3 P 132 9401 1a3a N 03 - Rev01

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

N BILL OF MATERIAL

SHOP MATERIALS
PT NPD
NO DESCRIPTION (IN) IDENT QTY.
1 Pipes (Length),ASME B36.10,ASTM A106 3 CPP002ZK 35665 MM
Gr.B,BE,Seamless,S-STD
2 2 90° Elb LR,ASME B16.9,ASTM A234 Gr.WPB,BW 3 CDB66GK3 4
Ends,Seamless,S-STD
S3
PIPE SUPPORTS
01 WE01
19 WE01-3"-B-300-STD-CS
3 WE01-3"-B-300-STD-CS 3 WE01 5
42
3"NPD >1 7
<5 5 FIELD MATERIALS
PT NPD
2 NO DESCRIPTION (IN) IDENT QTY.
S3 PIPE SUPPORTS
S4 WE01 4 WG01-3"-A-CS 3 WG01 3
114 WG01 WE01-3"-B-300-STD-CS
60 5 WS01-3"-A-CS 3 WS01 1
WG01-3"-A-CS 0 0
SEE SHT
P-132-9401 SHT 2 CUT PIPE LENGTH
PIECE LENGTH NPD REMARKS END END ITEM
NO (MM) (IN) ONE TWO CODE
S4
WG01 <5> 1672 3 BEVEL BEVEL CPP002ZK
WG01-3"-A-CS 60 <6> 32321 3 BEVEL BEVEL CPP002ZK
0 0 <7> 1672 3 BEVEL BEVEL CPP002ZK
32 S3
5 50 WE01
WE01-3"-B-300-STD-CS
S5
S3
WS01
WE01
WS01-3"-A-CS 60
0 WE01-3"-B-300-STD-CS
0
S4
WG01
WG01-3"-A-CS 60
The present document or drawing is property of TECHNIPFMC and shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or used, without its prior written consent,

00
S3
WE01 <6
WE01-3"-B-300-STD-CS >1
2
>1
<7
01
2 19
SEE ISO
3"NPD P-132-9401 SHT 4
for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use.

114
1 27-01-2021 ISSUED FOR CONSTRUCTION NRB SAB GP SDC
0 24-12-2020 ISSUED FOR CONSTRUCTION MP SAB GP SDC
REV. DATE. DESCRIPTION PRP CHK STR APR
Technip India Limited
B1-601/602, Boomerang, Chandivali Farm Road,
Andheri (East), Mumbai 400 072 India. www.technip.com
Bharat Petroleum Corporation Ltd.
MUMBAI REFINERY MAHUL, MUMBAI - 74
FABRICATION / INSPECTION DATA NOTE:
UNIT : DAS
1. ALL DIMENSIONS ARE IN MM, COORDINATES AND ELEVATIONS ARE IN METER, UNLESS OTHERWISE SPECIFIED
STRESS CRITICAL - YES / NO NO PAINTING STANDARD AE-S-5430-REV-3
2 . COATING & WRAPPING TO UG PIPES for OWS and CRWS lines (min 300 mm above ground level) WITH POLYMERIC TAPE COATING SUCH AS POLYKEN TAPE WITH
PWHT - YES / NO NO NDT SPEC 080834C001-000-STC-1391-0001 ADHESIVE RUBBER & BACKING CLOTH WITH BLASTING & PRIMER IN ACCORDANCE WITH IS10221
LINE NUMBER:
IBR - YES / NO NO INSULATION STANDARD 080834C001-000-STC-1391-0011
3.
4.
FOR LINE 1 1/2"AND SMALLER, DIMENSIONS AND ROUTING ARE TENTIVE AND SHALL BE CHECKED PHYSICALY AT SITE BEFORE FABRICATIONAND SUPPORTED IN FIELD.
FOR INFORMATION ABOUT LINE PRESSURES,TEMPERATURES,INSULATION,PAINT AND TRACING ETC REFER LINE LIST.
3"-P-132-9401-1A3A-N
TEST MEDIUM H (Note 4) SUPPORT STANDARD 080834C001-000-JSD-1380-0001 5. All CBD and CA UG LINES TO BE PAINTED / COATED BY EPOXY PAINTING (MIN 2 COATS)
TEST PRESS. (kg/cm²g) 16.50 (Note 4)
6. KINDLY CONSIDER 2" EXTRA PIPE FOR FIELD FABRICATION WELD (FFW) PROJ.No ISOMETRIC NUMBER SHT.No. REV
7. FOR PWHT REQUIREMENTS REFER TO MATERIAL SPECIFICATION (080834C001-001-JSD-1300-001).
P&ID DWG No 132-4211
PIPING SPEC 1A3A TEST PACK SYS No.
1025 P-132-9401 3 of 6 1

You might also like