KLAIM UPAH PERBAIKAN KAMAR 603, 614, PPI, 311, POLI 27, 409, 313, GANTI TRIPLEK 603,

KAMAR
516, KAMAR 504, KAMAR 402

No Nama Pekerja Posisi Status Jam Kerja


Kamis/10-08-2023
1 Rahmad Tukang Kawin - Anak 1 08.00 - 22.00
2 Linus Tukang Kawin - Anak 1 08.00 - 22.00
3 Dodi Pekerja Kawin - Anak 1 08.00 - 22.00
4 Rehan Pekerja Belum Kawin 08.00 - 22.00

Jum'at/11-08-2023
1 Rahmad Tukang Kawin - Anak 1 08.00 - 17.00
2 Linus Tukang Kawin - Anak 1 08.00 - 17.00
3 Dodi Pekerja Kawin - Anak 1 08.00 - 17.00
4 Rehan Pekerja Belum Kawin 08.00 - 17.00

Sabtu/12-08-2023
1 Rahmad Tukang Kawin - Anak 1 08.00 - 17.00
2 Linus Tukang Kawin - Anak 1 08.00 - 17.00
3 Dodi Pekerja Kawin - Anak 1 08.00 - 17.00
4 Rehan Pekerja Belum Kawin 08.00 - 17.00

Kamis/17-08-2023
1 Rahmad Tukang Kawin - Anak 1 08.00 - 17.00
2 Linus Tukang Kawin - Anak 1 08.00 - 17.00
3 Dodi Pekerja Kawin - Anak 1 08.00 - 17.00
4 Rehan Pekerja Belum Kawin 08.00 - 17.00

Jum'at/18-08-2023
1 Rahmad Tukang Kawin - Anak 1 08.00 - 17.00
2 Linus Tukang Kawin - Anak 1 08.00 - 17.00
4 Dodi Pekerja Kawin - Anak 1 08.00 - 17.00
5 Rehan Pekerja Belum Kawin 08.00 - 17.00

Sabtu/19-08-2023
1 Rahmad Tukang Kawin - Anak 1 08.00 - 17.00
2 Linus Tukang Kawin - Anak 1 08.00 - 17.00
4 Dodi Pekerja Kawin - Anak 1 08.00 - 17.00
5 Rehan Pekerja Belum Kawin 08.00 - 17.00

Kamis/24-08-2023
1 Rahmad Tukang Kawin - Anak 1 08.00 - 17.00
2 Linus Tukang Kawin - Anak 1 08.00 - 17.00
3 Dodi Pekerja Kawin - Anak 1 08.00 - 17.00
4 Rehan Pekerja Belum Kawin 08.00 - 17.00

Jum'at/25-08-2023
1 Rahmad Tukang Kawin - Anak 1 08.00 - 17.00
2 Linus Tukang Kawin - Anak 1 08.00 - 17.00
3 Dodi Pekerja Kawin - Anak 1 08.00 - 17.00
4 Rehan Pekerja Belum Kawin 08.00 - 17.00

Sabtu/26-08-2023
1 Rahmad Tukang Kawin - Anak 1 08.00 - 17.00
2 Dodi Pekerja Kawin - Anak 1 08.00 - 17.00

Minggu/27-08-2023
1 Rahmad Tukang Kawin - Anak 1 08.00 - 17.00
2 Dodi Pekerja Kawin - Anak 1 08.00 - 17.00

Total

Material
1 Mika Kenari 1 set Rp 463,000.00 Bon 1
2 Gypsum 1 set Rp 131,000.00 Bon 2
3 Gypsum Aplus 3 lbr Rp 216,000.00 Bon 3
4 Seng Angsa 1 set Rp 372,000.00 Bon 4
5 Triplek Kangguru 1 set Rp 575,000.00 Bon 5
6 Gypsum dan Seng 1 set Rp 1,076,000.00 Bon 6
7 Sekrup Gypsum 1 Set Rp 70,000.00 Bon 7
8 Cat 3 Galon 1 set Rp 580,000.00 Bon 8
9 Cat 1 Pail 1 set Rp 1,616,937.00 Bon 9

TOTAL MATERIAL Rp 5,099,937.00

Total Biaya Perbaikan Rp 10,299,937.00


, 313, GANTI TRIPLEK 603, KAMAR 301, KAMAR
AR 402

Hari Kerja Upah/Hari Total TGL 22- TGL 03


3
2 Hari Rp 150,000.00 Rp 300,000.00
2 Hari Rp 150,000.00 Rp 300,000.00
2 Hari Rp 110,000.00 Rp 220,000.00
2 Hari Rp 110,000.00 Rp 220,000.00

3
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 110,000.00 Rp 110,000.00
1 Hari Rp 110,000.00 Rp 110,000.00

3
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 110,000.00 Rp 110,000.00
1 Hari Rp 110,000.00 Rp 110,000.00

3
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 110,000.00 Rp 110,000.00
1 Hari Rp 110,000.00 Rp 110,000.00

3
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 110,000.00 Rp 110,000.00
1 Hari Rp 110,000.00 Rp 110,000.00

3
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 110,000.00 Rp 110,000.00
1 Hari Rp 110,000.00 Rp 110,000.00

3
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 110,000.00 Rp 110,000.00
1 Hari Rp 110,000.00 Rp 110,000.00

3
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 110,000.00 Rp 110,000.00
1 Hari Rp 110,000.00 Rp 110,000.00

3
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 110,000.00 Rp 110,000.00

3
1 Hari Rp 150,000.00 Rp 150,000.00
1 Hari Rp 110,000.00 Rp 110,000.00

Rp 5,200,000.00
1275

1275

1275

1275

1275

1275
1275

1275

1275

1275