Professional Documents
Culture Documents
TJS ECS Plant Room
TJS ECS Plant Room
A ISBT
A
GURU KI TAAL
RBS COLLEGE
TAJ MAHAL
TAJ EAST
GATE
B
15000 15000 15000 9250 KEY MAP FATEHABAD ROAD
BASAI
B
1002
1001
LVL +3500
B
LVL +3500 LVL +3200
SVS
C LVL +3200 SMOKE DOWN
TVS1C
VEF PLENUM
1000WX5100Lx1700(H)
C
SEF DUCT
SA DUCT SEF DUCT
STAND SA DUCT
A'
1500x600 1600x900, 2600x600, 1500x675 BOP 3500
6249 L/s
BOD 3775
8.7 M/s VELOCITY
17000 L/s
BOD 4150
12.6 M/s VELOCITY
20000 L/s
BOD 4700
17.5 M/s VELOCITY
8332 L/s
BOD 3775
9.2 M/s VELOCITY
2# VEF
13500 L/s EACH
EVS
4000X3000
TJS-VEA-303 & 304 ETVD DAMPER B/W
TJS-FMD-304 UPPER & LOWER PLENUM
TJS-MFD-301
TJS-VEF-301 TJS-MFD-301
3500x2250
IN UPPER PLENUM
OFFSET
DN
5425
C15 C16 C17 C18 BOP :-4790 10NOS. EAG
TJS-SAG-304 TJS-SAG-303
BOTTOM 350MM
TJS-MOD 303
900x900
TJS-EAG-308
TJS-MD 301
BOP :-4790
2#AHU, 37.5 CMS EACH
4400(W)X6800(L)X2850(H)
CF-4 800X400
1350 L/s EACH
900x900
m
m
TJS-FLFD-303 FOR PD AREA
m
2250(W)X1500(H) 635
TJS-SDA-302 10800 L/s BOD 3550
BO ATT. 3975
11.5 M/s VELOCITY SA DUCT
TJS-EAG-348 TJS-EAG-310
CD DUCT 2000x1500
900
CD DUCT 37500 L/s
2400x800
2400x800 TJS-MD-304 TJS-MD-303 TJS-MD-302
OFFSET
A''
20000 L/s
20000 L/s 2000x1550 2000x1800 2000x1800 2000x1800 2000x1800
BOD 3650 SP DUCT 1200x450
BOD 4550 37500 L/s
UP
12.5M/s VELOCITY
DN
12.5M/s VELOCITY TJS-AHU-301 TJS-AHU-302
TJS-MOD-309 m
TJS-EAG-311
(MODULATING)
TJS-SAD-303
C25 C26 2700x700,
CD DUCT,
20000 L/s, BOD 3650
TJS-VCD-306
C27 TJS-SDA-302
TVS1B TJS-VCD-301
U19 RA DUCT
2500x1800
EER CF-5
TJS-SPF-301 250Ø CHW.S/R. PIPE SA DUCT TJS-MOD-307 TJS-MOD-306 TJS-MOD-305 TJS-MOD-304 67500 L/s
SA DUCT
STAIRCASE BOP :-2800 2000x1500 BOD 3500
700x300
PRESS.FAN 37500 L/s
LIGHT 416.6 L/s
CF2 TJS-SAD-301 BOD 3900
2200Wx1600Hx14500L
BOD 3800
2.0 M/s VELOCITY 12# 595x595 (NECK SIZE SA DUCT 1800x900 S.P.GRILLE
TJS-SDA-301
12.5M/s VELOCITY
CF-4 SUPPLY AIR PLENUM
PANEL
CAPACITOR
LIGHT
SA DUCT
CF2
TJS-RAD-303
B.O.PIPE 5180 20000 L/s
17500 L/s 1750x1050 37500 L/s 1150x500 m
TJS-MFD-307
GI DUCT BOD 2200 20000 L/s BOD 3900
TY 0
PD2
60
CF-4 1400x750
P
TJS-SAD-309
400x150 WALL
CF-1
C36
U01 TJS-SAD-304
C37 C38
DN BOD 4250
16.0 M/s VELOCITY
RA DUCT TJS-TEF-301
300
2800Wx2400Hx10300L
16.0 M/s VELOCITY
TJS-MFD-303
SA DUCT 700X250 65Ø CHW S/R PIPE 45000 L/s TJS-FLFD-301
G BOD- 3925 (Typ.) B.O.PIPE 4550
15.6 M/s VELOCITY
AHU PANEL G
TEF PLENUM
SA DUCT TJS-MFD-304
B.O.P 2850
TJS-FMD-307 1750x1050 SEF DUCT
TJS-MFD-308
TJS-TEA-304
SEF DUCT 20000 L/s 1950x1300 TJS-TEA-303
DAMPER PANEL
TJS-TEF-302
1500x1100 100Ø CHW S/R PIPE TO PLATFORM BOD 3700
25000 L/s B.O.PIPE 5180 45000 L/s
TJS-SAG-305 ACCESS DOOR
2800Wx2200Hx10300L
18.2 M/s VELOCITY
TJS-SAG-302 BOD 3750
AD AD AD AD 600x750 (Typ.)
100Ø CHW S/R PIPE m
TJS-EAG-316
OFFSET
PLC
C52 C53 C54 C55 BOP 3280
EMBD PANEL PANEL TJS-FMD-302
CF-4
TEF PLENUM
RA DUCT
UP
BOP 3050
22500 L/s RA DUCT TJS-TEF-303
S2 BOD 1900
BOP :-2300
1900x1350
250Ø CHWS. PIPE
H TJS-EAG-318 TJS-EAG-314 11.2 M/s VELOCITY
BOP :-2800
22500 L/s H
BOD 3650 AD AD TJS-FMD-303
9.5 M/s VELOCITY 100Ø CHW S/R PIPE 9.5 M/s VELOCITY
BOP :-3300
C C
1001 TJS-MFD-305 1001
SA DUCT SEF DUCT OTE FROM BELOW 100Ø CHW S/R PIPE
1002
1001
LVL +3500
FLOOR MOUNTED EQUIPMENT/STRUCTURE
LEGENDS
NOTES :- SUPPLY/ RETURN AIR GRILLE BALANCING VALVE
CONCOURSE LEVEL PLAN
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE MENTIONED. VCD VOLUME CONTROL DAMPER BUTTERFLY VALVE STRUCTURAL COLUMN
2. ALL ELECTRICAL PANELS & PLC FOOT PRINT SHOWN IS TENTATIVE ONLY .
FD FIRE DAMPER (FUSIBLE LINK) 25 mm THK.
J 3. SUPPLY AIR A/C DUCT RUNNING IN A/C AREAS SHALL BE INSULATED WITH 25mm THK. FMD MANUAL DAMPER (Fire rated) DUCT INSULATION J
FIBER GLASS, 32kg/m3 DENSITY, AS PER SPECIFICATIONS / APPROVED DATA SHEET. 50 mm THK.
m MFD MOTORISED FIRE DAMPER
4. SUPPLY AIR A/C DUCT RUNNING IN NON-A/C AREAS SHALL BE INSULATED WITH 50mm DUCT INSULATION
THK. FIBER GLASS, 32kg/m3 DENSITY, AS PER SPECIFICATIONS / APPROVED DATA SHEET. CONTROL PANEL FIRE RATED DUCT
100mm THK. ROCK WOOL
Existing Corridor through ECS plant room
5. RETURN AIR A/C DUCT (FIRE RATED) SHALL BE INSULATED 100mm THK. ROCK WOOL, AP ACCESS PANEL KEY PLAN
120kg/m3 DENSITY, AS PER SPECIFICATIONS / APPROVED DATA SHEET.
Additional Door proposal 01 1 : 1000
REFERENCE DRAWINGS THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF THIS DRAWING INCLUDING ITS THIS DRAWING, DESIGN AND DETAILING HAVE BEEN CLIENT:
UP METRO RAIL CORPORATION LTD.
ACCURACY, CORRECTNESS, COMPLETENESS, INTEGRATION & DESIGN AND DETAILING HAS REVIEWED BY US AND IS APPROVED.
FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT BEEN PROOF CHECKED AND IS
COUNTER UTTAR PRADESH METRO RAIL CORPORATION LIMITED,
DRG. NO. REV DATE DESCRIPTION
OF DESIGN, ANALYSIS AND DRAWINGS RESTS WITH THE DETAILED RECOMMENDED TO GC GENERAL CONSULTANT SIGN BY DATE SIGN:
AGCC02-11718A-GFC-TJS- ADMINISTRATIVE BUILDING, VIPIN KHAND, GOMATI NAGAR,
AR-PLN-10404 A1 23-09-2022 CONCOURSE LEVEL PLAN DESIGN CONSULTANT & CONTRACTOR. UPMRCL LUCKNOW, UTTAR PRADESH-226010
K NOC NOWC RESUBMIT NOC NOWC RESUBMIT K
AGCC02-11718A-CRD-TJS-
R1 08-10-2022 ECS LAYOUT CONCOURSE
ME-ECS-60448 LEVEL PLAN 1 OF 2
ECS TVS CONTRACTOR CONTRACTOR PROOF CONSULTANT SIGN: SIGN: SIGN: PROJECT: AGRA METRO RAIL PROJECT
AGCC02-11718A-CRD-TJS-
R1 08-10-2022 ECS LAYOUT CONCOURSE CONTRACT AGCC02 : DESIGN AND CONSTRUCTION OF TUNNEL FROM START OF UNDERGROUND
ME-ECS-60449 LEVEL PLAN 2 OF 2 SIGN: SIGN: SIGN: SIGN: SIGN: SIGN: DATE: DATE: DATE:
THIS DRAWING IS THE PROPERTY OF
UP METRO RAIL CORPORATION LTD.
AGCC02-11718A-GFC-TJS- DY.CE RAMP (NEAR FATEHABAD ROAD METRO STATION) TO END OF RAMP AFTER RBS COLLEGE METRO
A1 25-04-2023 CONCOURSE LEVEL SEM DATE: 13.10.2023 DATE: 13.10.2023 DATE: 13.10.2023 DATE: DATE: DATE: NAME: NAME: NAME:
CO-SEM-90155 DRAWING (SHEET 2 OF 2) STATION INCLUDING SEVEN UNDERGROUND METRO STATIONS (VIZ. TAJ MAHAL, AGRA FORT, JAMA
R5 WRD UPDATED AS PER GC & DDC COMMENTS. M.S. R.T. 13.10.2023 MASJID, S.N. MEDICAL COLLEGE, AGRA COLLEGE, RAJA KI MANDI AND RBS COLLEGE) INCLUDING
NAME: M. Singh NAME: R. Tripathy NAME: Musthafa NAME: NAME: NAME: DESIGNATION: DESIGNATION: DESIGNATION:
AGCC02-11718A-GFC-TJS-
R4 WRD UPDATED AS PER GC & DDC COMMENTS. M.S. R.T. 14.08.2023 A4 16-08-2023 REVISED AS PER ARCHITECTURAL FINISHES, E&M, TVS, ECS ETC. WORK FROM CHAINAGE 3630.000 TO 11564.485 ON
AR-PLN-10404 GC/UPMRC OBSERVATION
DESIGN BY CHECKED BY APPROVED BY ACCEPTED BY (PROJ MGR) REVD. BY (STR. ENG.) APPD.BY (TEM LEDR) REVIEWED BY APPROVED BY VETTED BY CORRIDOR-1 OF AGRA MRTS PROJECT AT AGRA, UTTAR PRADESH, INDIA.
R3 WRD UPDATED AS PER REVISED SEM M.S. R.T. 13.06.2023
CONTRACTOR: DRG. TITLE SHEET NO.
L R2 WRD UPDATED AS PER GC & DDC COMMENTS. M.S. R.T. 29.05.2023 Consortium of Tecnica Y Proyectos, S.A. and TAJ MAHAL STATION L
Italferr S.P.A 710, 7th Floor, Cyber Helghts,
R1 WRD UPDATED AS PER GC & DDC COMMENTS. M.S. R.T. 31.03.2023
CEE ECS LAYOUT CONCOURSE LEVEL PLAN (3 OF 3) STATUS WRD