Wa0019.

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Name of the Meeting : LIFT Concerns

Project/Dept Name : Sumadhura Eden Garden


Meeting No: 05 Date of Meeting : 13.05.2023
Venue : Party Hall ( Small) Start Time: 11:15 AM
Called by: Enliven Estate Management End Time 12.00 PM

ATTENDEES:
Project/Dept.
Sl. No Name of the Attendee Designation
Name/Organization
1 Owners of Eden Garden Residents Eden Garden Owners
Operations
2 Mr. Suresh Kumar Enliven
Manager
3 Mr. Goureesh TechnicalManager Enliven
4 Mr. Naresh Facility Manager Enliven
5 Mr. Satish Area Manager Schlinder
6 Mr. Ranjith Site Technician Schlinder
Review Status
Sl No Topic discussed Target Date Responsibility
Open
Residents were complaining that during the call nearest floor
lift is not landing , hence to check for all the lift syncronization
1 so that nearest floor lift will be landing as per the call. Lift 30th May-23 Schlinder
vendor has to check all the lifts for the same and to submit
the report
During power fluctuation some lifts are not working . Same
2 30th May-23 Schlinder
has to be checked by the lift vendor for the lifts
Presently lift doors are closing at faster rate and lift vendor
3 has to reduce the timing for closing the door as per the norms Schlinder
of aparment
B Block lift car vibrate while traveling, Lift vendor has to check
4 Immediate Schlinder
and rectify the same immediately for safety of the residents
All lift emergency phones are not working, some making noise
5 30th May-23 Schlinder
, need to check and replace the same .
6 I Block lift FAN not working properly Immediate Schlinder

Intercom connection & Device required in lift to reach out all


7 30th May-23 Schlinder
the flats & main gate incase of emergency

8 Do's and Don'ts Video Scrolling in Adonmo Screen 30th May-23 Schlinder
To check the feasability for switch off Adonmo Screen after with immediate
9 Schlinder
10:00 PM to reduce the power consumption effect
In the basement residents are finding difficult in seeing the
10 lifts which is coming down first due to partitation wall, hence 30th May-23 Schlinder
Schlinder has to come up with a good solution .

You might also like