ASSIGNMENT/ TUGASAN

_________________________________________________________________________
EBQS3203
COST ANALYSIS AND ESTIMATING
ANALISA KOS DAN PENGANGGARAN
SEPTEMBER 2023

SPECIFIC INSTRUCTION / ARAHAN KHUSUS

1. Answer in ENGLISH or MALAY /


Jawab dalam BAHASA INGGERIS atau BAHASA MELAYU

2. Number of words : 2500 – 3000 word for question 1 excluding references /


Jumlah patah perkataan : 2500 – 3000 patah perkataan untuk soalan 1 tidak termasuk
rujukan.

3. Submit your assignment ONCE only in a SINGLE / file. /


Hantar tugasan SEKALI sahaja dalam SATU fail.

4. Submit your assignment ONLINE /


Tugasan ini dihantar secara ONLINE.

1. Submission date : 14 November 2023.


Tarikh penghantaran : 14 November 2023.

2. This assignment accounts for 60% of the total marks for the course / Tugasan ini
menyumbang sebanyak 60% dari jumlah markah kursus.
ASSIGNMENT QUESTION

Question 1
With reference to the cost data given, analyse the unit rates for external wall in the Bills of
Quantities below.
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
EXTERNAL WALLS

Non-loadbearing superstructure

Common clay bricks, in cement and sand


mortar (1:3) with brick reinforcement at
every forth course

A One brickwork in English bond m2 2,190

B Half brickwork in Stretcher bond m2 1,632

TOTAL CARRIER TO SUMMARY

Material Data:
MATERIAL SUPPLIED COST USAGE
Delivered to site
1. LAFARGE Masonry Cement (50kg) RM12.80 /bag
2. Mine sand (6 wheeler tipper lorry = 8MT) RM190.00 /load 1.52 MT/m3
3. Al Mortar Lime (8kg) RM4.20 /bag 320 kg/m3
4. Brickwork mesh reinforcement (100mm x 61.00m) RM8.50 /roll
5. Common clay bricks (720 pieces/pallet) RM270.00/pallet
Allow 0.333 for shrinkage and wastage.
Labour Data:
LABOUR COSTS and USAGE
skilled unskilled
LABOUR
LABOUR (local) (local)
CONSTANT
per day per day
RMIOO.OO RM60.00
1. to mix mortar using concrete mixed - 1 1.25 m3/hour
2. to transport and lay mortar - half brick - 1 0.35 hour/m2
th. 1 - 1.00 hour/m2
3. to lay bricks in bonds - half brick th.
Plant and Machineries Data:
RENTAL COST PLANT &
PLANT AND MACHINERIES COSTS inclusive of fuel and MACHINERIES
operator salary OUTPUT
Diesel hydraulic concrete mixer 7/5 RM300.00 per day 2.25 m3/hour
- for mixing mortar

(20 marks)

Question 2
Budget is the main parameter for any construction project. In projects with a long duration, it is
normal for the budget to be revised. One of the reasons for this is that the building materials,
labour and machinery cost increases annually due to inflation. Inflation plays a vital role in the
price increase of materials, labours, and machinery, which results in deviating the initial and the
final cost of the project.
a. Discuss the relationship between inflation and the performance of the construction
industry which has an impact on economic growth.
b. Conduct an interview with at least THREE (3) construction cost estimators or quantity
surveyors regarding the actions that will be taken when material costs fluctuate while a
construction project is ongoing.
c. Conclusion.
(30 marks)

Question 3 (ONLINE CLASS PARTICIPATION)


Discuss the question below in MyInspire forum.

Evolving building codes, environmental regulations, and safety requirements can impact
project scope and costs. Ensuring compliance with these regulations is crucial, but it can
complicate the estimating process and lead to unforeseen expenses. Discuss how this
problem can be solved.

INSTRUCTIONS ON HOW TO SUBMIT PROOF OF ONLINE PARTICIPATION (10%)


Do the following:
1. Select the best FIVE (5) of your postings from the forum discussion set up by your e-
tutor.
2. Do screenshots of the postings and include them as images in your assignment.
3. The screenshots should be in an image file (either in JPG or PNG format). Refer to the
sample of Screen Grab below.
4. The screenshots should contain: Name, Title of the discussion, Day, Date and Time. No
marks will be given if there is no evidence of attachment.

Sample

(10 marks)
[Total: 60 marks]
SOALAN TUGASAN

Soalan 1
Dengan merujuk kepada data kos yang diberikan, analisa kadar unit untuk dinding luar
dalam Bil Kuantiti di bawah.
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
EXTERNAL WALLS

Non-loadbearing superstructure

Common clay bricks, in cement and sand


mortar (1:3) with brick reinforcement at
every forth course

A One brickwork in English bond m2 2,190

B Half brickwork in Stretcher bond m2 1,632

TOTAL CARRIER TO SUMMARY

Data Bahan:
BAHAN KOS YANG PENGGUNAAN
DIBEKALKAN
Dihantar ke tapak
6. LAFARGE Masonry Cement (50kg) RM12.80 /bag
7. Mine sand (6 wheeler tipper lorry = 8MT) RM190.00 /load 1.52 MT/m3
8. Al Mortar Lime (8kg) RM4.20 /bag 320 kg/m3
9. Brickwork mesh reinforcement (100mm x 61.00m) RM8.50 /roll
10. Common clay bricks (720 pieces/pallet) RM270.00/pallet
Allow 0.333 for shrinkage and wastage.

Data Buruh:
KOS BURUH DAN PENGGUNAAN
berkemahiran tidak mahir
LABOUR
BURUH (tempatan) (tempatan)
CONSTANT
Sehari Sehari
RMIOO.OO RM60.00
4. to mix mortar using concrete mixed - 1 1.25 m3/hour
5. to transport and lay mortar - half brick - 1 0.35 jam/m2
th. 1 - 1.00 jam/m2
6. to lay bricks in bonds - half brick th.

Data Loji dan Jentera:


KOS SEWA
LOJI & JENTERA
KOS LOJI DAN JENTERA termasuk bahan api dan
PENGELUARAN
gaji operator
Diesel hydraulic concrete mixer 7/5 RM300.00 per hari 2.25 m3/jam
- for mixing mortar

(20 markah)
Soalan 2
Bajet adalah parameter utama untuk mana-mana projek pembinaan. Dalam projek dengan
tempoh yang panjang, adalah perkara biasa untuk bajet disemak. Salah satu sebabnya ialah
kos bahan binaan, buruh dan jentera meningkat setiap tahun disebabkan oleh inflasi. Inflasi
memainkan peranan penting dalam kenaikan harga bahan, buruh, dan mesin, yang
mengakibatkan penyelewengan kos awal dan akhir projek.
a. Bincangkan hubungan antara inflasi dengan prestasi industri pembinaan yang
memberi kesan kepada pertumbuhan ekonomi.
b. Menjalankan temu bual dengan sekurang-kurangnya TIGA (3) penganggar kos
pembinaan atau juruukur bahan mengenai tindakan yang akan diambil apabila kos
bahan turun naik semasa projek pembinaan sedang berjalan.
c. Kesimpulan.
(30 markah)

Soalan 3 (PERBINCANGAN ATAS TALIAN)


Bincangkan soalan di bawah dalam forum MyInspire.

Kod bangunan yang berkembang, peraturan alam sekitar dan keperluan keselamatan
boleh memberi kesan kepada skop dan kos projek. Memastikan pematuhan terhadap
peraturan ini adalah penting, tetapi ia boleh merumitkan proses anggaran dan membawa
kepada perbelanjaan yang tidak dijangka. Bincangkan bagaimana masalah ini boleh
diselesaikan.
ARAHAN BAGI TATACARA PENGHANTARAN SEBAGAI BUKTI AKTIVITI PENYERTAAN
DALAM TALIAN (10%)
Laksanakan perkara berikut:
1. Pilih LIMA (5) hantaran terbaik anda dari perbincangan dalam talian yang telah di
sediakan oleh tutor anda.
2. Laksanakan tangkap layar posting dan tampalkannya ke dalam laporan anda
bersama DOKUMENTASI pada BAHAGIAN I.
3. Imej tangkap layar mesti dalam format imej (sama ada JPG atau PNG). Rujuk pada
contoh tangkap layar di bawah.
4. Tangkap layar mesti mengandungi: Nama, Tajuk Perbincangan, Hari, Tarikh dan
Masa. Tiada markah akan diberi sekiranya tiada lampiran bukti.
Sample

(10 markah)
[Jumlah: 60 markah]
ATTACHMENT

EBQS3203 COST ANALYSIS AND ESTIMATING /SEPTEMBER 2023

Question 1
Excellent/ Good/ Fair/ Poor/ Unsatisfactory/
*QN/ Criteria/ Weight/ Cemerlang Baik Sederhana Lemah Tidak memuaskan Max
CLO
*NS Kriteria Pemberat Marks
4 3 2 1 0
Calculation on material cost (cement 90 – 100% of the Almost all (75-89%) Most (60-74%) of the Most (75-90%) of All (100%) of the
mortar) steps and solutions of the steps and steps and solutions the steps and steps and solutions
have no calculation solutions have no have no calculation solutions have have calculation
errors. calculation errors. errors. calculation errors. errors or totally
wrong.
Q1 2 Pengiraan kos bahan (mortar simen) 90 - 100% langkah Hampir keseluruhan Kebanyakan (60 - Kebanyakan (75 - Keseluruhan – 10
2.5
dan penyelesaian (75 - 89%) langkah 74%) langkah dan 90%) langkah dan (100%) langkah dan
tidak mempunyai dan penyelesaian penyelesaian tidak penyelesaian penyelesaian
kesalahan pengiraan. tidak mempunyai mempunyai mempunyai mempunyai
kesalahan pengiraan. kesalahan pengiraan. kesalahan kesalahan
pengiraan. pengiraan.
Calculation and total cost (halfbrick and 90 – 100% of the Almost all (75-89%) Most (60-74%) of the Most (75-90%) of All (100%) of the
one brick include labour cost) steps and solutions of the steps and steps and solutions the steps and steps and solutions
have no calculation solutions have no have no calculation solutions have have calculation
errors. calculation errors. errors. calculation errors. errors or totally
wrong.
Q1 2 Pengiraan dan jumlah kos (separuh bata 2.5 90 - 100% langkah Hampir keseluruhan Kebanyakan (60 - Kebanyakan (75 - Keseluruhan – 10
dan satu bata termasuk kos buruh) dan penyelesaian (75 - 89%) langkah 74%) langkah dan 90%) langkah dan (100%) langkah dan
tidak mempunyai dan penyelesaian penyelesaian tidak penyelesaian penyelesaian
kesalahan pengiraan. tidak mempunyai mempunyai mempunyai mempunyai
kesalahan pengiraan. kesalahan pengiraan. kesalahan kesalahan
pengiraan. pengiraan.
Total 5 20
*QN = Question Number / *NS = Nombor Soalan
Question 2
Excellent/ Good/ Fair/ Poor/ Unsatisfactory/
*QN/ Criteria/ Weight/ Cemerlang Baik Sederhana Lemah Tidak memuaskan Max
CLO
*NS Kriteria Pemberat Marks
4 3 2 1 0
Discuss the relationship between inflation Excellent discussion Good discussion on Fair discussion on the Poor discussion on No discussion was
and the performance of the construction on the relationship the relationship the relationship the relationship given
industry which has an impact on between inflation between inflation between inflation between inflation
economic growth. and the performance and the performance and the performance and the
of the construction of the construction of the construction performance of the
industry which has industry which has industry which has construction
an impact on an impact on an impact on industry which has
economic growth. economic growth. economic growth. an impact on
economic growth.
Explanations are Explanations are Explanations are
given with strong given with good given with some
support by relevant support by relevant support by relevant
literature literature literature
Bincangkan hubungan antara inflasi Perbincangan yang Perbincangan n yang Perbincangan yang Perbincangan yang Tiada perbincangan
Q2 3 8
dengan prestasi industri pembinaan yang 2 sangat baik baik mengenai sederhana mengenai lemah mengenai diberikan
memberi kesan kepada pertumbuhan mengenai hubungan hubungan antara hubungan antara hubungan antara
ekonomi. antara inflasi dengan inflasi dengan inflasi dengan inflasi dengan
prestasi industri prestasi industri prestasi industri prestasi industri
pembinaan yang pembinaan yang pembinaan. pembinaan.
memberi kesan memberi kesan
kepada pertumbuhan kepada pertumbuhan Penjelasan diberikan Kurang atau tiada
ekonomi. ekonomi. dengan sedikit sokongan dari
sokongan dari literatur yang
Penjelasan diberikan Penjelasan diberikan literatur yang berkaitan
dengan sokongan dengan sokongan berkaitan
yang kuat dari yang baik dari
literatur yang literatur yang
berkaitan berkaitan
Q2 3 Conduct an interview with at least THREE An excellent A good explanation A brief explanation A vague explanation No explanation was
(3) construction cost estimators or explanation on the on the actions that on the actions that on the actions that given.
quantity surveyors regarding the actions actions that will be will be taken by the will be taken by the will be taken by the
that will be taken when material costs taken by the interviewees when interviewees when interviewees when
fluctuate while a construction project is interviewees when material costs material costs material costs
ongoing. material costs fluctuate while a fluctuate while a fluctuate while a
fluctuate while a construction project construction project construction project
construction project is ongoing. is ongoing. is ongoing.
is ongoing.
The explanation was The explanation was
The explanation was including background not including
including background of interviewees (age, background.
of interviewees (age, gender, position,
gender, position, years of working
years of working experience and the
experience and the most common type
most common type of construction
of construction project involved)
project involved)
Menjalankan temu bual dengan sekurang- Penerangan yang Penerangan yang Penerangan ringkas Penerangan yang Penerangan tidak
kurangnya TIGA (3) penganggar kos sangat baik baik mengenai mengenai tindakan samar-samar diberikan.
pembinaan atau juruukur bahan mengenai mengenai tindakan tindakan yang akan yang akan diambil mengenai tindakan
tindakan yang akan diambil apabila kos yang akan diambil diambil oleh orang oleh orang yang yang akan diambil
bahan turun naik semasa projek oleh orang yang yang ditemuduga ditemuduga apabila oleh orang yang
pembinaan sedang berjalan. ditemuduga apabila apabila kos bahan kos bahan turun naik ditemuduga apabila
kos bahan turun naik turun naik semasa semasa projek kos bahan turun
semasa projek projek pembinaan pembinaan sedang naik semasa projek
pembinaan sedang sedang berjalan. berjalan. pembinaan sedang
berjalan. berjalan.
3.5 14
Penjelasan adalah
Penjelasan adalah termasuk latar
termasuk latar belakang orang yang
belakang orang yang ditemuduga (umur,
ditemuduga (umur, jantina, jawatan,
jantina, jawatan, tahun pengalaman
tahun pengalaman bekerja dan jenis
bekerja dan jenis projek pembinaan
projek pembinaan yang paling biasa
yang paling biasa terlibat)
terlibat)
Q2 3 Conclusion Excellent conclusion Good conclusion that Fair conclusion which Weak conclusion Conclusion was not
that is concisely and indicates indicates reasonable that does not given.
precisely written. It considerable analysis analysis and indicate an attempt
provides concluding and synthesis of synthesis of ideas of to synthesis the
remarks that shows ideas of the overall the overall discussion.
analysis and
synthesis of ideas of
assignment. assignment.
the overall
assignment.
Kesimpulan Penulisan kesimpulan
yang sangat baik, Kesimpulan yang
Kesimpulan yang baik
padat dan tepat. Ia sederhana yang Kesimpulan yang
yang menunjukkan
menyediakan menunjukkan analisis lemah yang tidak
1.5 analisis dan sintesis Tiada kesimpulan 6
kesimpulan ucapan dan sintesis yang menunjukkan usaha
yang agak besar diberikan.
yang menunjukkan munasabah terhadap untuk mensintesis
terhadap idea
analysis and sintesis idea tugasan perbincangan.
tugasan keseluruhan.
idea tugasan keseluruhan.
keseluruhan.
Mechanic of writing & references Excellent writing Good writing skills Simple writing skills Poor writing skills No formatting and
skills and organised and organised and organised and not organised no citation.
format. All format. Almost all of format. Missing some accordingly. Only a
references are cited the references are citations by using few of the
appropriately by cited appropriately APA referencing. references are cited.
using APA by using APA Some spelling and A lot of grammatical
referencing. Very few referencing. A few grammatical errors. and spelling errors
or no spelling and spelling and
grammatical errors grammatical errors.

Q2 3 Mekanisme penulisan & rujukan 0.5 Kemahiran menulis Kemahiran menulis Kemahiran menulis Kemahiran menulis Tidak ada format 2
yang sangat baik dan yang baik dan format yang sederhana dan yang lemah dan dan tidak ada
format yang teratur. yang teratur. Hampir format yang teratur. tidak disusun petikan.
Semua rujukan semua rujukan Hilang sebilangan dengan sewajarnya.
dipetik dengan tepat dikutip dengan tepat petikan dengan Hanya sebilangan
dengan dengan menggunakan rujukan yang
menggunakan menggunakan rujukan APA. dipetik. Banyak
rujukan APA. rujukan APA. Beberapa kesalahan kesalahan
Kesalahan ejaan dan Beberapa kesalahan ejaan dan tatabahasa dan
tatabahasa sangat ejaan dan tatabahasa. ejaan
sedikit atau tidak ada tatabahasa.
Total 7.5 30
Question 3
Excellent/ Good/ Fair/ Poor/ Unsatisfactory/
*QN/ Criteria/ Weight/ Cemerlang Baik Sederhana Lemah Tidak memuaskan Max
CLO
*NS Kriteria Pemberat Marks
4 3 2 1 0
Online Discussion: All five comments Four of the Two or three of the One post submitted. Postings done past
are good, comments are good, comments are OR All posts done assignment
appropriate, appropriate, somewhat good, in one day. timeline.
relevant, meaningful, relevant, meaningful, appropriate, OR None of the OR No postings
and respectful. and respectful. meaningful and comments are good given as proof of
Postings reflect Postings reflect respectful. and relevant. participation in
active participation participation within Postings show OR Comments are discussion
within assignment assignment timeline. relatively short short responses that
timeline. participation time. are not substantial
nor meaningful.
Minimum effort
(e.g. “I agree with
Tina”
2.5
Task 3 3 Kelima-lima komen Empat Dua atau tiga komen Satu penghantaran Postings melepasi 10
baik, sesuai, relevan, komen baik, sesuai, baik, sesuai, ATAU Semua tempoh tugasan.
bermakna dan relevan, bermakna relevan,bermakna penghantaran ATAU Tiada Postings
berhemah. dan berhemah. dan berhemah dibuat dalam satu diberi sebagai bukti
Postings Postings Postings hari . ATAU Tiada penyertaan dalam
mencerminkan mencerminkan menunjukkan komen yang baik perbincangan
penyertaan aktif penyertaan penyertaan dalam dan relevan. ATAU
sepanjang tempoh sepanjang tempoh jangakamasa yang Komen hanya
tugasan. tugasan. singkat. respon yang ringkas
dan tidak meluas
dan tidak
bermakna.Usaha
minimum (Cth:
“Saya bersetuju
dengan Tina”)
Total 2.5 10