Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

1NF

No. Proyek Nama Proyek No. Pegawai Nama Pegawai Golongan Gaji
Proyek 1 Tol 1 desi A 2,000,000.00
Proyek 1 Tol 5 anwar C 1,000,000.00
Proyek 1 Tol 3 indra B 700,000.00
Proyek 2 Jembatan 2 maman D 500,000.00
Proyek 2 Jembatan 4 oman E 900,000.00
Proyek 2 Jembatan 1 desi A 2,000,000.00

TABEL 1 2 NF TABEL 2
No. Proyek Nama Proyek No. Pegawai Nama Pegawai Golongan Gaji
Proyek 1 Tol 1 desi A 2,000,000.00
Proyek 2 Jembatan 5 anwar C 1,000,000.00
3 indra B 700,000.00
2 maman D 500,000.00
4 oman E 900,000.00
1 desi A 2,000,000.00
TABEL 2 3 NF
No. Pegawai
Nama Pegawai
Golongan Gaji
1 desi A 2,000,000.00
5 anwar C 1,000,000.00
3 indra B 700,000.00
2 maman D 500,000.00
4 oman E 900,000.00

You might also like