Varco PRODUCT BULLETIN NO.: TDS-99-14
Top Drive
[A Varco Company Product Information
Date: September 16, 1999
SUBJECT: Potting Inspection of AC Top Drive Connectors
PURPOSE: Advise Customers to Check Potting Integrity
EFFECTIVITY: All Portable AC Top Drives (TDS-9S, -10S & -118)
Due to several incidents of water ingress into AC Top Drive connectors, Varco has determined that
an inspection of the potting should be done as soon as possible. Constant lifting on the connector
and vibration can cause the connector to loosen itself from the potting and cable.
Varco has improved the quality of its potting compound and recommends replacing the old potting,
Varco P/N 77992-1080, 3M Scotchcast 2112, which is very soft and rubbery, with a new replace-
‘ment potting, Varco P/N 127386, 3M Compound #2130.
Newer Varco cables are potted with a proprietary potting compound called Calthane 1500 thats not
available in small quantities, thus not offered as a field retrofit.
How To Inspect Your Connectors
The visual differences in potting material used in Varco connectors:
Brand Physical Properties Use
3M Scotchcast 2112 Soft, rubbery butterscotch color Old production
Calthane 1500 Hard, butterscotch color New production
3M Compound #2130 Hard, black color Field kits only
if your connectors are found with the old potting, please order the following kits:
3M Compound #2130 Varco P/N 127386 - BSC. (7oz./small connector)
Varco P/N 127386-1 (20 oz,/large connector)
Ifyou have any further questions, please contact your local Varco Service Center.
Tos-90-14
1012Repotting AC Top Drive Connectors
Cable
Mechanical
Clamp Nut
Washer
Grommet
Cable
Adapter
(Barrel)
Coupling
Nut
SZ I) cover
Potting Fill A
Level <<
(should be just below the grommet)
Instructions to Repot Connectors
. Remove back of connector to expose cable sliding up the Mechanical Clamp Nut, Washer,
and the Grommet.
. With a blunt tool, remove old potting material from the connector cleaning all traces from
the connector barrel & connector components (disassembly of barrel is recommended).
3. Refill the connector with new potting (Varco P/N 127386-BSC or -1) to just below the
lower boundary of the Grommet (usually about 1 inch).
4. Immediately install the Grommet, Washer, and Mechanical Clamp Nut while the potting
is still UNCURED.
. Allow the potting to cure with the connector in a vertical position for at least 3 hours
before using.
Tos-09-14
20f2