PT Week 5

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

College of Engineering and Technology (CoET)

Weekly Report No: __5__from__21 AUGUST__2023__to__25_AUGUST__2023_

Day Brief description of work performed Hours


Service of generator at Regional commissioners house Tanga. 6
Monday

Service of generator at Regional Administrative Secretary house 6


Tuesday Tanga.

Maintanance of Air Conditioners (AC) at Regional Commissioners 6


Wednesday Office

Maintenance of a generator at Horohoro weight-bridge 7


Thursday

Writing report on the maintenance of a generator at Horohoro weight- 5


Friday bridge

Report writing
Saturday

Total hrs 30

Sequence of operations for main job


No Operation Tools, Machinery, Equipment
sss On the service and maintenance of generator we Spanner, Screw driver
do the following;
 We check the oil and fuel filters
 We replace the oil filter with new ones

 We replace the fuel filter with new ones

On the maintenance of generator we do the


following;
 We check if there is any fault in the
changeover switch and the isolator between
the mains and the generator
 If there is any fault we fix it for example
loose connection of wires

Signature Training Officer Date


Details of main job

Drawn Date Name Checked Date Name