15 MECHANICAL DESIGN DATA
16 DESIGN PRESSURE 47* BarG CORROSION ALLOWANCE (ON CS) Nil mm
17 DESIGN TEMPERATURE (MAX/ MIN) 115/-46* °C SHELL THICKNESS * mm
18 DESIGN CODE (Note 3) ASME Sec.VIII Div.1 HEAD THICKNESS * mm
19 SPECIFICATION Note 3 WIND VELOCITY 22 (3sec-gust) (Hold-1) m/s
20 MAX. ALLOW. WORKING PRESSURE * BarG SEISMIC FACTOR Hold-2
21 HYDROSTATIC TEST PRESSURE * BarG TRANSPORT LOADING Note 13
22 SUPPORT TYPE Saddles (2 Nos.) TOTAL VOLUME * m3
23 RADIOGRAPHY (X-rays) 100% INSULATION (IF YES, TYPE / THICK) Yes (By Others) mm
24 JOINT EFFICIENTCY (SHELL / HEAD) 1.0 / 1.0 FIRE PROOFING (IF YES, TYPE) Hold-3 (Note 29) mm
25 TYPE OF HEAD 2:1 S.E. & Flanged
26 MATERIAL SPECIFICATION
27 SHELL SA-240 gr 316L (NACE) NOZZLE FLANGES & BLINDS (Note 36) SA 182 F 316 (NACE)
28 HEAD(S) SA-240 gr 316L (NACE) NOZZLE NECKS PIPE SA 312 TP 316L (NACE)
29 INTERNAL LINING / CLADDING -- PLATE -
30 STIFFENER RINGS (EXTERNAL) SA-240 gr 316L (NACE) FORGING SA 182 F 316 (NACE)
31 SUPPORTS (SADDLE/BASE PLATE) SA-240 gr 316L/ SA 516 GR 70N WELDING FITTINGS SA 403 WP 316L(NACE)
32 INTERNALS : EXT. ATTACH. SA-240 gr 316L*
33 BAFFLE PLATE SA-240 gr 316L (NACE) EXTERNAL STUDS (Note 34) SA-193 Gr.B8M Class 1
34 HEATER SHEATH Incoloy 800 (NACE)* EXTERNAL NUTS (HEAVY) (Note 34) SA-194 Gr.8MA
35 INT. BOLTS / GASKET SS 316L (NACE)/- EXTERNAL GASKET (Note 4) Spiral Wound
36 TERMINAL BOX SS 316 LIFTING LUGS `
37 HEATER FLANGE / TUBESHEET SA-182-F316/SS316L* (NACE) EARTHING BOSS (M10) (Note 20) SS 316
38 HEATER COUPLING SS 316 * NAMEPLATE / BRACKET SS 316 / SA-516 Gr.70N
39 ANCHOR / SETTING BOLTS SA-325 Type-1
39 PAINTING / COATING DATA (Note 21)
40 SURFACE PREPARATION INSIDE: No OUTSIDE: Yes SPEC. No.: 10008-STD-6-COR-010-R01
41 PAINTING / COATING INSIDE: No OUTSIDE: Yes SPEC. No.: 10008-STD-6-COR-010-R01
42 WEIGHTS
43 EMPTY WEIGHT * kg FREIGHT (SHIPPING) WEIGHT * kg
44 MAX. OPERATING WEIGHT * kg WEIGHT OF INSULATION * kg
45 FULL WATER WEIGHT * kg WEIGHT OF INTERNALS * kg
46 FABRICATION AND INSPECTION REQUIREMENTS
REGULATING AUTHORITY (DOSH) Offshore Self-Regulation Inspector (OSRI) CODE STAMP REQUIREMENT Yes ASME "U" & "L" Stamp (Note-37)
47

48 INSPECTION AUTHORITY 3rd Party Inspection (Note-31) HYDROSTATIC TEST Yes Per Code & SPEC

49 RADIOGRAPHY Yes Per Code & SPEC PMI TEST Yes Per Code & SPEC

50 ULTRASONIC Yes Per Code & SPEC IMPACT TEST * Per Code & SPEC

51 MAGNETIC PARTICLE Yes Per Code & SPEC PWHT Yes Per Code & SPEC

52 DYE PENETRANT Yes Per Code & SPEC SPECIAL HEAT TREATMENT * Per Code & SPEC

53 SOAP-AIR LEAK TEST Yes Per Code & SPEC MATERIAL CERT. (EN 10204) Yes (Note 30)
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 14 of 26 Rev. F0
Item Name: Fuel Gas Superheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6230A/B
1 NOZZLE / CONNECTION SCHEDULE (Note 7, 8)
2 SIZE SCH. No./ FLANGE PER ASME B16.5
MARKS QTY. SERVICE NAME REMARKS
3 inch THK. RATING TYPE FACE
4 N1 1 4* * * SR RF Feed Inlet*
5 N2 1 4* * * SR RF Gas Outlet*
6 N3 1 2* * * LWN RF Drain*
7 N4 1 2* * * LWN RF *
8

9 INSTRUMENT CONNECTIONS
10

11
VENDOR TO FURNISH
12

13

14 ACCESS OPENING
15

16

17

18 HEATER / ELECTRICAL DESIGN DATA (NOTE 14,15,16, 35)


19 ELEMENT DIAMETER * mm SHEATH THERMOCUPLE, QTY. *
20 NUMBER OF ELEMENTS * SHEATH THERMOCUPLE, TYPE *
21 IMMERSED LENGTH * mm THERMOCOUPLE ATTACHMENT *
22 COLD LENGTH * mm MANUFACTURE *
23 HEATER FLANGE SIZE & RATING *
24

25 POWER SUPPLY 400 VAC, 50HZ, 3-PHASE NUMBER OF CIRCUITS *


26 AREA CLASSIFICATION Zone 2, Gas IIB, T3 TERMINAL HUB SIZE *
27 ENCLOSURE TYPE IP 66 Ex 'e' to IEC 60079-7 TERMINAL HUB QTY. *
28 HEATER CONTROL TYPE Thyristor Control ANTI-CONDENSATION HEATER Yes (Terminal Box)

SPECIFICATION MY-SK410B-LLCPP-ME-SP-0020-00 POWER SUPPLY 230 VAC, 50 Hz, 1-phase


29

30 GENERAL NOTES
31 1) ALL DIMENSIONS ARE IN ' mm ' UNLESS SPECIFIED OTHERWISE.
32 2) VENDOR / BIDDER TO COMPLETE/ RE-CONFIRM DATA MARKED ( * ) AND SUBMIT WITH THE BID.
33 3) VESSEL SHALL BE DESIGNED, CONSTRUCTED , INSPECTED AND TESTED ACCORDING TO ASME SECTION VIII DIV. 1 (LATEST ED.) WITH U & L STAMP ,
34 UNFIRED PRESSURE VESSELS DOC NO. 10008-STD-6-STA-001-R00 AND PROJECT PARTICULAR SPECIFICATION FOR PRESSURE VESSELS DOC NO.
35 MY-SK410B-LL-ME-SP-0003-00 AND PROJECT PARTICULAR SPECIFICATION FOR FUEL GAS PACKAGE MY-SK410B-LLCPP-ME-SP-0020-00.
36 4) GASKETS TO BE SPIRAL WOUND GRAPHITE FILLED WITH 4mm THK SS 316L WINDING , 3.2 mm THK SS 316L INNER & CENTER RING
37 AS PER ASME B16.20.
38 5) NOZZLE PROJECTIONS SHALL BE AS PER UNFIRED PRESSURE VESSELS, DOCUMENT NO. 10008-STD-6-STA-001-R00
39 6) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.
40 7) VENDOR TO FURNISH WITH HIS BID THE REQUIRED NOZZLES (SIZE & QTY.) FOR FUEL GAS HEATER.
41 8) MINIMUM NOZZLE SIZE SHALL BE 2" UNLESS OTHERWISE SPECIFIED. 2" NOZZLES SHALL BE OF "LWN" TYPE EXCEPT
42 BOTTOM NOZZLES WITH ELBOWS.
43 9) VENDOR TO SIZE THE BUNDLE TO MEET THE PROCESS REQUIREMENTS.
44 10) ALL INTERNAL BOLTING SHALL BE PROVIDED WITH DOUBLE NUTS.
45 11) REFER PROCESS DATA SHEET, DOCUMENT No.: MY-SK410B-LLCPP-PR-DS-0024-00 FOR PROCESS DATA AND REQUIREMENTS.
46 12) THE SKIN TEMPERATURE OF HEATING ELEMENT SHALL NOT EXCEED 80% OF THE IGNITION TEMPERATURE OF PROCESS FLUID
47 BEING HEATED.
48 13) TRANSPORTATION LOADS : SEA TRANSPORTATION : 0.8g IN ANY DIRECTION
49 : LAND TRANSPORTATION : 0.3g LONGITUDINAL AND 0.1 g VERTICAL AND TRANSVERSE
50

51 FOR ADDITIONAL NOTES REFER SHEET 16 OF 26.


52

53
54
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 15 of 26 Rev. F0
Item Name: Fuel Gas Superheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6230A/B
1 VESSEL SKETCH / GUIDE DRAWING (SCHEMATIC)
2

10

11

12

13
2 - LIFTING LUGS
14 HEATER BUNDLE
REMOVAL LENGTH *
15

16

17
2:1 S.E. HEAD
18 N1 N4 MIN. Thk. *
(AFTER FORMING)
19 THK (*)
20

21

22

23
CLL
C
ID *

24

25

26

27
*

28

29

30 EARTHING BOSS (2
FOF

N3 EACH) N2

TL
31

32 * *
33
FIXED END SLIDING END
34 *
35 *
36
ELEVATION
37

38

39

40

41 (*) VENDOR to advise


42 ACCESSORIES:
43 1) CLIPS FOR PIPE SUPPORT No
44 2) LIFTING LUG Yes
45 3) EARTHING BOSSES Yes
46 4) INSULATION SUPPORTS Yes
47

48

49

50

51
52
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 16 of 26 Rev. F0
Item Name: Fuel Gas Superheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6230A/B
1 GENERAL NOTES (Cont'd)
2 14) ELECTRIC HEATER SHALL BE PROVIDED WITH MINIMUM TWO (2) TEMPERATURE SENSING DEVICES OF PT 100 (3 WIRE TYPE)
3 FOR TEMPERATURE MEASUREMENT OF THE HEATER ELEMENTS AND SUPERHEATER FLANGE, RESPECTIVELY, FOR EACH FUEL GAS
4 SUPERHEATER TO CUT OFF POWER SUPPLY. THE MAXIMUM SKIN TEMPERATURE OF HEATER SHALL NOT EXCEED 80% OF FUEL GAS IGNITION
5 TEMPERATURE. VENDOR TO PROVIDE THE SET TEMPERATURE (TZAHH) FOR ELEMENT AND FLANGE TEMPERATURE SENSING DEVICES.
6 15) THE MINIMUM SPARE ELEMENT REQUIREMENT IS 20% OF EACH HEATER ELEMENTS REQUIRED TO FULFIL THE OPERATIONAL
7 DUTIES OF THE UNIT FOR EACH UNIT.
8 16) HEATER THEMAL DUTY SHALL BE CONFIRMED BY VENDOR. SIZING TO BE PROVIDED FOR PURCHASER REVIEW AND APPROVAL.
9 17) VENDOR TO ADVISE THE HEATING ELEMENTS CONFIGURATION FOR THE HEATER CONSIDERING VARYING LOAD THROUGHOUT
10 THE OPERATING YEARS AS DESCRIBED IN PROCESS DATASHEET.
11 18) FLANGE TEMPERATURE SENSING DEVICE AND ELEMENT TEMPERATURE SENSING DEVICE SHALL BE FURNISHED BY VENDOR.
12 19) SURFACE PREPARATION, PAINTING AND COATING OF EQUIPMENT SHALL BE AS PER 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL.
13 STRUCTURES AND FACILITIES) AND 10008-STD-6-COR-004-R01 (INTERNAL COATING OF PRESSURE VESSELS AND TANKS).
14 20) TWO EARTHING BOSSES SHALL BE PROVIDED DIAGONALLY OPPOSITE AT VESSEL SUPPORT WITH SS 316 STUD (1), NUTS (2), WASHERS (2)
15 AND SPRING WASHER (1).
16 21) UNPAINTED STAINLESS STEEL/ CRA SURFACES SHALL BE ACID PICKLED AND PASSIVATED AFTER FABRICATION.
17 22) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.
18 23) ALLOWABLE NOZZLE LOADS AND MOMENTS SHALL BE AS PER APPENDIX 2 OF UNFIRED PRESSURE VESSELS DOCUMENT NO. 10008-STD-6-STA-001-R00.
19 24) VENDOR SHALL SUBMIT VESSEL SIZING CALCULATION AND PERFORMANCE CALCULATIONS FOR ALL OPERATING CASES.
20 25) VENDOR SHALL SELECT MATERIAL WHICH SUITABLE FOR 20 YEARS DESIGN LIFE.
21 26) NOZZLE FLANGES SHALL BE AS PER ASME B16.5 FOR SIZES UP TO AND INCLUDING 600 DN AND ASME B16.47 SERIES A
22 FOR SIZES ABOVE 600 DN.
23 27) MATERIALS IN SOUR SERVICE SHALL MEET THE REQUIREMENTS OF LATEST EDITION OF NACE MR01-75 AND ISO 15156-1/2/3, MATERIALS FOR SOUR SERVICE
24 DOC NO. '10008-STD-6-COR-032-R00', UNFIRED PRESSURE VESSEL DOC NO. '10008-STD-6-STA-001-R00' AND MY-SK410B-LL-CM-RP-0001-00 MATERIAL
25 SELECTION AND CORROSION STUDY REPORT FOR TRUNKLINE#9 PIPELINE FROM WP2 TO CPP AND TOPSIDE FACILITIES OF CPP, WP01, WP02, FR, LQ.
26 28) VENDOR SHALL CONSIDER VESSEL EXPLOSION DRAG LOAD OF 0.1barg (HOLD-4)
27 29) REQUIREMENTS FOR FIREPROOFING: HOLD-3
28 30) ALL CS, CLADDED CS, AND SS PRESSURE RETAINING PARTS (WETTED AND NON-WETTED) SHALL BE TYPE 3.1. ALL PLATES WITH
29 NOMINAL THICKNESS 50 mm AND MORE SHALL BE PROVIDED SHALL BE TYPE 3.2 FOR NON PRESSURE
30 AND PRESSURE RETAINING PARTS. OTHER PARTS SHALL BE MINIMUM TYPE 2.2.
31 31) APPROVED THIRD PARTY INSPECTION AGENCIES ARE DNV GL, ABS, BV, LLOYDS OR EQUIVALENT.
32 32) ALL SOUR SERVICE NOZZLES SHALL BE DESIGNED AS SELF REINFORCED NOZZLE.
33 33) VESSEL SHALL BE DESIGNED AND CONSTRUCTED ACCORDING TO PROJECT SPECIFICATION FOR FUEL GAS
34 PACKAGE DOC. NO: MY-SK410B-LLCPP-ME-SP-0020-00.
35 34) COATING FOR EXTERNAL BOLTS & NUTS: REFER 10008-STD-6-COR-042-R01 (CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND
36 TOPSIDE APPLICATIONS) AND 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
37 35) ELECTRIC HEATER SHALL COMPLY WITH ELECTRICAL ENGINEERING GUIDELINE 1008-STD-ELE-001-R00.
38 36) ALL STAINLESS STEEL FLANGE MATERIAL SHALL BE DUAL CERTIFIED I.E SS316/SS316L.
39 37) FOR EQUIPMENT HANDLING HC WITH H2S MORE THAN 1000 ppm, "L" STAMP FOR LETHAL SERVICE SHALL BE PROVIDED AS PER
40 ASME SECTION Vlll DIV 1.
41

42

43

44

45

46

47

48

49

50

51

52

53

54
55
Document No.: MY-SK410B-LLCPP-ME-DS-0036-00
Sheet No.: 17 of F0
26 Rev : FB
DATA SHEET - ELECRTICAL HEATER CONTROL PANEL Fuel Gas Superheater
Item Name:
Tag No: 1H-6230A/B
1 GENERAL
2 Manufacturer ( * ) MAKE : MODEL :
3 Tag Number Qty:
4 Standards, Codes IEC BS NEMA ATEX
5 Certifying Authority (*) PTB BASEEFA ASTA
6 Certificate Nr. (*)
7 Language On Equipment English
7 Language On Documentation English
8 DESIGN CONDITIONS
9 Installation Location (indoor) / Ambient Type Indoor Outdoor Air-conditioned pressurised room
10 Ambient Temperature Design : 40 °C Min : °C
11 Relative Humidity Design: 100 % Min : %
12 Area Classification Safe Area Zone 1 Zone 2
13 GENERAL REQUIREMENTS
14 Supply Network Voltage/Frequency/Phases 400 V 50 Hz N°: 3
15 Supply Voltage Fault Level Max. / Withstand time (Note-14) 80 kA 1 s
16 Earhting Configuration IT
17 Upstream Protection Circuit Breaker (ACB)
18 HCP Input Side Isolating Device (Type / Rating) MCCB (preferred) or ACB (Note-4,5,8)
19 HCP Breaking Device (Type/ Rating) (*) Contactor (Note-6)
25 Unit Transformer (*)
26 Transformer data (if applicable) (*)
20 Ouput Side Isolating Device (Type/Rating) (*)
21 Auxiliary Rated Voltage (*)
22 Type of Fuse gG type (Note-7)
23 Thyrisytor Control Stage Single Cycling System (Note -2,17)
24 Guarantee Harmonic Content of Thyristor Controller HCP < 2% in the worst case - 50% load on fifth harmonic (Note-19)
25 Communication Between PCS Modbus TCP/IP (Note-10)
26 Cooling Natural Ventilation or 2x100% Fans
27 Earthing Copper Earth Bar (min 25mm x 5mm cross section)
28 Internal Wiring Flame Retardant
29 Marking As per Requisition document
30 Ramp Unit (Note-24) Yes No
31 Temperature Controller / Indicator Yes No
32 Space heater / Voltage / Frequency (Note-11) Yes X No 230 V AC 50 Hz
33 PANEL CONSTRUCTION
34 Degree of protection IP 41
35 Compartment Min 3 separate compartments (Note-15)
36 Power Cable Entry / Cable Type / Cable Size - Incoming (Note-12) Bottom CU/XLPE/PVC TBA
37 Power Cable Entry / Cable Type / Cable Size - Outgoing (Note-20) Bottom CU/XLPE/SWA/PVC TBA
38 Space Heater Cable Entry / Cable Type / Cable Size Bottom CU/XLPE/SWA/PVC 2C x 2.5sq.mm
37 Temperature Transmitter Cable Entry / Cable Type / Cable Size Bottom By Instrument By Instrument
38 Cable gland plate Undrilled, Non-Magnetic, Unpainted Removable Gland Plate
39 Access Front
40 Painting (Mfr standard,... / color) RAL 7032
41 REMOTE CONTROL
42 Auto - Manual selector switch Yes X No
43 Trip From SIS Yes X No
44 Start/Stop HCP From PCS Yes X No
45 REMOTE MONITORING AND SIGNALLING
46 Unit On/Off Status to PCS Yes X No
47 Local Remote Status to PCS Yes X No
48 Load Current Signal to PCS Yes X No type: 4-20 mA signal
49 Fault/Trip Alarm Status to PCS Yes X No
50 MEASUREMENT, PROTECTION AND ALARMS
51 Earth Fault Alarm Trip X With display X
52 Thyristor Over-Temperature Alarm Trip With display X
53 Fan Failure Alarm Trip With display X
54
Document No.: MY-SK410B-LLCPP-ME-DS-0036-00
Sheet No.: 18 of 26 Rev : F0
DATA SHEET - ELECRTICAL HEATER CONTROL PANEL Fuel Gas Superheater
Item Name:
Tag No: 1H-6230A/B
1 MANUFACTURER DATA
2 HCP Power Requirements (Note-18) (*) kW
3 Peak inrush current (*) A
4 Transformer data (if applicable) (*)
5 Heat Load Dissipation At Full Load (*)
6 ELECTRICAL HEATER DIMENSIONS AND WEIGHT
7 Length x Depth x Height in mm (*)
8 Dimension Limit From Equipment Layout N/A
9 Weight in kg (*)
10 LOAD CONFIGURATION
11 Nos. of Stage Control / Type of Control / Duty kW (*)
12 Load Configuration (*)
13
14 Notes:
15 1. ( * ) indicates information or data to be confirmed and completed by VENDOR.
16 2. Regulation of power to the heater shall use complete full cycles of mains power rather than chopped cycles. Switching ON and OFF shall be
17 done at the zero voltage crossover points of the mains complete full cycles. Vendor shall advise the impact to power system during
18 switching in particularly when big heater load is provided.
19 3. VENDOR to provide auto/manual selector switch on HCP to facilitate manual override control of the thyristor via local potentiometer inside
20 HCP.
21 4. Incoming ACB or MCCB for the HCP shall interlock with panel door.
22 5. Incoming CB shall be 3-pole. The selectivity category for the incoming CB (if rated 800A and above) as defined in IEC 60947-2 shall be
23 category B. CB shall be padlockable in the "Off" position.
24 For CB feeding electrical heater, CB selectivity category shall be category A.
25 6. Contactors shall comply with IEC 60947-4-1 and rated for both uninterrupted duty and interminttent duty. The utilisation category for AC
26 contactors shall be AC-1. VENDOR shall advice on the Contactor intermittent duty class for Purchaser review and approval.
27 7. General purpose fuse links shall be type gG and comply with IEC 60269. Fuses shall be screened from each other and arranged so that they
28 can safely removed.
29 8. CB shall have a rated short-circuit making and service breaking capacity in conformity with the prospective short circuit current as specified
30 in the datasheet.
31 9. The input signal shall be galvanically separated from the driver unit and its power supply.
32 10. PCS shall have the option to control and monitor the HCP via 4-20 mA from PCS. Status can be Modbus TCP/IP communication links.
33 To be quote as optional.
34 11. Anti-condensation heating shall be provided inside the assembly and it shall be supplied from a separate source. The heating system shall
35 be switched for isolation purpose by means of MCB in combination with an earth leakage protecting device of 30mA sensitivity.
36 12. Size and armour type (SWA or AWA) for incoming power cable to the HCP shall be confirm upon confirmation of Heater power from
37 Vendor data.
38 13. In the event of internal fault in one of the compartments, the damage shalll be confined to that compartment. Other compartments shall
39 remain fit for further service.
40 14. The terminals for the power cable shall be located so that a free space of at least 400mm remains between the gland plate and the lowest
41 terminal. Facilities shall be provided for clamping the cables where these enter the enclosure.
42 15. The enclosure shall have 3 separate compartments (incoming supply, power control, and measurment and control).
43 16. The HCP shall be able to provide 10% margin performance design at nominal voltage and frequency.
44 17.Thyristor shall be effectively protected against overload, e.g. by means of ultrarapid fuses.
45 18. A ramp unit shall be provided in order to protect the heater or power system from damage that could occur as a result of electrical,
46 mechanical and thermal shock caused by direct full load switching.
47 19. Vendor to advise Purchaser on the harmonic content during low loading or worst case condition. Vendor shall guarantee the nominal
48 harmonic generation across all values would not exceed 5%.
49 20. Size for outgoing power cable to the electrical heater shall be confirm upon confirmation of heater power and heater configuration from
50 Vendor data.
51
52
53
54
55
56
57
58
59
60
61
62
63
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 19 of 26 Rev. F0
Item Name: Start-Fuel Gas Preheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6240
1 APPLICABLE TO PROPOSAL PURCHASE AS-BUILT
2 OWNER PTTEP INSIDE DIA. * mm (Note-11) TYPE HORIZONTAL
3 PLATFORM CPP LANG LEBAH LENGTH TL/FOF * mm (Note-11) QTY 1 x 100%
4 GENERAL DESIGN DATA
5 FLUID HANDLED Hydrocarbon Gas P&ID REFERENCE MY-SK410B-LLCPP-PR-PNID-0048-01
6 VAPOUR FLOW RATE Note 11 MMscfd SOUR SERVICE REQUIREMENT YES (LETHAL) (Note-44)
7 LIQUID FLOW RATE -- m3/hr INLET PRESSURE Note 11 BarG
8 TEMPERATURE (MAX/ MIN) Note 11 °C PRESSURE DROP * Bar
9 DENSITY Note 11 kg/m³ DUTY * kW
10 VISCOSITY Note 11 cP EXCESS AREA * %
11 THERMAL CONDUCTIVITY * W/m°C SPARE ELEMENTS 20% (Note 15)
12 SPECIFIC HEAT Note 11 KJ/Kg°C MAXIMUM SHEATH TEMPERATURE * °C
13 VAPOUR MOLECULAR WEIGHT Note 11 FLUX DENSITY (Max.) * kW/m2
14 CORROSIVE COMPONENTS Yes
15 MECHANICAL DESIGN DATA
16 DESIGN PRESSURE 140* BarG CORROSION ALLOWANCE (ON CS) Nil mm
17 DESIGN TEMPERATURE (MAX/ MIN) */-46* °C SHELL THICKNESS * mm
18 DESIGN CODE (Note 3) ASME Sec.VIII Div.1 HEAD THICKNESS * mm
19 SPECIFICATION Note 3 WIND VELOCITY 22 (3sec-gust) (Hold-1) m/s
20 MAX. ALLOW. WORKING PRESSURE * BarG SEISMIC FACTOR Hold-2
21 HYDROSTATIC TEST PRESSURE * BarG TRANSPORT LOADING Note 13
22 SUPPORT TYPE Saddles (2 Nos.) TOTAL VOLUME * m3
23 RADIOGRAPHY (X-rays) 100% INSULATION (IF YES, TYPE / THICK) Yes (By Others) mm
24 JOINT EFFICIENTCY (SHELL / HEAD) 1.0 / 1.0 FIRE PROOFING (IF YES, TYPE) Hold-3 mm
25 TYPE OF HEAD 2:1 S.E. & Flanged
26 MATERIAL SPECIFICATION
27 SHELL SA-240 gr 316L (NACE) NOZZLE FLANGES & BLINDS SA 182 F 316 (NACE)
28 HEAD(S) SA-240 gr 316L (NACE) NOZZLE NECKS PIPE (Note 38) SA 312 TP 316L (NACE)
29 INTERNAL LINING / CLADDING -- PLATE -
30 STIFFENER RINGS (EXTERNAL) SA-240 gr 316L (NACE) FORGING SA 182 F 316 (NACE)
31 SUPPORTS (SADDLE/BASE PLATE) SA-240 gr 316L/ SA 516 GR 70N WELDING FITTINGS (Note 38) SA 403 WP 316L(NACE)
32 INTERNALS : EXT. ATTACH. SA-240 gr 316L*
33 BAFFLE PLATE SA-240 gr 316L (NACE) EXTERNAL STUDS (Note 34) SA-193 Gr.B8M Class 1
34 HEATER SHEATH * EXTERNAL NUTS (HEAVY) (Note 34) SA-194 Gr.8MA
35 INT. BOLTS / GASKET SS 316L (NACE)/- EXTERNAL GASKET (Note 4) Spiral Wound
36 TERMINAL BOX SS 316 LIFTING LUGS SA-240 gr 316L*
37 HEATER FLANGE / TUBESHEET SA-182-F316/SS316L* (NACE) EARTHING BOSS (M10) (Note 20) SS 316
38 HEATER COUPLING SS 316 * NAMEPLATE / BRACKET SS 316 / SA-516 Gr.70N
39 ANCHOR / SETTING BOLTS SA-325 Type-1
40 PAINTING / COATING DATA (Note-21)
41 SURFACE PREPARATION INSIDE: No OUTSIDE: Yes SPEC. No.: 10008-STD-6-COR-010-R01
42 PAINTING / COATING INSIDE: No OUTSIDE: Yes SPEC. No.: 10008-STD-6-COR-010-R01
43 WEIGHTS
44 EMPTY WEIGHT * kg FREIGHT (SHIPPING) WEIGHT * kg
45 MAX. OPERATING WEIGHT * kg WEIGHT OF INSULATION * kg
46 FULL WATER WEIGHT * kg WEIGHT OF INTERNALS * kg
47 FABRICATION AND INSPECTION REQUIREMENTS
REGULATING AUTHORITY (DOSH) Offshore Self-Regulation Inspector (OSRI) CODE STAMP REQUIREMENT Yes ASME "U" & "L" Stamp (Note-44)
48

49 INSPECTION AUTHORITY 3rd Party Inspection (Note-31) HYDROSTATIC TEST Yes Per Code & SPEC

50 RADIOGRAPHY Yes Per Code & SPEC PMI TEST Yes Per Code & SPEC

51 ULTRASONIC Yes Per Code & SPEC IMPACT TEST * Per Code & SPEC

52 MAGNETIC PARTICLE Yes Per Code & SPEC PWHT Yes Per Code & SPEC

53 DYE PENETRANT Yes Per Code & SPEC SPECIAL HEAT TREATMENT * Per Code & SPEC

54 SOAP-AIR LEAK TEST Yes Per Code & SPEC MATERIAL CERT. (EN 10204) Yes (Note 30)
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 20 of 26 Rev. F0
Item Name: Start-Fuel Gas Preheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6240
1 NOZZLE / CONNECTION SCHEDULE (Note 7, 8)
2 SIZE SCH. No./ FLANGE PER ASME B16.5
MARKS QTY. SERVICE NAME REMARKS
3 inch THK. RATING TYPE FACE
4 N1 1 4* * * SR RF Feed Inlet*
5 N2 1 4* * * SR RF Gas Outlet*
6 N3 1 2* * * LWN RF Drain*
7 N4 1 2* * * LWN RF *
8

10

11

12 INSTRUMENT CONNECTIONS
13

14
VENDOR TO FURNISH
15

16

17 ACCESS OPENING
18

19

20

21 HEATER / ELECTRICAL DESIGN DATA (NOTE 14,15,16, 35)


22 ELEMENT DIAMETER * mm SHEATH THERMOCUPLE, QTY. *
23 NUMBER OF ELEMENTS * SHEATH THERMOCUPLE, TYPE *
24 IMMERSED LENGTH * mm THERMOCOUPLE ATTACHMENT *
25 COLD LENGTH * mm MANUFACTURE *
26 HEATER FLANGE SIZE & RATING *
27

28 POWER SUPPLY 400 VAC, 50HZ, 3-PHASE NUMBER OF CIRCUITS *


29 AREA CLASSIFICATION Zone 2, Gas IIB, T3 TERMINAL HUB SIZE *
30 ENCLOSURE TYPE IP 66 Ex 'e' to IEC 60079-7 TERMINAL HUB QTY. *
31 HEATER CONTROL TYPE Thyristor Control ANTI-CONDENSATION HEATER Yes (Terminal Box)
32 SPECIFICATION MY-SK410B-LLCPP-ME-SP-0020-00 POWER SUPPLY 230 VAC, 50 Hz, 1-phase
33 GENERAL NOTES
34 1) ALL DIMENSIONS ARE IN ' mm ' UNLESS SPECIFIED OTHERWISE.
35 2) VENDOR / BIDDER TO COMPLETE/ RE-CONFIRM DATA MARKED ( * ) AND SUBMIT WITH THE BID.
36 3) VESSEL SHALL BE DESIGNED, CONSTRUCTED , INSPECTED AND TESTED ACCORDING TO ASME SECTION VIII DIV. 1 (LATEST ED.)
37 WITH U & L STAMP , UNFIRED PRESSURE VESSELS DOC NO. 10008-STD-6-STA-001-R00 AND PROJECT PARTICULAR SPECIFICATION FOR PRESSURE
38 PRESSURE VESSELS DOC NO.MY-SK410B-LL-ME-SP-0003-00 AND PROJECT PARTICULAR SPECIFICATION FOR FUEL GAS PACKAGE
39 MY-SK410B-LLCPP-ME-SP-0020-00.
40 4) GASKETS TO BE OCTAGONAL RING JOINT, SOFT IRON PER ASME B16.20 AND PEGS-12059-PIP-029. VENDOR TO SUBMIT GASKET
41 MATERIAL SPECIFICATION INCLUDING MAXIMUM BRINELL HARDNESS FOR CONTRACTOR/COMPANY REVIEW AND APPROVAL.
42 5) NOZZLE PROJECTIONS SHALL BE AS PER UNFIRED PRESSURE VESSELS, DOCUMENT NO. 10008-STD-6-STA-001-R00
43 6) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.
44 7) VENDOR TO FURNISH WITH HIS BID THE REQUIRED NOZZLES (SIZE & QTY.) FOR FUEL GAS PREHEATER.
45 8) MINIMUM NOZZLE SIZE SHALL BE 2" UNLESS OTHERWISE SPECIFIED. 2" NOZZLES SHALL BE OF "LWN" TYPE EXCEPT
46 BOTTOM NOZZLES WITH ELBOWS.
47 9) VENDOR TO SIZE THE BUNDLE TO MEET THE PROCESS REQUIREMENTS.
48 10) ALL INTERNAL BOLTING SHALL BE PROVIDED WITH DOUBLE NUTS.

49 11) REFER PROCESS DATA SHEET, DOCUMENT No.: MY-SK410B-LLCPP-PR-DS-0024-00 FOR PROCESS DATA AND REQUIREMENTS.

50 12) THE SKIN TEMPERATURE OF HEATING ELEMENT SHALL NOT EXCEED 80% OF THE IGNITION TEMPERATURE OF PROCESS FLUID

51 BEING HEATED.
52 13) TRANSPORTATION LOADS : SEA TRANSPORTATION : 0.8g IN ANY DIRECTION
53 : LAND TRANSPORTATION : 0.3g LONGITUDINAL AND 0.1 g VERTICAL AND TRANSVERSE
54
55 FOR ADDITIONAL NOTES REFER SHEET 22 OF 26.
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 21 of 26 Rev. F0
Item Name: Start-Fuel Gas Preheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: 1H-6240
1 VESSEL SKETCH / GUIDE DRAWING (SCHEMATIC)
2

10

11

12

13
2 - LIFTING LUGS
14 HEATER BUNDLE
REMOVAL LENGTH *
15

16

17
2:1 S.E. HEAD
18 N1 N4 MIN. Thk. *
(AFTER FORMING)
19 THK (*)
20

21

22

23
CLL
C
ID *

24

25

26

27
*

28

29

30 EARTHING BOSS (2
FOF

N3 EACH) N2

TL
31

32 * *
33
FIXED END SLIDING END
34 *
35 *
36
ELEVATION
37

38

39

40

41 (*) VENDOR to advise


42 ACCESSORIES:
43 1) CLIPS FOR PIPE SUPPORT No
44 2) LIFTING LUG Yes
45 3) EARTHING BOSSES Yes
46 4) INSULATION SUPPORTS Yes
47

48

49

50

51
52
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
FUEL GAS PACKAGE DATASHEET
Sheet 22 of 26 Rev. F0
Item Name: Start-Fuel Gas Preheater
LANG LEBAH DEVELOPMENT PROJECT
Tag No.: H-6240
1 GENERAL NOTES (Cont'd)
2 14) ELECTRIC HEATER SHALL BE PROVIDED WITH MINIMUM TWO (2) TEMPERATURE SENSING DEVICES OF PT 100 (3 WIRE TYPE)
3 FOR TEMPERATURE MEASUREMENT OF THE HEATER ELEMENTS AND SUPERHEATER FLANGE, RESPECTIVELY, FOR EACH FUEL GAS
4 SUPERHEATER TO CUT OFF POWER SUPPLY. THE MAXIMUM SKIN TEMPERATURE OF HEATER SHALL NOT EXCEED 80% OF FUEL GAS IGNITION
5 TEMPERATURE. VENDOR TO PROVIDE THE SET TEMPERATURE (TZAHH) FOR ELEMENT AND FLANGE TEMPERATURE SENSING DEVICES.
6 15) THE MINIMUM SPARE ELEMENT REQUIREMENT IS 20% OF EACH HEATER ELEMENTS REQUIRED TO FULFIL THE OPERATIONAL
7 DUTIES OF THE UNIT FOR EACH UNIT.
8 16) HEATER THEMAL DUTY SHALL BE CONFIRMED BY VENDOR. SIZING TO BE PROVIDED FOR PURCHASER REVIEW AND APPROVAL.
9 17) VENDOR TO ADVISE THE HEATING ELEMENTS CONFIGURATION FOR THE HEATER CONSIDERING VARYING LOAD THROUGHOUT
10 THE OPERATING YEARS AS DESCRIBED IN PROCESS DATASHEET.
11 18) FLANGE TEMPERATURE SENSING DEVICE AND ELEMENT TEMPERATURE SENSING DEVICE SHALL BE FURNISHED BY VENDOR.
12 19) SURFACE PREPARATION, PAINTING AND COATING OF EQUIPMENT SHALL BE AS PER 10008-STD-6-COR-010 (PAINTING OF OFFSHORE AND COASTAL.
13 STRUCTURES AND FACILITIES) AND 10008-STD-6-COR-004-R01 (INTERNAL COATING OF PRESSURE VESSELS AND TANKS).
14 20) TWO EARTHING BOSSES SHALL BE PROVIDED DIAGONALLY OPPOSITE AT VESSEL SUPPORT WITH SS 316 STUD (1), NUTS (2), WASHERS (2)
15 AND SPRING WASHER (1).
16 21) UNPAINTED STAINLESS STEEL/ CRA SURFACES SHALL BE ACID PICKLED AND PASSIVATED AFTER FABRICATION.

17 22) SKETCH SHOWING THE MAJOR DIMENSIONS AND THICKNESSES SHALL BE SUBMITTED ALONG WITH THE BID.
18 23) ALLOWABLE NOZZLE LOADS AND MOMENTS SHALL BE AS PER APPENDIX 2 OF UNFIRED PRESSURE VESSELS DOCUMENT NO. 10008-STD-6-STA-001-R00.
19 24) VENDOR SHALL SUBMIT VESSEL SIZING CALCULATION AND PERFORMANCE CALCULATIONS FOR ALL OPERATING CASES.
20 25) VENDOR SHALL SELECT MATERIAL WHICH SUITABLE FOR 20 YEARS DESIGN LIFE.
21 26) NOZZLE FLANGES SHALL BE AS PER ASME B16.5 FOR SIZES UP TO AND INCLUDING 600 DN AND ASME B16.47 SERIES A
22 FOR SIZES ABOVE 600 DN.
23 27) MATERIALS IN SOUR SERVICE SHALL MEET THE REQUIREMENTS OF LATEST EDITION OF NACE MR01-75 AND ISO 15156-1/2/3, MATERIALS FOR SOUR SERVICE
24 DOC NO. '10008-STD-6-COR-032-R00', UNFIRED PRESSURE VESSEL DOC NO. '10008-STD-6-STA-001-R00' AND MY-SK410B-LL-CM-RP-0001-00 MATERIAL
25 SELECTION AND CORROSION STUDY REPORT FOR TRUNKLINE#9 PIPELINE FROM WP2 TO CPP AND TOPSIDE FACILITIES OF CPP, WP01, WP02, FR, LQ.
26 28) VENDOR SHALL CONSIDER VESSEL EXPLOSION DRAG LOAD OF 0.1barg (HOLD)
27 29) REQUIREMENTS FOR FIREPROOFING: HOLD
28 30) ALL CS, CLADDED CS, AND SS PRESSURE RETAINING PARTS (WETTED AND NON-WETTED) SHALL BE TYPE 3.1. ALL PLATES WITH NOMINAL
29 THICKNESS 50 mm AND MORE SHALL BE PROVIDED SHALL BE TYPE 3.2 FOR NON PRESSURE AND PRESSURE RETAINING PARTS.
30 OTHER PARTS SHALL BE MINIMUM TYPE 2.2.
31 31) APPROVED THIRD PARTY INSPECTION AGENCIES ARE DNV GL, ABS, BV, LLOYDS OR EQUIVALENT.
32 32) ALL SOUR SERVICE NOZZLES SHALL BE DESIGNED AS SELF REINFORCED NOZZLE.
33 33) VESSEL SHALL BE DESIGNED AND CONSTRUCTED ACCORDING TO PROJECT SPECIFICATION FOR FUEL GAS TREATMENT
34 PACKAGE DOC. NO: MY-SK410B-LLCPP-ME-SP-0020-00.
35 34) COATING FOR EXTERNAL BOLTS & NUTS: REFER 10008-STD-6-COR-042-R01 (CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND
36 TOPSIDE APPLICATIONS) AND 10008-STD-6-COR-010-R01 (PAINTING OF OFFSHORE AND COASTAL STRUCTURES AND FACILITIES).
37 35) ELECTRIC HEATER SHALL COMPLY WITH ELECTRICAL ENGINEERING GUIDELINE 1008-STD-ELE-001-R00.
38 36) DELTETED
39 37) DELETED
40 38) DELETED
41 39) DELETED
42 40) DELETED
43 41) DELETED
44 42) DELETED
45 43) ALL STAINLESS STEEL FLANGE MATERIAL SHALL BE DUAL CERTIFIED I.E SS316/SS316L.
46 44) FOR EQUIPMENT HANDLING HC WITH H2S MORE THAN 1000 ppm, "L" STAMP FOR LETHAL SERVICE SHALL BE PROVIDED AS PER
47 ASME SECTION Vlll DIV 1.
48
49
50
51
Document No.: MY-SK410B-LLCPP-ME-DS-0036-00
Sheet No.: 23 of 26 Rev : F0
DATA SHEET - ELECRTICAL HEATER CONTROL PANEL Start-Fuel Gas Preheater
Item Name:
Tag No: 1H-6240
1 GENERAL
2 Manufacturer ( * ) MAKE : MODEL :
3 Tag Number Qty:
4 Standards, Codes IEC BS NEMA ATEX
5 Certifying Authority (*) PTB BASEEFA ASTA
6 Certificate Nr. (*)
7 Language On Equipment English
7 Language On Documentation English
8 DESIGN CONDITIONS
9 Installation Location (indoor) / Ambient Type Indoor Outdoor Air-conditioned pressurised room
10 Ambient Temperature Design : 40 °C Min : °C
11 Relative Humidity Design: 100 % Min : %
12 Area Classification Safe Area Zone 1 Zone 2
13 GENERAL REQUIREMENTS
14 Supply Network Voltage/Frequency/Phases 400 V 50 Hz N°: 3
15 Supply Voltage Fault Level Max. / Withstand time (Note-14) 80 kA 1 s
16 Earhting Configuration IT
17 Upstream Protection Circuit Breaker (ACB)
18 HCP Input Side Isolating Device (Type / Rating) MCCB (preferred) or ACB (Note-4,5,8)
19 HCP Breaking Device (Type/ Rating) (*) Contactor (Note-6)
25 Unit Transformer (*)
26 Transformer data (if applicable) (*)
20 Ouput Side Isolating Device (Type/Rating) (*)
21 Auxiliary Rated Voltage (*)
22 Type of Fuse gG type (Note-7)
23 Thyrisytor Control Stage Single Cycling System (Note -2,17)
24 Guarantee Harmonic Content of Thyristor Controller HCP < 2% in the worst case - 50% load on fifth harmonic (Note-19)
25 Communication Between PCS Modbus TCP/IP (Note-10)
26 Cooling Natural Ventilation or 2x100% Fans
27 Earthing Copper Earth Bar (min 25mm x 5mm cross section)
28 Internal Wiring Flame Retardant
29 Marking As per Requisition document
30 Ramp Unit (Note-24) Yes No
31 Temperature Controller / Indicator Yes No
32 Space heater / Voltage / Frequency (Note-11) Yes X No 230 V AC 50 Hz
33 PANEL CONSTRUCTION
34 Degree of protection IP 41
35 Compartment Min 3 separate compartments (Note-15)
36 Power Cable Entry / Cable Type / Cable Size - Incoming (Note-12) Bottom CU/XLPE/PVC TBA
37 Power Cable Entry / Cable Type / Cable Size - Outgoing (Note-20) Bottom CU/XLPE/SWA/PVC TBA
38 Space Heater Cable Entry / Cable Type / Cable Size Bottom CU/XLPE/SWA/PVC 2C x 2.5sq.mm
37 Temperature Transmitter Cable Entry / Cable Type / Cable Size Bottom By Instrument By Instrument
38 Cable gland plate Undrilled, Non-Magnetic, Unpainted Removable Gland Plate
39 Access Front
40 Painting (Mfr standard,... / color) RAL 7032
41 REMOTE CONTROL
42 Auto - Manual selector switch Yes X No
43 Trip From SIS Yes X No
44 Start/Stop HCP From PCS Yes X No
45 REMOTE MONITORING AND SIGNALLING
46 Unit On/Off Status to PCS Yes X No
47 Local Remote Status to PCS Yes X No
48 Load Current Signal to PCS Yes X No type: 4-20 mA signal
49 Fault/Trip Alarm Status to PCS Yes X No
50 MEASUREMENT, PROTECTION AND ALARMS
51 Earth Fault Alarm Trip X With display X
52 Thyristor Over-Temperature Alarm Trip With display X
53 Fan Failure Alarm Trip With display X
54
Document No.: MY-SK410B-LLCPP-ME-DS-0033600
Sheet No.: 24 of 26 Rev : F0
DATA SHEET - ELECRTICAL HEATER CONTROL PANEL Start-Fuel Gas Preheater
Item Name:
Tag No: 1H-6240
1 MANUFACTURER DATA
2 HCP Power Requirements (Note-18) (*) kW
3 Peak inrush current (*) A
4 Transformer data (if applicable) (*)
5 Heat Load Dissipation At Full Load (*)
6 ELECTRICAL HEATER DIMENSIONS AND WEIGHT
7 Length x Depth x Height in mm (*)
8 Dimension Limit From Equipment Layout N/A
9 Weight in kg (*)
10 LOAD CONFIGURATION
11 Nos. of Stage Control / Type of Control / Duty kW (*)
12 Load Configuration (*)
13
14 Notes:
15 1. ( * ) indicates information or data to be confirmed and completed by VENDOR.
16 2. Regulation of power to the heater shall use complete full cycles of mains power rather than chopped cycles. Switching ON and OFF shall be
17 done at the zero voltage crossover points of the mains complete full cycles. Vendor shall advise the impact to power system during
18 switching in particularly when big heater load is provided.
19 3. VENDOR to provide auto/manual selector switch on HCP to facilitate manual override control of the thyristor via local potentiometer inside
20 HCP.
21 4. Incoming ACB or MCCB for the HCP shall interlock with panel door.
22 5. Incoming CB shall be 3-pole. The selectivity category for the incoming CB (if rated 800A and above) as defined in IEC 60947-2 shall be
23 category B. CB shall be padlockable in the "Off" position.
24 For CB feeding electrical heater, CB selectivity category shall be category A.
25 6. Contactors shall comply with IEC 60947-4-1 and rated for both uninterrupted duty and interminttent duty. The utilisation category for AC
26 contactors shall be AC-1. VENDOR shall advice on the Contactor intermittent duty class for Purchaser review and approval.
27 7. General purpose fuse links shall be type gG and comply with IEC 60269. Fuses shall be screened from each other and arranged so that they
28 can safely removed.
29 8. CB shall have a rated short-circuit making and service breaking capacity in conformity with the prospective short circuit current as specified
30 in the datasheet.
31 9. The input signal shall be galvanically separated from the driver unit and its power supply.
32 10. PCS shall have the option to control and monitor the HCP via 4-20 mA from PCS. Status can be Modbus TCP/IP communication links.
33 To be quote as optional.
34 11. Anti-condensation heating shall be provided inside the assembly and it shall be supplied from a separate source. The heating system shall
35 be switched for isolation purpose by means of MCB in combination with an earth leakage protecting device of 30mA sensitivity.
36 12. Size and armour type (SWA or AWA) for incoming power cable to the HCP shall be confirm upon confirmation of Heater power from
37 Vendor data.
38 13. In the event of internal fault in one of the compartments, the damage shalll be confined to that compartment. Other compartments shall
39 remain fit for further service.
40 14. The terminals for the power cable shall be located so that a free space of at least 400mm remains between the gland plate and the lowest
41 terminal. Facilities shall be provided for clamping the cables where these enter the enclosure.
42 15. The enclosure shall have 3 separate compartments (incoming supply, power control, and measurment and control).
43 16. The HCP shall be able to provide 10% margin performance design at nominal voltage and frequency.
44 17.Thyristor shall be effectively protected against overload, e.g. by means of ultrarapid fuses.
45 18. A ramp unit shall be provided in order to protect the heater or power system from damage that could occur as a result of electrical,
46 mechanical and thermal shock caused by direct full load switching.
47 19. Vendor to advise Purchaser on the harmonic content during low loading or worst case condition. Vendor shall guarantee the nominal
48 harmonic generation across all values would not exceed 5%.
49 20. Size for outgoing power cable to the electrical heater shall be confirm upon confirmation of heater power and heater configuration from
50 Vendor data.
51
52
53
54
55
56
57
58
59
60
61
62
63
Equipment No : 1A-6200
Data Sheet for Service : Fuel Gas Treatment Package
EQUIPMENT NOISE LIMITATION Numbers Rqd : One (1)
Datasheet No : MY-SK410B-LLCPP-ME-DS-0036-00
Type of equipment: Fuel Gas Treatment Package Mechanical Power: kW
VENDOR / Manufacturer: Speed: r / min
Type no.: Size I x b x h: m

1. GENERAL
This requisition covers the noise limits of the equipment, given below.

2. NOISE LIMITS TO BE MET BY THE EQUIPMENT


The noise generated by the equipment shall not exceed the more stringent of the noise limits given in the table below, for
any of the conditions of operation for which the equipment may normally be expected to be used.
Lp is the maximum sound pressure level, in dB re 20 µPa, for the mode of operation indicated at any location at 1 m from
the equipment surface or operator position, if specified..
Lw is the maximum sound power level, in dB re 1 pW, for the mode of operation indicated.
If the equipment generates noise with tonal or impulsive components, the limits shall be taken 5 dB(A) more stringent.
Noise levels will be verified according to the following standards: ISO 3740 series, ISO 11200 series or ISO 9614.

3. INFORMATION TO BE SUBMITTED WITH THE TENDER


This noise data sheet shall be returned with the tender and with guaranteed noise data filled in.
VENDOR shall state which add-on silencing measures were taken to meet the noise requirements.

Equipment a Sound pressure/power levels guaranteed by VENDOR in dB b Remarks


items/locations (upper tolerance + 0 dB) Noise
Un-weighted octave-band levels Total limit
63 125 250 500 1 2 4 8
Hz Hz Hz Hz kHz kHz kHz kHz dB (A) dB (A) Silencing measures
Lp 85
Fuel Gas Package ( A-6051) 1
Lw
Lp
1
Lw
Lp
1
Lw
LP
1
Lw
Lp
3
Lw
Lp
2
Lw
Lp
2
Lw
Lp
2
Lw
Lp
1
Lw
Lp
1
Lw
Lp
1
Lw

Purchaser shall indicate:


- In column "b", the A-weighted sound pressure/power limit
- In column "a" using the appropriate number, which of the following applies to the required noise levels:
1) without acoustic provisions
2) with acoustic provisions
3) special low-noise design
4) VENDORs best estimate, not necessarily guaranteed
5) ……………………………………………………………………………………………………………………..
Document No. MY-SK410B-LLCPP-ME-DS-0036-00
MECHANICAL DATASHEET FOR

Revision
Sheet No. 26 of 26 Rev. F0
WEIGHT / CENTRE OF MASS FUEL GAS PACKAGE
Equipment
DATASHEET Description
FUEL GAS TREATMENT PACKAGE

Vendor * Tag No. 1A-6200 Qty : 1X100%

1 REQUISITION No.: MY-SK410B-LLCPP-ME-RFQ-0012-00 INFORMATION STATUS


2 EQUIPMENT DESCRIPTION: (Tick as necessary)

3 TENDER ESTIMATE
FUEL GAS TREATMENT PACKAGE
4 DESIGN ESTIMATE
5 HEAVIEST COMPONENT TO BE HANDLED DURING MAINTENANCE: DESIGN UPDATE
6 DESCRIPTION: WEIGHT: Kg AS SUPPLIED
7 WEIGHT DATA
8 NOTES:
9 1) ONE SHEET SHALL BE COMPLETED FOR EACH SEPARATELY INSTALLED SKID OR ITEM.
10 2) AS SUPPLIED EQUIPMENT SHALL BE WEIGHED BY VENDOR AND WITNESSED BY PURCHASER OR NOMINEE.
11 3) VENDOR SHALL PROVIDE CURRENT CALIBRATION CERTIFICATE OR WEIGHING EQUIPMENT CALIBRATION
12 METHODS SHALL BE TO BS EN ISO 7500-1:2004.
13 4) VENDOR SHALL SUBMIT DESIGN UPDATE FOR SIGNIFICANT CHANGES IN WEIGHT.
14

15 DRY KG OPERATING KG TEST KG


16

17 DESCRIPTION:
OTHER TEMPORARY WEIGHTS KG
18

19

20
CERTIFIED FINAL WEIGHT DATE NAME COMPANY

21 INSPECTOR
22 VENDOR
23

24 DIMENSIONAL DATA
25 ‘L’
26
‘X’
27 OVERALL SIZES, mm (NOTE 4)
28 DIMENSION ‘L’ *

29 DIMENSION ‘W’ *
C of M *
30 DIMENSION ‘H’
‘W’

31
‘Y’

32

33 CENTRE OF MASS, mm
34 (0, 0) DIM. DRY OPERATING
PLAN
35 ‘X’
36 ‘Y’
37 ‘Z’
C of M
38
‘H’

39
‘Z’

40

41 (0, 0)
ELEVATION
42

43 NOTES:
44 1) EQUIPMENT ORIENTATION ON EACH SKID OR ITEM TO BE INDICATED.
45 2) C of G CO-ORDINATES TO BE CLEARLY SHOWN ON G.A. DRAWINGS.
46 3) VENDOR SHALL DULY FILL-IN WITH SIGNATURE/ STAMP AND SUBMIT AT VARIOUS STAGES:
47 FOR REVIEW / APPROVAL AND CERTIFIED DURING FINAL TESTING / INSPECTION.
48 4) OVERALL PROPOSED SKID SHALL BE DESIGNED WITHIN THESE DIMENSION PARAMETER LIMIT.
49

50

51

52

53

54
55 VENDOR'S SEAL VENDOR'S SIGNATURE & DATE
DOCUMENT PROCESS DATASHEET CPP FUEL GAS PACKAGE 1A-6200 PTTEPHK
MY-SK410B-LLCPP-PR-DS-0024-00 Rev.FB
TITLE Rev.FB DOC. NO.

Lang Labah PROJECT: Review Comments Sheet PTTEPHK RETURN STATUS


Lang Labah PROJECT
PTTEPHK PRW
Date issued: 26-Jan-2023 Date Received:
Code B Revise and Resubmit_work may
proceed
Issued by: anusorns Action on:

Approval by: suchatk Approval by:

DO NOT DELETE OTHER REVIEWERS COMMENTS WITHOUT DISCUSSING WITH THEM!

COMMENT STATUS
COMMENT NO. SECT. PAGE & REF. CLIENT COMMENTS (REVIEWER) PRW RESPONSE
OPEN/CLOSED

Item 2 has been deleted due to duplicate with item


1 6 microns?
3. Comment is not incorporated.

Item 2 has been deleted due to duplicate with item


2 6 Duplicate to Item 3?
3. Comment is incorporated.

Vendor to provide the switching methodology from duty to


3 6 stand by filter to preventing internal damage and supported Comment is incorporated.
remote operation/NNM

Item 1 has been revised. No additional margin shall


4 6 margin is already included in 12 MMscfd (almost 20%) be considered on normal operating flowrate.
Comment is incorporated.

no additional design margin on flowrate but 20% design margin


5 7 Comment is incorporated.
on duty

6 7 but 20% design margin on duty Comment is incorporated.

7 7 is this thyristor? If yes, please specify Yes. Item 6 in Section 6.3 has been added.

8 8 included Comment is incorporated.

Turndown should be based on 1 GTG running for sizing control


9 8 Comment is incorporated.
valve to ensure the stable flow

P&ID to be included as well. This is not proprietary package so


10 9 Comment is incorporated.
Vendor will follow our P&ID for transmitter/valves etc.

11 10 To be replaced by the latest UFD Comment is incorporated.

N:\Engineering\Process\00- Projects\LL FEED 412020-00342\04-D-Sheet\A-Latest\01-For Mech Equip\CPP Fuel Gas Package\Rev. F0\MY-SK410B-LLCPP-PR-DS-0024-00 Rev.FB_Comment Sheet_1 Page 1 of 1
PTTEP HK Offshore Limited
PTTEP Sarawak Oil Limited
PTTEP Sabah Oil Limited

LANG LEBAH DEVELOPMENT PROJECT


PROVISION OF FRONT-END ENGINEERING DESIGN (FEED)
SERVICES FOR OFFSHORE FACILITIES FOR SK410B LANG LEBAH
DEVELOPMENT

Process Datasheet
CPP Fuel Gas Package 1A-6200

REVISION HISTORY

Rev. Date Description Author Checked Approved

F0 06-Apr-2023 Approved For Design Norashikin Mohd Hatta Chan Kok Wei Dhanaseelan Gunasekaran

FB 28-Dec-2022 Issued For Approval Abdullah Rafaee Farmand Masoomi Miri Saravana S.

FA 03-Oct-2022 Issued For Review Norashikin Mohd Hatta Farmand Masoomi Miri Liz Mullis

COUNTRY FIELD/ASSET FACILITY DISCIPLINE DOCUMENT SEQUENCE SHEET


REV.
Document CODE CODE CODE CODE TYPE NO. NO.
Number
MY SK410B LLCPP PR DS 0024 00 F0
MY-SK410B-LLCPP-PR-DS-0024-00
Process Datasheet
Rev.: F0
CPP Fuel Gas Package 1A-6200
Page 2 of 21

REVISION STATUS / SUMMARY OF CHANGES

Revision
Rev. Revised Paragraphs Reason for Revision
Description
st
FA Issued for Review 1 Issuance
FB All Sections Issued for Approval Incorporated Comments
F0 All Sections Approved for Design Final Issuance

DISCLAIMER STATEMENT

The information provided by PTTEP is confidential and shall only be used by the party to whom it is disclosed to (“the
Receiving Party”). The Receiving Party shall not disclose, publish, reproduce or reveal the information received to
any other third party whatsoever except with the specific prior written authorization of PTTEP. The Receiving Party
shall within five (5) days from notice from PTTEP return or destroy (upon instruction of PTTEP) all confidential
Information furnished by PTTEP.

The Receiving Party shall also take such precautions as are reasonably necessary to protect the confidential
information, including taking measures to prevent loss, theft and misuse.

The Receiving Party shall fully indemnify and keep PTTEP at all time fully indemnified from and against any loss or
disclosure of confidential information and from all actions, proceedings, claims, demands, costs, awards and
damages arising directly or indirectly as a result of such unauthorized disclosure.
MY-SK410B-LLCPP-PR-DS-0024-00
Process Datasheet
Rev.: F0
CPP Fuel Gas Package 1A-6200
Page 3 of 21

TABLE OF CONTENTS

1.0 GENERAL DESCRIPTION 4


2.0 SCOPE OF SUPPLY 4
3.0 PROCESS DESCRIPTION 4
4.0 PACKAGE BOUNDARY 4
4.1 PACKAGE DESIGN CONDITION 4
4.2 INLET FEED GAS TO FUEL GAS PACKAGE 1A-6200 4
4.3 FUEL GAS PACKAGE (1A-6200) GAS OUTLET CONDITION 4
4.4 AVAILABLE UTILITIES 5
5.0 HEAT AND MATERIAL BALANCE 5
6.0 SPECIFIC DESIGN REQUIREMENT 5
6.1 FUEL GAS SCRUBBER (1V-6210) 5
6.2 FUEL GAS FILTER COALESCERS (1F-6220A/B) 5
6.3 FUEL GAS HEATERS (1H-6230A/B) 6
6.4 START-FUEL GAS PREHEATER (1H-6240) 6
6.5 OTHERS 6
7.0 PROCESS GUARANTEE 6
8.0 PROCESS DELIVERABLES REQUIRED FROM VENDOR 6
9.0 NOTES 7
10.0 HOLDS 7

Appendices:
APPENDIX 1 – UFD FUEL GAS SYSTEM
APPENDIX 2 – P&ID FUEL GAS SYSTEM
APPENDIX 3 – HMB FUEL GAS PACKAGE INLET
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 1.0 GENERAL DESCRIPTION
7 1. This datasheet defines the minimum process requirements for the fuel gas package 1A-6200 on the LLCPP Platform.
8 2. The fuel gas package shall be a single package and shall be integrated into the overall platform design.
9 3. Vendor shall provide performance guarantee on both process and mechanical performance of the equipment supplied within the
10 scope of the supply of the fuel gas skid. Refer to Section 8.0 for the details of required performance guarantee.
11
12 2.0 SCOPE OF SUPPLY
13 The fuel gas package system shall comprise of the key components/ equipment as a minimum:
14 • 1 x 100% Fuel Gas Scrubber (1V-6210)
15 • 2 x 100% Fuel Gas Filter Coalescers (1F-6220A/B)
16 • 2 x 100% Fuel Gas Heaters (1H-6230A/B)
17 • 1 x 100% Start-Fuel Gas Preheater (1H-6240)
18 • Heater Control panel for Fuel Gas Heaters and Start Fuel Gas Preheater
19 • All control and safety devices which include but not limited to pressure control valve (PCV) , shutdown valve (SDV), blowdown valve (BDV)
20 and pressure safety valve (PSV) as required by facilities inside the skid.
21 • All instrument which include pressure transmitters, temperature transmitters, flow transmitters and level transmitters.
22 • All piping and valves within package.
23
24 3.0 PROCESS DESCRIPTION
25 1. The fuel gas system supplies HP superheated fuel gas to the Gas Turbine Generators at LLCPP platform. The system also supplies low
26 pressure fuel gas as pilot gas/ignition gas for flare ignition package and as primary purge gas for the HP/LP flare headers.
27 2. There are three (3) sources of fuel gas as feed gas to the Fuel Gas package :-
28 i - Primary fuel gas source (during normal operation) - Gas from downstream Dry Gas / Lean Glycol Heat Exchanger (1E-4515/4525)
29 ii - Secondary fuel gas source (as back-up/start-up) - From export piping / pipeline with alternative to tap from Inlet Separator Gas
30 Outlet (1V-4110/4115).
31 3. The feed fuel gas pressure will be let down via 2x100% pressure control valve upstream of the Fuel Gas Scrubber to 40 barg.
32 Fuel Gas Scrubber is provided to knock-out any potential liquid formed associated to pressure letdown. The liquid that is knocked out from
33 Fuel Gas Scrubber is disposed to Closed Drain Vessel through on/off level actuated valve and restriction orifice.
34 4. The fuel gas at gas outlet of Fuel Gas Scrubber (1V-6210) is then routed to Fuel Gas Filter Coalescers (1F-6220A/B) to remove any fine liquid
35 droplets and particles that may be carried over from the Fuel Gas Scrubber 1V-6210.
36 5. Fuel Gas Heaters are provided to give 30⁰C with respect to the Fuel Gas Scrubber (1V-6210) gas outlet temperature.
37 6. For start-up the supply gas from the gas outlet of Inlet Separator is 120 barg and will be sent to Start-Fuel Gas Preheater for preheating.
38 The pressure of the preheated gas will be reduced to 40 barg by Pressure Control Valve before sending to Fuel Gas Scrubber.
39
40
41 4.0 PACKAGE BOUNDARY
42 4.1 Package Design Condition
43 Design Pressure : 140 (inlet) / 47 barg (downstream of letdown PCV) / 0 barg (Note 8)
44 Design Temperature : 70 / -29 ⁰C (Hold 1)
45 Design Capacity : Normal 12 MMscfd (at package outet)
46 : Startup 5.5 MMscfd (at package outet)
47
48 4.2 Inlet Feed Gas to Fuel Gas Package 1A-6200
49 Operating Conditions
50 i - Primary fuel gas source : Refer to the HMB Case 1 - 4 (Normal Operation) in Attachment B
51 ii - Secondary fuel gas source : Refer to the HMB Case 1 - 7 (Start-Up / Back-Up) in Attachment B
52
53 Design Conditions
54 i - Primary fuel gas source
55 Design Pressure : 140 barg
56 Design Temperature : 70 / -29 ⁰C
57
58 ii - Secondary fuel gas source
59 Design Pressure : 140 barg
60 Design Temperature : 70 / -29 ⁰C
61
62 4.3 Fuel Gas Package (1A-6200) Gas Outlet Condition
63 Operating Pressure : 38.5 barg (40 barg minus system pressure drop) (Note 9)
64 Operating Temperature : 30⁰C Superheat
65 Filtration Requirement : 100% efficiency for solids removal for 3 micron size and above
66 100% efficiency for liquid droplets removal for 10 micron size and above
67 99% efficiency for liquid droplets removal for 5 micron to 10 micron size
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 4 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 4.0 PACKAGE BOUNDARY (Continued)
7 4.4 Available Utilities
8 HP Flare
9 Design Pressure : 15.8 barg
10 Design Temperature : 150 / -45⁰C
11 Operating Pressure : 0.1 to maximum 12 barg
12 Operating Temperature : AMB
13
14 Closed Drain
15 Design Pressure : 7 barg
16 Design Temperature : 150 / -29⁰C
17 Operating Pressure : 0.2 barg
18 Operating Temperature : AMB
19
20 Hazardous Open Drain
21 Design Pressure : 3.5 barg
22 Design Temperature : 70 / 0 ⁰C
23 Operating Pressure : ATM
24 Operating Temperature : AMB
25
26 Instrument Air
27 Design Pressure : 13.8 barg
28 Design Temperature : 70 / 0 ⁰C
29 Supply Pressure : 4.5 - 7.5 barg
30 Supply Temperature : 22 - 50 ⁰C
31
32 5.0 HEAT AND MATERIAL BALANCE
33 1. Properties of feed gas to Fuel Gas system is given in Attachment B.
34 2. Refer to the Attachment A for the Uitility Flow Diagram of Fuel Gas system.
35 3. Vendor to design the Fuel Gas Package to suit the feed conditions provided in attachment B for all the scenarios and cases.
36 6.0 SPECIFIC DESIGN REQUIREMENT
37 FG package design shall be according to Process Sizing Criteria - 10008-STD-6-PRO-002-R01 Section 7.2.3.1. Any deviation from
38 COMPANY specification should be highlighted by vendor and needs COMPANY review and approval.
39 The package shall be designed for Not Normally Manned (NNM) operation and control.
40 6.1 Fuel Gas Scrubber (1V-6210)
41 1. The scrubber shall be a two-phase vertical separator with wiremesh demister. The inlet nozzle shall be equipped with half open pipe as inlet
42 device. The liquid outlet shall be equipped with vortex breaker. 20% margin on flow should be considered for scrubber sizing.
43 2. The scrubber shall be capable of removing 99% of liquid droplets of up to 10 microns and liquid entrainment not more than 0.1 USG/MMScf.
44 3. Scrubber sizing shall comply to Process Sizing Criteria 10008-STD-6-PRO-002-R01.
45 4. A Shutdown Valve (SDV) is to be provided at liquid outlet of the fuel gas scrubber.
46 5. A XV shall have integrated on-off control function to drain liquid hold-up from LAH to LAL within 15 minutes via restriction orifice downstream
47 of the XV. In addition, the restriction orifice shall also be sized to ensure the gas blowby rates to the Closed Drain Vessel is within gas
48 handling capacity of the Closed Drain Vessel.
49 6. The following shutdown trips shall be provided on the Fuel Gas Scrubber (1V-6210):
50 • High high pressure trip (PZAHH)
51 • Low low pressure trip (PZALL)
52 • High high Level trip (LZAHH)
53 • Low low level trip (LZALL)
54 7. 2 x 100% of Pressure Safety Valve (PSV) shall be provided for Fuel Gas Scrubber. Vendor to size the PSV for the control valve (letdown
55 valve) fails at full open position during backup operation, by considering maximum upstream pressure from LLCPP is 120 barg.
56 8. GTG will start switchover when scrubber pressure drops at 33 barg to 23 barg, hence scrubber to be sized with 6.5 m3 buffer volume on gas
57 phase above LAHH to cater GTG switchover with 30 second.
58 6.2 Fuel Gas Filter Coalescers (1F-6220A/B)
59 1. Total design flowrate of filter coalescers shall not consider any design margin on normal operating flowrate.
60 2. Deleted.
61 3. The filter coalescer shall separation efficiency of: 100% efficiency for solids removal for 3 micron size and above, 100% efficiency for liquid
62 droplets removal for 10 micron size and above and 99% efficiency for liquid droplets removal for 5 micron to 10 micron size.
63 4. The filter top shall have a flat head completed with davit for easy changing out the filter element.
64 5. A Shutdown Valve (SDV) is to be provided at liquid outlet of the fuel gas scrubber.
65 6. A XV shall have integrated on-off control function to drain liquid hold-up from LAH to LAL within 15 minutes via restriction orifice downstream
66 of the XV. In addition, the restriction orifice shall also be sized to ensure the gas blowby rates to the Closed Drain Vessel is within gas
67 handling capacity of the Closed Drain Vessel. Vendor to provide the switching methodology from duty to stand by filter to preventing internal
68 damage and supported remote operation/NNM.

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 5 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 6.0 SPECIFIC DESIGN (Continued)
7 6.3 Fuel Gas Heaters (1H-6230A/B)
8 1. The Fuel Gas Heaters shall be designed as 2 x 100% electric heaters. The heater also shall be capable of remote and local start and stop by
9 operator.
10 2. Total design flowrate of heaters shall not consider any margin on normal operating flowrate but 20% design margin shall be considered on
11 duty.
12 3. A high high temperature trip shall be provided at the outlet of the heater, as well as for the heating element. Vendor shall advise number of
13 high high temperature trip to be provided for heating element and the set point for high high temperature trip for the heating element.
14 4. Electrical heater design shall comply with Electrical Engineering Guideline 10008-STD-6-ELE-001-R00.
15 5. A low low flow trip shall be provided at the outlet of the heater. Vendor shall advise low low flow trip set point for overheating protection.
16 6. Heater to be fully thyristor controlled. Heaters shall be provided with temperature elements and thyristor control panel for remote installation.
17
18 6.4 Start-Fuel Gas Preheater (1H-6240)
19 1. The Start-Fuel Gas Preheater shall be designed as 1 x 100% electric heater. The heater also shall be capable of remote and local start and
20 stop by operator.
21 2. Total design flowrate of heaters shall not consider any margin on normal operating flowrate but 20% design margin shall be considered on
22 duty.
23 3. A high high temperature trip shall be provided at the outlet of the heater, as well as for the heating element. Vendor shall advise number of
24 high high temperature trip to be provided for heating element and the set point for high high temperature trip for the heating element.
25 4. Electrical heater design shall comply with Electrical Engineering Guideline 10008-STD-6-ELE-001-R00.
26 5. Temperature at outlet of the preheater should be set to provide 5⁰C above hydrate formation temperature at downstream of letdown PCV.
27
28 6.5 Others
29 1. The line sizing within the Fuel Gas Package shall comply to Process Sizing Criteria 10008-STD-6-PRO-002-R01.
30 2. Emergency depressurization requirement to comply with Relief, Vent, Flare and Blowdown 10008-STD-6-PRO-004-R00.
31 3. Pressure relief / blowdown from the Fuel Gas Package shall be collected in a single header and will be connected to LLCPP HP flare header.
32 4. The liquid from Fuel Gas Scrubber (1V-6210) and Fuel Gas Filter Coalescers (1F-6220A/B) to be routed to Closed Drain Vessel.
33 5. Material of construction for all equipment and piping shall comply with NACE MR0175 /ISO 15156 requirements.
34 6. All flare and drain within the package boundary shall be collected and manifolded into single tie-in connection at the package boundary limit.
35 7. The HMBs and PIDs provided in this PDS serves as preliminary reference to vendor. Vendor to update the PIDs and HMBs based Vendor's
36 design. The HMB should include LHV, HHV and Wobbe index.
37 8. The pressure control valve(s) and associated controller shall be such that the pressure variations in steady conditions do not exceed
38 ± 1% of the nominal value requested at the fuel gas package outlet.
39
40 7.0 PROCESS GUARANTEE
41 The vendor shall have final and total responsibility for the design and the Process / Mechanical performance of the equipment supplied
42 within the scope of this Fuel Gas Skid. Guarantees to be provided by vendor include, but not limited, to:
43 • 100% efficiency for solids removal for 3 micron size and above
44 • 100% efficiency for liquid droplets removal for 10 micron size and above
45 • 99% efficiency for liquid droplets removal for 5 micron to 10 micron size
46 • 30⁰C superheat at the package outlet
47 • Vendor shall advise and thereby guarantee the superheated fuel gas minimum pressure at the outlet of package limit during normal
48 operation, based on the Fuel Gas Scrubber operating pressure and maximum allowable pressure drop for equipment.
49 • Vendor shall advise the minimum turndown of the fuel gas package.
50 8.0 PROCESS DELIVERABLES REQUIRED FROM VENDOR
51 1. Updated Utility Flow Diagram and Heat and Material Balance of Fuel Gas System.
52 2. Updated Piping and Instrumentation Diagram of Fuel Gas Package.
53 3. Process Calculation and Equipment Datasheet of Fuel Gas Scrubber, Fuel Gas Filter Coalescers, Fuel Gas Heaters and Start-Fuel Gas
54 Preheater.
55 4. Detailed data sheet for all the control valves, shutdown valves, blowdown valves, flowmeters, restriction orifices, pressure safety valves,
56 pressure instruments, level instruments, temperature instruments and flow instruments.
57 5. Sizing calculation for control valves, pressure safety valves, flowmeter, restriction orifice, etc.
58 6. Start-up, shutdown and operating procedures write-up for the Fuel Gas Package.
59 7. Alarms and trips set point list, cause and effect matrix, SAFE chart, ESD shutdown logic diagram.
60 8. Utility consumption list.
61 9. Operating and Maintenance Procedures Manual, which include troubleshooting guide. Vendor to design package for NNM and high
62 H2S field practices.
63 10. Fuel Gas skid size and weight estimation for each unit in the package.
64 11. Material of construction.
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 6 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 9.0 NOTES
7 (*) Denotes Vendor To Furnish / Advise / Confirm
8 1. Sizing Cases for the design of Fuel Gas Package are as follows:
9 • Case 1 - 1480 MMscfd Low Contaminant
10 • Case 2 - 1560 MMscfd High Contaminant
11 • Case 3 - 1650 MMscfd Design Contaminant
12 • Case 4 - 1650 MMscfd High CGR
13 • Case 6 - 1055 MMscfd Low Contaminant with B14
14 • Case 7 - 1174 MMscfd Design Contaminant with B14
15 2. Fuel gas package shall be designed to provide 12 MMSCFD of gas in normal operation and 5.5 MMSCFD of gas in during startup at
16 the package outlet. 12 MMSCFD is based on maximum Fuel Gas consumption included 20% design margin on flowrate.
17 3. The Fuel Gas Scrubber shall be designed for two (2) phase vertical separator.
18 4. Separator liquid retention time shall be given as following:
19 Parameter Criteria
20 Minimum distance between the top of the vessel and the LAHH is the largest of 300 mm or
Top of Vessel
21 0.2 x Vessel ID
22 2.0 minutes liquid volume between LAH and LAHH or 150 mm minimum above LAH,
LAHH
23 whichever is greater
24 3.0 minute liquid volume between LAL and LAH or 300 mm minimum above LAL or to
LAH
25 accommodate buffer volume for 1 minute, whichever is greater
26 NLL Midway between LAL and LAH
27 1.0 minute liquid volume between LALL and LAL or 200 mm minimum above LALL,
LAL
28 whichever is greater
29 LALL Minimum 300 mm above BTL
30 5. Liquid levels to be confirmed by separator vendor.
31 6. Inlet nozzle sizing criteria (VTC):
32 • Feed Inlet Nozzle, ρV2 2100 kg/m.s2 (half open pipe inlet nozzle)
33 • Hydrocarbon Gas Outlet Nozzle, ρV2 4500 kg/m.s2
34 • Velocity for Hydrocarbon Liquid Outlet 1.0 m/s with minimum 2 inch.
35 7. Vendor to submit vessel sizing calculation and performance calculation.
36 8. Vendor to advise the design pressure/max operating pressure to acheive the outlet condition
37 9. The delivery pressure of the gas treatment unit shall be sufficient to feed the gas turbine and the gas engine at 120% of their maximum
38 required fuel flow.
39
40
41 *VTA: Vendor to Advise
42 *VTC: Vendor to Confirm
43
44
45
46
47
48
49
50 10. HOLDS
51 1. Minimum design temperature will be verified again during detail design phase with actual vendor information.
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 7 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Appendix 1
36
37
38
39
40
UFD Fuel Gas
System
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 8 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Appendix 2
36
37
38
39
40
P&ID Fuel Gas
System
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 10 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Appendix 3
36
37
38
39
40
HMB Fuel Gas
Package Inlet
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 15 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 HMB Cases (Normal Operation) - Inlet Stream
7
8 HMB Case Unit Case 1 Case 2 Case 3 Case 4
9 Overall
10 Vapour Fraction 1.00 1.00 1.00 1.00
11 Temperature ⁰C 42.61 42.64 42.66 42.61
12 Pressure barg 118.90 118.90 118.90 118.90
13 Molar Flow kgmole/h 599.08 599.08 599.08 599.08 *VTC
14 Mass Flow kg/h 12347 12976 13341 13336 *VTC
15 Molecular Weight 20.61 21.66 22.27 22.26
16 Mass Density kg/m3 114.26 121.63 126.08 126.03
17
18
19 Vapour Phase
20 Phase Std Gas Flow (Note 2) MMSCFD 12.0 12.0 12.0 12.0 *VTC
21 Phase Actual Volume Flow m3/h 108.07 106.69 105.82 105.81 *VTC
22 Phase Mass Flow kg/h 12347 12976 13341.48 13335.61 *VTC
23 Phase Molecular Weight 20.61 21.66 22.27 22.26
24 Phase Z Factor 0.82 0.81 0.81 0.81
25 Phase Mass Heat Capacity kJ/kg-C 2.65 2.57 2.53 2.53
26 Phase Cp/Cv 1.73 1.76 1.78 1.78
27 Phase Mass Density kg/m3 kg/m3 114.26 121.63 126.08 126.03
28 Phase Viscosity cP 0.02 0.02 0.02 0.02
29 Phase Thermal Conductivity W/m-K 0.05 0.04 0.04 0.04
30
31 Oil Phase
32 Phase Actual Volume Flow bpd - - - -
33 Phase Liq Vol Flow @ Std Cond Sbpd - - - -
34 Phase Mass Flow kg/h - - - -
35 Phase Mass Density kg/m3 - - - -
36 Phase Viscosity cP - - - -
37 Phase Mass Heat Capacity kJ/kg-C - - - -
38 Phase Thermal Conductivity W/m-K - - - -
39 Phase Surface Tension dyne/cm - - - -
40
41 Aqueous Phase
42 Phase Actual Volume Flow bpd - - - -
43 Phase Liq Vol Flow @ Std Cond Sbpd - - - -
44 Phase Mass Flow kg/h - - - -
45 Phase Mass Density kg/m3 - - - -
46 Phase Viscosity cP - - - -
47 Phase Mass Heat Capacity kJ/kg-C - - - -
48 Phase Thermal Conductivity W/m-K - - - -
49 Phase Surface Tension dyne/cm - - - -
50
51 • Case 1 - 1480 MMSCFD Low Contaminant
52 • Case 2 - 1560 MMSCFD High Contaminant
53 • Case 3 - 1650 MMSCFD Design Contaminant
54 • Case 4 - 1650 MMSCFD High CGR
55
56
57
58
59
60
61
62
63
64
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 16 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 HMB Cases (Start-Up / Back-Up) - Inlet Stream
7
8 HMB Case Unit Case 1 Case 2 Case 3 Case 4 Case 6 Case 7
9 Overall B14 Only B14 Only
10 Vapour Fraction 1.00 1.00 1.00 1.00 1.00 1.00
11 Temperature ⁰C 22.00 22.00 22.00 22.00 20.00 20.00
12 Pressure barg 119.80 119.80 119.80 119.80 106.70 111.80
13 Molar Flow kgmole/h 273.88 273.88 273.88 273.88 273.88 273.88 * VTA
14 Mass Flow kg/h 5644 5932 6100 6097 5361 5589 * VTA
15 Molecular Weight 20.61 21.66 22.27 22.26 19.57 20.41
16 Mass Density kg/m3 132.50 141.89 147.65 147.53 109.94 122.50
17
18
19 Vapour Phase
20 Phase Std Gas Flow (Note 2) MMSCFD 5.5 5.5 5.5 5.5 5.5 5.5 * VTA
21 Phase Actual Volume Flow m3/h 42.60 41.81 41.31 41.33 48.76 45.62 * VTA
22 Phase Mass Flow kg/h 5644 5932 6100 6097 5361 5589 * VTA
23 Phase Molecular Weight 20.61 21.66 22.27 22.26 19.57 20.41
24 Phase Z Factor 0.766 0.751 0.743 0.743 0.787 0.771
25 Phase Mass Heat Capacity kJ/kg-C 2.90 2.84 2.81 2.81 2.87 2.86
26 Phase Cp/Cv 1.93 1.98 2.02 2.01 1.89 1.91
27 Phase Mass Density kg/m3 kg/m3 132.50 141.89 147.65 147.53 109.94 122.50
28 Phase Viscosity cP 0.02 0.02 0.02 0.02 0.02 0.02
29 Phase Thermal Conductivity W/m-K 0.046 0.045 0.045 0.045 0.043 0.044
30
31 Oil Phase
32 Phase Actual Volume Flow bpd - - - - - -
33 Phase Liq Vol Flow @ Std Cond Sbpd - - - - - -
34 Phase Mass Flow kg/h - - - - - -
35 Phase Mass Density kg/m3 - - - - - -
36 Phase Viscosity cP - - - - - -
37 Phase Mass Heat Capacity kJ/kg-C - - - - - -
38 Phase Thermal Conductivity W/m-K - - - - - -
39 Phase Surface Tension dyne/cm - - - - - -
40
41 Aqueous Phase
42 Phase Actual Volume Flow bpd - - - - - -
43 Phase Liq Vol Flow @ Std Cond Sbpd - - - - - -
44 Phase Mass Flow kg/h - - - - - -
45 Phase Mass Density kg/m3 - - - - - -
46 Phase Viscosity cP - - - - - -
47 Phase Mass Heat Capacity kJ/kg-C - - - - - -
48 Phase Thermal Conductivity W/m-K - - - - - -
49 Phase Surface Tension dyne/cm - - - - - -
50
51 • Case 1 - 1480 MMSCFD Low Contaminant
52 • Case 2 - 1560 MMSCFD High Contaminant
53 • Case 3 - 1650 MMSCFD Design Contaminant
54 • Case 4 - 1650 MMSCFD High CGR
55 • Case 6 - 1055 MMSCFD Low Contaminant With B14
56 • Case 7 - 1174 MMSCFD Design Contaminat With B14
57
58
59
60
61
62
63
64
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 17 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 HMB Cases (Normal Operation) - Inlet Stream
7
8 HMB Case Case 1 Case 2 Case 3 Case 4
9 Composition (Mole Fraction)
10 Nitrogen 0.0029997 0.0028573 0.0027739 0.0027749
11 CO2 0.1248055 0.1597490 0.1797228 0.1796928
12 H2S 0.0098249 0.0157168 0.0196417 0.0196163
13 Methane 0.8317172 0.7923613 0.7693314 0.7695003
14 Ethane 0.0165659 0.0157857 0.0153290 0.0153239
15 Propane 0.0063017 0.0060080 0.0058359 0.0058284
16 i-Butane 0.0014401 0.0013740 0.0013352 0.0013320
17 n-Butane 0.0017526 0.0016730 0.0016262 0.0016209
18 22-Mpropane 0.0000265 0.0000253 0.0000246 0.0000245
19 i-Pentane 0.0007499 0.0007170 0.0006976 0.0006938
20 n-Pentane 0.0004920 0.0004708 0.0004583 0.0004552
21 Cyclopentane 0.0001182 0.0001133 0.0001105 0.0001094
22 C6* 0.0005022 0.0004827 0.0004710 0.0004652
23 m-c-C5* 0.0000202 0.0000194 0.0000190 0.0000187
24 Benzene* 0.0004248 0.0004101 0.0004012 0.0003930
25 c-C6* 0.0001500 0.0001448 0.0001416 0.0001391
26 m-c-C6* 0.0001443 0.0001401 0.0001375 0.0001342
27 Toluene* 0.0005202 0.0005075 0.0004995 0.0004838
28 et-Benzene* 0.0000254 0.0000252 0.0000250 0.0000239
29 m&p-Xylene* 0.0001547 0.0001537 0.0001529 0.0001454
30 o-Xylene* 0.0000322 0.0000321 0.0000320 0.0000303
31 C7* 0.0004188 0.0004114 0.0004066 0.0003933
32 C8* 0.0001935 0.0001911 0.0001894 0.0001822
33 C9* 0.0001498 0.0001497 0.0001494 0.0001433
34 C10* 0.0000829 0.0000861 0.0000880 0.0000816
35 C11* 0.0000376 0.0000398 0.0000411 0.0000381
36 C12* 0.0000270 0.0000291 0.0000304 0.0000283
37 C13-C15* 0.0000318 0.0000352 0.0000374 0.0000365
38 C16-C20_3* 0.0000024 0.0000028 0.0000030 0.0000033
39 C21-C25_3* 0.0000000 0.0000001 0.0000001 0.0000001
40 C26-C30_3* 0.0000000 0.0000000 0.0000000 0.0000000
41 C31-C35* 0.0000000 0.0000000 0.0000000 0.0000000
42 C36-C80* 0.0000000 0.0000000 0.0000000 0.0000000
43 H2O 0.0001053 0.0001053 0.0001055 0.0001053
44 TEGlycol 0.0000005 0.0000006 0.0000007 0.0000007
45 Mercury 0.0000000 0.0000000 0.0000000 0.0000000
46 M-Mercaptan 0.0000330 0.0000330 0.0000330 0.0000328
47 E-Mercaptan 0.0000002 0.0000002 0.0000002 0.0000002
48 2Propanthiol 0.0000001 0.0000001 0.0000001 0.0000001
49 t-B-Mercapta 0.0000003 0.0000003 0.0000003 0.0000002
50 nPMercaptan 0.0000001 0.0000001 0.0000001 0.0000001
51 M-E-Sulfide 0.0000000 0.0000000 0.0000000 0.0000000
52 2Butanethiol 0.0000001 0.0000000 0.0000000 0.0000000
53 Thiophene 0.0000002 0.0000001 0.0000001 0.0000001
54 2-M-1C3Thiol 0.0000000 0.0000000 0.0000000 0.0000000
55 nBMercaptan 0.0000000 0.0000000 0.0000000 0.0000000
56 CS2 0.0000002 0.0000002 0.0000002 0.0000002
57 diE-diSulphd 0.0000000 0.0000000 0.0000000 0.0000000
58 3MThiophene 0.0000000 0.0000000 0.0000000 0.0000000
59 5-Methybenzo(b)thiophene* 0.0000001 0.0000001 0.0000001 0.0000001
60 3-Methylbenzothiophen* 0.0000001 0.0000001 0.0000001 0.0000001
61 diE-Sulphide 0.0000002 0.0000002 0.0000001 0.0000001
62 COS 0.0001473 0.0001473 0.0001472 0.0001470
63
64
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 18 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 HMB Cases (Start-Up / Back-Up) - Inlet Stream
7
8 HMB Case Case 1 Case 2 Case 3 Case 4 Case 6 Case 7
9 Composition (Mole Fraction)
10 Nitrogen 0.0030002 0.0028576 0.0027741 0.0027751 0.0031400 0.0030268
11 CO2 0.1249042 0.1598840 0.1798808 0.1798494 0.0939169 0.1199819
12 H2S 0.0098698 0.0157997 0.0197549 0.0197292 0.0034613 0.0099166
13 Methane 0.8312740 0.7918019 0.7686919 0.7688548 0.8682303 0.8367504
14 Ethane 0.0165573 0.0157753 0.0153173 0.0153122 0.0188832 0.0182034
15 Propane 0.0062976 0.0060034 0.0058310 0.0058237 0.0058087 0.0056043
16 i-Butane 0.0014386 0.0013724 0.0013335 0.0013304 0.0013540 0.0013086
17 n-Butane 0.0017505 0.0016708 0.0016239 0.0016188 0.0014844 0.0014366
18 22-Mpropane 0.0000265 0.0000253 0.0000246 0.0000245 0.0000211 0.0000202
19 i-Pentane 0.0007487 0.0007157 0.0006963 0.0006927 0.0006123 0.0005946
20 n-Pentane 0.0004911 0.0004699 0.0004573 0.0004543 0.0003926 0.0003827
21 Cyclopentane 0.0001179 0.0001131 0.0001102 0.0001091 0.0000000 0.0000000
22 C6* 0.0005007 0.0004812 0.0004695 0.0004640 0.0000000 0.0000000
23 m-c-C5* 0.0000201 0.0000194 0.0000189 0.0000186 0.0000000 0.0000000
24 Benzene* 0.0004229 0.0004083 0.0003994 0.0003916 0.0000000 0.0000000
25 c-C6* 0.0001494 0.0001442 0.0001410 0.0001386 0.0000000 0.0000000
26 m-c-C6* 0.0001434 0.0001393 0.0001367 0.0001336 0.0000000 0.0000000
27 Toluene* 0.0005161 0.0005037 0.0004959 0.0004809 0.0000000 0.0000000
28 et-Benzene* 0.0000251 0.0000249 0.0000247 0.0000236 0.0000000 0.0000000
29 m&p-Xylene* 0.0001523 0.0001515 0.0001508 0.0001438 0.0000000 0.0000000
30 o-Xylene* 0.0000317 0.0000316 0.0000316 0.0000300 0.0000000 0.0000000
31 C7* 0.0004146 0.0004077 0.0004032 0.0003905 0.0000000 0.0000000
32 C8* 0.0001912 0.0001890 0.0001874 0.0001806 0.0000000 0.0000000
33 C9* 0.0001475 0.0001477 0.0001476 0.0001418 0.0000000 0.0000000
34 C10* 0.0000785 0.0000821 0.0000842 0.0000787 0.0000000 0.0000000
35 C11* 0.0000343 0.0000367 0.0000383 0.0000358 0.0000000 0.0000000
36 C12* 0.0000229 0.0000253 0.0000268 0.0000255 0.0000000 0.0000000
37 C13-C15* 0.0000197 0.0000235 0.0000261 0.0000268 0.0000000 0.0000000
38 C16-C20_3* 0.0000005 0.0000006 0.0000008 0.0000009 0.0000000 0.0000000
39 C21-C25_3* 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
40 C26-C30_3* 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
41 C31-C35* 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
42 C36-C80* 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
43 H2O 0.0004694 0.0005108 0.0005374 0.0005372 0.0001457 0.0001458
44 TEGlycol 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
45 Mercury 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
46 M-Mercaptan 0.0000336 0.0000337 0.0000337 0.0000336 0.0000523 0.0000525
47 E-Mercaptan 0.0000002 0.0000002 0.0000002 0.0000002 0.0000370 0.0000374
48 2Propanthiol 0.0000001 0.0000001 0.0000001 0.0000001 0.0000000 0.0000000
49 t-B-Mercapta 0.0000003 0.0000003 0.0000003 0.0000003 0.0000000 0.0000000
50 nPMercaptan 0.0000001 0.0000001 0.0000001 0.0000001 0.0000077 0.0000080
51 M-E-Sulfide 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
52 2Butanethiol 0.0000001 0.0000001 0.0000001 0.0000001 0.0000000 0.0000000
53 Thiophene 0.0000002 0.0000002 0.0000002 0.0000002 0.0000000 0.0000000
54 2-M-1C3Thiol 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
55 nBMercaptan 0.0000001 0.0000000 0.0000000 0.0000000 0.0000066 0.0000069
56 CS2 0.0000002 0.0000002 0.0000002 0.0000002 0.0000000 0.0000000
57 diE-diSulphd 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
58 3MThiophene 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
59 5-Methybenzo(b)thiophene* 0.0000001 0.0000001 0.0000001 0.0000001 0.0000000 0.0000000
60 3-Methylbenzothiophen* 0.0000001 0.0000001 0.0000001 0.0000001 0.0000000 0.0000000
61 diE-Sulphide 0.0000002 0.0000002 0.0000002 0.0000002 0.0000000 0.0000000
62 COS 0.0001483 0.0001484 0.0001485 0.0001483 0.0000207 0.0000207
63
64
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 19 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 HMB Cases (Start-Up / Back-Up) - Inlet Stream - Continued
7
8 HMB Case Case 1 Case 2 Case 3 Case 4 Case 6 Case 7
9 Composition (Mole Fraction)
10 n-Hexane 0.0000000 0.0000000 0.0000000 0.0000000 0.0004883 0.0004832
11 Mcyclopentan 0.0000000 0.0000000 0.0000000 0.0000000 0.0001742 0.0001726
12 Benzene 0.0000000 0.0000000 0.0000000 0.0000000 0.0003623 0.0003606
13 Cyclohexane 0.0000000 0.0000000 0.0000000 0.0000000 0.0001459 0.0001456
14 n-Heptane 0.0000000 0.0000000 0.0000000 0.0000000 0.0002310 0.0002351
15 Mcyclohexane 0.0000000 0.0000000 0.0000000 0.0000000 0.0001532 0.0001557
16 Toluene 0.0000000 0.0000000 0.0000000 0.0000000 0.0003604 0.0003725
17 n-Octane 0.0000000 0.0000000 0.0000000 0.0000000 0.0001273 0.0001353
18 E-Benzene 0.0000000 0.0000000 0.0000000 0.0000000 0.0000267 0.0000289
19 m-Xylene 0.0000000 0.0000000 0.0000000 0.0000000 0.0001013 0.0001109
20 o-Xylene 0.0000000 0.0000000 0.0000000 0.0000000 0.0000319 0.0000350
21 n-Nonane 0.0000000 0.0000000 0.0000000 0.0000000 0.0000593 0.0000668
22 124-MBenzene 0.0000000 0.0000000 0.0000000 0.0000000 0.0000105 0.0000122
23 n-Decane 0.0000000 0.0000000 0.0000000 0.0000000 0.0000528 0.0000628
24 2C3Mercaptan 0.0000000 0.0000000 0.0000000 0.0000000 0.0000179 0.0000182
25 C11-C15_3* 0.0000000 0.0000000 0.0000000 0.0000000 0.0000806 0.0001046
26 C16-C20_4* 0.0000000 0.0000000 0.0000000 0.0000000 0.0000015 0.0000023
27 C21-C25_4* 0.0000000 0.0000000 0.0000000 0.0000000 0.0000001 0.0000001
28 C26-C30_4* 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
29 C31+_3* 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000 0.0000000
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 20 of 21
Process Datasheet for CPP Fuel Gas Package
1 Tag No. : 1A-6200 Client: PTTEP
2 Equipment Name: CPP Fuel Gas Package Equipment Location: LLCPP
3 P&ID No. : MY-SK410B-LLCPP-PR-PNID-0044/0045/0046/0047/0048-01 Equipment Type.: Fuel Gas Package
4 Service: Fuel Gas Quantity: One (1) 1 x 100%
5 Corrosive inlet gas due to: H2S (max 2%mole) and CO2 (max 18%mole)
6 Component Properties
7
8 Component Normal MW Liquid Density Tc Pc Vc centricity
Boiling (kg/m3) ⁰C barg m3/kmol
9 Point
10 ⁰C
11 C6* 68.4 86.18 664.00 234.250 28.675 0.370 0.296
12 m-c-C5* 76.4 84.16 755.00 259.550 36.882 0.319 0.239
13 Benzene* 47.1 78.11 886.00 288.950 47.927 0.259 0.212
14 c-C6* 79.5 84.16 783.00 280.250 39.720 0.308 0.213
15 m-c-C6* 106.1 98.19 775.00 298.950 33.741 0.368 0.233
16 Toluene* 99.8 92.14 871.00 318.550 40.125 0.316 0.257
17 et-Benzene* 123.2 106.17 871.00 343.950 35.059 0.374 0.301
18 m&p-Xylene* 122.5 106.17 866.50 343.450 34.299 0.378 0.327
19 o-Xylene* 125.5 106.17 884.00 357.050 36.274 0.369 0.314
20 C7* 97.0 96.00 738.00 301.760 20.524 0.482 0.421
21 C8* 120.9 107.00 765.00 280.869 18.595 0.490 0.598
22 C9* 147.2 121.00 781.00 335.493 16.488 0.515 0.475
23 C10* 160.1 134.00 836.40 387.973 21.677 0.523 0.450
24 C11* 180.0 147.00 843.90 408.879 20.228 0.575 0.487
25 C12* 200.2 161.00 850.80 429.970 18.950 0.634 0.522
26 C13-C15* 238.0 189.32 862.80 469.560 17.011 0.760 0.597
27 C16-C20_3* 301.2 243.93 881.30 515.392 16.331 1.011 0.724
28 C21-C25_3* 367.1 310.15 900.40 579.988 14.576 1.322 0.848
29 C26-C30_3* 428.2 379.47 916.30 640.032 13.474 1.661 0.944
30 C31-C35* 485.0 449.80 929.60 695.486 12.743 2.014 1.003
31 C36-C80* 551.6 538.01 943.80 717.577 12.134 2.482 1.014
32
33
34 Component Normal MW Liquid Density Tc Pc Vc centricity
Boiling (kg/m3) ⁰C barg m3/kmol
35
Point
36 ⁰C
37 C11-C15* 215.4 174.50 811.80 407.600 20.490 0.650 0.475
38 C18-C20* 299.9 248.10 851.20 488.690 15.760 0.884 0.644
39 G21-C25* 365.3 314.20 875.20 543.820 12.960 1.084 0.787
40 C28-C30* 423.7 380.70 894.00 592.080 10.780 1.287 0.932
41 C31+* 497.1 473.50 913.40 644.720 8.700 1.533 1.112
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

LANG LEBAH DEVELOPMENT PROJECT

Doc.Name : PDS - CPP Fuel Gas Package 1A-6200 SHEET


Doc. No: MY-SK410B-LLCPP-PR-DS-0024-00 21 of 21