Professional Documents
Culture Documents
Jinka Aregawiyan Supp
Jinka Aregawiyan Supp
No Description
REBATE % ( if any)
AFTER REBATE
VAT 15% 15%
PRICE SUMMARY
PRICE SUMMARY FOR G+3 BUT G+0 MAIN BLOCK
I.no Description Amount
B. SUPER-STRUCTURE FOR GROUND FLOOR
1 BALUSTER AND HAND RAIL
2 FINISHING WORK
Total
2/26
S/OZ/ LABOUR AND SOCIAL AFFAIRS DEPARTMENT G+3 BUT G+0 BUILDING
Supply & fix 1000mm high & dia, 30mm circular baluster on staire cases anchored
to concrete slabs placed c/c 300mm made of Akaki or class B profiles.Price shall
include all other necessary accessories to complete the work.All to be done
1.20 according to detail drwaing ml 32.00
TOTAL CARRIED TO SUMMARY........
2.00 FINISHING WORK
Apply water proof (Acrylic) paint on top of first floor slab. The colour shal be white
and must be in two coat to make surface non- permeable and ready for future
2.01 construction. m2 650.00
Apply prime coat gypsum plastering to selected internal partition wall, column, beam
and slab surfaces.All surfaces to be plastered in prime coat shall be selected by the
supervisor. Unit rate shall include profile works levelling of wave surfaces and all
2.02 other works to proceed. m2 650.00
Apply natural stone paint (Contextra) finishing to all external two coat plastered
surfaces. Unit rate shall include pre-cleaning, airline crack maintenance and all
2.03 other proceedings to finalize the work. m2 650.00
TOTAL CARRIED TO SUMMARY
3/26
PRICE SUMMARY
Price Summary For Fence Work
No Description
A.Sub Structure
B.Super structure
A.Sub Structure
B.Super structure
Supply and fix 8 mm thick chip wood ceiling machine cut panels
with 1cm recess between joints on and including 4 x 5cm Zigba
battens fixed at 60 x 60cm. Price shall include decorated ceiling
corner lists with sides at 90º not less than 5cm every where at
4.20 corners of ceiling. m2 6.00
TOTAL CARRIED TO SUMMARY………………… Birr
5.0 Metal Work
Supply and fix 20x40 cm dobel side vent opening made from 2mm
5.30 galvanized steel mesh wire provide 20*20*1.5mm angle iron frame. Pcs 1.00
TOTAL CARRIED TO SUMMARY………………… Birr
6.0 Pointing and Plastering Work
Pointing to both internal and external HCB wall with 1:3 mix ratio
6.10 of cement sand mortar m2 36.06
Apply three coats of plastering with 1:3 cement mortar for grade
6.20 beam, lintels, window and door edge. m2 29.10
TOTAL CARRIED TO SUMMARY………………… Birr
7.0 Paving and Flooring Work
5 cm thick smooth finished cement sand screed (1:3) floor finish .All
as per engineers instruction. Price shall include cement sand screed
7.10 skirting as per the drawing. m2 8.00
15cm thick semi dressed stone pavement around the building on &
including 10cm thick compacted red ash, and having a slope of 2-
4% towards the side ditch. Joints shall be pointed in 1:3 mix ratio
7.20 cement mortar. m2 25.44
Supply and lay storm water concrete pipes of half diameter 30cm
with a minimum slope of 2% or natural ground slope which ever is
greater on and including a firm bed of sand 10cm red ash sand
thick below. The joints shall be grouted in cement sand mortar of
(1:3). Price shall include 15cm thick stone masonry shoulder and
7.30 all the necessary earth work mentioned in item number ml 30.60
Supply and lay throated 3 x 25cm terrazzo window cill bedded in
7.40 cement sand mortar of 1:3 mix ratio. ml 3.20
TOTAL CARRIED TO SUMMARY………………… Birr
8.0 Glazing Work
8.1 Supply and fix 4mm thick clear sheet glass with putty in to frames
& beads (Approvedby engineer)
a 4mm thick clear glass m2 3.50
TOTAL CARRIED TO SUMMARY………………… Birr
9.0 Painting Work
Apply three coats of painting approved type of plastic emulsion
paint (Approved by engineer) plasterd parts of beams, parafits and
9.10 columns. m2 65.16
9.20 Ditto but to chip wood ceiling. m2 6.00
TOTAL CARRIED TO SUMMARY………………… Birr
10.0 Electrical Instalation Work
10.1 a) .LIGHT POINTS
A.Sub Structure
B.Super structure
Roof cover in G-32 CIS nailed with dome head nails to Zigba
purlins. Price shall include 50*70mm zigba wood battens with c/c
spacing 900mm both ways ridge cover and roof measured in
3.01 horizontal projection. m2 29.00
Supply and fix wire mesh ventillation under eave nailed to zigba
battens size 40 * 50mm. Price shall include zigba wood battens c/c
600mm both ways, corner & middle list and all the necessary
3.06 accessories. m2 8.00
TOTAL CARRIED TO SUMMARY………………… Birr
4. CARPENTRY & JOINERY
Supply , assemble and mount dia. 100mm eucalyptus wooden truss
as per the detail drawing. Price shall include anti- termite treatment
4.01 and all the necessary accessories. ml 20.00
Supply and fix 50 * 70mm zigba wood purlins as per the detail
drawing. Price shall include anti- termite treatment and all the
4.02 necessary accessories. ml 30.00
Supply and fix fascia board 250 *25mm. Price shall include one
coat primer and two coats of oil paint and all the necessary
4.03 accessories to finalize the work. ml 15.00
TOTAL CARRIED TO SUMMARY………………… Birr
5 METAL WORK
Metal windows and doors manufactured from 38 * 1.25mm LTZ
frame profile and 0.8mm thick ribbed sheet all as per the engineers
apptoval and window door schedule.
DOORS
5.01 D1L size: 700 * 2150mm Pcs 4.00
TOTAL CARRIED TO SUMMARY………………… Birr
6 FINISHING
20x20cm glazed ceramic wall tiles stuck to the wall on & including
6.09 cement mortar mix (1:3) backing & white cement grout. m² 24.00
Supply and fix Hand Wash Basins with chrome plated water tap
mixer made of white vitreous china, complete with plug, chrome
plated chain holder P-smell trap with connection pipe and all other
6.10 necessary accessories. Pcs 2.00
Supply and install Wash Down Water Closets made of white
vitreous turkish with plastic seat and cover including low flush
6.11 cistern, complete with all accessories. Pcs 4.00
Half circle Dia. 400mm wide CP ditch for storm water drainage
around the pavement. Price shall include red ash or equivalent
bedding material and shall be done as per detail drawing and
6.12 Engineer's direction. ml 24.00
Urinal trough made from 25cm thick double burnt brick bedded in
cement sand mortar 1:3 mix. Work includes two coat plastering and
white ceramic tile finishing of all internal surfaces. Height 60cm.
Unit rate includes pionting of external brick wall floor drain inside
6.13 the trough. Pcs 2.00
TOTAL CARRIED TO SUMMARY………………… Birr
7. PAINTING
Apply three coats of synthetic paint to all smooth finished wall
7.01 surfaces m2 52.00
7.02 Ditto but to external pointed wall syrface m 2
29.00
TOTAL CARRIED TO SUMMARY………………… Birr
9. ELECTRIC INSTALLATION
Discretion
Grill work
2 86.00 Top and Bottom Member 40*40*2.5mm
2.94 505.68 kg
2 231.3333 25*25*2.5mm Vertical Member
1.5 1.77 1,228.38 kg
Finishing work
24 1.5 Plastering
1.3 46.8
6 4.5
1.6 43.2
2 80.00
0.2 32
122 m2
for door column
0 -
2 -
122.00 m2 total
2 120.00 Pointing For Masonry
1.25 300.00 m2
2 30 Pointing For HCB
1.5 90 m2
6 1.84 11.04 Copping
24 1.54 17.0016
28.0416 Ml
Discretion
Elevation column
above GB at 150cm height
27
m 3
1
9.75
m3
m3
2.4-Form work 24
Footing pad 97
34 30
footing column 131 11
120
m2 total
In gread beam
m2 total
In elevation column
m2 total
m2 total
3- Masonary work
BNGL
m3
ANGL 12
48000
HCB Wall
m2 total
4-Metal work
Main door
Pedastrian gate
1 20
24
172
Discretion 223.5 1.5
8.4
97
87 1,734.06 433,515.00
174
485 727.5
298
800
26.66666667
252
1.84
0.77
1.54 36.96
38.8
REINFORCING BAR SCHEDULE
No of
Item Position DR. No. Dia (mm) Shape No. of bars member Length 6
Grade Beam ---
GFB1 ---
Top 12 2 1 104.08 ---
Bottom 12 2 1 104.04 ---
Stirrups 8 481 1 1.30 ---
Footing ---
Pad 10 16 6 1.70 ---
Footing Column ---
12 6 6 2.88 ---
8 13 6 1.50 ---
---
Total Length 0.00
. Kg per meter 0.222
Weight in kg 0.0
---
. Total Length 6.00
Kg per meter 0.222
Weight in kg 1.3
AR SCHEDULE
8 10 12 14 16 20 24
--- --- --- --- --- --- ---
--- --- --- --- --- --- ---
--- --- 208.16 --- --- --- ---
--- --- 208.08 --- --- --- ---
625.30 --- --- --- --- --- ---
--- --- --- --- --- --- ---
--- 163.2 --- --- --- --- ---
--- --- --- --- --- --- ---
--- --- 103.68 --- --- --- ---
117.00 --- --- --- --- --- ---
--- --- --- --- --- --- ---
742.30 163.20 519.92 0.00 0.00 0.00 0.00
0.395 0.617 0.888 1.209 1.579 2.466 3.552
292.9 100.6 461.7 0.0 0.0 0.0 0.0
8 10 12 14 16 20 24
--- --- --- --- --- --- ---
--- --- 201.6 --- --- --- ---
259.20 --- --- --- --- --- ---
---
--- --- 193.68 --- --- --- ---
108.00 --- --- --- --- --- ---
--- ---
--- ---
--- ---
--- --- --- --- --- --- ---
367.20 0.00 395.28 0.00 0.00 0.00 0.00
0.395 0.617 0.888 1.209 1.579 2.466 3.552
145.0 0.0 351.0 0.0 0.0 0.0 0.0