FL3B PROJECT

PT. RIAU ANDALAN PULP AND PAPER


PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

No. Description Unit Quantity Total Rate Amount


Remarks
[IDR] [IDR]

I PRELIMINARY

Mobilization of all personnel and manpower, provide skill


1.
and unskill manpower for execution of work

a. Site management & supervisory staff person(s) 7 1,500,000 10,500,000


b. Supervisors person(s) 5 1,500,000 7,500,000
c. Operators person(s) 8 1,500,000 12,000,000
d. QA & QC Engineer person(s) 2 1,500,000 3,000,000
e. Safety Officers person(s) 2 1,500,000 3,000,000
f. Skilled and Unskilled manpower person(s) 48 1,500,000 72,000,000
108,000,000
Demobilization of all personnel and manpower, upon
2. completion of the works, with the approval from the
engineer
a. Site management & supervisory staff person(s) 7 1,500,000 10,500,000
b. Supervisors person(s) 5 1,500,000 7,500,000
c. Operators person(s) 8 1,500,000 12,000,000
d. QA & QC Engineer person(s) 2 1,500,000 3,000,000
e. Safety Officers person(s) 2 1,500,000 3,000,000
f. Skilled and Unskilled manpower person(s) 48 1,500,000 72,000,000
108,000,000
Mobilization of all required equipment, tools and materials
3. to carry out the work and to maintain them until job
completion
a Diesel Hammer unit(s) 5 20,000,000 100,000,000
b Diesel Hammer Driver Machine unit(s) 5 90,000,000 450,000,000
c Mobile Crane up to 50 tonnes unit(s) - - -
d Diesel Generator Set unit(s) - - -
e Standard Trailer truck unit(s) 2 - -
f Welding Machine unit(s) 10 - -
g Pneumatic Jack Hammer unit(s) 1 - -
h Air Compressor Machine unit(s) 1 - -
i Total Station unit(s) 3 - -
j Theodolite unit(s) - - -
k Auto Level unit(s) 2 - -
l Other necessary equipment and tools Lot - -
- Service Crane unit(s) 3 90,000,000 270,000,000
- Dolly Truck unit(s) - - -
- Electrode Baking Oven unit(s) 1 - -
- Electrode Holding Oven unit(s) 10 - -
- Fuel Tank Truck unit(s) 1 -
- Steel Plate 1.5 x 6 M x 20 Mm unit(s) 25 - -
820,000,000
Demobilization of all required equipment, tools &
4. materials upon completion of the works, with the approval
from the Engineer
a Diesel Hammer unit(s) 5 20,000,000 100,000,000
b Diesel Hammer Driver Machine unit(s) 5 90,000,000 450,000,000
c Mobile Crane up to 50 tonnes unit(s) - - -
d Diesel Generator Set unit(s) - - -
e Standard Trailer truck unit(s) 2 - -
f Welding Machine unit(s) 10 - -
g Pneumatic Jack Hammer unit(s) 1 - -
h Air Compressor Machine unit(s) 1 - -
i Total Station unit(s) 3 - -

1/95
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

No. Description Unit Quantity Total Rate Amount


Remarks
[IDR] [IDR]
j Theodolite unit(s) - - -
k Auto Level unit(s) 2 - -
l Other necessary equipment and tools Lot - -
- Service Crane unit(s) 3 90,000,000 270,000,000
- Dolly Truck unit(s) - - -
- Electrode Baking Oven unit(s) 1 - -
- Electrode Holding Oven unit(s) 10 - -
- Fuel Tank Truck unit(s) 1 -
- Steel Plate 1.5 x 6 M x 20 Mm unit(s) 25 - -
820,000,000

Establish and maintain during the entire period of stay at


site contractor's all temporary facilities such as container
5. Lot 1 25,000,000 25,000,000
office, workshop, fabrication area, store, sanitary facilities,
temporary water & electrical supplies, etc.

Site Office, Temporary Area Works / Material Storage


6.
Area
a Contractor Site Office (Size = 2.4x12) M2 x 2 Unit m2 57.6 - -
b Workers Rest Area (Size = 8 x10 ) M2 m2 80.0 500,000 40,000,000
c Sanitary Facilities such as Toilets unit(s) 5 10,000,000 50,000,000
Temporary water source & electrical power tapping, area
d Lot 1 10,000,000 10,000,000
cleaning and maintenance

Removal of all contractor's temporary facilities after


completion of the works and make the complete area
7. Lot 1 10,000,000 10,000,000
clean before leaving the site, with the approval from the
engineer

Provision of site management & supervisory staff, as per


8.
requirement of the services
a Site management & supervisory staff person(s) 7 37,500,000 262,500,000
b Supervisors person(s) 5 24,000,000 120,000,000
c Operators person(s) 8 30,000,000 240,000,000
d QA & QC Engineer person(s) 2 24,000,000 48,000,000
e Safety Officers person(s) 2 21,000,000 42,000,000
f Skilled and Unskilled manpower person(s) 48 15,000,000 720,000,000

9. Local Transport
a Bus unit(s) 1 60,000,000 60,000,000
b Mini Bus unit(s) 1 33,000,000 33,000,000
c Colt Diesel / Light Truck / Pick-up unit(s) 1 21,000,000 21,000,000

Loading and unloading of materials from logistic store to


10. Lot 52,920 35,000 1,852,200,000
contractor's fabrication workshop and to job site location

11. Provision & implementation of SMK3 Lot 1 10,000,000 10,000,000


a. Contractor Safety Management System (CSMS)
b. Proper Personal Protection Equipment (PPE)
Security services for safekeeping & loss prevention of
c.
equipment, tools and materials,

Health insurances like Jamsostek, BPJS for the duration


d. of contract period, area cleaning & maintenance during
and after completion of the works

- Labour

2/95
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

No. Description Unit Quantity Total Rate Amount


Remarks
[IDR] [IDR]
Jamsostek Lot 1 15,000,000 15,000,000
Swab Test, MCU persons 72 2,400,000 172,800,000
- Insurance of Equipment at site Lot 1 75,000,000 75,000,000

Provide proper safety equipment & safety standard as


12. necessary for completion of the works as per direction of
the Engineer

a safety helmet, safety shoes, helmet, gloves, mask, google set(s) 72 1,000,000 72,000,000

b safety body harness set(s) 10 400,000 4,000,000


Others (as necessary for completion of the works as per
c Lot 1 2,500,000 2,500,000
directions of engineer)

Security of contractor's tools and equipment provided by


13. Lot 1 6,000,000 6,000,000
contractor
3,891,000,000

II PILING WORK
(Conforming to Project Standard: PMO-LGEN-K107,
PMO-LGEN-K117 and PMO-LGEN-K118)
Driving of Pile by using Diesel Hammer up to the
1.
required level for:
1.1 450-mm dia. concrete spun piles
- in area of 135- ETP m 52,920 45,000 2,381,400,000 B

- in area of 275- WTP Water Intake and Discharging Pipe m - - A

- in area of 275- WTP Reservoir - -


- in area of 275- WTP Clarifier - -
- in area of 328- Wood Handling #7 m - - A
- in area of 329- Wood Handling #8 m - - A
in area of 344- Screening, Chip Storage and Chip
- m - - A
Conveyor

Driving of Dolly by using Diesel Hammer on the


2.
following piles:
2.1 450-mm dia. concrete spun piles
- in area of 135- ETP m 2,205 45,000 99,225,000 B

- in area of 275- WTP Water Intake and Discharging Pipe m - - A

- in area of 275- WTP Reservoir m - -


- in area of 275- WTP Clarifier m - -
- in area of 328- Wood Handling #7 m - - A
- in area of 329- Wood Handling #8 m - - A
in area of 344- Screening, Chip Storage and Chip
- m - - A
Conveyor

3. Welding of pile's joint to:


3.1 450-mm dia. concrete spun piles
- in area of 135- ETP point(s) 2,940 172,500 507,150,000 B

- in area of 275- WTP Water Intake and Discharging Pipe point(s) - - A

- in area of 275- WTP Reservoir point(s) - -


- in area of 275- WTP Clarifier point(s) - -
- in area of 328- Wood Handling #7 point(s) - - A
- in area of 329- Wood Handling #8 point(s) - - A
in area of 344- Screening, Chip Storage and Chip
- point(s) - - A
Conveyor

3/95
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

No. Description Unit Quantity Total Rate Amount


Remarks
[IDR] [IDR]

Perform High Strain Dynamic Load Test or PDA Test


4.
on the installed pile:
4.1 600-mm dia. concrete spun piles
in area of 474- Recausticizing point(s) 1 12,500,000 12,500,000

4.2 450-mm dia. concrete spun piles


- in area of 135- ETP point(s) 1 12,500,000 12,500,000
- in area of 186- Pipe Bridge point(s) - -

- in area of 275- WTP Water Intake and Discharging Pipe point(s) - -

- in area of 275- WTP Reservoir point(s) 1 12,500,000 12,500,000


- in area of 275- WTP Clarifier point(s) - -
- in area of 285- PB#5 point(s) - -
- in area of 285- Coal Storage and Coal Conveyor point(s) 1 12,500,000 12,500,000

- in area of 296- TG9, TG10, Compressed Air and GIS point(s) 1 12,500,000 12,500,000

- in area of 328- Wood Handling #7 point(s) - -


- in area of 329- Wood Handling #8 point(s) 1 12,500,000 12,500,000
in area of 344- Screening, Chip Storage and Chip
- point(s) 1 12,500,000 12,500,000
Conveyor
- in area of 414- Cooking point(s) 1 12,500,000 12,500,000
- in area of 424- Washing, Screening and O2X point(s) 1 12,500,000 12,500,000
- in area of 434- Bleaching point(s) 1 12,500,000 12,500,000
- in area of 451- Evaporator Upgrade point(s) - -
- in area of 465- RB#5 Upgrade point(s) - -
- in area of 474- Recausticizing point(s) - -
- in area of 486- LK#6 Upgrade point(s) - -
- in area of 613- NaOH Plant #3 point(s) 1 12,500,000 12,500,000
- in area of 626- CLO2 Plant #6 point(s) 1 12,500,000 12,500,000
- in area of 645- O2 Plant #5 point(s) - -
- in area of 651- H2O2 Plant #1 point(s) 1 12,500,000 12,500,000
- in area of 855- Pulp Dryer 5 point(s) 1 12,500,000 12,500,000
- in area of 877- Baling Line 7 & 8 point(s) - -
- in area of 895- Pulp warehouse #5 point(s) - -
- in area of Demin Plant point(s) - -
- in area of mill warehouse point(s) 1 12,500,000 12,500,000

4.3 400x400mm square concrete piles

- in area of 296- TG9, TG10, Compressed Air and GIS point(s) 1 12,500,000 12,500,000

Provision for shifting the Diesel Hammer between one


location to another location within the project areas by
5. ea 6 - -
using lowbed trailer, mobile crane and trailer trucks as
directed by the Engineer.

a. Piling Rig + Diesel Hammer ea 1 8,000,000 Rate Only


b. Service Crane ea 1 6,000,000 Rate Only

Total [IDR] 10,790,775,000

Jakarta, 5th February 2021


Prepared by,

4/95
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

No. Description Unit Quantity Total Rate Amount


Remarks
[IDR] [IDR]
PT. MASTERPANCANG PONDASI

Ir. Yung Iskandar


General Manager

5/95
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

Total Amou
No. Description Unit Quantity
Rate nt Remarks
[IDR] [IDR]
I PRELIMINARY

Mobilization of all personnel and manpower, provide skill


1.
and unskill manpower for execution of work

a. Site management & supervisory staff person(s) 7 ### ###


b. Supervisors person(s) 5 ### ###
c. Operators person(s) 8 ### ###
d. QA & QC Engineer person(s) 2 ### ###
e. Safety Officers person(s) 2 ### ###
f. Skilled and Unskilled manpower person(s) 48 ### ###
Rp 108,000,000
Demobilization of all personnel and manpower, upon
2. completion of the works, with the approval from the
engineer
a. Site management & supervisory staff person(s) 7 ### ###
b. Supervisors person(s) 5 ### ###
c. Operators person(s) 8 ### ###
d. QA & QC Engineer person(s) 2 ### ###
e. Safety Officers person(s) 2 ### ###
f. Skilled and Unskilled manpower person(s) 48 ### ###
Rp 108,000,000
Mobilization of all required equipment, tools and materials
3. to carry out the work and to maintain them until job
completion
a Diesel Hammer unit(s) 5 ### ###
b Diesel Hammer Driver Machine unit(s) 5 ### ###
c Mobile Crane up to 50 tonnes unit(s) - - -
d Diesel Generator Set unit(s) - - -
e Standard Trailer truck unit(s) 2 - -
f Welding Machine unit(s) 10 - -
g Pneumatic Jack Hammer unit(s) 1 - -
h Air Compressor Machine unit(s) 1 - -
i Total Station unit(s) 3 - -
j Theodolite unit(s) - - -
k Auto Level unit(s) 2 - -
l Other necessary equipment and tools Lot - -
- Service Crane unit(s) 3 ### ###
- Dolly Truck unit(s) - - -
- Electrode Baking Oven unit(s) 1 - -
- Electrode Holding Oven unit(s) 10 - -
- Fuel Tank Truck unit(s) 1 -
- Steel Plate 1.5 x 6 M x 20 Mm unit(s) 25 - -
Rp 820,000,000
Demobilization of all required equipment, tools &
4. materials upon completion of the works, with the approval
from the Engineer
a Diesel Hammer unit(s) 5 ### ###
b Diesel Hammer Driver Machine unit(s) 5 ### ###
c Mobile Crane up to 50 tonnes unit(s) - - -
d Diesel Generator Set unit(s) - - -
e Standard Trailer truck unit(s) 2 - -
f Welding Machine unit(s) 10 - -
g Pneumatic Jack Hammer unit(s) 1 - -
h Air Compressor Machine unit(s) 1 - -
i Total Station unit(s) 3 - -

6/95
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

Total Amou
No. Description Unit Quantity
Rate nt Remarks
[IDR] [IDR]
j Theodolite unit(s) - - -
k Auto Level unit(s) 2 - -
l Other necessary equipment and tools Lot - -
- Service Crane unit(s) 3 ### ###
- Dolly Truck unit(s) - - -
- Electrode Baking Oven unit(s) 1 - -
- Electrode Holding Oven unit(s) 10 - -
- Fuel Tank Truck unit(s) 1 -
- Steel Plate 1.5 x 6 M x 20 Mm unit(s) 25 - -
Rp 820,000,000

Establish and maintain during the entire period of stay at


site contractor's all temporary facilities such as container
5. Lot 1 ### ###
office, workshop, fabrication area, store, sanitary facilities,
temporary water & electrical supplies, etc.

Site Office, Temporary Area Works / Material Storage


6.
Area
a Contractor Site Office (Size = 2.4x12) M2 x 2 Unit m2 57.6 - -
b Workers Rest Area (Size = 8 x10 ) M2 m2 80.0 ### ###
c Sanitary Facilities such as Toilets unit(s) 5 ### ###
Temporary water source & electrical power tapping, area
d Lot 1 ### ###
cleaning and maintenance

Removal of all contractor's temporary facilities after


completion of the works and make the complete area
7. Lot 1 ### ###
clean before leaving the site, with the approval from the
engineer

Provision of site management & supervisory staff, as per


8.
requirement of the services
a Site management & supervisory staff person(s) 7 ### ###
b Supervisors person(s) 5 ### ###
c Operators person(s) 8 ### ###
d QA & QC Engineer person(s) 2 ### ###
e Safety Officers person(s) 2 ### ###
f Skilled and Unskilled manpower person(s) 48 ### ###

9. Local Transport
a Bus unit(s) 1 ### ###
b Mini Bus unit(s) 1 ### ###
c Colt Diesel / Light Truck / Pick-up unit(s) 1 ### ###

Loading and unloading of materials from logistic store to


10. Lot 52,920 ### ###
contractor's fabrication workshop and to job site location

11. Provision & implementation of SMK3 Lot 1 ### ###


a. Contractor Safety Management System (CSMS)
b. Proper Personal Protection Equipment (PPE)
Security services for safekeeping & loss prevention of
c.
equipment, tools and materials,

Health insurances like Jamsostek, BPJS for the duration


d. of contract period, area cleaning & maintenance during
and after completion of the works

- Labour

7/95
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

Total Amou
No. Description Unit Quantity
Rate nt Remarks
[IDR] [IDR]
Jamsostek Lot 1 ### ###
Swab Test, MCU persons 72 ### ###
- Insurance of Equipment at site Lot 1 ### ###

Provide proper safety equipment & safety standard as


12. necessary for completion of the works as per direction of
the Engineer

a safety helmet, safety shoes, helmet, gloves, mask, google set(s) 72 ### ###

b safety body harness set(s) 10 ### ###


Others (as necessary for completion of the works as per
c Lot 1 ### ###
directions of engineer)

Security of contractor's tools and equipment provided by


13. Lot 1 ### ###
contractor
###

II PILING WORK
(Conforming to Project Standard: PMO-LGEN-K107,
PMO-LGEN-K117 and PMO-LGEN-K118)
Driving of Pile by using Diesel Hammer up to the
1.
required level for:
1.1 450-mm dia. concrete spun piles
- in area of 135- ETP m 52,920 ### ### B

- in area of 275- WTP Water Intake and Discharging Pipe m - - A

- in area of 275- WTP Reservoir - -


- in area of 275- WTP Clarifier - -
- in area of 328- Wood Handling #7 m - - A
- in area of 329- Wood Handling #8 m - - A
in area of 344- Screening, Chip Storage and Chip
- m - - A
Conveyor
###
Driving of Dolly by using Diesel Hammer on the
2.
following piles:
2.1 450-mm dia. concrete spun piles
- in area of 135- ETP m 2,205 ### ### B

- in area of 275- WTP Water Intake and Discharging Pipe m - - A

- in area of 275- WTP Reservoir m - -


- in area of 275- WTP Clarifier m - -
- in area of 328- Wood Handling #7 m - - A
- in area of 329- Wood Handling #8 m - - A
in area of 344- Screening, Chip Storage and Chip
- m - - A
Conveyor
###
3. Welding of pile's joint to:
3.1 450-mm dia. concrete spun piles
- in area of 135- ETP point(s) 2,940 ### ### B

- in area of 275- WTP Water Intake and Discharging Pipe point(s) - - A

- in area of 275- WTP Reservoir point(s) - -


- in area of 275- WTP Clarifier point(s) - -
- in area of 328- Wood Handling #7 point(s) - - A
- in area of 329- Wood Handling #8 point(s) - - A
in area of 344- Screening, Chip Storage and Chip
- point(s) - - A
Conveyor

8/95
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

Total Amou
No. Description Unit Quantity
Rate nt Remarks
[IDR] [IDR]
Rp 507,150,000
Perform High Strain Dynamic Load Test or PDA Test
4.
on the installed pile:
4.1 600-mm dia. concrete spun piles
in area of 474- Recausticizing point(s) 1 ### ###

4.2 450-mm dia. concrete spun piles


- in area of 135- ETP point(s) 1 ### ###
- in area of 186- Pipe Bridge point(s) - -

- in area of 275- WTP Water Intake and Discharging Pipe point(s) - -

- in area of 275- WTP Reservoir point(s) 1 ### ###


- in area of 275- WTP Clarifier point(s) - -
- in area of 285- PB#5 point(s) - -
- in area of 285- Coal Storage and Coal Conveyor point(s) 1 ### ###

- in area of 296- TG9, TG10, Compressed Air and GIS point(s) 1 ### ###

- in area of 328- Wood Handling #7 point(s) - -


- in area of 329- Wood Handling #8 point(s) 1 ### ###
in area of 344- Screening, Chip Storage and Chip
- point(s) 1 ### ###
Conveyor
- in area of 414- Cooking point(s) 1 ### ###
- in area of 424- Washing, Screening and O2X point(s) 1 ### ###
- in area of 434- Bleaching point(s) 1 ### ###
- in area of 451- Evaporator Upgrade point(s) - -
- in area of 465- RB#5 Upgrade point(s) - -
- in area of 474- Recausticizing point(s) - -
- in area of 486- LK#6 Upgrade point(s) - -
- in area of 613- NaOH Plant #3 point(s) 1 ### ###
- in area of 626- CLO2 Plant #6 point(s) 1 ### ###
- in area of 645- O2 Plant #5 point(s) - -
- in area of 651- H2O2 Plant #1 point(s) 1 ### ###
- in area of 855- Pulp Dryer 5 point(s) 1 ### ###
- in area of 877- Baling Line 7 & 8 point(s) - -
- in area of 895- Pulp warehouse #5 point(s) - -
- in area of Demin Plant point(s) - -
- in area of mill warehouse point(s) 1 ### ###

4.3 400x400mm square concrete piles

- in area of 296- TG9, TG10, Compressed Air and GIS point(s) 1 ### ###

Rp 200,000,000

Provision for shifting the Diesel Hammer between one


location to another location within the project areas by
5. ea 6 - -
using lowbed trailer, mobile crane and trailer trucks as
directed by the Engineer.

a. Piling Rig + Diesel Hammer ea 1 ### Rate Only


b. Service Crane ea 1 ### Rate Only
14,000,000
Total [IDR] ###

Jakarta, 5th February 2021


Prepared by,

9/95
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

Total Amou
No. Description Unit Quantity
Rate nt Remarks
[IDR] [IDR]
PT. MASTERPANCANG PONDASI

Ir. Yung Iskandar


General Manager

10/95
CONSTRUCTION SCHEDULE FOR DIESEL HAMMER GROUP B (PACKAGE 8)
PT MASTERPANCANG PONDASI
Durati Februari/21 Maret/21 April/21 May/21 June/21
on Persen Persen/
No. Description Quantity Unit Price Remarks
(days (%) Days (%) 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
)
I PRELIMINARY
1 Mobilization of all personnel and 72 person( 1 ### 1.21% 1.21% ###
manpower, provide skill, and unskill s)
manpower for execution of work

2 Mobilization of all required equipment, 70 unit(s) 7 ### 9.18% 1.31% ### ### ### ### ### ### ###
tools and materials to carry out the work
and to maintain them until job completion

3 Demobilization of all personnel and 72 person( 7 ### 1.21% 0.17%


manpower, provide skill, and unskill s) ### ### ### ### ### ### ###
manpower for execution of work

4 Demobilization of all required equipment, 70 unit(s) 10 ### 9.18% 0.92%


tools and materials to carry out the work
and to maintain them until job completion ### ### ### ### ### ### ### ### ### ###

5 Setting out Board Machine area 67 ### 43.55% 0.65% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

II PILING WORK
1 Supplying pile from RAPP is carried out 2
days before the driving of pile
1 ETP (spun piles, 450 mm dia., 59 5 nos/unit/day
L = 36 m (12+12+12), Q
5 nos/unit/day
= 1470 nos)
5 nos/unit/day
5 nos/unit/day
5 nos/unit/day

- Driving of Pile 52,920 m ### 26.65% 0.45% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 24 24 24 24 24 24 24
- Driving of Dolly 2,205 m ### 1.11% 0.02% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 6 6 6 6 6 6 6
- Welding of Pile's Joint 2,940 point(s) 0.10%
### 5.68% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

III PILE TESTING


Perform High Strain Dynamic Load Test or
PDA Test on the installed pile:
- ETP (spun piles, 450 mm dia., 2 point(s) 7 0.32%
L = 36 m (12+12+12), Q = ### 2.24% ### ### ### ### ### ### ###

1470 nos)

IV PILE SHIFTING
Provision for shifting the Diesel Hammer
between one location to another location
within RAPP mill complex by using lowbed
trailer, mobile crane, and trailer trucks as Rate Only 100%
directed by the engineer

### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

PLAN PROGRESS DAILY ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
90%
PLAN PROGRESS ACCUMULATION ### 100%
NO.
DETAIL OF UNIT OF Note: Jakarta, 15th February 2021
RIG PT Masterpancang Pondasi
D1 : Tripodal Crane DHP-80 + Diesel Hammer DD6.5 unit 1 unit Safe Spare Time 80%
D2 : Tripodal Crane DHP-80 + Diesel Hammer DD6.5 unit 2 unit
D3 : Tripodal Crane P&H 85P + Diesel Hammer DD6.5 unit 3 unit
XY
D4 : Tripodal Crane P&H 85P + Diesel Hammer DD6.5 unit 4 unit X: Equipment used
-Z
D5 : Tripodal Crane P&H 85P + Diesel Hammer DD6.5 unit 5 unit - D refers to Diesel Hammer
S55-1 : Service Crane SANY SCC-550A unit 1 unit - P refers to Piling Pontoon Ir. Yung Iskandar
S55-2 : Service Crane SANY SCC-550A unit 2 unit Y: See the detail of unit General Manager
70%
Z: Sequences of unit work

60%

50%

40%

30%

20%

10%

0%
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

Februari/21 Maret/21 April/21 May/21 June/21


Duration(d Persen
No. Description Unit Qty. Remarks
ays) (%) 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

I PRELIMINARY 100%

Mobilization of all personnel and manpower, provide skill


1.
and unskill manpower for execution of work

a. Site management & supervisory staff person(s) 7 3 0.12% 0.05% 0.02% 0.05%
b. Supervisors person(s) 5 1 0.09% 0.09%
c. Operators person(s) 8 2 0.14% 0.03% 0.10%
d. QA & QC Engineer person(s) 2 1 0.03% 0.03%
e. Safety Officers person(s) 2 1 0.03% 0.02% 0.02%
f. Skilled and Unskilled manpower person(s) 48 2 0.82% 0.09% 0.74%

Demobilization of all personnel and manpower, upon 90%


2. completion of the works, with the approval from the
engineer
a. Site management & supervisory staff person(s) 7 1 0.12% 0.12%
b. Supervisors person(s) 5 1 0.09% 0.09%
c. Operators person(s) 8 1 0.14% 0.14%
d. QA & QC Engineer person(s) 2 1 0.03% 0.03%
e. Safety Officers person(s) 2 1 0.03% 0.03%
f. Skilled and Unskilled manpower person(s) 48 1 0.82% 0.82%

Mobilization of all required equipment, tools and materials


3. to carry out the work and to maintain them until job
completion 80%
a Diesel Hammer unit(s) 5 5 1.14% 0.23% 0.23% 0.23% 0.23% 0.23%
b Diesel Hammer Driver Machine unit(s) 5 12 5.14% 0.43% 0.43% 0.43% 0.43% 0.43% 0.43% 0.43% 0.43% 0.43% 0.43% 0.43% 0.43%
c Service Crane unit(s) 3 10 3.08% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31%

Demobilization of all required equipment, tools &


4. materials upon completion of the works, with the approval
from the Engineer
a Diesel Hammer unit(s) 5 6 1.14% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19%
b Diesel Hammer Driver Machine unit(s) 5 6 5.14% 0.86% 0.86% 0.86% 0.86% 0.86% 0.86%
c Service Crane unit(s) 3 4 3.08% 0.77% 0.77% 0.77% 0.77%

70%
Establish and maintain during the entire period of stay at
site contractor's all temporary facilities such as container 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5. Lot 1 75
office, workshop, fabrication area, store, sanitary facilities,
temporary water & electrical supplies, etc.

Site Office, Temporary Area Works / Material Storage


6.
Area
a Workers Rest Area (Size = 8 x10 ) M2 m2 80 2 0.46% 0.23% 0.23%
b Sanitary Facilities such as Toilets unit(s) 5 1 0.57% 0.57%
Temporary water source & electrical power tapping, area 0.11% 0.11%
c Lot 1 1
cleaning and maintenance
60%
Removal of all contractor's temporary facilities after
completion of the works and make the complete area 0.11% 0.06% 0.06%
7. Lot 1 2
clean before leaving the site, with the approval from the
engineer

Provision of site management & supervisory staff, as per 15 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
8. person(s) 72 16.35%
requirement of the services
a Site management & supervisory staff person(s) 7 5
b Supervisors person(s) 5 5
c Operators person(s) 8 5
d QA & QC Engineer person(s) 2 5
e Safety Officers person(s) 2 5 50%
f Skilled and Unskilled manpower person(s) 48 5

9. Local Transport
a Bus unit(s) 1 69 0.68% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
b Mini Bus unit(s) 1 69 0.38% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
c Colt Diesel / Light Truck / Pick-up unit(s) 1 69 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Loading and unloading of materials from logistic store to 21.14% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31%
10. Lot 52920 69
contractor's fabrication workshop and to job site location

11. Provision & implementation of SMK3 Lot 1 10 0.11% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 40%

Health insurances like Jamsostek, BPJS for the duration


a. of contract period, area cleaning & maintenance during
and after completion of the works

- Labour
Jamsostek Lot 1 2 0.17% 0.09% 0.09%
Swab Test, MCU persons 72 4 1.97% 0.08% 0.03% 0.03% 0.19% 1.64%
- Insurance of Equipment at site Lot 1 2 0.86% 0.43% 0.43%

Provide proper safety equipment & safety standard as


12. necessary for completion of the works as per direction of
the Engineer 30%

a safety helmet, safety shoes, helmet, gloves, mask, google set(s) 72 4 0.82% 0.03% 0.01% 0.01% 0.08% 0.68%

b safety body harness set(s) 10 1 0.05% 0.05%


Others (as necessary for completion of the works as per 0.03% 0.03%
c Lot 1 1
directions of engineer)

Security of contractor's tools and equipment provided by 0.07% 0.07%


13. Lot 1 1
contractor

II PILING WORK
20%
(Conforming to Project Standard: PMO-LGEN-K107,
PMO-LGEN-K117 and PMO-LGEN-K118)
Driving of Pile by using Diesel Hammer up to the
1.
required level for:
1.1 450-mm dia. concrete spun piles m 52920 69 27.19% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37%
25 25 25 25 25 25 25 25 25 25 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Driving of Dolly by using Diesel Hammer on the 25 50 75 100 125 150 175 200 225 250 271 292 313 334 355 376 397 418 439 460 481 502 523 544 565 586 607 628 649 670 691 712 733 754 775 796 817 838 859 880 901 922 943 964 985 1006 1027 1048 1069 1090 1110 1130 1150 1170 1190 1210 1230 1250 1270 1290 1310 1330 1350 1370 1390 1410 1430 1450 1470
2.
following piles:
2.1 450-mm dia. concrete spun piles 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69
- in area of 135- ETP m 2205 69 1.13% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%

3. Welding of pile's joint to:


3.1 450-mm dia. concrete spun piles 10%
- in area of 135- ETP point(s) 2940 69 5.79% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08%

Perform High Strain Dynamic Load Test or PDA Test


4.
on the installed pile:

4.2 450-mm dia. concrete spun piles


- in area of 135- ETP point(s) 2 1 0.29% 0.29%

Provision for shifting the Diesel Hammer between one


location to another location within the project areas by
5. ea 6
using lowbed trailer, mobile crane and trailer trucks as
directed by the Engineer. 0%
a. Piling Rig + Diesel Hammer ea 1
b. Service Crane ea 1

PLAN PROGRESS DAILY 100.00% 0.17% 0.00% 0.00% 0.00% 0.44% 0.44% 0.00% 0.17% 0.15% 0.75% 1.84% 1.84% 1.89% 1.13% 0.98% 0.98% 0.96% 0.96% 0.96% 0.43% 0.43% 3.43% 0.00% 0.69% 0.00% 0.23% 0.23% 0.00% 0.91% 0.91% 0.91% 0.91% 0.91% 0.91% 0.00% 0.91% 0.91% 0.91% 0.91% 0.82% 0.82% 0.00% 1.91% 1.91% 1.91% 0.82% 0.00% 0.82% 0.00% 0.82% 0.82% 0.82% 0.82% 0.82% 1.10% 0.00% 0.82% 0.82% 0.82% 0.82% 0.82% 0.82% 0.00% 0.82% 0.82% 0.82% 0.82% 0.82% 0.82% 0.00% 0.82% 0.82% 1.91% 1.91% 1.91% 0.00% 0.00% 0.82% 0.82% 0.82% 0.82% 0.82% 0.82% 0.00% 0.82% 0.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.82% 0.82% 0.79% 0.00% 0.79% 0.79% 0.00% 0.79% 1.88% 1.88% 0.00% 1.88% 0.00% 0.79% 0.79% 0.79% 0.79% 0.00% 0.79% 0.79% 0.79% 0.79% 0.79% 0.79% 0.00% 0.79% 0.79% 1.11% 1.11% 1.82% 1.82% 1.82% 1.82% 1.04% 0.00% 0.00% 0.00% 0.00% 0.00% 1.09% 1.09% 1.28%
PLAN PROGRESS ACCUMULATION 0.2% 0.2% 0.2% 0.2% 0.6% 1.0% 1.0% 1.2% 1.4% 2.1% 4.0% 5.8% 7.7% 8.8% 9.8% 10.8% 12% 13% 14% 14% 15% 18% 18% 19% 19% 19% 19% 19% 20% 21% 22% 23% 24% 25% 25% 25% 26% 27% 28% 29% 30% 30% 32% 34% 36% 36% 36% 37% 37% 38% 39% 40% 40% 41% 42% 42% 43% 44% 45% 46% 46% 47% 47% 48% 49% 50% 51% 51% 52% 52% 53% 54% 56% 58% 60% 60% 60% 60% 61% 62% 63% 64% 64% 64% 65% 66% 66% 66% 66% 66% 66% 66% 66% 66% 67% 68% 68% 68% 69% 70% 70% 71% 73% 75% 75% 76% 76% 77% 78% 79% 80% 80% 80% 81% 82% 83% 84% 84% 84% 85% 86% 87% 88% 90% 92% 94% 95% 97% 97% 97% 97% 97% 97% 98% 99% 100%
ACTUAL PROGRESS DAILY 0.17% 0.00% 0.00% 0.00% 0.44% 0.44% 0.00% 0.10% 0.16% 0.50% 1.59% 1.59% 1.64% 0.94% 0.59% 0.59% 0.59% 0.59% 0.59% 0.67% 0.87% 2.23% 1.97% 0.59% 0.59% 0.48% 0.00% 0.00% 0.94% 0.25% 0.02% 0.06% 0.08% 0.19% 0.34% 0.17% 0.28% 0.52% 0.42% 0.36% 0.02% 0.56% 1.77% 2.20% 2.04% 0.96% 0.95% 1.21% 1.33% 1.17% 1.00% 0.89% 1.19% 1.40% 0.88% 0.00% 1.68% 1.47% 1.34% 1.11% 1.21% 0.02% 1.21% 0.89% 0.92% 0.89% 0.97% 1.16%
ACTUAL PROGRESS ACCUMULATION 0.2% 0.2% 0.2% 0.2% 0.6% 1.1% 1.1% 1.2% 1.3% 1.8% 3.4% 5.0% 6.6% 7.6% 8.2% 8.7% 9.3% 9.9% 10.5% 11.2% 12.0% 14.3% 16.2% 16.8% 17.4% 17.9% 17.9% 17.9% 18.8% 19.1% 19.1% 19.2% 19.3% 19.4% 19.8% 19.9% 20.2% 20.7% 21.2% 21.5% 21.6% 22.1% 23.9% 26.1% 28.1% 29.1% 30.0% 31.2% 32.6% 33.7% 34.7% 35.6% 36.8% 38.2% 39.1% 39.1% 40.8% 42.2% 43.6% 44.7% 45.9% 45.9% 47.1% 48.0% 49.0% 49.8% 50.8% 52.0%
DEVIATION 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% -0.1% -0.1% -0.3% -0.6% -0.8% -1.1% -1.2% -1.6% -2.0% -2.4% -2.8% -3.2% -2.9% -2.5% -3.7% -1.7% -1.8% -1.2% -1.0% -1.2% -1.2% -1.2% -1.8% -2.7% -3.6% -4.4% -5.1% -4.8% -5.5% -6.2% -6.5% -7.0% -7.5% -8.3% -7.7% -7.8% -7.6% -7.4% -7.3% -6.3% -5.9% -4.6% -4.2% -4.1% -4.0% -3.6% -3.0% -3.3% -3.3% -2.4% -1.7% -1.2% -0.9% -0.5% -1.3% -0.1% 0.0% 0.1% 0.1% 0.3% 0.6%

Balaraja, 01 March 2021

APPROVED BY PROPOSED BY
PT. RIAU ANDALAN PULP AND PAPER PT. MASTERPANCANG PONDASI

(................................. ) ( Ir. Danny Kurniawan)


Construction Manager
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA

BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B

Duration(d Persen
No. Description Unit Qty.
ays) (%) 2/15/21 2/16/21 2/17/21

I PRELIMINARY

Mobilization of all personnel and manpower, provide skill


1.
and unskill manpower for execution of work

a. Site management & supervisory staff person(s) 7 3 0.12% 0.05%


b. Supervisors person(s) 3 1 0.09%
c. Operators person(s) 8 2 0.14%
d. QA & QC Engineer person(s) 2 1 0.03%
e. Safety Officers person(s) 2 1 0.03%
f. Skilled and Unskilled manpower person(s) 50 2 0.82%

Demobilization of all personnel and manpower, upon


2. completion of the works, with the approval from the
engineer
a. Site management & supervisory staff person(s) 7 1 0.12%
b. Supervisors person(s) 5 1 0.09%
c. Operators person(s) 8 1 0.14%
d. QA & QC Engineer person(s) 2 1 0.03%
e. Safety Officers person(s) 2 1 0.03%
f. Skilled and Unskilled manpower person(s) 48 1 0.82%

Mobilization of all required equipment, tools and materials


3. to carry out the work and to maintain them until job
completion
a Diesel Hammer unit(s) 5 11 1.14%
b Diesel Hammer Driver Machine unit(s) 5 17 5.14%
c Service Crane unit(s) 3 17 3.08%

Demobilization of all required equipment, tools &


4. materials upon completion of the works, with the approval
from the Engineer
a Diesel Hammer unit(s) 5 6 1.14%
b Diesel Hammer Driver Machine unit(s) 5 6 5.14%
c Service Crane unit(s) 3 4 3.08%

Establish and maintain during the entire period of stay at


site contractor's all temporary facilities such as container 0.29%
5. Lot 1 73
office, workshop, fabrication area, store, sanitary facilities,
temporary water & electrical supplies, etc.

Site Office, Temporary Area Works / Material Storage


6.
Area
a Workers Rest Area (Size = 8 x10 ) M2 m2 80 2 0.46%
b Sanitary Facilities such as Toilets unit(s) 5 1 0.57%
Temporary water source & electrical power tapping, area 0.11%
c Lot 1 1
cleaning and maintenance

Removal of all contractor's temporary facilities after


completion of the works and make the complete area 0.11%
7. Lot 1 2
clean before leaving the site, with the approval from the
engineer

Provision of site management & supervisory staff, as per 15


8. person(s) 72 16.35%
requirement of the services
a Site management & supervisory staff person(s) 7 5
b Supervisors person(s) 5 5
c Operators person(s) 8 5
d QA & QC Engineer person(s) 2 5
e Safety Officers person(s) 2 5
f Skilled and Unskilled manpower person(s) 48 5

9. Local Transport
a Bus unit(s) 1 69 0.68%
b Mini Bus unit(s) 1 69 0.38%
c Colt Diesel / Light Truck / Pick-up unit(s) 1 69 0.24%

Loading and unloading of materials from logistic store to 21.14%


10. Lot 52920 69
contractor's fabrication workshop and to job site location

11. Provision & implementation of SMK3 Lot 1 8 0.11%

Health insurances like Jamsostek, BPJS for the duration


a. of contract period, area cleaning & maintenance during
and after completion of the works

- Labour
Jamsostek Lot 1 2 0.17%
Swab Test, MCU persons 72 4 1.97% 0.08%
- Insurance of Equipment at site Lot 1 2 0.86%

Provide proper safety equipment & safety standard as


12. necessary for completion of the works as per direction of
the Engineer

a safety helmet, safety shoes, helmet, gloves, mask, google set(s) 72 4 0.82% 0.03%

b safety body harness set(s) 10 1 0.05%


Others (as necessary for completion of the works as per 0.03%
c Lot 1 1
directions of engineer)

Security of contractor's tools and equipment provided by 0.07%


13. Lot 1 1
contractor

II PILING WORK
(Conforming to Project Standard: PMO-LGEN-K107,
PMO-LGEN-K117 and PMO-LGEN-K118)
Driving of Pile by using Diesel Hammer up to the
1.
required level for:
1.1 450-mm dia. concrete spun piles m 52920 69 27.19%

Driving of Dolly by using Diesel Hammer on the


2.
following piles:
2.1 450-mm dia. concrete spun piles
- in area of 135- ETP m 2205 69 1.13%

3. Welding of pile's joint to:


3.1 450-mm dia. concrete spun piles
- in area of 135- ETP point(s) 4410 69 5.79%

Perform High Strain Dynamic Load Test or PDA Test


4.
on the installed pile:

4.2 450-mm dia. concrete spun piles


- in area of 135- ETP point(s) 1 1 0.29%

Provision for shifting the Diesel Hammer between one


location to another location within the project areas by
5. ea 6
using lowbed trailer, mobile crane and trailer trucks as
directed by the Engineer.
a. Piling Rig + Diesel Hammer ea 1
b. Service Crane ea 1

ACTUAL PROGRESS DAILY 100.00% 0.17% 0.00% 0.00%


ACTUAL PROGRESS ACCUMULATION 0.2% 0.2% 0.2%
Februari/21
2/18/21 2/19/21 2/20/21 2/21/21 2/22/21 2/23/21 2/24/21 2/25/21 2/26/21 2/27/21 2/28/21 3/1/21 3/2/21 3/3/21 3/4/21 3/5/21 3/6/21 3/7/21 3/8/21

0.02%
0.03%
0.03% 0.05%

0.02% 0.02%
0.08% 0.03% 0.23%

0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%


0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30% 0.30%
0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18%
1.09% 1.09% 1.09%

0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%

0.09% 0.09%
0.03% 0.03% 0.19% 1.64%
0.43% 0.43%

0.01% 0.01% 0.08%

0.07%
0.00% 0.44% 0.44% 0.00% 0.10% 0.16% 0.50% 1.59% 1.59% 1.64% 0.94% 0.59% 0.59% 0.59% 0.59% 0.59% 0.67% 0.87% 2.23%
0.2% 0.6% 1.1% 1.1% 1.2% 1.3% 1.8% 3.4% 5.0% 6.6% 7.6% 8.2% 8.7% 9% 10% 11% 11% 12% 14%
Maret/21
3/9/21 3/10/21 3/11/21 3/12/21 3/13/21 3/14/21 3/15/21 3/16/21 3/17/21 3/18/21 3/19/21 3/20/21 3/21/21 3/22/21 3/23/21 3/24/21 3/25/21 3/26/21 3/27/21

0.05%
0.03% 0.03%
0.03%
0.03%

0.48%

0.10% 0.10% 0.10%


0.30% 0.30% 0.30% 0.30%
0.18% 0.18% 0.18% 0.18%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.23% 0.23%
0.57%
0.11%

0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.68%

0.05%

0.03%

0.04% 0.05% 0.14% 0.29% 0.12% 0.19% 0.43% 0.34% 0.29% 0.00%
71 95 282 566.5 239 376.3 842 664.3 568.5 0

71 166 448 1015 1254 1630 2472 3136 3705 3705

1 2 3 4 5 6 7 8 9 10
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

4 6 18 36 15 24 53 42 36 0
0.01% 0.01% 0.02% 0.05% 0.02% 0.03% 0.07% 0.06% 0.05% 0.00%

1.97% 0.59% 0.59% 0.48% 0.00% 0.00% 0.94% 0.25% 0.02% 0.06% 0.08% 0.19% 0.34% 0.17% 0.28% 0.52% 0.42% 0.36% 0.02%
16% 17% 17% 18% 18% 18% 19% 19% 19% 19% 19% 19% 20% 20% 20% 21% 21% 22% 22%
April/21
3/28/21 3/29/21 3/30/21 3/31/21 4/1/21 4/2/21 4/3/21 4/4/21 4/5/21 4/6/21 4/7/21 4/8/21 4/9/21 4/10/21 4/11/21 4/12/21 4/13/21 4/14/21 4/15/21

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.09% 1.09% 1.09%

0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.11% 0.27% 0.45% 0.38% 0.38% 0.39% 0.49% 0.55% 0.48% 0.40% 0.35% 0.48% 0.57% 0.35% 0.00% 0.69% 0.60% 0.57% 0.45%

276 672 1116 948 960 984 1224 1380 1200 1008 888 1212 1428 888 0 1716 1500 1416 1116

0.39% 0.34% 0.55% 0.47% 0.48% 0.48% 0.60% 0.67% 0.57% 0.49% 0.44% 0.59% 0.69% 0.43% 0.00% 0.84% 0.73% 0.65% 0.55%
752 658 1079.5 913 924.7 934 1165.5 1302.5 1114.5 954 855 1155.5 1350 846 0 1629.5 1421.5 1266 1076.5

4457 5115 6194 7107 8032 8966 10131 11434 12548 13502 14357 15513 16863 17709 17709 19338 20760 22026 23102

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

48 42 67 57 60 61 76 85 73 61 52 71 85 53 0 101 88 78 64
0.06% 0.06% 0.09% 0.07% 0.08% 0.08% 0.10% 0.11% 0.10% 0.08% 0.07% 0.09% 0.11% 0.07% 0.00% 0.13% 0.12% 0.10% 0.08%

0.56% 1.77% 2.20% 2.04% 0.96% 0.95% 1.21% 1.33% 1.17% 1.00% 0.89% 1.19% 1.40% 0.88% 0.00% 1.68% 1.47% 1.34% 1.11%
22% 24% 26% 28% 29% 30% 31% 33% 34% 35% 36% 37% 38% 39% 39% 41% 42% 44% 45%
April/21
4/16/21 4/17/21 4/18/21 4/19/21 4/20/21 4/21/21 4/22/21 4/23/21 4/24/21 4/25/21 4/26/21 4/27/21 4/28/21 4/29/21 4/30/21 5/1/21 5/2/21 5/3/21 5/4/21

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.09% 1.09% 1.09%

0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.49% 0.00% 0.50% 0.35% 0.37% 0.35% 0.39% 0.47% 0.15% 0.00% 0.00% 0.42% 0.45% 0.53% 0.56% 0.42% 0.29% 0.66% 0.49%

1224 0 1248 888 924 888 972 1176 372 0 0 1044 1116 1332 1404 1044 720 1656 1224

0.61% 0.00% 0.62% 0.45% 0.46% 0.44% 0.49% 0.58% 0.18% 0.00% 0.00% 0.52% 0.57% 0.68% 0.72% 0.52% 0.37% 0.77% 0.63%
1188 0 1213 872 897 859.5 945.5 1135 351 0 0 1018.5 1102.5 1325.5 1396.5 1016 717 1507 1224

24290 24290 25503 26375 27272 28132 29077 30212 30563 30563 31582 32684 34010 35406 36913 38137

28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

70 0 71 50 52 51 55 67 22 0 0 59 62 74 78 58 40 92 68
0.09% 0.00% 0.09% 0.07% 0.07% 0.07% 0.07% 0.09% 0.03% 0.00% 0.00% 0.08% 0.08% 0.10% 0.10% 0.08% 0.05% 0.12% 0.09%

1.21% 0.02% 1.21% 0.89% 0.92% 0.89% 0.97% 1.16% 0.38% 0.00% 0.02% 1.04% 2.21% 2.42% 2.49% 1.02% 0.71% 1.58% 1.23%
46% 46% 47% 48.0% 49.0% 49.8% 50.8% 52.0% 52.4% 52.4% 52.4% 53.4% 55.6% 58.1% 60.5% 61.6% 62.3% 63.9% 65.1%
May/21
5/5/21 5/6/21 5/7/21 5/8/21 5/9/21 5/10/21 5/11/21 5/12/21 5/13/21 5/14/21 5/15/21 5/16/21 5/17/21 5/18/21 5/19/21 5/20/21 5/21/21 5/22/21 5/23/21

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%


0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.46% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

1152 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0.52% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1008 0 0 0 0 0 0 0 0 0 0

39145 39145 39145 39145 39145 39145 39145 39145 39145

44 45 46 47 48 49 50 51 52
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

64 0 0 0 0 0 0 0 0 0 0
0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

1.08% 0.02% 0.02% 0.02% 0.00% 0.02% 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.02% 0.02% 0.00%
66.2% 66.2% 66.2% 66.2% 66% 66% 66% 66% 66% 66% 66% 66% 66% 66% 66% 66% 66% 66% 66%

APPROVED BY
PT. RIAU ANDALAN PULP A

(..............................
5/24/21 5/25/21 5/26/21 5/27/21 5/28/21 5/29/21 5/30/21 5/31/21 6/1/21 6/2/21 6/3/21 6/4/21 6/5/21 6/6/21 6/7/21 6/8/21 6/9/21 6/10/21 6/11/21

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.09% 1.09% 1.09%

0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

39145 39145 39145 39145 39145 39145 39145 39145 39145 39145 39145 39145 39145 39145 39145

53 54 55 56 57 58 59 60 61 62 63 64 65 66 67
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.02% 0.02% 0.00% 0.02% 1.11% 1.11% 0.00% 1.11% 0.00% 0.02% 0.02% 0.02% 0.02% 0.00% 0.02% 0.02% 0.02% 0.02% 0.02%
66% 66% 66% 66% 68% 69% 69% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70%

APPROVED BY
DALAN PULP AND PAPER

.......................... )
June/21
6/12/21 6/13/21 6/14/21 6/15/21 6/16/21 6/17/21 6/18/21 6/19/21 6/20/21 6/21/21 6/22/21 6/23/21 6/24/21 6/25/21 6/26/21 6/27/21 6/28/21 6/29/21 6/30/21

0.12%
0.09%
0.14%
0.03%
0.03%
0.82%

0.19% 0.19% 0.19% 0.19% 0.19% 0.19%


0.86% 0.86% 0.86% 0.86% 0.86% 0.86%
0.77% 0.77% 0.77% 0.77%

0.00% 0.00% 0.00% 0.00% 0.00%


0.06% 0.06%

1.09% 1.09% 1.09%

0.01% 0.01% 0.01%


0.01% 0.01% 0.01%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0 0 0 0

0.00% 0.00% 0.00% 0.00%


0 0 0 0

39145 39145 39145

68 69 70
0.00% 0.00% 0.00% 0.00%

0 0 0 0
0.00% 0.00% 0.00% 0.00%

0.02% 0.00% 0.02% 0.02% 1.11% 1.11% 1.82% 1.82% 1.82% 1.82% 1.04% 0.00% 0.00% 0.00% 0.00% 0.00% 1.09% 1.09% 1.28%
70% 70% 70% 70% 71% 72% 74% 76% 78% 80% 81% 81% 81% 81% 81% 81% 82% 83% 84%

Balaraja, 01 March 2021

PROPOSED BY
PT. MASTERPANCANG PONDASI

( Ir. Danny Kurniawan)


Construction Manager
Remarks
021

ONDASI

an)
ger
DIESEL HAMMER RECORD

Proyek / Project : FL3B PROJECT


Pekerjaan / Work : DIESEL HAMMER GROUP B
Area : 135-ETP
Nama Kontraktor / Contractor Name : PT. Masterpancang Pondasi

Nomor Surat Perjanjian / Contract No. : No. 394/II/RAPP/2021


Periode / Period : 30 Maret 2021 sampai dengan 22 April 2021

Length of The Pile Used Total Height of Pay Length


Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
A ETP
1 SC 09 SP663 18-Mar-2021 18-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15.5 721 9 Rig 1 MPP-111
2 SC 09 SP573 18-Mar-2021 18-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14.7 724 10 Rig 1 MPP-111
3 SC 09 SP13 19-Mar-2021 19-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 17.5 1116 11 Rig 1 MPP-111
4 SC 09 SP5 19-Mar-2021 19-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 12 1275 13 Rig 1 MPP-111
5 SC 09 SP2 20-Mar-2021 20-Mar-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 18.8 1136 11 Rig 1 MPP-111
6 SC 09 SP3 20-Mar-2021 20-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 15.3 1123 8 Rig 2 MPP-110
7 SC 09 SP4 20-Mar-2021 20-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15.3 982 8 Rig 2 MPP-110
8 SC 09 SP7 20-Mar-2021 20-Mar-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 11.3 1208 10 Rig 1 MPP-111
9 SC 09 SP14 20-Mar-2021 20-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 19.6 1156 13 Rig 1 MPP-111
10 SC 09 SP9 20-Mar-2021 20-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 20.3 1231 7 Rig 2 MPP-110
11 SC 09 SP6 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 17.8 1208 11 Rig 1 MPP-111
12 SC 09 SP23 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 19.1 1210 9 Rig 2 MPP-110
13 SC 09 SP32 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 15.8 1278 10 Rig 1 MPP-111
14 SC 09 SP24 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15 1249 8 Rig 2 MPP-110
15 SC 09 SP50 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 11.8 1258 13 Rig 1 MPP-111
16 SC 09 SP10 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 21.2 1218 8 Rig 2 MPP-110
17 SC 09 SP12 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 18.7 1256 8 Rig 2 MPP-110
18 SC 09 SP35 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 19.5 1206 10 Rig 1 MPP-111
19 SC 09 SP11 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 13.9 1182 9 Rig 2 MPP-110
20 SC 09 SP17 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 11.9 1296 10 Rig 1 MPP-111
21 SC 09 SP25 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 14.1 1276 9 Rig 2 MPP-110
22 SC 09 SP15 21-Mar-2021 21-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 12.6 1211 10 Rig 1 MPP-111
23 SC 09 SP16 22-Mar-2021 22-Mar-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 13.9 1211 12 Rig 1 MPP-111
24 SC 09 SP28 22-Mar-2021 22-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 17.3 1218 7 Rig 2 MPP-110
25 SC 09 SP27 22-Mar-2021 22-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15.1 1194 8 Rig 2 MPP-110
26 SC 09 SP53 22-Mar-2021 22-Mar-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 15.3 1218 10 Rig 1 MPP-111
27 SC 09 SP93 22-Mar-2021 22-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 15.6 1157 9 Rig 2 MPP-110
28 SC 09 SP26 22-Mar-2021 22-Mar-2021 Ø450 12 12 5.5 6.5 0 6.5 0 DD 6,5 Rig 1 MPP-111
29 SC 09 SP62 23-Mar-2021 23-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 12.2 1136 7 Rig 2 MPP-110
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
30 SC 09 SP41 23-Mar-2021 23-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15 1193 9 Rig 2 MPP-110
31 SC 09 SP94 23-Mar-2021 23-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 8.3 1167 7 Rig 2 MPP-110
32 SC 09 SP95 23-Mar-2021 23-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 18.3 1137 9 Rig 2 MPP-110
33 SC 09 SP42 23-Mar-2021 23-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 13.5 1078 7 Rig 2 MPP-110
34 SC 09 SP63 23-Mar-2021 23-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 16.9 1148 8 Rig 2 MPP-110
35 SC 09 SP33 23-Mar-2021 23-Mar-2021 Ø450 12 12 12 12 48 0.9 47.1 0 47.1 3 DD 6,5 13.3 1074 11 Rig 1 MPP-111
36 SC 09 SP34 23-Mar-2021 23-Mar-2021 Ø450 12 12 12 12 48 1.3 46.7 0 46.7 3 DD 6,5 10.6 1092 10 Rig 1 MPP-111
37 SC 09 SP52 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 16.1 1572 6.0 Rig 3 MPP-101
38 SC 09 SP51 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15.3 1292 6.0 Rig 3 MPP-101
39 SC 09 SP78 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 13.2 1057 7.0 Rig 3 MPP-101
40 SC 09 SP77 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 11.6 897 7.0 Rig 3 MPP-101
41 SC 09 SP76 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 16.1 1152 7.0 Rig 3 MPP-101
42 SC 09 SP96 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 19.4 1110 7.0 Rig 2 MPP-110
43 SC 09 SP43 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 13.8 1148 8.0 Rig 2 MPP-110
44 SC 09 SP64 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 20.2 1167 9.0 Rig 2 MPP-110
45 SC 09 SP97 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 18.9 1127 9.0 Rig 2 MPP-110
46 SC 09 SP26A 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 16.7 1121 5.0 Rig 2 MPP-110
47 SC 09 SP45 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 8.7 1127 7.0 Rig 2 MPP-110
48 SC 09 SP44 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 20 1126 9.0 Rig 1 MPP-111
49 SC 09 SP49 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 42.4 1220 11.0 Rig 1 MPP-111
50 SC 09 SP31 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 21.3 1182 10.0 Rig 1 MPP-111
51 SC 09 SP30 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15.2 1130 13.0 Rig 1 MPP-111
52 SC 09 SP29 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 18.2 1141 8.0 Rig 1 MPP-111
53 SC 09 SP46 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 16.2 1097 11.0 Rig 1 MPP-111
54 SC 09 SP48 24-Mar-2021 24-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 12.2 1151 10.0 Rig 1 MPP-111
55 SC 09 SP47 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 17.1 951 10.0 Rig 1 MPP-111
56 SC 09 SP75 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 18.7 1930 8.0 Rig 1 MPP-111
57 SC 09 SP73 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 20.3 840 13.0 Rig 1 MPP-111
58 SC 09 SP110 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15.6 780 10.0 Rig 1 MPP-111
59 SC 09 SP111 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 17.8 915 8.0 Rig 1 MPP-111
60 SC 09 SP65 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 19.5 1117 7.0 Rig 2 MPP-110
61 SC 09 SP98 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15.6 1096 7.0 Rig 2 MPP-110
62 SC 09 SP66 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 16.7 1157 8.0 Rig 2 MPP-110
63 SC 09 SP138 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 12.3 1223 7.0 Rig 2 MPP-110
64 SC 09 SP99 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 14.8 1163 7.0 Rig 2 MPP-110
65 SC 09 SP68 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 11.4 1107 7.0 Rig 2 MPP-110
66 SC 09 SP225 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.8 47.2 0 47.2 3 DD 6,5 14.9 1151 14.0 Rig 4 MPP-103
67 SC 09 SP131 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.4 47.6 0 47.6 3 DD 6,5 15.2 1160 12.0 Rig 4 MPP-103
68 SC 09 SP177 25-Mar-2021 25-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 16.4 975 11.0 Rig 4 MPP-103
69 SC 09 SP67 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 19.8 1157 8 Rig 3 MPP-101
70 SC 09 SP102 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 17.2 1127 9 Rig 3 MPP-101
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
71 SC 09 SP100 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 14.6 1057 9 Rig 2 MPP-110
72 SC 09 SP101 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 19.1 1132 7 Rig 2 MPP-110
73 SC 09 SP139 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 19.3 1157 8 Rig 2 MPP-110
74 SC 09 SP108 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 24.6 1034 10 Rig 2 MPP-110
75 SC 09 SP72 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 40.4 1412 10 Rig 2 MPP-110
76 SC 09 SP109 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 22.8 869 10 Rig 1 MPP-111
77 SC 09 SP74 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 23.9 1225 10 Rig 1 MPP-111
78 SC 09 SP71 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 24.8 1028 10 Rig 1 MPP-111
79 SC 09 SP79 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 14.8 9 Rig 1 MPP-111
80 SC 09 SP159 26-Mar-2021 26-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15.7 10 Rig 1 MPP-111
81 SC 09 SP115 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 16.7 1102 10 Rig 3 MPP-101
82 SC 09 SP112 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 13.4 1162 10 Rig 3 MPP-101
83 SC 09 SP157 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 16.8 857 9 Rig 3 MPP-101
84 SC 09 SP113 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12.1 527 12 Rig 3 MPP-101
85 SC 09 SP114 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 17.2 878 9 Rig 3 MPP-101
86 SC 09 SP158 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 14.9 747 10 Rig 3 MPP-101
87 SC 09 SP69 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 23.4 891 8 Rig 1 MPP-111
88 SC 09 SP103 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 18.6 843 10 Rig 1 MPP-111
89 SC 09 SP70 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 23.2 1020 8 Rig 1 MPP-111
90 SC 09 SP107 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 459 14 Rig 1 MPP-111
91 SC 09 SP104 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 23.5 1034 9 Rig 1 MPP-111
92 SC 09 SP140 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15.6 1227 5 Rig 2 MPP-110
93 SC 09 SP186 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 16 1196 7 Rig 2 MPP-110
94 SC 09 SP141 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 14.9 1078 5 Rig 2 MPP-110
95 SC 09 SP187 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 17.8 1186 7 Rig 2 MPP-110
96 SC 09 SP132 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 17 1071 13 Rig 4 MPP-103
97 SC 09 SP226 28-Mar-2021 28-Mar-2021 Ø450 12 12 12 12 48 12 36 0 36 3 DD 6,5 16 361 9 Rig 4 MPP-103
98 SC 09 SP190 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 25.7 867 10 Rig 1 MPP-111
99 SC 09 SP143 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 28.5 975 10 Rig 1 MPP-111
100 SC 09 SP189 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 27.7 957 10 Rig 1 MPP-111
101 SC 09 SP142 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 30.2 959 10 Rig 1 MPP-111
102 SC 09 SP105 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 28.1 875 10 Rig 1 MPP-111
103 SC 09 SP106 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 24 987 10 Rig 1 MPP-111
104 SC 09 SP237 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 14.8 1158 7 Rig 2 MPP-110
105 SC 09 SP236 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 18.7 1181 8 Rig 2 MPP-110
106 SC 09 SP291 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 15.1 1161 7 Rig 2 MPP-110
107 SC 09 SP235 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 16.5 1186 6 Rig 2 MPP-110
108 SC 09 SP234 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 17.4 1057 7 Rig 2 MPP-110
109 SC 09 SP188 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 21.3 1186 6 Rig 2 MPP-110
110 SC 09 SP156 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 24.1 1014 9 Rig 3 MPP-101
111 SC 09 SP155 29-Mar-2021 29-Mar-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 20.2 1249 9 Rig 3 MPP-101
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
112 SC 09 SP292 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 15.1 1182 7 Rig 2 MPP-110
113 SC 09 SP293 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 16.7 1183 7 Rig 2 MPP-110
114 SC 09 SP294 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 13.7 1186 8 Rig 2 MPP-110
115 SC 09 SP238 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 14.9 1157 8 Rig 2 MPP-110
116 SC 09 SP295 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 19.4 1108 9 Rig 2 MPP-110
117 SC 09 SP351 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 21.6 976 9 Rig 2 MPP-110
118 SC 09 SP205 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 1.5 34.5 0 34.5 2 DD 6,5 22 492 9 Rig 3 MPP-101
119 SC 09 SP204 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 23.7 1165 9 Rig 3 MPP-101
120 SC 09 SP253 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 9 39 0 39 3 DD 6,5 22.8 632 10 Rig 3 MPP-101
121 SC 09 SP203 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 20 1137 9 Rig 3 MPP-101
122 SC 09 SP252 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21.5 568 8 Rig 3 MPP-101
123 SC 09 SP251 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18.3 631 8 Rig 3 MPP-101
124 SC 09 SP239 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 20.8 1297 10 Rig 1 MPP-111
125 SC 09 SP191 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 23.6 1015 10 Rig 1 MPP-111
126 SC 09 SP240 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 27.5 1087 10 Rig 1 MPP-111
127 SC 09 SP144 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 24.3 1256 10 Rig 1 MPP-111
128 SC 09 SP241 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 0 48 0 48 3 DD 6,5 26.5 1224 10 Rig 1 MPP-111
129 SC 09 SP178 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 650 14 Rig 4 MPP-103
130 SC 09 SP133 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18.7 670 10 Rig 4 MPP-103
131 SC 09 SP227 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 19.2 1024 14 Rig 4 MPP-103
132 SC 09 SP179 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 621 12 Rig 4 MPP-103
133 SC 09 SP134 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18.9 685 14 Rig 4 MPP-103
134 SC 09 SP228 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14 656 10 Rig 4 MPP-103
135 SC 09 SP180 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15 666 10 Rig 4 MPP-103
136 SC 09 SP135 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16.8 633 10 Rig 4 MPP-103
137 SC 09 SP181 30-Mar-2021 30-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14.6 691 11 Rig 4 MPP-103
138 SC 09 SP411 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 20 11181 8 Rig 2 MPP-110
139 SC 09 SP480 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 19.2 1078 7 Rig 2 MPP-110
140 SC 09 SP481 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 21.8 1167 7 Rig 2 MPP-110
141 SC 09 SP352 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 16.3 1086 9 Rig 2 MPP-110
142 SC 09 SP412 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 11.8 1108 6 Rig 2 MPP-110
143 SC 09 SP353 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 20.7 1131 8 Rig 2 MPP-110
144 SC 09 SP482 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 21.7 1121 9 Rig 2 MPP-110
145 SC 09 SP413 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 17.4 1148 7 Rig 2 MPP-110
146 SC 09 SP151 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17.8 512 9 Rig 3 MPP-101
147 SC 09 SP199 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 642 8 Rig 3 MPP-101
148 SC 09 SP152 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 19.7 1009 8 Rig 3 MPP-101
149 SC 09 SP153 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 17.8 899 9 Rig 3 MPP-101
150 SC 09 SP154 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 18.7 863 8 Rig 3 MPP-101
151 SC 09 SP200 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 8 40 0 40 3 DD 6,5 27.7 545 8 Rig 3 MPP-101
152 SC 09 SP201 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20.6 417 8 Rig 3 MPP-101
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
153 SC 09 SP202 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21.4 521 8 Rig 3 MPP-101
154 SC 09 SP229 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 17 1198 11 Rig 4 MPP-103
155 SC 09 SP136 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 552 11 Rig 4 MPP-103
156 SC 09 SP182 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 13 604 9 Rig 4 MPP-103
157 SC 09 SP137 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 12 701 8 Rig 4 MPP-103
158 SC 09 SP230 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16 707 12 Rig 4 MPP-103
159 SC 09 SP183 31-Mar-2021 31-Mar-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16 587 12 Rig 4 MPP-103
160 SC 09 SP192 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 20.7 1004 9 Rig 1 MPP-111
161 SC 09 SP145 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 2.3 45.7 0 45.7 3 DD 6,5 16.3 1047 10 Rig 1 MPP-111
162 SC 09 SP193 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 12.5 1026 9 Rig 1 MPP-111
163 SC 09 SP146 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 21.4 1024 10 Rig 1 MPP-111
164 SC 09 SP150 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 18.3 1023 8 Rig 1 MPP-111
165 SC 09 SP198 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 6 42 0 42 3 DD 6,5 17.6 881 10 Rig 1 MPP-111
166 SC 09 SP247 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 16.4 912 9 Rig 3 MPP-101
167 SC 09 SP306 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 23 889 8 Rig 3 MPP-101
168 SC 09 SP307 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 19.8 868 8 Rig 3 MPP-101
169 SC 09 SP367 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 23.7 724 8 Rig 3 MPP-101
170 SC 09 SP248 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 16 832 10 Rig 3 MPP-101
171 SC 09 SP249 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 19.4 712 8 Rig 3 MPP-101
172 SC 09 SP483 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 13.5 1147 8 Rig 2 MPP-110
173 SC 09 SP354 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 19.4 1188 8 Rig 2 MPP-110
174 SC 09 SP414 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 22.4 1048 7 Rig 2 MPP-110
175 SC 09 SP355 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 24.1 1192 8 Rig 2 MPP-110
176 SC 09 SP484 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 24.8 1128 8 Rig 2 MPP-110
177 SC 09 SP415 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 15.6 1181 7 Rig 2 MPP-110
178 SC 09 SP485 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 14.5 1167 9 Rig 2 MPP-110
179 SC 09 SP296 1-Apr-2021 1-Apr-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 15.7 1107 8 Rig 2 MPP-110
180 SC 09 SP298 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 20.5 1129 8 Rig 2 MPP-110
181 SC 09 SP297 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 16.8 1129 7 Rig 2 MPP-110
182 SC 09 SP356 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 21.8 1186 7 Rig 2 MPP-110
183 SC 09 SP416 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 21.3 1137 8 Rig 2 MPP-110
184 SC 09 SP358 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 8.5 39.5 0 39.5 3 DD 6,5 13.7 837 8 Rig 2 MPP-110
185 SC 09 SP357 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13.4 657 8 Rig 2 MPP-110
186 SC 09 SP149 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 16.7 1014 9 Rig 1 MPP-111
187 SC 09 SP194 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 16.3 1096 10 Rig 1 MPP-111
188 SC 09 SP148 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 17.3 1085 9 Rig 1 MPP-111
189 SC 09 SP147 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 16.2 1010 9 Rig 1 MPP-111
190 SC 09 SP185 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 17 1076 8 Rig 4 MPP-103
191 SC 09 SP184 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 19 742 9 Rig 4 MPP-103
192 SC 09 SP231 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 8 40 0 40 3 DD 6,5 17 768 10 Rig 4 MPP-103
193 SC 09 SP232 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 17 1117 7 Rig 4 MPP-103
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
194 SC 09 SP233 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 732 10 Rig 4 MPP-103
195 SC 09 SP308 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 11.2 721 10 Rig 3 MPP-101
196 SC 09 SP250 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 14.2 872 11 Rig 3 MPP-101
197 SC 09 SP309 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 10.7 1106 10 Rig 3 MPP-101
198 SC 09 SP310 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 13.8 986 9 Rig 3 MPP-101
199 SC 09 SP311 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 12.8 993 10 Rig 3 MPP-101
200 SC 09 SP427 2-Apr-2021 2-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 11.4 805 9 Rig 3 MPP-101
201 SC 09 SP571 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15.3 1203 10 Rig 3 MPP-101
202 SC 09 SP499 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 12.8 987 10 Rig 3 MPP-101
203 SC 09 SP500 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 14.7 1154 9 Rig 3 MPP-101
204 SC 09 SP368 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 6.5 41.5 0 41.5 3 DD 6,5 14.8 872 11 Rig 3 MPP-101
205 SC 09 SP428 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 16.7 1004 10 Rig 3 MPP-101
206 SC 09 SP369 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 21.2 1157 10 Rig 3 MPP-101
207 SC 09 SP429 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 17.2 905 10 Rig 3 MPP-101
208 SC 09 SP246 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 15 974 9 Rig 1 MPP-111
209 SC 09 SP305 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 12.8 978 11 Rig 1 MPP-111
210 SC 09 SP196 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 18.4 918 12 Rig 1 MPP-111
211 SC 09 SP197 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 13.5 970 11 Rig 1 MPP-111
212 SC 09 SP195 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 20.9 1012 10 Rig 1 MPP-111
213 SC 09 SP242 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17.9 847 8 Rig 1 MPP-111
214 SC 09 SP299 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 22.1 1020 9 Rig 1 MPP-111
215 SC 09 SP418 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 20.9 1107 7 Rig 2 MPP-110
216 SC 09 SP417 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 19.6 1098 8 Rig 2 MPP-110
217 SC 09 SP486 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 18.3 1118 7 Rig 2 MPP-110
218 SC 09 SP488 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 17.3 1121 6 Rig 2 MPP-110
219 SC 09 SP487 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 14.6 1071 8 Rig 2 MPP-110
220 SC 09 SP560 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 16.6 1121 7 Rig 2 MPP-110
221 SC 09 SP479 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 24.3 1052 10 Rig 4 MPP-103
222 SC 09 SP478 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 18.8 1199 10 Rig 4 MPP-103
223 SC 09 SP410 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 20.4 1182 9 Rig 4 MPP-103
224 SC 09 SP477 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 650 10 Rig 4 MPP-103
225 SC 09 SP290 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 17.9 1150 9 Rig 4 MPP-103
226 SC 09 SP350 3-Apr-2021 3-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 13.8 1153 11 Rig 4 MPP-103
227 SC 09 SP359 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 16 982 11 Rig 1 MPP-111
228 SC 09 SP360 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 18 1021 11 Rig 1 MPP-111
229 SC 09 SP300 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 24 1028 10 Rig 1 MPP-111
230 SC 09 SP243 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 16 925 11 Rig 1 MPP-111
231 SC 09 SP245 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 17 1006 9 Rig 1 MPP-111
232 SC 09 SP244 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 29 971 9 Rig 1 MPP-111
233 SC 09 SP737 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 24 1046 8 Rig 2 MPP-110
234 SC 09 SP647 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 22 1039 8 Rig 2 MPP-110
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
235 SC 09 SP736 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 14 1108 8 Rig 2 MPP-110
236 SC 09 SP559 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 15 1079 7 Rig 2 MPP-110
237 SC 09 SP646 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 17 1186 9 Rig 2 MPP-110
238 SC 09 SP558 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 13,6 1158 8 Rig 2 MPP-110
239 SC 09 SP645 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 13.6 1204 7 Rig 2 MPP-110
240 SC 09 SP735 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 16.3 1013 7 Rig 2 MPP-110
241 SC 09 SP289 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 16 309 9 Rig 4 MPP-103
242 SC 09 SP288 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 7 41 0 41 3 DD 6,5 15 1013 8 Rig 4 MPP-103
243 SC 09 SP349 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 15 1094 8 Rig 4 MPP-103
244 SC 09 SP409 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 18 1197 9 Rig 4 MPP-103
245 SC 09 SP348 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 980 8 Rig 4 MPP-103
246 SC 09 SP347 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 1129 9 Rig 4 MPP-103
247 SC 09 SP408 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 14 1138 8 Rig 4 MPP-103
248 SC 09 SP476 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 6.5 41.5 0 41.5 3 DD 6,5 15 1271 10 Rig 4 MPP-103
249 SC 09 SP501 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 19 866 11 Rig 3 MPP-101
250 SC 09 SP370 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 15 717 11 Rig 3 MPP-101
251 SC 09 SP502 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 18 740 10 Rig 3 MPP-101
252 SC 09 SP430 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 338 11 Rig 3 MPP-101
253 SC 09 SP371 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 18 710 9 Rig 3 MPP-101
254 SC 09 SP431 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 6 42 0 42 3 DD 6,5 17 500 9 Rig 3 MPP-101
255 SC 09 SP503 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 20 572 9 Rig 3 MPP-101
256 SC 09 SP372 4-Apr-2021 4-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 23 537 12 Rig 3 MPP-101
257 SC 09 SP365 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 22.9 1070 9 Rig 1 MPP-111
258 SC 09 SP304 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 20.1 952 11 Rig 1 MPP-111
259 SC 09 SP364 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 20.6 918 10 Rig 1 MPP-111
260 SC 09 SP301 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 15.7 972 9 Rig 1 MPP-111
261 SC 09 SP302 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 14.2 974 8 Rig 1 MPP-111
262 SC 09 SP303 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 16.8 1022 10 Rig 1 MPP-111
263 SC 09 SP407 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 7 41 0 41 3 DD 6,5 17.8 781 10 Rig 4 MPP-103
264 SC 09 SP475 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15.8 550 9 Rig 4 MPP-103
265 SC 09 SP474 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 5.5 42.5 0 42.5 3 DD 6,5 15.6 1020 8 Rig 4 MPP-103
266 SC 09 SP287 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 9.5 38.5 0 38.5 3 DD 6,5 16.4 691 9 Rig 4 MPP-103
267 SC 09 SP286 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 18 801 10 Rig 4 MPP-103
268 SC 09 SP284 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16.6 675 9 Rig 4 MPP-103
269 SC 09 SP285 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15.4 724 9 Rig 4 MPP-103
270 SC 09 SP734 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 17.3 1121 5 Rig 2 MPP-110
271 SC 09 SP557 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 14.3 1118 9 Rig 2 MPP-110
272 SC 09 SP644 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 17.3 1083 9 Rig 2 MPP-110
273 SC 09 SP733 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 17.3 1172 7 Rig 2 MPP-110
274 SC 09 SP643 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 18.2 1053 8 Rig 2 MPP-110
275 SC 09 SP504 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19.4 318 9 Rig 3 MPP-101
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
276 SC 09 SP432 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 539 10 Rig 3 MPP-101
277 SC 09 SP433 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 22.1 502 9 Rig 3 MPP-101
278 SC 09 SP505 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 23.1 759 10 Rig 3 MPP-101
279 SC 09 SP312 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 17.3 725 9 Rig 3 MPP-101
280 SC 09 SP373 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 6 42 0 42 3 DD 6,5 15.8 678 11 Rig 3 MPP-101
281 SC 09 SP374 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 16.2 629 8 Rig 3 MPP-101
282 SC 09 SP313 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16.9 459 8 Rig 3 MPP-101
283 SC 09 SP375 5-Apr-2021 5-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 16.7 534 9 Rig 3 MPP-101
284 SC 09 SP346 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17.9 555 8 Rig 4 MPP-103
285 SC 09 SP344 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20.6 592 11 Rig 4 MPP-103
286 SC 09 SP345 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17.4 598 8 Rig 4 MPP-103
287 SC 09 SP406 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15.8 630 10 Rig 4 MPP-103
288 SC 09 SP405 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12.5 683 10 Rig 4 MPP-103
289 SC 09 SP404 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 36 3 33 0 33 2 DD 6,5 14.7 530 7 Rig 4 MPP-103
290 SC 09 SP314 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 15.7 982 10 Rig 3 MPP-101
291 SC 09 SP254 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 17.6 1055 10 Rig 3 MPP-101
292 SC 09 SP316 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 15.8 920 11 Rig 3 MPP-101
293 SC 09 SP315 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 14.5 972 9 Rig 3 MPP-101
294 SC 09 SP255 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 19.8 896 11 Rig 3 MPP-101
295 SC 09 SP206 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 20.1 920 10 Rig 3 MPP-101
296 SC 09 SP363 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 14.2 976 10 Rig 1 MPP-111
297 SC 09 SP362 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 17.4 981 9 Rig 1 MPP-111
298 SC 09 SP361 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 17 1012 10 Rig 1 MPP-111
299 SC 09 SP423 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 808 10 Rig 1 MPP-111
300 SC 09 SP422 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 23.2 971 10 Rig 1 MPP-111
301 SC 09 SP556 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 23.8 1021 7 Rig 2 MPP-110
302 SC 09 SP732 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 20.9 1096 7 Rig 2 MPP-110
303 SC 09 SP642 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12 751 9 Rig 2 MPP-110
304 SC 09 SP555 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 14.5 1169 9 Rig 2 MPP-110
305 SC 09 SP731 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 17.6 1079 8 Rig 2 MPP-110
306 SC 09 SP641 6-Apr-2021 6-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 16.8 1096 6 Rig 2 MPP-110
307 SC 09 SP162 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 708 10 Rig 3 MPP-101
308 SC 09 SP116 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 16 689 10 Rig 3 MPP-101
309 SC 09 SP80 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 14 1172 9 Rig 3 MPP-101
310 SC 09 SP81 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 699 9 Rig 3 MPP-101
311 SC 09 SP256 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 640 9 Rig 3 MPP-101
312 SC 09 SP564 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15.9 782 12 Rig 1 MPP-111
313 SC 09 SP420 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 13.5 778 11 Rig 1 MPP-111
314 SC 09 SP421 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 20 1006 8 Rig 1 MPP-111
315 SC 09 SP489 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 16.2 924 9 Rig 1 MPP-111
316 SC 09 SP492 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15 742 8 Rig 1 MPP-111
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
317 SC 09 SP419 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 13.1 802 9 Rig 1 MPP-111
318 SC 09 SP473 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 610 9 Rig 4 MPP-103
319 SC 09 SP472 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 23 564 8 Rig 4 MPP-103
320 SC 09 SP471 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 2 34 0 34 2 DD 6,5 19 517 9 Rig 4 MPP-103
321 SC 09 SP281 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16 569 8 Rig 4 MPP-103
322 SC 09 SP282 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 22 607 8 Rig 4 MPP-103
323 SC 09 SP283 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 614 8 Rig 4 MPP-103
324 SC 09 SP730 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 18 1117 6 Rig 2 MPP-110
325 SC 09 SP554 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 17 1017 8 Rig 2 MPP-110
326 SC 09 SP640 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 18 1072 7 Rig 2 MPP-110
327 SC 09 SP729 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 18 1128 9 Rig 2 MPP-110
328 SC 09 SP639 7-Apr-2021 7-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 12 1216 9 Rig 2 MPP-110
329 SC 09 SP491 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12 813 13 Rig 1 MPP-111
330 SC 09 SP490 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 11 1068 12 Rig 1 MPP-111
331 SC 09 SP561 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 834 9 Rig 1 MPP-111
332 SC 09 SP649 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 784 9 Rig 1 MPP-111
333 SC 09 SP562 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12 806 8 Rig 1 MPP-111
334 SC 09 SP563 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16 816 9 Rig 1 MPP-111
335 SC 09 SP650 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 17 1162 11 Rig 1 MPP-111
336 SC 09 SP118 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 16 965 8 Rig 3 MPP-101
337 SC 09 SP117 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 875 9 Rig 3 MPP-101
338 SC 09 SP161 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 11.5 36.5 0 36.5 3 DD 6,5 936 Rig 3 MPP-101
339 SC 09 SP160 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 867 9 Rig 3 MPP-101
340 SC 09 SP209 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 692 10 Rig 3 MPP-101
341 SC 09 SP207 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 916 10 Rig 3 MPP-101
342 SC 09 SP208 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 826 8 Rig 3 MPP-101
343 SC 09 SP553 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 16 1159 7 Rig 2 MPP-110
344 SC 09 SP728 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 11 1096 9 Rig 2 MPP-110
345 SC 09 SP638 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 20 1123 8 Rig 2 MPP-110
346 SC 09 SP552 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 16 1159 8 Rig 2 MPP-110
347 SC 09 SP727 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 18 1121 7 Rig 2 MPP-110
348 SC 09 SP637 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 13 1123 6 Rig 2 MPP-110
349 SC 09 SP551 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 15 1079 8 Rig 2 MPP-110
350 SC 09 SP343 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16 597 9 Rig 4 MPP-103
351 SC 09 SP341 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 627 7 Rig 4 MPP-103
352 SC 09 SP342 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 21 510 8 Rig 4 MPP-103
353 SC 09 SP401 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15 597 9 Rig 4 MPP-103
354 SC 09 SP402 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 22 560 8 Rig 4 MPP-103
355 SC 09 SP403 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 589 7 Rig 4 MPP-103
356 SC 09 SP470 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 629 9 Rig 4 MPP-103
357 SC 09 SP469 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 612 8 Rig 4 MPP-103
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
358 SC 09 SP468 8-Apr-2021 8-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15 603 8 Rig 4 MPP-103
359 SC 09 SP651 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 821 10 Rig 1 MPP-111
360 SC 09 SP648 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 6 42 0 42 3 DD 6,5 15 1067 12 Rig 1 MPP-111
361 SC 09 SP738 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 17 1158 11 Rig 1 MPP-111
362 SC 09 SP1184 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 5.5 42.5 0 42.5 3 DD 6,5 15 1006 10 Rig 1 MPP-111
363 SC 09 SP1063 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 16 1062 9 Rig 1 MPP-111
364 SC 09 SP1185 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 827 9 Rig 1 MPP-111
365 SC 09 SP838 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 7 41 0 41 3 DD 6,5 16 984 9 Rig 1 MPP-111
366 SC 09 SP434 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 834 10 Rig 3 MPP-101
367 SC 09 SP506 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 784 9 Rig 3 MPP-101
368 SC 09 SP435 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 2 34 0 34 2 DD 6,5 14 555 10 Rig 3 MPP-101
369 SC 09 SP507 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 851 9 Rig 3 MPP-101
370 SC 09 SP436 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 6 42 0 42 3 DD 6,5 17 1096 8 Rig 3 MPP-101
371 SC 09 SP508 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14.1 716 9 Rig 3 MPP-101
372 SC 09 SP437 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 13 1273 8 Rig 3 MPP-101
373 SC 09 SP509 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 14 1233 8 Rig 3 MPP-101
374 SC 09 SP510 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 792 9 Rig 3 MPP-101
375 SC 09 SP376 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 15 1057 8 Rig 3 MPP-101
376 SC 09 SP726 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 15 987 10 Rig 2 MPP-110
377 SC 09 SP636 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 12 1013 8 Rig 2 MPP-110
378 SC 09 SP550 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 14 1127 6 Rig 2 MPP-110
379 SC 09 SP725 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 19 1142 8 Rig 2 MPP-110
380 SC 09 SP635 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 16 1082 6 Rig 2 MPP-110
381 SC 09 SP724 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 17 921 7 Rig 2 MPP-110
382 SC 09 SP549 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 15 1076 6 Rig 2 MPP-110
383 SC 09 SP634 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 16 1133 7 Rig 2 MPP-110
384 SC 09 SP278 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 23 629 7 Rig 4 MPP-103
385 SC 09 SP279 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 591 8 Rig 4 MPP-103
386 SC 09 SP280 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 602 8 Rig 4 MPP-103
387 SC 09 SP340 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 21 607 8 Rig 4 MPP-103
388 SC 09 SP339 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15 612 7 Rig 4 MPP-103
389 SC 09 SP338 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 634 8 Rig 4 MPP-103
390 SC 09 SP398 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 606 8 Rig 4 MPP-103
391 SC 09 SP399 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 600 9 Rig 4 MPP-103
392 SC 09 SP400 9-Apr-2021 9-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 597 8 Rig 4 MPP-103
393 SC 09 SP946 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 17 1136 8 Rig 1 MPP-111
394 SC 09 SP839 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 16 1124 9 Rig 1 MPP-111
395 SC 09 SP947 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 36 3 33 0 33 2 DD 6,5 18 510 8 Rig 1 MPP-111
396 SC 09 SP467 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16 654 9 Rig 4 MPP-103
397 SC 09 SP466 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 602 9 Rig 4 MPP-103
398 SC 09 SP464 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 623 9 Rig 4 MPP-103
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
399 SC 09 SP465 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 633 8 Rig 4 MPP-103
400 SC 09 SP539 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 629 9 Rig 4 MPP-103
401 SC 09 SP574 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 0.5 47.5 0 47.5 3 DD 6,5 22 898 7 Rig 5 MPP-106
402 SC 09 SP754 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 22 736 8 Rig 5 MPP-106
403 SC 09 SP664 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 17 743 7 Rig 5 MPP-106
404 SC 09 SP755 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 549 9 Rig 5 MPP-106
405 SC 09 SP438 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 14 1082 10 Rig 3 MPP-101
406 SC 09 SP511 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 721 10 Rig 3 MPP-101
407 SC 09 SP377 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 732 8 Rig 3 MPP-101
408 SC 09 SP439 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 728 8 Rig 3 MPP-101
409 SC 09 SP512 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 14 979 10 Rig 3 MPP-101
410 SC 09 SP723 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 18 1037 8 Rig 2 MPP-110
411 SC 09 SP633 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 18 1078 7 Rig 2 MPP-110
412 SC 09 SP548 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 11 1186 6 Rig 2 MPP-110
413 SC 09 SP722 10-Apr-2021 10-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 19 957 9 Rig 2 MPP-110
414 SC 09 SP756 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12.9 495 10 Rig 5 MPP-106
415 SC 09 SP665 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18.5 543 10 Rig 5 MPP-106
416 SC 09 SP575 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 11.8 473 12 Rig 5 MPP-106
417 SC 09 SP757 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 10.8 534 11 Rig 5 MPP-106
418 SC 09 SP666 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13.4 560 13 Rig 5 MPP-106
419 SC 09 SP576 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14.2 524 14 Rig 5 MPP-106
420 SC 09 SP538 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18.2 592 8 Rig 4 MPP-103
421 SC 09 SP536 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19.2 627 9 Rig 4 MPP-103
422 SC 09 SP616 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18.4 630 7 Rig 4 MPP-103
423 SC 09 SP537 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16.8 608 8 Rig 4 MPP-103
424 SC 09 SP617 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18.6 600 9 Rig 4 MPP-103
425 SC 09 SP620 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19.4 731 8 Rig 4 MPP-103
426 SC 09 SP618 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18.7 596 9 Rig 4 MPP-103
427 SC 09 SP619 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18.6 542 10 Rig 4 MPP-103
428 SC 09 SP710 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 22.7 597 7 Rig 4 MPP-103
429 SC 09 SP810 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 631 8 Rig 4 MPP-103
430 SC 09 SP840 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 15.9 1061 9 Rig 1 MPP-111
431 SC 09 SP1064 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 17.3 1074 9 Rig 1 MPP-111
432 SC 09 SP1186 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 16.4 1106 10 Rig 1 MPP-111
433 SC 09 SP948 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 14.7 1108 9 Rig 1 MPP-111
434 SC 09 SP841 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 17.6 1076 9 Rig 1 MPP-111
435 SC 09 SP1065 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 15.8 1086 10 Rig 1 MPP-111
436 SC 09 SP949 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 17.4 1058 11 Rig 1 MPP-111
437 SC 09 SP842 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 16.9 1052 10 Rig 1 MPP-111
438 SC 09 SP317 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 12.5 589 9 Rig 3 MPP-101
439 SC 09 SP378 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12.6 738 9 Rig 3 MPP-101
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
440 SC 09 SP318 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 11.9 754 8 Rig 3 MPP-101
441 SC 09 SP258 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13.7 712 8 Rig 3 MPP-101
442 SC 09 SP259 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13.1 674 8 Rig 3 MPP-101
443 SC 09 SP440 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 12.4 748 8 Rig 3 MPP-101
444 SC 09 SP379 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 12.6 1052 9 Rig 3 MPP-101
445 SC 09 SP319 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 14.7 996 9 Rig 3 MPP-101
446 SC 09 SP380 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 36 1.5 34.5 0 34.5 2 DD 6,5 14 392 10 Rig 3 MPP-101
447 SC 09 SP632 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 15.3 1216 7 Rig 2 MPP-110
448 SC 09 SP547 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 14.6 1091 7 Rig 2 MPP-110
449 SC 09 SP825 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 18.6 1083 8 Rig 2 MPP-110
450 SC 09 SP933 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 12.9 1078 7 Rig 2 MPP-110
451 SC 09 SP826 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 15.1 1071 7 Rig 2 MPP-110
452 SC 09 SP934 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 15.5 1091 7 Rig 2 MPP-110
453 SC 09 SP827 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 12.9 1218 8 Rig 2 MPP-110
454 SC 09 SP935 12-Apr-2021 12-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 12.7 1113 8 Rig 2 MPP-110
455 SC 09 SP257 12-Apr-2021 12-Apr-2021 Ø450 12 12 24 2 22 0 22 1 DD 6,5 Rig 2 MPP-110
456 SC 09 SP1068 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13.5 776 10 Rig 1 MPP-111
457 SC 09 SP844 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 12.2 1013 11 Rig 1 MPP-111
458 SC 09 SP843 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17.3 721 9 Rig 1 MPP-111
459 SC 09 SP950 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 8.5 39.5 0 39.5 3 DD 6,5 15.3 751 12 Rig 1 MPP-111
460 SC 09 SP1067 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14.5 746 11 Rig 1 MPP-111
461 SC 09 SP1066 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 19.4 997 10 Rig 1 MPP-111
462 SC 09 SP828 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 15 1031 9 Rig 2 MPP-110
463 SC 09 SP936 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 15.3 1107 7 Rig 2 MPP-110
464 SC 09 SP829 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 15.8 1086 8 Rig 2 MPP-110
465 SC 09 SP937 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 19.4 1094 9 Rig 2 MPP-110
466 SC 09 SP830 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 18.3 1121 9 Rig 2 MPP-110
467 SC 09 SP938 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 18 1123 8 Rig 2 MPP-110
468 SC 09 SP831 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 14.5 1079 8 Rig 2 MPP-110
469 SC 09 SP709 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 624 9 Rig 4 MPP-103
470 SC 09 SP809 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 607 8 Rig 4 MPP-103
471 SC 09 SP808 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18.2 650 8 Rig 4 MPP-103
472 SC 09 SP708 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 21 621 10 Rig 4 MPP-103
473 SC 09 SP807 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 1.5 34.5 0 34.5 2 DD 6,5 18 597 8 Rig 4 MPP-103
474 SC 09 SP707 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 1.5 34.5 0 34.5 2 DD 6,5 17.6 596 8 Rig 4 MPP-103
475 SC 09 SP806 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18.6 572 8 Rig 4 MPP-103
476 SC 09 SP706 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15 670 9 Rig 4 MPP-103
477 SC 09 SP805 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19.5 597 10 Rig 4 MPP-103
478 SC 09 SP577 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18.9 554 12 Rig 5 MPP-106
479 SC 09 SP667 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21.8 549 11 Rig 5 MPP-106
480 SC 09 SP758 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20.3 539 12 Rig 5 MPP-106
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
481 SC 09 SP578 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20.4 563 13 Rig 5 MPP-106
482 SC 09 SP668 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19.6 590 11 Rig 5 MPP-106
483 SC 09 SP760 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20.5 551 10 Rig 5 MPP-106
484 SC 09 SP320 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 10.3 926 10 Rig 3 MPP-101
485 SC 09 SP381 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 13.7 983 7 Rig 3 MPP-101
486 SC 09 SP260 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 709 9 Rig 3 MPP-101
487 SC 09 SP321 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 13 984 9 Rig 3 MPP-101
488 SC 09 SP322 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13.5 759 9 Rig 3 MPP-101
489 SC 09 SP261 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12.9 767 10 Rig 3 MPP-101
490 SC 09 SP262 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21.8 781 10 Rig 3 MPP-101
491 SC 09 SP263 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14.2 698 8 Rig 3 MPP-101
492 SC 09 SP210 13-Apr-2021 13-Apr-2021 Ø450 12 12 12 12 48 13 35 0 35 3 DD 6,5 13.6 654 9 Rig 3 MPP-101
493 SC 09 SP951 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 6 42 0 42 3 DD 6,5 20 1012 10 Rig 1 MPP-111
494 SC 09 SP1069 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16 720 10 Rig 1 MPP-111
495 SC 09 SP952 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 12.5 35.5 0 35.5 3 DD 6,5 16 721 10 Rig 1 MPP-111
496 SC 09 SP739 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 798 13 Rig 1 MPP-111
497 SC 09 SP740 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 11 806 10 Rig 1 MPP-111
498 SC 09 SP1070 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 3 33 0 33 2 DD 6,5 13 697 10 Rig 1 MPP-111
499 SC 09 SP939 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 20 1096 8 Rig 2 MPP-110
500 SC 09 SP832 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 17 1086 7 Rig 2 MPP-110
501 SC 09 SP940 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 22 1032 7 Rig 2 MPP-110
502 SC 09 SP833 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 20 1081 9 Rig 2 MPP-110
503 SC 09 SP941 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 20 1096 9 Rig 2 MPP-110
504 SC 09 SP834 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 21 1027 10 Rig 2 MPP-110
505 SC 09 SP942 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 21 1040 8 Rig 2 MPP-110
506 SC 09 SP579 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 598 11 Rig 5 MPP-106
507 SC 09 SP669 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 576 14 Rig 5 MPP-106
508 SC 09 SP761 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 24 978 8 Rig 5 MPP-106
509 SC 09 SP580 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 24 521 11 Rig 5 MPP-106
510 SC 09 SP670 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 27 547 8 Rig 5 MPP-106
511 SC 09 SP762 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 27 498 13 Rig 5 MPP-106
512 SC 09 SP615 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 594 9 Rig 4 MPP-103
513 SC 09 SP705 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 627 7 Rig 4 MPP-103
514 SC 09 SP804 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 603 9 Rig 4 MPP-103
515 SC 09 SP614 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 622 10 Rig 4 MPP-103
516 SC 09 SP704 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 607 8 Rig 4 MPP-103
517 SC 09 SP803 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 589 10 Rig 4 MPP-103
518 SC 09 SP802 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 617 8 Rig 4 MPP-103
519 SC 09 SP211 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 5.5 42.5 0 42.5 3 DD 6,5 13 906 8 Rig 3 MPP-101
520 SC 09 SP212 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 14 1062 9 Rig 3 MPP-101
521 SC 09 SP213 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 708 7 Rig 3 MPP-101
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
522 SC 09 SP214 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 36 0 0 DD 6,5 Rig 3 MPP-101
523 SC 09 SP166 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 12 48 48 0 0 DD 6,5 Rig 3 MPP-101
524 SC 09 SP165 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 748 9 Rig 3 MPP-101
525 SC 09 SP121 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 13 758 9 Rig 3 MPP-101
526 SC 09 SP163 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14 668 10 Rig 3 MPP-101
527 SC 09 SP164 14-Apr-2021 14-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 759 11 Rig 3 MPP-101
528 SC 09 SP583 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 531 10 Rig 5 MPP-106
529 SC 09 SP764 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 579 11 Rig 5 MPP-106
530 SC 09 SP672 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 25 597 10 Rig 5 MPP-106
531 SC 09 SP582 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 25 581 12 Rig 5 MPP-106
532 SC 09 SP763 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 28 584 11 Rig 5 MPP-106
533 SC 09 SP671 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 25 552 12 Rig 5 MPP-106
534 SC 09 SP581 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 29 521 11 Rig 5 MPP-106
535 SC 09 SP55 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 759 9 Rig 3 MPP-101
536 SC 09 SP54 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 13 743 8 Rig 3 MPP-101
537 SC 09 SP83 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14 678 8 Rig 3 MPP-101
538 SC 09 SP82 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 724 9 Rig 3 MPP-101
539 SC 09 SP84 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 17 907 10 Rig 3 MPP-101
540 SC 09 SP120 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 657 9 Rig 3 MPP-101
541 SC 09 SP119 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 642 10 Rig 3 MPP-101
542 SC 09 SP1072 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 771 11 Rig 2 MPP-110
543 SC 09 SP954 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 766 13 Rig 2 MPP-110
544 SC 09 SP1071 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19.6 768 10 Rig 2 MPP-110
545 SC 09 SP846 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14.8 747 11 Rig 2 MPP-110
546 SC 09 SP953 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 2.5 33.5 0 33.5 2 DD 6,5 14.5 723 13 Rig 2 MPP-110
547 SC 09 SP845 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20.3 736 12 Rig 2 MPP-110
548 SC 09 SP397 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 580 9 Rig 4 MPP-103
549 SC 09 SP463 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 463 9 Rig 4 MPP-103
550 SC 09 SP535 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 601 9 Rig 4 MPP-103
551 SC 09 SP703 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 634 8 Rig 4 MPP-103
552 SC 09 SP613 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16 619 7 Rig 4 MPP-103
553 SC 09 SP836 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 17 1071 6 Rig 1 MPP-111
554 SC 09 SP837 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 17 1079 7 Rig 1 MPP-111
555 SC 09 SP943 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 15 1091 7 Rig 1 MPP-111
556 SC 09 SP835 15-Apr-2021 15-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 17.3 1023 8 Rig 1 MPP-111
557 SC 09 SP8 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 612 10 Rig 3 MPP-101
558 SC 09 SP18 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 629 10 Rig 3 MPP-101
559 SC 09 SP19 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 716 9 Rig 3 MPP-101
560 SC 09 SP20 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 672 8 Rig 3 MPP-101
561 SC 09 SP21 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14 702 10 Rig 3 MPP-101
562 SC 09 SP36 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 743 9 Rig 3 MPP-101
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
563 SC 09 SP1062 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 13 1026 4 Rig 1 MPP-111
564 SC 09 SP945 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 18 1091 4 Rig 1 MPP-111
565 SC 09 SP944 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 21 1096 7 Rig 1 MPP-111
566 SC 09 SP1061 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 20 1031 8 Rig 1 MPP-111
567 SC 09 SP1060 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 23 1086 7 Rig 1 MPP-111
568 SC 09 SP1059 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 15 1048 7 Rig 1 MPP-111
569 SC 09 SP765 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 584 10 Rig 5 MPP-106
570 SC 09 SP673 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 598 10 Rig 5 MPP-106
571 SC 09 SP766 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 596 9 Rig 5 MPP-106
572 SC 09 SP768 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 574 10 Rig 5 MPP-106
573 SC 09 SP675 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 26 584 11 Rig 5 MPP-106
574 SC 09 SP585 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 561 10 Rig 5 MPP-106
575 SC 09 SP534 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 608 8 Rig 4 MPP-103
576 SC 09 SP462 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 581 7 Rig 4 MPP-103
577 SC 09 SP396 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 607 8 Rig 4 MPP-103
578 SC 09 SP533 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 617 8 Rig 4 MPP-103
579 SC 09 SP461 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 621 7 Rig 4 MPP-103
580 SC 09 SP395 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 639 8 Rig 4 MPP-103
581 SC 09 SP460 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 602 8 Rig 4 MPP-103
582 SC 09 SP532 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 599 9 Rig 4 MPP-103
583 SC 09 SP741 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14.7 1028 10 Rig 2 MPP-110
584 SC 09 SP652 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17.8 796 13 Rig 2 MPP-110
585 SC 09 SP742 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17.8 761 8 Rig 2 MPP-110
586 SC 09 SP743 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19.3 771 10 Rig 2 MPP-110
587 SC 09 SP744 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17.9 768 9 Rig 2 MPP-110
588 SC 09 SP653 16-Apr-2021 16-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 32.5 791 12 Rig 2 MPP-110
589 SC 09 SP1058 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 17 992 7 Rig 2 MPP-110
590 SC 09 SP1057 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 19 1048 8 Rig 2 MPP-110
591 SC 09 SP1056 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 20 1068 5 Rig 2 MPP-110
592 SC 09 SP1055 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 12 48 12 36 0 36 3 DD 6,5 20 891 6 Rig 2 MPP-110
593 SC 09 SP1054 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 739 8 Rig 2 MPP-110
594 SC 09 SP1053 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23.5 692 6 Rig 2 MPP-110
595 SC 09 SP1052 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 757 7 Rig 2 MPP-110
596 SC 09 SP1051 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21 657 9 Rig 2 MPP-110
597 SC 09 SP224 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 594 8 Rig 4 MPP-103
598 SC 09 SP337 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 625 7 Rig 4 MPP-103
599 SC 09 SP277 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 607 9 Rig 4 MPP-103
600 SC 09 SP223 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 2 34 0 34 2 DD 6,5 20 547 8 Rig 4 MPP-103
601 SC 09 SP336 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 629 8 Rig 4 MPP-103
602 SC 09 SP276 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 3 33 0 33 2 DD 6,5 18 536 9 Rig 4 MPP-103
603 SC 09 SP222 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 670 8 Rig 4 MPP-103
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
604 SC 09 SP275 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 527 9 Rig 4 MPP-103
605 SC 09 SP335 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 610 8 Rig 4 MPP-103
606 SC 09 SP584 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 25 558 12 Rig 5 MPP-106
607 SC 09 SP767 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 586 13 Rig 5 MPP-106
608 SC 09 SP674 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 596 20 Rig 5 MPP-106
609 SC 09 SP586 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 3 33 0 33 2 DD 6,5 23 476 12 Rig 5 MPP-106
610 SC 09 SP676 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 24 589 12 Rig 5 MPP-106
611 SC 09 SP769 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 29 594 13 Rig 5 MPP-106
612 SC 09 SP587 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 29 549 12 Rig 5 MPP-106
613 SC 09 SP38 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 624 9 Rig 3 MPP-101
614 SC 09 SP37 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 634 10 Rig 3 MPP-101
615 SC 09 SP56 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 712 8 Rig 3 MPP-101
616 SC 09 SP57 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 672 9 Rig 3 MPP-101
617 SC 09 SP58 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15 648 10 Rig 3 MPP-101
618 SC 09 SP85 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 629 8 Rig 3 MPP-101
619 SC 09 SP86 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 -9 45 0 45 2 DD 6,5 13 1074 8 Rig 3 MPP-101
620 SC 09 SP87 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 707 9 Rig 3 MPP-101
621 SC 09 SP122 18-Apr-2021 18-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 14 952 10 Rig 3 MPP-101
622 SC 09 SP1050 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 669 7 Rig 2 MPP-110
623 SC 09 SP1049 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21 657 7 Rig 2 MPP-110
624 SC 09 SP1048 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 697 8 Rig 2 MPP-110
625 SC 09 SP1047 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 723 9 Rig 2 MPP-110
626 SC 09 SP1046 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 686 8 Rig 2 MPP-110
627 SC 09 SP1045 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 22 639 6 Rig 2 MPP-110
628 SC 09 SP932 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 792 7 Rig 2 MPP-110
629 SC 09 SP931 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 716 7 Rig 2 MPP-110
630 SC 09 SP9A 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 672 9 Rig 3 MPP-101
631 SC 09 SP61 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 14 957 10 Rig 3 MPP-101
632 SC 09 SP22 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 694 10 Rig 3 MPP-101
633 SC 09 SP40 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 13 1035 8 Rig 3 MPP-101
634 SC 09 SP221 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 651 9 Rig 4 MPP-103
635 SC 09 SP272 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 602 8 Rig 4 MPP-103
636 SC 09 SP274 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 601 7 Rig 4 MPP-103
637 SC 09 SP273 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 607 10 Rig 4 MPP-103
638 SC 09 SP332 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 610 10 Rig 4 MPP-103
639 SC 09 SP333 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 626 9 Rig 4 MPP-103
640 SC 09 SP677 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 523 12 Rig 5 MPP-106
641 SC 09 SP770 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 590 12 Rig 5 MPP-106
642 SC 09 SP588 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 570 13 Rig 5 MPP-106
643 SC 09 SP678 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 28 561 14 Rig 5 MPP-106
644 SC 09 SP771 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 26 576 13 Rig 5 MPP-106
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
645 SC 09 SP772 19-Apr-2021 19-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 25 531 12 Rig 5 MPP-106
646 SC 09 SP930 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 679 8 Rig 2 MPP-110
647 SC 09 SP824 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 716 8 Rig 2 MPP-110
648 SC 09 SP823 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 1.5 34.5 0 34.5 2 DD 6,5 17 676 7 Rig 2 MPP-110
649 SC 09 SP822 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 22 706 7 Rig 2 MPP-110
650 SC 09 SP721 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 1.5 34.5 0 34.5 2 DD 6,5 17 676 7 Rig 2 MPP-110
651 SC 09 SP631 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 721 9 Rig 2 MPP-110
652 SC 09 SP720 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 746 9 Rig 2 MPP-110
653 SC 09 SP630 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 757 8 Rig 2 MPP-110
654 SC 09 SP334 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 22 623 8 Rig 4 MPP-103
655 SC 09 SP392 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 670 9 Rig 4 MPP-103
656 SC 09 SP393 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 625 8 Rig 4 MPP-103
657 SC 09 SP456 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 698 10 Rig 4 MPP-103
658 SC 09 SP528 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 651 10 Rig 4 MPP-103
659 SC 09 SP459 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 689 7 Rig 4 MPP-103
660 SC 09 SP679 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 29 580 12 Rig 5 MPP-106
661 SC 09 SP589 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 28 594 11 Rig 5 MPP-106
662 SC 09 SP513 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 28 576 12 Rig 5 MPP-106
663 SC 09 SP441 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 598 13 Rig 5 MPP-106
664 SC 09 SP442 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 26 579 11 Rig 5 MPP-106
665 SC 09 SP39 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 16 962 10 Rig 3 MPP-101
666 SC 09 SP60 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 12 48 1.5 46.5 0 46.5 3 DD 6,5 12 1012 9 Rig 3 MPP-101
667 SC 09 SP59 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 12 986 8 Rig 3 MPP-101
668 SC 09 SP176 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 735 11 Rig 3 MPP-101
669 SC 09 SP92 20-Apr-2021 20-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 13 967 9 Rig 3 MPP-101
670 SC 09 SP394 20-Apr-2021 20-Apr-2021 Ø450 12 12 6 6 0 6 0 DD 6,5 24 197 9 Rig 1 MPP-111
671 SC 09 SP546 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 17 1086 6 Rig 2 MPP-110
672 SC 09 SP719 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 19 1068 8 Rig 2 MPP-110
673 SC 09 SP629 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 20 1091 8 Rig 2 MPP-110
674 SC 09 SP130 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12 656 8 Rig 3 MPP-101
675 SC 09 SP175 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 14 1009 10 Rig 3 MPP-101
676 SC 09 SP91 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 12 48 2.5 45.5 0 45.5 3 DD 6,5 12 996 10 Rig 3 MPP-101
677 SC 09 SP129 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 668 9 Rig 3 MPP-101
678 SC 09 SP174 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14 679 8 Rig 3 MPP-101
679 SC 09 SP89 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 654 10 Rig 3 MPP-101
680 SC 09 SP90 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 739 9 Rig 3 MPP-101
681 SC 09 SP173 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 743 9 Rig 3 MPP-101
682 SC 09 SP531 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 639 7 Rig 4 MPP-103
683 SC 09 SP611 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 652 8 Rig 4 MPP-103
684 SC 09 SP612 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 21 623 9 Rig 4 MPP-103
685 SC 09 SP702 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 623 7 Rig 4 MPP-103
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
686 SC 09 SP701 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 628 8 Rig 4 MPP-103
687 SC 09 SP801 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 21 661 7 Rig 4 MPP-103
688 SC 09 SP800 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 730 7 Rig 4 MPP-103
689 SC 09 SP514 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 26 534 13 Rig 5 MPP-106
690 SC 09 SP515 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 554 10 Rig 5 MPP-106
691 SC 09 SP880 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 24 549 13 Rig 5 MPP-106
692 SC 09 SP881 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 3 33 0 33 2 DD 6,5 24 486 13 Rig 5 MPP-106
693 SC 09 SP989 21-Apr-2021 21-Apr-2021 Ø450 12 12 12 36 2 34 0 34 2 DD 6,5 24 451 12 Rig 5 MPP-106
694 SC 09 SP493 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 15 982 10 Rig 1 MPP-111
695 SC 09 SP494 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 12 48 5.5 42.5 0 42.5 3 DD 6,5 17 980 9 Rig 1 MPP-111
696 SC 09 SP565 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 761 11 Rig 1 MPP-111
697 SC 09 SP88 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 673 10 Rig 3 MPP-101
698 SC 09 SP127 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 746 9 Rig 3 MPP-101
699 SC 09 SP128 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 695 11 Rig 3 MPP-101
700 SC 09 SP220 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 12 48 3 45 0 45 3 DD 6,5 13 1005 8 Rig 3 MPP-101
701 SC 09 SP172 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 727 10 Rig 3 MPP-101
702 SC 09 SP171 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 676 9 Rig 3 MPP-101
703 SC 09 SP219 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 677 10 Rig 3 MPP-101
704 SC 09 SP126 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 678 10 Rig 3 MPP-101
705 SC 09 SP909 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 626 7 Rig 4 MPP-103
706 SC 09 SP908 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 657 9 Rig 4 MPP-103
707 SC 09 SP1022 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 629 7 Rig 4 MPP-103
708 SC 09 SP912 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 638 7 Rig 4 MPP-103
709 SC 09 SP911 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 642 10 Rig 4 MPP-103
710 SC 09 SP910 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 679 9 Rig 4 MPP-103
711 SC 09 SP1023 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21 687 7 Rig 4 MPP-103
712 SC 09 SP988 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 29 561 11 Rig 5 MPP-106
713 SC 09 SP879 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 560 13 Rig 5 MPP-106
714 SC 09 SP987 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 24 578 12 Rig 5 MPP-106
715 SC 09 SP878 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 23 510 12 Rig 5 MPP-106
716 SC 09 SP986 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 532 14 Rig 5 MPP-106
717 SC 09 SP985 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 21 521 11 Rig 5 MPP-106
718 SC 09 SP984 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 25 496 12 Rig 5 MPP-106
719 SC 09 SP877 22-Apr-2021 22-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 25 511 12 Rig 5 MPP-106
720 SC 09 SP566 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 17 1066 11 Rig 1 MPP-111
721 SC 09 SP654 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 12 48 5.5 42.5 0 42.5 3 DD 6,5 18 1014 6 Rig 1 MPP-111
722 SC 09 SP366 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 16 1062 10 Rig 1 MPP-111
723 SC 09 SP498 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 12 48 1 47 0 47 3 DD 6,5 16 1167 10 Rig 1 MPP-111
724 SC 09 SP426 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 17 1040 11 Rig 1 MPP-111
725 SC 09 SP425 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21 796 9 Rig 1 MPP-111
726 SC 09 SP125 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 539 10 Rig 3 MPP-101
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
727 SC 09 SP124 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 704 10 Rig 3 MPP-101
728 SC 09 SP170 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 16 728 10 Rig 3 MPP-101
729 SC 09 SP218 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 725 9 Rig 3 MPP-101
730 SC 09 SP123 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 657 10 Rig 3 MPP-101
731 SC 09 SP167 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 758 9 Rig 3 MPP-101
732 SC 09 SP215 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 658 10 Rig 3 MPP-101
733 SC 09 SP168 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 12 642 9 Rig 3 MPP-101
734 SC 09 SP169 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 14 675 9 Rig 3 MPP-101
735 SC 09 SP1024 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 745 9 Rig 4 MPP-103
736 SC 09 SP1025 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 627 8 Rig 4 MPP-103
737 SC 09 SP916 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 652 9 Rig 4 MPP-103
738 SC 09 SP1029 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 646 8 Rig 4 MPP-103
739 SC 09 SP915 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 670 8 Rig 4 MPP-103
740 SC 09 SP914 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 679 8 Rig 4 MPP-103
741 SC 09 SP913 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 672 9 Rig 4 MPP-103
742 SC 09 SP1026 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 3 33 0 33 2 DD 6,5 17 570 6 Rig 4 MPP-103
743 SC 09 SP1028 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 636 9 Rig 4 MPP-103
744 SC 09 SP876 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 21 521 13 Rig 5 MPP-106
745 SC 09 SP875 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 27 561 10 Rig 5 MPP-106
746 SC 09 SP874 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 25 487 11 Rig 5 MPP-106
747 SC 09 SP983 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 24 482 13 Rig 5 MPP-106
748 SC 09 SP873 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 23 493 12 Rig 5 MPP-106
749 SC 09 SP872 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 481 13 Rig 5 MPP-106
750 SC 09 SP990 23-Apr-2021 23-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 23 531 11 Rig 5 MPP-106
751 SC 09 SP424 24-Apr-2021 24-Apr-2021 Ø450 12 12 12 12 48 4 44 0 44 3 DD 6,5 17 1121 12 Rig 1 MPP-111
752 SC 09 SP497 24-Apr-2021 24-Apr-2021 Ø450 12 12 12 12 48 5.5 42.5 0 42.5 3 DD 6,5 14 1023 9 Rig 1 MPP-111
753 SC 09 SP496 24-Apr-2021 24-Apr-2021 Ø450 12 12 12 12 48 2 46 0 46 3 DD 6,5 26 1168 12 Rig 1 MPP-111
754 SC 09 SP495 24-Apr-2021 24-Apr-2021 Ø450 12 12 12 12 48 4.5 43.5 0 43.5 3 DD 6,5 20 1102 11 Rig 1 MPP-111
755 SC 09 SP1027 24-Apr-2021 24-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15 667 8 Rig 4 MPP-103
756 SC 09 SP1021 24-Apr-2021 24-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 663 10 Rig 4 MPP-103
757 SC 09 SP1020 24-Apr-2021 24-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16 651 8 Rig 4 MPP-103
758 SC 09 SP1019 24-Apr-2021 24-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 647 8 Rig 4 MPP-103
759 SC 09 SP799 24-Apr-2021 24-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 625 7 Rig 4 MPP-103
760 SC 09 SP907 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 19 625 9 Rig 4 MPP-103
761 SC 09 SP798 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 16 652 6 Rig 4 MPP-103
762 SC 09 SP906 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 20 631 7 Rig 4 MPP-103
763 SC 09 SP1018 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 646 8 Rig 4 MPP-103
764 SC 09 SP1017 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 627 9 Rig 4 MPP-103
765 SC 09 SP905 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 3 33 0 33 2 DD 6,5 20 582 7 Rig 4 MPP-103
766 SC 09 SP797 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 17 661 6 Rig 4 MPP-103
767 SC 09 SP796 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 18 677 7 Rig 4 MPP-103
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
768 SC 09 SP904 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 1 35 0 35 2 DD 6,5 15 663 8 Rig 4 MPP-103
769 SC 09 SP572 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 20 1008 12 Rig 1 MPP-111
770 SC 09 SP660 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 12 48 5 43 0 43 3 DD 6,5 18 1020 9 Rig 1 MPP-111
771 SC 09 SP570 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 12 48 3.5 44.5 0 44.5 3 DD 6,5 19 1086 11 Rig 1 MPP-111
772 SC 09 SP871 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 26 542 10 Rig 5 MPP-106
773 SC 09 SP870 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 521 12 Rig 5 MPP-106
774 SC 09 SP979 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 568 13 Rig 5 MPP-106
775 SC 09 SP982 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 563 10 Rig 5 MPP-106
776 SC 09 SP981 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 25 641 12 Rig 5 MPP-106
777 SC 09 SP980 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 524 12 Rig 5 MPP-106
778 SC 09 SP869 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 549 13 Rig 5 MPP-106
779 SC 09 SP978 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 531 12 Rig 5 MPP-106
780 SC 09 SP217 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 746 10 Rig 3 MPP-101
781 SC 09 SP391 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 682 11 Rig 3 MPP-101
782 SC 09 SP331 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 704 10 Rig 3 MPP-101
783 SC 09 SP271 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 742 11 Rig 3 MPP-101
784 SC 09 SP390 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 680 10 Rig 3 MPP-101
785 SC 09 SP270 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 16 682 10 Rig 3 MPP-101
786 SC 09 SP330 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 708 10 Rig 3 MPP-101
787 SC 09 SP389 27-Apr-2021 27-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 696 10 Rig 3 MPP-101
788 SC 09 SP659 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 742 13 Rig 1 MPP-111
789 SC 09 SP658 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 714 10 Rig 1 MPP-111
790 SC 09 SP569 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 708 10 Rig 1 MPP-111
791 SC 09 SP568 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 702 9 Rig 1 MPP-111
792 SC 09 SP657 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 722 13 Rig 1 MPP-111
793 SC 09 SP216 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 12 732 10 Rig 3 MPP-101
794 SC 09 SP329 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12 687 10 Rig 3 MPP-101
795 SC 09 SP269 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 740 11 Rig 3 MPP-101
796 SC 09 SP268 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 703 11 Rig 3 MPP-101
797 SC 09 SP328 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 12 720 10 Rig 3 MPP-101
798 SC 09 SP388 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 12 702 10 Rig 3 MPP-101
799 SC 09 SP267 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 13 655 11 Rig 3 MPP-101
800 SC 09 SP327 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 673 10 Rig 3 MPP-101
801 SC 09 SP387 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 2.5 33.5 0 33.5 2 DD 6,5 13 474 11 Rig 3 MPP-101
802 SC 09 SP1016 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 687 6 Rig 4 MPP-103
803 SC 09 SP1015 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21 701 8 Rig 4 MPP-103
804 SC 09 SP903 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 679 7 Rig 4 MPP-103
805 SC 09 SP795 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 690 8 Rig 4 MPP-103
806 SC 09 SP794 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 650 7 Rig 4 MPP-103
807 SC 09 SP1014 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 3 33 0 33 2 DD 6,5 20 554 6 Rig 4 MPP-103
808 SC 09 SP902 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,6 18 673 7 Rig 4 MPP-103
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
809 SC 09 SP1013 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 679 8 Rig 4 MPP-103
810 SC 09 SP901 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 2.5 33.5 0 33.5 2 DD 6,5 18 602 8 Rig 4 MPP-103
811 SC 09 SP977 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 564 13 Rig 5 MPP-106
812 SC 09 SP976 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 570 14 Rig 5 MPP-106
813 SC 09 SP868 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 26 529 12 Rig 5 MPP-106
814 SC 09 SP759 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 624 14 Rig 5 MPP-106
815 SC 09 SP867 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 487 10 Rig 5 MPP-106
816 SC 09 SP975 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 478 10 Rig 5 MPP-106
817 SC 09 SP866 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 25 542 11 Rig 5 MPP-106
818 SC 09 SP974 28-Apr-2021 28-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 536 12 Rig 5 MPP-106
819 SC 09 SP656 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12 752 12 Rig 1 MPP-111
820 SC 09 SP655 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21 766 12 Rig 1 MPP-111
821 SC 09 SP745 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 27 774 11 Rig 1 MPP-111
822 SC 09 SP1073 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 23 754 11 Rig 1 MPP-111
823 SC 09 SP847 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 774 13 Rig 1 MPP-111
824 SC 09 SP955 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 15 742 10 Rig 1 MPP-111
825 SC 09 SP1074 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 736 9 Rig 1 MPP-111
826 SC 09 SP848 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 751 10 Rig 1 MPP-111
827 SC 09 SP956 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 768 10 Rig 1 MPP-111
828 SC 09 SP1075 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 774 10 Rig 1 MPP-111
829 SC 09 SP165A 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 13 675 11 Rig 3 MPP-101
830 SC 09 SP213A 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 13 691 10 Rig 3 MPP-101
831 SC 09 SP386 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 676 10 Rig 3 MPP-101
832 SC 09 SP266 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 682 11 Rig 3 MPP-101
833 SC 09 SP326 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 748 9 Rig 3 MPP-101
834 SC 09 SP265 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 12 678 10 Rig 3 MPP-101
835 SC 09 SP264 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 700 9 Rig 3 MPP-101
836 SC 09 SP325 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 716 10 Rig 3 MPP-101
837 SC 09 SP385 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 704 10 Rig 3 MPP-101
838 SC 09 SP324 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 712 10 Rig 3 MPP-101
839 SC 09 SP610 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 629 9 Rig 4 MPP-103
840 SC 09 SP700 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 687 7 Rig 4 MPP-103
841 SC 09 SP699 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 689 6 Rig 4 MPP-103
842 SC 09 SP530 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 682 7 Rig 4 MPP-103
843 SC 09 SP609 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 687 7 Rig 4 MPP-103
844 SC 09 SP698 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 724 8 Rig 4 MPP-103
845 SC 09 SP608 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 767 7 Rig 4 MPP-103
846 SC 09 SP697 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 699 8 Rig 4 MPP-103
847 SC 09 SP607 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 723 7 Rig 4 MPP-103
848 SC 09 SP865 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 531 12 Rig 5 MPP-106
849 SC 09 SP973 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 494 11 Rig 5 MPP-106
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
850 SC 09 SP864 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 572 10 Rig 5 MPP-106
851 SC 09 SP972 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 524 13 Rig 5 MPP-106
852 SC 09 SP863 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 536 10 Rig 5 MPP-106
853 SC 09 SP971 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 572 14 Rig 5 MPP-106
854 SC 09 SP862 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 24 563 13 Rig 5 MPP-106
855 SC 09 SP970 29-Apr-2021 29-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 24 512 16 Rig 5 MPP-106
856 SC 09 SP849 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 752 9 Rig 1 MPP-111
857 SC 09 SP957 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 797 11 Rig 1 MPP-111
858 SC 09 SP1076 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 771 10 Rig 1 MPP-111
859 SC 09 SP850 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 757 11 Rig 1 MPP-111
860 SC 09 SP958 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 774 10 Rig 1 MPP-111
861 SC 09 SP1077 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 821 9 Rig 1 MPP-111
862 SC 09 SP851 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 759 9 Rig 1 MPP-111
863 SC 09 SP959 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 771 11 Rig 1 MPP-111
864 SC 09 SP1078 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 792 9 Rig 1 MPP-111
865 SC 09 SP1079 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 796 10 Rig 1 MPP-111
866 SC 09 SP384 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 668 11 Rig 3 MPP-101
867 SC 09 SP323 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 2 34 0 34 2 DD 6,5 15 567 8 Rig 3 MPP-101
868 SC 09 SP383 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 562 9 Rig 3 MPP-101
869 SC 09 SP443 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 13 684 10 Rig 3 MPP-101
870 SC 09 SP516 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 12 716 9 Rig 3 MPP-101
871 SC 09 SP444 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 728 10 Rig 3 MPP-101
872 SC 09 SP382 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 700 9 Rig 3 MPP-101
873 SC 09 SP517 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 704 10 Rig 3 MPP-101
874 SC 09 SP445 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 13 731 9 Rig 3 MPP-101
875 SC 09 SP606 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 701 7 Rig 4 MPP-103
876 SC 09 SP696 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 707 7 Rig 4 MPP-103
877 SC 09 SP793 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 652 9 Rig 4 MPP-103
878 SC 09 SP695 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 691 7 Rig 4 MPP-103
879 SC 09 SP605 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 642 8 Rig 4 MPP-103
880 SC 09 SP792 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 707 8 Rig 4 MPP-103
881 SC 09 SP604 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 672 8 Rig 4 MPP-103
882 SC 09 SP694 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 718 5 Rig 4 MPP-103
883 SC 09 SP603 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 718 7 Rig 4 MPP-103
884 SC 09 SP791 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 655 8 Rig 4 MPP-103
885 SC 09 SP662 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 566 10 Rig 5 MPP-106
886 SC 09 SP661 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 25 554 13 Rig 5 MPP-106
887 SC 09 SP750 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 572 11 Rig 5 MPP-106
888 SC 09 SP751 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 551 13 Rig 5 MPP-106
889 SC 09 SP859 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 539 11 Rig 5 MPP-106
890 SC 09 SP967 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 539 11 Rig 5 MPP-106
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
891 SC 09 SP682 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 538 10 Rig 5 MPP-106
892 SC 09 SP752 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 549 12 Rig 5 MPP-106
893 SC 09 SP753 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 561 11 Rig 5 MPP-106
894 SC 09 SP860 30-Apr-2021 30-Apr-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 540 13 Rig 5 MPP-106
895 SC 09 SP852 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 786 9 Rig 1 MPP-111
896 SC 09 SP960 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 779 11 Rig 1 MPP-111
897 SC 09 SP746 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 765 12 Rig 1 MPP-111
898 SC 09 SP747 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 781 9 Rig 1 MPP-111
899 SC 09 SP748 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 766 8 Rig 1 MPP-111
900 SC 09 SP853 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 776 8 Rig 1 MPP-111
901 SC 09 SP961 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 799 8 Rig 1 MPP-111
902 SC 09 SP446 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 753 9 Rig 3 MPP-101
903 SC 09 SP518 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 687 8 Rig 3 MPP-101
904 SC 09 SP447 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 670 11 Rig 3 MPP-101
905 SC 09 SP519 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 13 737 10 Rig 3 MPP-101
906 SC 09 SP448 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 13 673 9 Rig 3 MPP-101
907 SC 09 SP450 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 739 9 Rig 3 MPP-101
908 SC 09 SP522 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 589 10 Rig 3 MPP-101
909 SC 09 SP1012 1-May-2021 1-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 602 7 Rig 4 MPP-103
910 SC 09 SP900 1-May-2021 1-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 626 8 Rig 4 MPP-103
911 SC 09 SP1011 1-May-2021 1-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21 648 7 Rig 4 MPP-103
912 SC 09 SP899 1-May-2021 1-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 679 8 Rig 4 MPP-103
913 SC 09 SP1010 1-May-2021 1-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 679 6 Rig 4 MPP-103
914 SC 09 SP898 1-May-2021 1-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 621 7 Rig 4 MPP-103
915 SC 09 SP790 1-May-2021 1-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 23 647 9 Rig 4 MPP-103
916 SC 09 SP861 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 580 10 Rig 5 MPP-106
917 SC 09 SP1087 1-May-2021 1-May-2021 Ø450 12 12 12 36 24.5 11.5 0 11.5 2 DD 6,5 Rig 5 MPP-106
918 SC 09 SP968 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 492 12 Rig 5 MPP-106
919 SC 09 SP969 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 464 11 Rig 5 MPP-106
920 SC 09 SP590 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 24 548 12 Rig 5 MPP-106
921 SC 09 SP591 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 543 12 Rig 5 MPP-106
922 SC 09 SP680 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 571 13 Rig 5 MPP-106
923 SC 09 SP773 1-May-2021 1-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 558 14 Rig 5 MPP-106
924 SC 09 SP545 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 751 7 Rig 2 MPP-110
925 SC 09 SP718 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 621 7 Rig 2 MPP-110
926 SC 09 SP628 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 621 8 Rig 2 MPP-110
927 SC 09 SP544 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 658 9 Rig 2 MPP-110
928 SC 09 SP1080 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 746 10 Rig 1 MPP-111
929 SC 09 SP962 2-May-2021 2-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 24 778 12 Rig 1 MPP-111
930 SC 09 SP854 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 763 8 Rig 1 MPP-111
931 SC 09 SP855 2-May-2021 2-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 12 806 10 Rig 1 MPP-111
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
932 SC 09 SP1081 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 24 766 12 Rig 1 MPP-111
933 SC 09 SP449 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 399 8 Rig 3 MPP-101
934 SC 09 SP520 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 33.5 2 DD 6,5 17 404 9 Rig 3 MPP-101
935 SC 09 SP596 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 34 2 DD 6,5 13 256 10 Rig 3 MPP-101
936 SC 09 SP1009 2-May-2021 2-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 51 8 Rig 4 MPP-103
937 SC 09 SP1008 2-May-2021 2-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21 686 9 Rig 4 MPP-103
938 SC 09 SP897 2-May-2021 2-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 659 8 Rig 4 MPP-103
939 SC 09 SP789 2-May-2021 2-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 642 9 Rig 4 MPP-103
940 SC 09 SP681 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 549 11 Rig 5 MPP-106
941 SC 09 SP774 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 526 11 Rig 5 MPP-106
942 SC 09 SP775 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 532 10 Rig 5 MPP-106
943 SC 09 SP776 2-May-2021 2-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 574 10 Rig 5 MPP-106
944 SC 09 SP717 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 610 9 Rig 2 MPP-110
945 SC 09 SP627 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 617 8 Rig 2 MPP-110
946 SC 09 SP543 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 682 9 Rig 2 MPP-110
947 SC 09 SP626 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 571 8 Rig 2 MPP-110
948 SC 09 SP716 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 757 9 Rig 2 MPP-110
949 SC 09 SP715 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 727 7 Rig 2 MPP-110
950 SC 09 SP542 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 718 8 Rig 2 MPP-110
951 SC 09 SP625 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 637 8 Rig 2 MPP-110
952 SC 09 SP858 3-May-2021 3-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21 738 10 Rig 1 MPP-111
953 SC 09 SP749 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 786 11 Rig 1 MPP-111
954 SC 09 SP857 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 792 11 Rig 1 MPP-111
955 SC 09 SP856 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 798 11 Rig 1 MPP-111
956 SC 09 SP1082 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 702 11 Rig 1 MPP-111
957 SC 09 SP963 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 788 10 Rig 1 MPP-111
958 SC 09 SP1083 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 748 11 Rig 1 MPP-111
959 SC 09 SP964 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 826 11 Rig 1 MPP-111
960 SC 09 SP965 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 829 11 Rig 1 MPP-111
961 SC 09 SP521 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 716 7 Rig 3 mpp-101
962 SC 09 SP597 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 760 7 Rig 3 mpp-101
963 SC 09 SP458 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 748 10 Rig 3 mpp-101
964 SC 09 SP457 3-May-2021 3-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 728 9 Rig 3 mpp-101
965 SC 09 SP529 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 687 9 Rig 3 mpp-101
966 SC 09 SP455 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 732 10 Rig 3 mpp-101
967 SC 09 SP527 3-May-2021 3-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 17 760 9 Rig 3 mpp-101
968 SC 09 SP454 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 718 11 Rig 3 mpp-101
969 SC 09 SP526 3-May-2021 3-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 20 561 10 Rig 3 mpp-101
970 SC 09 SP788 3-May-2021 3-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 19 664 8 Rig 4 mpp-103
971 SC 09 SP896 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 13 712 10 Rig 4 mpp-103
972 SC 09 SP1007 3-May-2021 3-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 16 720 8 Rig 4 mpp-103
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
973 SC 09 SP1006 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 792 7 Rig 4 mpp-103
974 SC 09 SP895 3-May-2021 3-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 18 697 8 Rig 4 mpp-103
975 SC 09 SP787 3-May-2021 3-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 16 612 6 Rig 4 mpp-103
976 SC 09 SP786 3-May-2021 3-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 14 751 6 Rig 4 mpp-103
977 SC 09 SP894 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 651 9 Rig 4 mpp-103
978 SC 09 SP1005 3-May-2021 3-May-2021 Ø450 12 12 12 36 0.5 35.5 0 35.5 2 DD 6,5 21 692 7 Rig 4 mpp-103
979 SC 09 SP991 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 539 10 Rig 5 mpp-106
980 SC 09 SP882 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 543 11 Rig 5 mpp-106
981 SC 09 SP992 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 587 10 Rig 5 mpp-106
982 SC 09 SP993 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 549 11 Rig 5 mpp-106
983 SC 09 SP883 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 496 10 Rig 5 mpp-106
984 SC 09 SP994 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 566 10 Rig 5 mpp-106
985 SC 09 SP884 3-May-2021 3-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 14 647 10 Rig 5 mpp-106
986 SC 09 SP541 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 610 8 Rig 2 MPP-110
987 SC 09 SP540 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 739 9 Rig 2 MPP-110
988 SC 09 SP624 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 613 7 Rig 2 MPP-110
989 SC 09 SP622 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 756 8 Rig 2 MPP-110
990 SC 09 SP623 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 657 8 Rig 2 MPP-110
991 SC 09 SP714 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 710 7 Rig 2 MPP-110
992 SC 09 SP713 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 657 8 Rig 2 MPP-110
993 SC 09 SP712 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 518 8 Rig 2 MPP-110
994 SC 09 SP966 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 781 12 Rig 1 MPP-111
995 SC 09 SP1084 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 796 11 Rig 1 MPP-111
996 SC 09 SP1085 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 741 11 Rig 1 MPP-111
997 SC 09 SP1086 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 807 12 Rig 1 MPP-111
998 SC 09 SP453 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 682 9 Rig 3 MPP-101
999 SC 09 SP525 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 688 10 Rig 3 MPP-101
1000 SC 09 SP452 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 15 700 9 Rig 3 MPP-101
1001 SC 09 SP693 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 736 9 Rig 3 MPP-101
1002 SC 09 SP692 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 721 8 Rig 3 MPP-101
1003 SC 09 SP524 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 685 10 Rig 3 MPP-101
1004 SC 09 SP602 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 659 10 Rig 3 MPP-101
1005 SC 09 SP691 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 716 9 Rig 3 MPP-101
1006 SC 09 SP1004 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 725 7 Rig 4 MPP-103
1007 SC 09 SP893 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 19 620 8 Rig 4 MPP-103
1008 SC 09 SP785 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 631 8 Rig 4 MPP-103
1009 SC 09 SP784 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 18 630 9 Rig 4 MPP-103
1010 SC 09 SP892 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 627 8 Rig 4 MPP-103
1011 SC 09 SP1003 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 637 8 Rig 4 MPP-103
1012 SC 09 SP1002 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 16 617 5 Rig 4 MPP-103
1013 SC 09 SP891 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 17 627 8 Rig 4 MPP-103
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
1014 SC 09 SP592 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 22 524 10 Rig 5 MPP-106
1015 SC 09 SP593 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 574 10 Rig 5 MPP-106
1016 SC 09 SP594 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 20 572 11 Rig 5 MPP-106
1017 SC 09 SP682 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 23 558 10 Rig 5 MPP-106
1018 SC 09 SP683 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 524 10 Rig 5 MPP-106
1019 SC 09 SP684 4-May-2021 4-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 21 570 10 Rig 5 MPP-106
1020 SC 09 SP917 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1021 SC 09 SP1030 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1022 SC 09 SP1031 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1023 SC 09 SP918 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1024 SC 09 SP1032 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1025 SC 09 SP811 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1026 SC 09 SP919 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1027 SC 09 SP1033 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1028 SC 09 SP812 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1029 SC 09 SP690 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1030 SC 09 SP451 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1031 SC 09 SP601 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1032 SC 09 SP523 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1033 SC 09 SP600 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1034 SC 09 SP599 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1035 SC 09 SP783 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1036 SC 09 SP782 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1037 SC 09 SP1001 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1038 SC 09 SP890 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1039 SC 09 SP781 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1040 SC 09 SP1000 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1041 SC 09 SP889 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1042 SC 09 SP777 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1043 SC 09 SP778 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1044 SC 09 SP779 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1045 SC 09 SP885 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1046 SC 09 SP887 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1047 SC 09 SP886 5-May-2021 5-May-2021 Ø450 12 12 12 36 0 36 0 36 2 DD 6,5 FALSE
1048 SC 09 5-May-2021 5-May-2021 Ø450 12 12 12 36 36 0 0 2 DD 6,5 FALSE
1049 SC 09 5-May-2021 5-May-2021 Ø450 12 12 12 36 36 0 0 2 DD 6,5 FALSE
1050 SC 09 5-May-2021 5-May-2021 Ø450 12 12 12 36 36 0 0 2 DD 6,5 FALSE
1051 SC 09 5-May-2021 5-May-2021 Ø450 12 12 12 36 36 0 0 2 DD 6,5 FALSE
1052 SC 09 3-May-2021 3-May-2021 Ø450 12 12 12 36 36 0 0 2 DD 6,5 0
1053 SC 09 3-May-2021 3-May-2021 Ø450 12 12 12 36 36 0 0 2 DD 6,5 0
1054 SC 09 3-May-2021 3-May-2021 Ø450 12 12 12 36 36 0 0 2 DD 6,5 0
Length of The Pile Used Total Height of Pay Length
Pile's [m] Driving Depth of Model Of Temporary Final
Pile's Start Date of Finish Date of Length of Pile above of Pile Number of Rig
No. Area Size by Dolly Penetration Diesel Pile Compression Total Blows Set Remarks
Name Diesel Hammer Diesel Hammer Pile Used Ground Penetration Joints Name
[mm] 1st 2nd 3rd 4th [m] [m] Hammer (mm) (mm)
[m] [m] [m]
1055 SC 09 3-May-2021 3-May-2021 Ø450 12 12 12 36 36 0 0 2 DD 6,5 0
TOTAL 30348.00 1270.70 29077.30 0.00 29077.30 1805.00

Notes: Rig 1 = Diesel Pile Hammer MPP-111


Rig 2 = Diesel Pile Hammer MPP-110
Rig 3 = Diesel Pile Hammer MPP-101
Rig 4 = Diesel Pile Hammer MPP-103
Rig 5 = Diesel Pile Hammer MPP-106

Driving by
Pay Length Number of
Progress of Works dolly
[m] joints
[m]
Up To Last Period 5114.6 0 324
This Period 23962.70 0 1481.00
Up To This Period 29077.30 0 1805.00

Pangkalan Kerinci, 03 Mei 2021


Prepared by, Checked by,
PT. Masterpancang Pondasi PT. Riau Andalan Pulp and Paper

(…........................................) (….......................................)
Ukuran
No. Tanggal Item Pekerjaan Jumlah
(m)
1 4/10/2021 Piling ᴓ 450 mm 12 24
2 4/12/2021 Piling ᴓ 450 mm 12 45
3 4/14/2021 Piling ᴓ 450 mm 12 21
4 4/18/2021 Piling ᴓ 450 mm 12 50
5 4/19/2021 Piling ᴓ 450 mm 12 36
6 4/20/2021 Piling ᴓ 450 mm 12 36
7 4/21/2021 Piling ᴓ 450 mm 12 60
8 4/22/2021 Piling ᴓ 450 mm 12 24
9 4/23/2021 Piling ᴓ 450 mm 12 60
TOTAL 356
SP10 2
SP100 3
SP101 4
SP102 5
SP103 6
SP104 7
SP107 8
SP108 9
SP109 10
SP11 11
SP110 12
SP111 13
SP112 14
SP113 15
SP114 16
SP115 17
SP12 18
SP13 19
SP131 20
SP132 21
SP138 22
SP139 23
SP14 24
SP140 25
SP141 26
SP15 27
SP157 28
SP158 29
SP159 30
SP16 31
SP17 32
SP177 33
SP186 34
SP187 35
SP2 36
SP225 37
SP226 38
SP23 39
SP24 40
SP25 41
SP26 42
SP26A 43
SP27 44
SP28 45
SP29 46
SP3 47
SP30 48
SP31 49
SP32 50
SP33 51
SP34 52
SP35 53
SP4 54
SP41 55
SP42 56
SP43 57
SP44 58
SP45 59
SP46 60
SP47 61
SP48 62
SP49 63
SP5 64
SP50 65
SP51 66
SP52 67
SP53 68
SP573 69
SP6 70
SP62 71
SP63 72
SP64 73
SP65 74
SP66 75
SP663 76
SP67 77
SP68 78
SP69 79
SP7 80
SP70 81
SP71 82
SP72 83
SP73 84
SP74 85
SP75 86
SP76 87
SP77 88
SP78 89
SP79 90
SP9 91
SP93 92
SP94 93
SP95 94
SP96 95
SP97 96
SP98 97
SP99 98
SP1005 99
SP1006 100
SP1007 101
SP1008 102
SP1009 103
SP1010 104
SP1011 105
SP1012 106
SP1013 107
SP1014 108
SP1015 109
SP1016 110
SP1017 111
SP1018 112
SP1019 113
SP1020 114
SP1021 115
SP1022 116
SP1023 117
SP1024 118
SP1025 119
SP1026 120
SP1027 121
SP1028 122
SP1029 123
SP1045 124
SP1046 125
SP1047 126
SP1048 127
SP1049 128
SP105 129
SP1050 130
SP1051 131
SP1052 132
SP1053 133
SP1054 134
SP1055 135
SP1056 136
SP1057 137
SP1058 138
SP1059 139
SP106 140
SP1060 141
SP1061 142
SP1062 143
SP1063 144
SP1064 145
SP1065 146
SP1066 147
SP1067 148
SP1068 149
SP1069 150
SP1070 151
SP1071 152
SP1072 153
SP1073 154
SP1074 155
SP1075 156
SP1076 157
SP1077 158
SP1078 159
SP1079 160
SP1080 161
SP1081 162
SP1082 163
SP1083 164
SP1087 165
SP116 165
SP117 166
SP118 167
SP1184 168
SP1185 169
SP1186 170
SP119 171
SP120 172
SP121 173
SP122 174
SP123 175
SP124 176
SP125 177
SP126 178
SP127 179
SP128 180
SP129 181
SP130 182
SP133 183
SP134 184
SP135 185
SP136 186
SP137 187
SP142 188
SP143 189
SP144 190
SP145 191
SP146 192
SP147 193
SP148 194
SP149 195
SP150 196
SP151 197
SP152 198
SP153 199
SP154 200
SP155 201
SP156 202
SP160 203
SP161 204
SP162 205
SP163 206
SP164 207
SP165 208
SP165A 209
SP166 210
SP167 211
SP168 212
SP169 213
SP170 213
SP171 214
SP172 215
SP173 216
SP174 217
SP175 218
SP176 219
SP178 220
SP179 221
SP18 222
SP180 223
SP181 224
SP182 225
SP183 226
SP184 227
SP185 228
SP188 229
SP189 230
SP19 231
SP190 232
SP191 233
SP192 234
SP193 235
SP194 236
SP195 237
SP196 238
SP197 239
SP198 240
SP199 241
SP20 242
SP200 243
SP201 244
SP202 245
SP203 246
SP204 247
SP205 248
SP206 249
SP207 250
SP208 251
SP209 252
SP21 253
SP210 254
SP211 255
SP212 256
SP213 257
SP213A 258
SP214 259
SP215 260
SP216 261
SP217 262
SP218 263
SP219 264
SP22 265
SP220 266
SP221 267
SP222 268
SP223 269
SP224 270
SP227 271
SP228 272
SP229 273
SP230 274
SP231 275
SP232 276
SP233 277
SP234 278
SP235 279
SP236 280
SP237 281
SP238 282
SP239 283
SP240 284
SP241 285
SP242 286
SP243 287
SP244 288
SP245 289
SP246 290
SP247 291
SP248 292
SP249 293
SP250 294
SP251 295
SP252 296
SP253 297
SP254 298
SP255 299
SP256 300
SP257 301
SP258 302
SP259 303
SP260 304
SP261 305
SP262 306
SP263 307
SP264 308
SP265 309
SP266 310
SP267 311
SP268 312
SP269 313
SP270 314
SP271 315
SP272 316
SP273 317
SP274 318
SP275 319
SP276 320
SP277 321
SP278 322
SP279 323
SP280 324
SP281 325
SP282 326
SP283 327
SP284 328
SP285 329
SP286 330
SP287 331
SP288 332
SP289 333
SP290 334
SP291 335
SP292 336
SP293 337
SP294 338
SP295 339
SP296 340
SP297 341
SP298 342
SP299 343
SP300 344
SP301 345
SP302 346
SP303 347
SP304 348
SP305 349
SP306 350
SP307 351
SP308 352
SP309 353
SP310 354
SP311 355
SP312 356
SP313 357
SP314 358
SP315 359
SP316 360
SP317 361
SP318 362
SP319 363
SP320 364
SP321 365
SP322 366
SP323 367
SP324 368
SP325 369
SP326 370
SP327 371
SP328 372
SP329 373
SP330 374
SP331 375
SP332 376
SP333 377
SP334 378
SP335 379
SP336 380
SP337 381
SP338 382
SP339 383
SP340 384
SP341 385
SP342 386
SP343 387
SP344 388
SP345 389
SP346 390
SP347 391
SP348 392
SP349 393
SP350 395
SP351 396
SP352 397
SP353 398
SP354 399
SP355 400
SP356 401
SP357 402
SP358 403
SP359 404
SP36 405
SP360 406
SP361 407
SP362 408
SP363 409
SP364 410
SP365 411
SP366 412
SP367 413
SP368 414
SP369 415
SP37 416
SP370 417
SP371 418
SP372 419
SP373 420
SP374 421
SP375 422
SP376 423
SP377 424
SP378 425
SP379 426
SP38 427
SP380 428
SP381 429
SP382 430
SP383 431
SP384 432
SP385 433
SP386 434
SP387 435
SP388 436
SP389 437
SP39 438
SP390 439
SP391 440
SP392 441
SP393 442
SP395 443
SP396 444
SP397 445
SP398 446
SP399 447
SP40 448
SP400 449
SP401 450
SP402 454
SP403 455
SP404 456
SP405 457
SP406 458
SP407 459
SP408 460
SP409 461
SP410 462
SP411 463
SP412 464
SP413 465
SP414 466
SP415 467
SP416 468
SP417 469
SP418 470
SP419 471
SP420 472
SP421 473
SP422 474
SP423 475
SP424 476
SP425 477
SP426 478
SP427 479
SP428 480
SP429 481
SP430 482
SP431 483
SP432 484
SP433 485
SP434 486
SP435 487
SP436 488
SP437 489
SP438 490
SP439 491
SP440 492
SP441 493
SP442 494
SP443 495
SP444 496
SP445 497
SP446 498
SP447 499
SP448 500
SP449 501
SP450 502
SP454 503
SP455 504
SP456 505
SP457 506
SP458 507
SP459 508
SP460 509
SP461 510
SP462 511
SP463 512
SP464 513
SP465 514
SP466 515
SP467 516
SP468 517
SP469 518
SP470 519
SP471 520
SP472 521
SP473 522
SP474 526
SP475 527
SP476 528
SP477 529
SP478 530
SP479 531
SP480 532
SP481 533
SP482 534
SP483 535
SP484 536
SP485 537
SP486 538
SP487 539
SP488 542
SP489 543
SP490 544
SP491 545
SP492 546
SP493 547
SP494 548
SP495 549
SP496 550
SP497 551
SP498 552
SP499 553
SP500 554
SP501 555
SP502 556
SP503 557
SP504 558
SP505 559
SP506 560
SP507 561
SP508 562
SP509 563
SP510 564
SP511 565
SP512 566
SP513 568
SP514 569
SP515 570
SP516 571
SP517 572
SP518 573
SP519 574
SP520 575
SP521 576
SP522 577
SP526 578
SP527 579
SP528 580
SP529 581
SP530 582
SP531 583
SP532 584
SP533 585
SP534 586
SP535 587
SP536 588
SP537 589
SP538 590
SP539 591
SP54 596
SP542 597
SP543 603
SP544 604
SP545 605
SP546 606
SP547 607
SP548 608
SP549 609
SP55 610
SP550 611
SP551 612
SP552 613
SP553 614
SP554 615
SP555 616
SP556 617
SP557 618
SP558 619
SP559 620
SP56 625
SP560 626
SP561 627
SP562 628
SP563 629
SP564 630
SP565 631
SP566 632
SP568 633
SP569 634
SP57 635
SP570 636
SP571 637
SP662 638
SP574 639
SP575 640
SP576 641
SP577 642
SP578 643
SP579 644
SP58 645
SP580 646
SP581 647
SP582 648
SP583 649
SP584 650
SP585 651
SP586 652
SP587 653
SP588 654
SP589 655
SP59 656
SP590 657
SP591 658
SP596 659
SP597 660
SP60 661
SP603 662
SP604 663
SP605 664
SP606 665
SP607 666
SP608 667
SP609 668
SP61 669
SP610 670
SP611 671
SP612 672
SP613 673
SP614 674
SP615 675
SP616 676
SP617 677
SP618 678
SP619 679
SP620 680
SP625 681
SP626 682
SP627 694
SP628 695
SP629 696
SP630 697
SP631 698
SP632 699
SP633 700
SP634 701
SP635 702
SP636 703
SP637 704
SP638 705
SP639 706
SP640 707
SP641 708
SP642 709
SP643 710
SP644 715
SP645 716
SP646 717
SP647 718
SP648 719
SP649 720
SP650 721
SP651 722
SP652 723
SP653 724
SP654 725
SP655 726
SP656 727
SP657 728
SP658 729
SP659 730
SP660 731
SP661 732
SP572 733
SP664 734
SP665 735
SP666 736
SP667 737
SP668 738
SP669 739
SP670 740
SP671 741
SP672 742
SP673 743
SP674 744
SP675 745
SP676 746
SP677 747
SP678 748
SP679 749
SP680 750
SP681 751
SP682 752
SP694 753
SP695 754
SP696 755
SP697 756
SP698 757
SP699 758
SP700 759
SP701 760
SP702 761
SP703 762
SP704 763
SP705 764
SP706 765
SP707 766
SP708 767
SP709 768
SP710 769
SP715 770
SP716 771
SP717 772
SP718 773
SP719 774
SP720 775
SP721 776
SP722 786
SP723 787
SP724 788
SP725 789
SP726 790
SP727 791
SP728 792
SP729 793
SP730 794
SP731 795
SP732 796
SP733 797
SP734 798
SP735 799
SP736 800
SP737 801
SP738 802
SP739 803
SP740 804
SP741 805
SP742 806
SP743 807
SP744 808
SP745 809
SP746 810
SP747 822
SP748 823
SP749 824
SP750 825
SP751 826
SP752 827
SP753 828
SP754 829
SP755 830
SP756 831
SP757 832
SP758 833
SP759 834
SP760 835
SP761 836
SP762 837
SP763 838
SP764 839
SP765 840
SP766 841
SP767 842
SP768 843
SP769 844
SP770 845
SP771 846
SP772 847
SP773 848
SP774 849
SP775 850
SP776 851
SP786 852
SP787 853
SP788 854
SP789 855
SP790 856
SP791 857
SP792 858
SP793 859
SP794 860
SP795 861
SP796 862
SP797 863
SP798 864
SP799 865
SP8 866
SP80 867
SP800 868
SP801 869
SP802 870
SP803 871
SP804 872
SP805 873
SP806 874
SP807 875
SP808 876
SP809 877
SP81 878
SP810 879
SP82 880
SP822 881
SP823 882
SP824 883
SP825 884
SP826 894
SP827 895
SP828 896
SP829 897
SP83 898
SP830 899
SP831 900
SP832 901
SP833 902
SP834 903
SP835 904
SP836 905
SP837 906
SP838 907
SP839 908
SP84 909
SP840 910
SP841 911
SP842 912
SP843 913
SP844 914
SP845 915
SP846 916
SP847 930
SP848 931
SP849 932
SP85 933
SP850 934
SP851 935
SP852 936
SP853 937
SP854 938
SP855 939
SP856 940
SP857 941
SP858 942
SP859 943
SP86 944
SP860 945
SP861 946
SP862 947
SP863 948
SP864 949
SP865 950
SP866 951
SP867 952
SP868 953
SP869 954
SP87 955
SP870 956
SP871 957
SP872 958
SP873 959
SP874 960
SP875 961
SP876 962
SP877 963
SP878 964
SP879 965
SP88 967
SP880 968
SP881 969
SP882 970
SP883 971
SP884 972
SP89 973
SP894 974
SP895 975
SP896 976
SP897 977
SP898 978
SP899 979
SP90 980
SP900 981
SP901 982
SP902 983
SP903 984
SP904 985
SP905 986
SP906 987
SP907 988
SP908 989
SP909 990
SP91 991
SP910 992
SP911 993
SP912 994
SP913 1005
SP914 1006
SP915 1007
SP916 1008
SP92 1009
SP930 1010
SP931 1011
SP932 1012
SP933 1013
SP934 1014
SP935 1015
SP936 1016
SP937 1017
SP938 1018
SP939 1019
SP940 1020
SP941 1021
SP942 1022
SP943 1023
SP944 1024
SP945 1025
SP946 1026
SP947 1027
SP948 1028
SP949 1029
SP950 1045
SP951 1046
SP952 1047
SP953 1048
SP954 1049
SP955 1050
SP956 1051
SP957 1052
SP958 1053
SP959 1054
SP960 1055
SP961 1056
SP962 1057
SP963 1058
SP964 1059
SP965 1060
SP967 1061
SP968 1062
SP969 1063
SP970 1064
SP971 1065
SP972 1066
SP973 1067
SP974 1068
SP975 1069
SP976 1070
SP977 1071
SP978 1072
SP979 1073
SP980 1074
SP981 1075
SP982 1076
SP983 1077
SP984 1078
SP985 1079
SP986 1080
SP987 1081
SP988 1082
SP989 1083
SP990 1087
SP991 1184
SP992 1185
SP993 1186
SP994 26A
SP9A 9A
SP541
SP540
SP624
SP622
SP623
SP714
SP713
SP712
SP966
SP1084
SP1085
SP1086
SP453
SP525
SP452
SP693
SP692
SP524
SP602
SP691
SP1004
SP893
SP785
SP784
SP892
SP1003
SP1002
SP891
SP592
SP593
SP594
SP682
SP683
SP684
SP917
SP1030
SP1031
SP918
SP1032
SP811
SP919
SP1033
SP812
SP690
SP451
SP601
SP523
SP600
SP599
SP783
SP782
SP1001
SP890
SP781
SP1000
SP889
SP777
SP778
SP779
SP885
SP887
SP886
0
0
0
0
0
0
0
0
TOTAL
0
Rig 1 = Diesel Pile Hammer MPP-111
Rig 2 = Diesel Pile Hammer MPP-110
Rig 3 = Diesel Pile Hammer MPP-101
Rig 4 = Diesel Pile Hammer MPP-103
Rig 5 = Diesel Pile Hammer MPP-106
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
LOADING UNLOADING PILE RECORD

Proyek / Project : FL3B PROJECT


Pekerjaan / Work : DIESEL HAMMER GROUP B
Area : 135-ETP
Nama Kontraktor / Contractor Name : PT. Masterpancang Pondasi

Nomor Surat Perjanjian / Contract No. : No. 394/II/RAPP/2021


Periode / Period : 30 Maret 2021 sampai dengan 22 April 2021

Length of The Pile Loading and unloading


No. Date Quantity Area Source
Used [m] Pilling (m)
1 3/18/2021
2 3/19/2021
3 3/20/2021
4 3/21/2021
5 3/22/2021
6 3/23/2021
7 3/24/2021
8 3/25/2021
9 3/26/2021
10 3/27/2021 -
11 3/28/2021 12 23 276 Laydown
12 3/29/2021 12 56 672 Laydown
13 3/30/2021 12 93 1116 Laydown
14 3/31/2021 12 79 948 Laydown
15 4/1/2021 12 80 960 Laydown
16 4/2/2021 12 82 984 Laydown
17 4/3/2021 12 102 1224 Laydown
18 4/4/2021 12 115 1380 Laydown
19 4/5/2021 12 100 1200 Laydown
20 4/6/2021 12 84 1008 Laydown
21 4/7/2021 12 74 888 Laydown
22 4/8/2021 12 101 1212 Laydown
23 4/9/2021 12 119 1428 Laydown
24 4/10/2021 12 24 288 Water Intake
25 4/11/2021 12 0 0
26 4/12/2021 12 45 540 Water Intake
27 4/13/2021 12 0 0
28 4/14/2021 12 21 252 Water Intake
29 4/15/2021 12 0 0
30 4/16/2021 12 0 0
31 4/17/2021 12 0 0
32 4/18/2021 12 50 600 Water Intake
33 4/19/2021 12 36 432 Water Intake
34 4/20/2021 12 36 432 Water Intake
35 4/21/2021 12 60 720 Water Intake
36 4/22/2021 12 24 288 Water Intake
37 4/23/2021 12 60 720 Water Intake
38 4/24/2021 12 0 0
Total 1464 17568

Pay Length
Progress of Works
[m]
Up To Last Period 948
This Period 16620.00
Up To This Period 17568.00

Pangkalan Kerinci, 04 Mei 2021


Prepared by, Checked by,
PT. Masterpancang Pondasi PT. Riau Andalan Pulp and Paper

(…........................................) (….......................................)