DPP GMRCL NOTE-Responsibility For Completion of Work & Interface For Commissioning of Ahmedabad Metro Rail Project, PH-II (DT. 05.12.2023) - 1

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
File No. DPP/2023/16 Note Dt. 05.12.2023 Sub.:- Responsibility for completion of work & interface for commissioning of Ahmedabad Metro Rail Project, PH-II Responsibility for ensuring completion of works daily monitoring & reporting, co-ordination, interfacing etc till CMRS for the following stations of Ahmedabad Metro Rail Project, PH-II is as below:- Sr. | Station Name Responsible Person | Contact Number No. 1 | Raysan Finishing works | Mr. Bhavin Rathod, | 9099982696 Sr. DGM/Const. Raysan Entry-Exit Mr. Rajesh Mistry, | 7574001438 works AM/Civil 2 Randesan Finishing Mr. R.K. Mishra, | 7574814540 works DGM Const. Randesan Entry-Exit | Mr. Rajesh Mistry, | 7574001438 works AM/Civil 3 |Dholakuva Finishing | Mr. Ankur Patel, Sr. | 7574000381 works DGM/Const. Dholakuva Entry-Exit |Ms. Chinmayee, | 7574001340 works Engineer 4 _| Infocity Finishing Mr. Suresh Yadav, RE | 8368006696 works : Infocity Entry-Exit Mr. Ankit Dwivedi, | 7982614179 works SrEr. 5 | Sector-1 Finishing Mr. Arvind Ambade, | 7574001436 works Manager Sector-1 Entry-Exit |Ms. _Chinmayee, | 7574001340 works Engineer The above responsibility is in addition to the other duties given to them. Bsa Director (P&P) Copy to:- 1, CGM/P&D, CGM/PKG-C2 & CGM Finishing works 2. All concerned officials listed above Copy for information to:- 1. PAto MD, GMRC OULAIIEU WILT Gal oC

You might also like