TRAFFIC MANAGEMENT PLAN (TMP)

Rev Date Prepared by Reviewed by Approved by


Name Sign Name Sign Name Sign

01 Yudha Setiawan Achsan Hamzah Teddy Pramudhita

02 Eko Budi Mulyono Dekky Hermawan

1. TRAFFIC CONTROL PLAN DETAILS

Project: 0112C LEVEE Responsible Department: SHE & Enggineering

Location: Circuit 2 Application Dates (From-To/Permanent): Permanent

Brief Description of reason for TCP: Traffic Management Plan (TMP) Buttress Work from EMA-45 to EMA-50 via
EMA-55

Departments/Stakeholders To Be Notified: OPERATION SHE

ENGINEERING

AMG
2. DESCRIPTION OF CONDITIONS

Speed Limit and  Reduce the speed (±10 km/hr) when approaching the Access Ramp and Dumping Point
Operating Conditions

Traffic Volumes  Medium

Parking Areas  Only Light Vehicle park near by lighting tower covered by safety berm

Pedestrians/  None
Motorcyclists

Public Transport  None

Drainage  Yes
3. TRAFFIC MANAGEMENT & ROAD SAFETY

Safety Barriers and  Blockage crest access road at EMA 55 southern side
Terminal Treatments  Blockage road at EMA 55 northern side
 Loaded truck must keep safe distance (min 50 m) while queuing into the Dumping Point
 Follow the supervisor's directions via radio when dumping material
Speed Zone  10 Kph when approaching the Access Ramp and Dumping Point
Management
Agreed Lane Closure  Nil
Times
Road Closures and  Nil
Detours
Other Road Users  Nil

Once printed this document becomes uncontrolled. Refer to Petrosea Intranet for controlled copy.
Form No. 0112C-PTP-FO-G-0007 Rev No. 0 1 of 4
4. TRAFFIC SIGN TO BE POSTED

RISING ROAD AREA

WATER FILL
5. TMP DIAGRAM & SUMMARY

Entry Access Ramp at EMA 55

MA-55

SPOTTER
Dumping Point to rising road at buttress EMA 120 – EMA 130

RISING
ROAD
AREA