Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

This drawing should not be scaled. Dimensions to be verified on site.

Any discrepancies should be referred to the Engineer prior to work being put in
hand.

T
PLATFORM TYPE B
700x700x500mm DEEP
This drawing is the property of Kiloh Associates Limited, and the drawing is issued
FOUNDATION PAD on the condition that it is not copied reproduced, retained or disclosed to any
PLATFORM TYPE C
2000 unauthorised person, either wholly or in part without the consent in writing of Kiloh
1200x250x200mm DEEP Associates Limited, Unit 6, Pitreavie Court, Pitreavie Business Park, Dunfermline,
DETAIL 1 Fife, KY11 8UU, t: 0131 629 3434
A

23
FOUNDATION PAD

UC

2x
15
DETAIL 1

15
PLATFORM TYPE A

2x
GENERAL NOTES

2x
DETAIL 3 DETAIL 3

15

15
2x

UC
23
1. DO NOT SCALE THIS DRAWING. ANY DISCREPANCY IS TO BE
KEE KLAMP HANDRAIL -DOUBLE TUBE
UC152x152x23 REPORTED TO THE ENGINEER IMMEDIATELY.
DETAIL 4 DETAIL 4 GALVANISED WITH 100mm KICK PLATE
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL
1000

ENGINEER'S, ARCHITECT'S OR OTHER RELEVANT DRAWINGS AND

930
PLATFORM TYPE A
76 1848 76 SPECIFICATIONS.
NUMBER OF TREAD: 1

F
DETAIL 3 UC152x152x23 DETAIL 3 3. ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE BY THE
KEE KLAMP HANDRAIL - CONTRACTOR PRIOR TO PREPARING ANY WORKING DRAWINGS OR
2000

DOUBLE TUBE COMMENCING ON SITE.


1200x250x200mm DEEP
GALVANISED WITH
UC152x152x23

UC152x152x23
UC152x152x23 FOUNDATION PAD
100mm KICK PLATE 4. THE CONTRACTOR MUST ENSURE AND WILL BE HELD RESPONSIBLE
UC152x152x23 UC152x152x23
700x700x500mm DEEP FOR THE OVERALL STABILITY OF THE
FOUNDATION PAD
924

BUILDING/STRUCTURE/EXCAVATION AT ALL STAGES OF THE WORK.


UC152x152x23
GRP GRATING 5. ALL WORK BY THE CONTRACTOR MUST BE CARRIED OUT IN SUCH A
DETAIL 2 DETAIL 2 UC152x152x23 DETAIL 2 DETAIL 2 UC152x152x23 WAY THAT ALL REQUIREMENTS UNDER THE HEALTH AND SAFETY AT
WORK ACT ARE SATISFIED.
80

GRP GRATING
150

6. ALL WORK IS TO BE CARRIED OUT IN COMPLIANCE WITH THE


REQUIREMENTS OF THE RELEVANT STATUTORY AUTHORITIES AND
REGULATIONS.

REFERENCE DOCUMENT
A Document Number Document Name

A
KIL2315_200_0001 PLATFORM AND STAIRS GENERAL ARRANGEMENT

PLATFORM TYPE A - STEELWORK PLAN SECTION A-A


1 : 25 1 : 25

KEYPLAN
700x700x500mm DEEP 1 : 100
FOUNDATION PAD
2000
1200x250x200mm DEEP
DETAIL 1
UC

FOUNDATION PAD
23
2x

B
15

DETAIL 1
15
2x

2x
15

DETAIL 3 DETAIL 3 300 152


15
2x

UC
23

50 100 100 50 152


76

36 40 40 36
36 40 40 36

R
DETAIL 4 UC152x152x23 DETAIL 4
NUMBER OF TREAD: 2 120 10

50
KEE KLAMP HANDRAIL -DOUBLE TUBE 1No 152x152x10mm
25 70 25

36
GALVANISED WITH 100mm KICK PLATE
1000

1No 250x152x10mm THICK PLATES

100
924

52

10
76 1848 76 THICK PLATES UC152x152x23

300

40
16

152
24
100
UC152x152x23

35 25

40
DETAIL 3 DETAIL 3 1No 120x120x10mm
KEE KLAMP HANDRAIL -

UC
50
UC152x152x23 THICK PLATES
2000

15
DOUBLE TUBE

36
250

120
2x

126
15
UC152x152x23

UC152x152x23

GALVANISED WITH

25 35
2x
23
100mm KICK PLATE UC152x152x23

UC152x152x23
4No 14mm ⌀ HOLES FOR
UC152x152x23
300x300x15mm THICK BASEPLATE WITH 4

16
1200x250x200mm DEEP 4 No 18mmØ HOLES FOR M12 G8.8 BOLTS
924

UC152x152x23 UC152x152x23 No 18mmØ HOLES FOR M16 HILTI-HT-


M16 HILTI-HT-HY200.

10
FOUNDATION PAD

48
UC152x152x23 HY200. 200mm EMBEDMENT. COLUMN
GRP GRATING 200mm EMBEDMENT
700x700x500mm DEEP WELDED TO PLATE BY 6mm FILLET WELD
DETAIL 2 UC152x152x23 DETAIL 2 4No 14mm ⌀ HOLES FOR
DETAIL 2 DETAIL 2 UC152x152x23 FOUNDATION PAD
M12 G8.8 BOLTS
UC152x152x23 DETAIL 1 - BASE PLATE DETAIL 2 DETAIL 3 DETAIL 4
126

1 : 10 1:5 1:5 1:5

D
GRP GRATING

PLATFORM TYPE B - STEELWORK PLAN SECTION B-B


1 : 25 1 : 25

GRP FLOORING LOAD REQUIREMENTS KEE KLAMP HANDRAIL -


DOUBLE TUBE GALVANISED
1. TREADS SHOULD BE DESIGNED TO ALLOW FOR A 1.5kN LOAD DISTRIBUTED OVER A 100mm x 100mm AREA APPLIED WITH 100mm KICK PLATE
T THE MIDDLE FRONT EDGE OF THE TREAD. DEFELECTION OF THE TREAD SHOULD NO EXCEED 1/300TH OR 6mm, 00 02/10/23 ISSUED FOR CONSTRUCTION WM SM
KEE KLAMP HANDRAIL -DOUBLE TUBE
WHICH EVER IS THE LESSER.
GALVANISED WITH 100mm KICK PLATE Rev Date Description Dr'n Ch'd
700x700x500mm DEEP FABRICATION - OPERATIVES AND COMPETENCY
FOUNDATION PAD Amendments
DETAIL 1 DETAIL 1
C 1200x250x200mm DEEP 1. ALL OPERATIVES SHALL BE TRAINED AND APPROVED TO CARRY OUT THE DIFFERENT SPECIFIC FABRICATION TASKS Project
GRP GRATING REQUIRED.
FOUNDATION PAD

DETAIL 3
1520
DETAIL 3
2. THE FRP STRUCTURAL FABRICATOR MUST HAVE WORKSHOP OPERATIVES TRAINED TO INDUSTRY NVQ2 IN
ENGINEERING SUPPORT ACTIVITIES RECOGNISED STANDARDS. FOUNTAINBRIDGE SUBSTATION
3. TRAINING AND COMPENTENCY ASSESSMENTS SHALL BE CARRIED OUT BY ECITB (ENGINEERING CONSTRUCTION
UC152x152x23
76

INDUSTRY TRAINING BOARD) APPROVED TRAINING PROVIDERS.


1200x250x200mm DEEP UC152x152x23 Title
76 DETAIL 4 1368 DETAIL 4 76 FOUNDATION PAD GRP GRATING FABRICATION - SAMPLE TESTING
NUMBER OF TREAD: 2
700x700x500mm DEEP PLATFORM AND STAIRS GENERAL
1000

1. ALL LAMINATING AND ADHESIVE MATERIALS SHALL HAVE BEEN TESTED ON THE TYPE FRP MATERIALS BEING USED
848

1050

KEE KLAMP HANDRAIL - FOUNDATION PAD UC152x152x23


DOUBLE TUBE
GALVANISED WITH
UC152x152x23 ON THE PROJECT. THE RESULTS SHALL BE CHECKED AS MEETING THE DESIGNERS REQUIREMENTS AND HELD ON
RECORD.
ARRANGEMENT
DETAIL 2 DETAIL 2 2. ADHESIVE BONDED JOINTS SHALL HAVE SHEAR, PULL OFF AND DSC TESTING CARRIED OUT TO PROVE
100mm KICK PLATE
COMPATIBILITY OF ADHESIVE AND BASE MATERIAL, CONFIRM ADHESIVE STRENGTH, CONFIRM MATERIAL Client
126

PREPARATION AND ADHESIVE CORRECTLY CURED AND MIXED. TESTING SHOULD BE BASED ON BATCH QUANTITIES.
3. WHERE REQUIRED, SPECIFIC TESTS OF LAMINATE PR ADHESIVE MATERIALS SHALL BE CARRIED OUT FOR A CONTRASTING LUDDON CONSTRUCTION
PARTICULAR PROJECT, AND THE RESULTS HELD ON RECORD FOR THIS PROJECT NOSING 250

COATING
Kiloh Associates
C 1. ALL STEELWORK EXTERNAL TO THE BUILDING SHALL BE POWDER COATED TO MATCH INTERPON D1036 - SW240F Local Engineering for Local Clients
RAL 10-35 MATT Unit 6, Pitreavie Court,
Pitreavie Business Park,
PLATFORM TYPE C - STEELWORK PLAN SECTION C-C

133

28.07°
CONTRASTING NOSING Dunfermline, Fife,
1 : 25 1 : 25 KY11 8UU
1. CONTRASTING NOSING SHOULD BE PROVIDED. t: 0131 629 3434
e: enquiries@kiloh.co.uk
SPECIFICATION - STEPS www.kiloh.co.uk

CALCULATION RULE: (2*RISE) + (1* GOING) = MIN. 550mm - MAX. 700mm

ANGLE: 28.07° CONSTRUCTION


RISE: 133mm
GOING: 250mm Drawn by Date Designed by Checked by

WM OCTOBER 2023 SM MG
Scales @ A1 Project
As indicated KIL2315
STEEL STAIRS DETAIL
No.
work to figured dimensions only

KIL2315_200_0001
Drawing No. Rev.
1 : 10 00