㈜유텍솔루션
(YOU-TECH SOLUTION) 관 리 계 획 서 (CONTROI PLAN)
성 명 상 성 명
(Name) 호 (Name)
기
품질보증팀 서 명 능 서 명
(Quality Assurance Team) (Signature) 팀 (Signature)
일 자 일 자
(Date) (Date)
개정일자
no ( Revision Date) Page 개 정 내 용(Revised Conte
- -
0 3-Mar-20 Release product in YTG Vina
배포처
관리계획서 번호
(Part Number) CP-156-00
개 정 번 호
(Revision No) 0
QA 생판재
(Purchasing department)
생기
(manufacturing technology)
○ #00 Incomming Material Inspection Incomming Inspection Standard First Lot Incomming test report Return
○ #10 Start Bobbin Insert Molding Injection Molding M/C Material(Resin) dry Time Min 4 HR Timer First Shift
Start Bobbin + Start Terminal & dehumidify Drying 100±10℃ thermometer First Shift
Mold'g Temp 40~60℃ thermometer First Shift MC Check Sheet Adjust
Resin humidity Max 0.05% Moisture First Shift
Injection condition Injection condition standard visual First Shift
( PA66 + GF30%
BLACK )
Classification Speed(%) Pres.(bar) Position
Molding 1 45~55 45~55 8~14
Molding 2 40~50 40~50 7~13
Injection
Molding 3 30~40 30~40 2~8
Holding 5~15 5~15 0~2s
Nozzle Cylinder 1 Cylinder2 Cylinder3
Temp(° C)
260~280 270~290 270~290 270~290
Time Injection time: 0.5~1.5s Cooling time: 15~30s
Apprearance No short shot, burrs, deformed Visual 100% Shift Working diary waste
○ #10 End Bobbin Insert Molding Injection Molding M/C Material(Resin) dry Time Min 4 HR Timer First Shift
End Bobbin + End Terminal & dehumidify Drying 100±10℃ thermometer First Shift
Mold'g Temp 40~60℃ thermometer First Shift MC Check Sheet Adjust
Resin humidity Max 0.05% Moisture First Shift
Injection condition Injection condition standard visual First Shift
○ #20 Winding Coil Winding M/C Coil 2-UEW Coil Turns 160±1% Winding Program First Shift Condition Check Sheet Adjust
Coil Spec Ø0.15 Label First Shift Condition Check Sheet Adjust
3 times
Tension 90±20g Tension meter Shift Condition Check Sheet Adjust
n=shaft
3 times
Resistance after wind'g 8.90 ~ 10.3Ω Resistance Tester Shift Daily Work Report waste
n=shaft
appearance inspection no scratch on coil surface visual 100% Shift Daily Work Report waste
Taping Tape(Kapton) Wrap up the coils of start BB visual 100% Shift Daily Work Report Adjust/scrap
3 times
○ #30 Soldering Soldering M/C Material Plumbum Temperature 300 ~ 350℃ thermometer Shift Condition Check Sheet Adjust
n=shaft
3 times
Resistance 8.90 ~ 10.3Ω Resistance Tester Shift Daily Work Report
n=shaft
waste
appearance inspection no excessive - soldering visual 100% Shift Daily Work Report
Charateristics Methods
Part/ Machine, Device, Special
Process Name/ Product/Process Evaluation Sample
Process Jig, Tools Char. Reaction Plan
Number Operation Description For Mfg. No. Product Process Class. Specification/ Measurement Control Method
Tolerance Technique Size Freq.
○ SUB5
#40 Outer Injection Injection Molding M/C Material(Resin) dry Time Min 4 HR Timer First Shift