Construction of Power Plant

Sl. Approx. Value Period of


Name of the Customer Project Execution
No. (Rs. in million)

1 MAMC/DVC Entire Civil Construction work for 120.00 1983-85


Coal Handling Plant at Bokaro
“B” 210 MW Thermal Power Plant

2 GRSE/NTPC Drawing, Development Fabrication, 225.00 1982-85


Erection & Commissioning of all
Structural work including Conveyor
System for Coal Handling Plant at
Farakka Super Thermal Power Plant

3 ABL/DPL 1 x 110 MW Boiler Pressure Pipe 30.00 1983-84


Special Welding work for 10,000 Joints

4 Burn Standard/ Ash Handling Plant for Bokaro 150.00 1983-85


DVC 210 MW “B” Thermal Plant

5 ABL/DVC 1 x 210 MW Boiler Erection at Bokaro 172.60 1982-83


“B” Thermal Plant

6 ABL/CESC 4 x 62.5 MW Boiler Erection at Titagarh 53.34 1982-83


Thermal Power Plant